HomeMy WebLinkAboutSDP201900045 Review Comments Minor Amendment 2019-10-29�/Rcir�1Q
County of Albemarle
Department of Community Development
Memorandum
To: Tim Miller (tmiller(c�meridianwbe.com)
From: Cameron Langille — Senior Planner
Division: Planning Services
Date: September 11, 2019
First Revision: October 29, 2019
Subject: SDP201900045 — 5" Street Commercial Development — Minor Site Plan Amendment #1
The Planner for the Planning Services Division of the Albemarle County Department Community Development will
recommend approval of the plan referred to above when the following items have been satisfactorily addressed. (The
following comments are those that have been identified at this time. Additional comments or conditions may be added or
eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County
Code.]
First Review Comments:
1. [32.5.2 (s)] Please add the application number, SDP201900045, to the project title on Sheet C-001. State that this is
minor site plan amendment #1 in the title. Rev. 1: Comment addressed.
2. [32.5.2 (s)] In the signature panel on Sheet C-001, remove the Health Department and add Albemarle County Service
Authority. Rev. 1: Comment addressed.
3. [32.5.2 (a)] Remove reference to SP201300027 in the Special Use Permit and Zoning Overlay notes on Sheet C-001.
Rev. 1: Comment addressed.
4. [32.5.2 (s)] Please revise the project narrative on Sheet C-001 so that it explains all proposed revisions in Phase 1. This
includes the revisions to the drive -through lane design, the revisions to the location of the paved asphalt vehicular and
pedestrian travel way down to Moore's Creek, easement vacations/revisions, lighting changes, landscaping changes,
etc. Rev. 1: Please revise the proiect narrative so that it clearlv states that this minor amendment only pertains
to changes to phase 1 of SDP201700012 and all site improvements in phases 2 and 3 will be shown on a future
site plan amendment to be reviewed and approved by the County.
5. [32.5.2 (a)] Please provide the parcel boundary dimensions, and add a note to Sheet C-001 stating the instrument number
of most recent plat of record. Rev. 1: The instrument referenced in the note is the deed of dedication for certain
easements. The actual plat of record is recorded in DB 5013, pages 259-264. Please revise the instrument number
in the note on Sheet C-001.
[32.5.2 (a)] Revise the Zoning Overlay note on Sheet 1 so that it states that "portions of the property lie within the
Preserved Steep Slopes Overlay District." Rev. 1: Comment addressed.
7. [32.5.2 (a) and ZMA201200007] The realignment of the 10' paved vehicle and pedestrian travel way down to Moore's
Creek is within an existing 15' public access easement recorded on a plat in DB 5013, pg. 259-264 with a deed of
easement in DB 5013, pg.265-274. The revised alignment of the travel goes outside of that easement. Per the approved
proffer #5C of ZMA201200007, the existing easement will need to be vacated, and a new easement platted with an
associated deed of dedication that dedicates the revised easement to Albemarle County for public use.
a. Please submit an easement plat application for review and approval. Rev. 1: An easement plat,
SUB201900169 was submitted to the County for review and approval and is in review as of October
29, 2019. Once this plat is reviewed, approved, and recorded and the minor amendment is revised to
reflect the recorded plat, this comment will be addressed.
b. Once approved and recorded, add labels to all applicable sheets showing the new easement boundaries and
reference the instrument of the recorded plat and deed of dedication. Rev. 1: Comment stands.
8. 132.5.2 (a)] On Sheet C-001, please add the Steep Slopes note as stated on Sheet 1 of SDP201700012. Rev. 1: Comment
addressed.
[32.5.2 (n)] On sheet C-201, please identify all existing and proposed improvements. The location and dimensions of
all existing and proposed improvements including buildings (maximum footprint and height) and other structures;
walkways; fences; walls; trash containers; outdoor lighting; landscaped areas and open space; recreational areas and
facilities; parking lots and other paved areas; loading and service areas; signs; and the proposed paving material types
for all walks, parking lots and driveways. If details or exhibits are provided on other sheets, state the sheet number in
the label. Rev. 1: Comment not fully addressed. The callouts for the proffered travelway and the primitive trail
connection do not reference the exhibits/details provided for these items on Sheet C-302. Please revise sheet C-
201 so that it references those details.
