HomeMy WebLinkAboutWPO201900021 Bond Estimates 2019-10-23 (2)Project Name: UVA Research Park Loop Road VSMP Plan WP0201900021 WPO file number: WP0201900021 TMP(s): 03200-00-00-006R0, 03200-00-00-01800 Date Estimate Completed: 10/22/19 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 1 stablization (PS, TS) 4.7 acres $5,000.00 $23,300.00 2 silt fence (SF) 1316.0 ft $5.00 $6,580.00 3 tree protection (TP) 458.0 ft $5.00 $2,290.00 3 safety fence (SAF) 200.0 ft $5.00 $1,000.00 4 diversion (DID, FD, RWD) 1260 ft $13.00 $16,380.00 5 temporary slope drain (TSD) pipe length 45 ft pipe diameter 15 in $35.00 $2,075.00 13 Sediment Trap #1 _ 14 earthwork for trap/basin 15 height of dam at toe SO ft cut at high sideMdft ft 16 height of fill at faceft cut at face ft 17 length of damft length of cut ft 18 top width ft width of cut 19 (area above transition 0 sf (area below transiti( 112 sf 20 (total width of dam) 6 ft (total width of cut) 42 ft 21 (height below transitio 3 ft (depth below transit 3 ft 22 (area below transition 0 sf (area above transiti 54 sf 23 (total fill volume) 0.0 cy (total fill volume) 215.2 cy 24 length of spillway ft (TOAL CY estimate 215 cy $13.00 $2,795.00 25 width of spillway ft (spillway stone tons 17.6 tons $50.00 $880.00 26 Sediment Trap #2 27 earthwork for trap/basin 28 height of dam at toe 3 ft cut at high side 6 ft 29 height of fill at face cut at face 4 ft 30 length of damn2ft 7 ft length of cut L=40ft 31 top width 3 ft width of cut ft 32 �-- Qoove transition 1- �-- —ow transiti( 92 sf 33 (total width of dam) 6 ft (total width of cut) 35 ft 34 (height below transitio 1 ft (depth below transit 2 ft 35 (area below transition 2 sf (area above transiti 31 sf 36 (total fill volume) 51.6 cy (total fill volume) 182.2 cy 37 length of spillway ft (TOAL CY estimate 199 cy $13.00 $2,587.00 38 width of spillwayWft (spillway stone tons 12.1 tons $50.00 $605.00 39 structures for basin 40 riser height 0 ft 10/29/2019 Project Name: UVA Research Park Loop Road VSMP Plan WP0201900021 WPO file number: WP0201900021 TMP(s): 03200-00-00-006R0, 03200-00-00-01800 Date Estimate Completed: 10/22/19 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 41 riser diameter in (riser unit price) $0.00 $0.00 42 barrel lengthMin ft base plate or fdn $200.00 $0 43 barrel diameter (barrel . price) $0.00 $0.00 44 barrel collars $200.00 $0 45 baffle length Mft $50.00 $0 46 47 silt fence inlet protection (IP) $100.00 $100.00 48 stone inlet protection (IP) $200.00 $2,200.00 49 outlet protection (OP)-@ Str 200 length 9 ft width ft $364.50 $364.50 50 outlet protection (OP)-@ Str. 300 length 9 ft width ft $243.00 $0.00 51 outlet protection (OP) length 0 ft width 0 ft $0.00 $0.00 52 channel (SCC, matted) length 0 ft width 0 ft $0.00 53 check dam depth in channel 0 ft channel width 0 ft $0.00 $0.00 54 construction entrance (CE) $2,500.00 $0.00 55 wash rack $2,000.00 $2,000.00 56 paved construction entrance $3,500.00 $3,500.00 57 rip -rap, placed depth 0 ft length ` Aft 58 width (tons) 0 tons $60.00 $0.00 59 6o survey and layout (price per 0.1 mi.) acres traps and basins $3,330.00 61 mobilization $2,500.00 62 Temporary Access road $500.00 cost sum $72,986.50 WP0201900021 UVA Research Park Loop Road_ESC_bond_est 102219Ja rev 102919 contingency $7,298.65 Total $80,290 10/29/2019