Loading...
HomeMy WebLinkAboutWPO201900021 Bond Estimates 2019-10-23 (3)Project Name: UVA Research Park Loop Road VSMP Plan WP0201900021 WPO file number: WP0201900021 TMP(s): 03200-00-00-01800 Date Estimate Completed: 10/23/19 Stormwater Management Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 1 permanent diversion or ditch ft $13.00 $0.00 2 standard manhole frame top (not inlet) ea $500.00 $0.00 3 drop inlet or grate ea $3,500.00 $0.00 4 manhole structure (per ft. rise) ft $450.00 $0.00 5 pipe, rcp, cmp (15 to 48") M 2J in d ES-1,2 1 EC-1 ft $50.00 $1,000.00 6 aggregate base or drainage stone in d WftL ft W 0.0 ton $35.00 $0.00 7 8 earthwork for dry pond 9 height of dam at toe 0 ft cut at high side ft 10 height of fill at face 0 ft cut at face ft 11 length of dam 0 ft length of cut ft 12 top width A ft width of cut ft 13 (area above transitioi 0 sf (area below transitic 0 sf 14 (total width of dam) 0 ft (total width of cut) 0 ft 15 (height below transit 0 ft (depth below transit 0 ft 16 (area below transitio- 0 sf (area above transitic 0 sf 17 (total fill volume, 0.0 cy (total fill volume; 0.0 cy 18 length of spillway ft JOAL CY estimate 406 cy Direct entry: Vol. from page $13.00 $5,281.90 19 width of spillway =ft (spillway stone tons 0 tons 62 Cale. booklet: 10,970cf $50.00 $0.00 20 structures for dry pond 21 riser height 4 ft 22 riser diameter 0 in (riser unit price) $0.00 $0.00 23 barrel length 52 ft base plate or fdn $200.00 $0 24 barrel diameter 24 in (barrel unit price) S50.00 $2,600.00 25 barrel collars 0 $200.00 $0 26 baffle length 0 ft $50.00 $0 27 28 trees ea $275.00 $0.00 29 shrubs ea $50.00 $0.00 30 seedlings ea $5.00 $0.00 31 underdrain (LF) 0 ft $5.00 $0.00 32 biofrlter soil mix (CY) 0 cy $45.00 $0.00 33 trash rack/ anti vortex devices �ea $1,500.00 $1,500.00 34 maintenance access road (LF) ft $50.00 $2,500.00 10/29/2019 Project Name: UVA Research Park Loop Road VSMP Plan WP0201900021 WPO file number: WP0201900021 TMP(s): 03200-00-00-01800 Date Estimate Completed: 10/23/19 Stormwater Management Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 35 rip -rap, placed depth ft length _ft 36 width (tons) 0 $60.00 $0.00 37 survey and layout (price per 0.1 mi.,' acres basins $0.00 38 mobilization $2,500.00 39 as -built drawings (per facility) ea $2,000.00 $2,000.00 40 materials testing (per facility; ea Mea $2,000.00 $2,000.00 41 compaction testing (per dam) $3,000.00 $3,000.00 42 43 earthwork for Stormtech SC-740 chamber system -direct entr3 44 (TOAL CY estimateF 0 ey $13.00 $0.00 45 manufactured facilities (attach manufacturer's or contractor's price as a base $23,000.00 46 Ref. email, 10/22/2019 5:50 PM, James Clark (james.clark@ads-pipe.com ) Mfr. quote: 47 'For the Stormtech, I would estimate $8000 Material and $4000 Labor for the installation; for the Barracuda Unit - $8000 and $3000' - Total = $23,000 cost sum $45,381.90 contingency $4,538.19 WP0201900021 UVA Research Park Loop Road_SWM_bond_est 102319ja rev102919 Total $49,930 10/29/2019