HomeMy WebLinkAboutSP201700022 Correspondence 2017-09-01 Johnathan Newberry
From: Alexander Morrison <amorrison@serviceauthority.org>
Sent: Friday, September 01, 2017 8:37 AM
To: Johnathan Newberry
Subject: RE: Pre-App (SPCA on Berkmar)
JT,
Any expansion would require fixture counts to verify the water meter size. If an upsize is required there would be
additional connection fees. From the CCP it looks like they are proposing work on 2 separate parcels.Separate water
meters will be required for building on separate parcels. DEQ may require confirmation that the private pump station is
adequately sized. Maintenance agreements will be required of buildings on separate parcels tie into the same private
pump station.
Alexander J. Morrison, P.E.
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville,Virginia 22911
(0)434-977-4511 Ext. 116
(C)434-981-5577
(F)434-979-0698
From:Johnathan Newberry [mailto:jnewberry@albemarle.org]
Sent:Thursday,August 31,2017 12:34 PM
To:Alexander Morrison<amorrison@serviceauthority.org>
Subject: FW: Pre-App (SPCA on Berkmar)
Hey Alex,
I'm taking the SPCA application to the Planning Commission next Tuesday. Did you have any comments on their CCP
application?
We have been approached by the SPCA several times over the past few years with small variations to their proposals,
but maybe the ACSA comments are pretty fixed? Below are comments from earlier this year.
An ACSA rep at a 2015 pre-app (maybe Michael?) mentioned that DEQ may want to know that the grinder pump is still
adequately sized for any anticipated additional volume.
Thanks,
J.T.
From:Alexander Morrison [mailto:amorrison@serviceauthority.org]
Sent: Monday,June 12, 2017 12:50 PM
To:Johnathan Newberry<inewberrv@albemarle.org>
Subject: Pre-App (SPCA on Berkmar)
JT,
1
I will be handling pre-apps until we hire another engineer. I have asked that all pre-apps be sent each week so I can
review them and see if we have comments. I was able to get Elaine to send me todays list.This pre-app is the only one
that I.have comments for. I will not be at the meeting due to schedule constraints, but wanted to pass along this
information.
The ACSA would need to review the expansion plans to ensure there is no conflict with existing ACSA infrastructure on
site. •
The ACSA would need to review existing plumbing fixtures as well as proposed additional fixtures associated with an
expansion and renovation.This review would be=,to verify that the existing 2" water meter will suffice after the
renovation and expansion.Any:upsize to the water meter would require connection fees that would need to be paid
before a building permit would be approved by the ACSA.There is a good chance that the 2" meter will be fine, but we
need to verify.
Let me know if you have any questions.
Alexander J. Morrison,P.E.
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville,Virginia 22911
(0)434-977-4511 Ext. 116
(C)434-981-5577
(F)434-979-0698
2