10. 132.5.2 (b)] Please add a note to the Site Data table on Sheet C-001 stating the maximum building height permitted, and
the proposed building height in accordance with Section 21.4 of the Zoning Ordinance. Rev. 1: Comment addressed.
a. Maximum building height permitted: sixty-five (65) feet. The minimum stepback requirements for any
story that begins above forty (40) feet in height or for each story above the third story, whichever is less, in
height shall be as provided in section 4.20. Rev. 1: Comment addressed.
11. [32.6.2 (g)] Please provide a construction detail for the proffered 10' paved vehicle and pedestrian travel way down to
Moore's Creek on Sheet C-301 or C-302. Rev. 1: Comment not fully addressed. The legend for the Pavement
Detail on Sheet C-302 does not include the symbology used for the proffered travel way. Please revise. Also,
reference the sheet and detail number in the callout for this feature on Sheet C-201.
12. [32.6.2 (g)] Please provide a construction detail for the proffered primitive trail connection from 5t' Street to the 10'
paved vehicle and pedestrian travelway on Sheet C-301 or C-302. Rev. 1: Comment partially addressed. Add a label
for this feature to sheet C-201 and reference the sheet number and detail provided for this feature.
13. [32.5.2 0)] Please show all existing easements and water, sewer, and drainage systems on the Sheet C-101. No
easements are shown. State the easement type (public/private), the width, and recorded instrument number for the plat
and deed of easement (if applicable).
a. Easements that will be vacated prior to this minor amendment approval should state the deed book and page
number of the vacation plat. Rev. 1: SUB201900169 is currently under review.
b. All new easements should be shown on Sheets C-206 and C-207. Rev. 1: Once SUB201900169 is
reviewed, approved, and recorded, please update sheets C-206 and C-207 to state the recorded
instrument number for new and/or realigned easements.
14. [32.7.8 and 4.17] Several revisions are needed to the Lighting Plan (Sheet C-501). See ARB comments #7-8 for
additional information.
a. [4.17.4 (b) (1)] Provide additional footcandle measurements within the parcel, they are currently spaced
too far apart. Revise the photometric plan to provide light levels all along the property line along 5t1i
Street. Rev. 1: See ARB comment #3 for additional revisions needed to the lighting Dlan in order to
make site lighting comply with Entrance Corridor footcandle maximums.
b. Include the standard lighting note on the lighting plan: Each outdoor luminaire equipped with a lamp that
emits 3, 000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to
reflect light away from adjoining residential districts and away from adjacent roads. The spillover of
lighting from luminaires onto public roads and property in residential or rural areas zoning districts
shall not exceed one-halffootcandle. Rev. 1: Comment addressed.
c. Pole locations on Sheet C-501 do not match other drawings. Ensure pole locations are correct across all
sheets where visible. Rev. 1: Comment not fully addressed. Pole locations differ from the previously
approved final site plan. Since this property is in the entrance corridor, all site lighting should be
shown on this plan. If this is not possible due to pole locations in phases 2 and 3 not vet being finalized,
add a note stating that no lighting in phase 2 and 3 is proposed with this amendment. All phase 2
and 3 lighting will be shown on a future site plan amendment for phase 2. See ARB comment #2 for
additional details.
15. [32.7.9] Sheet C-204 implies that all landscaping required for the overall site development is being provided with the
minor amendment. However, the full extent of the property is not visible, and internal landscaping is going to be
installed as part of the site plan for Phases 2 & 3 since hardscapes in those areas are not being installed/approved with
this minor amendment. This plan should only show landscaping required for Phase 1, unless the intent is to provide all
landscaping. Please clarify what the intent is. Additional comments may be forthcoming about revisions to the Plant
Schedule and landscape plan drawing. Rev. 1: Comment not fully addressed. Per comment #3, it is staffs
understanding that site revisions, including landscaping, in phases 2 and 3 will be submitted for review and
approval on a future site plan amendment application. Please add a note to the landscape plans stating this.
a. Per the approved Application Plan of ZMA201200007, all Phase 1 landscaping around the retaining wall
must be installed with Phase 1. The landscape plan must be enlarged to show those items. Update the Plant
Schedule on Sheet C-204 as necessary. Rev. 1: Please revise the landscape plan so that it includes the 4
serviceberry trees along the south perimeter of the site that were approved with the previous plan.
Please see ARB comment #6 for additional details.
b. If internal parking lot trees or other vegetation being used for overall canopy requirements will be provided
with the future site plan amendment for Phases 2 and 3, state this on the plans and remove those future
items from the Plant Schedule quantities and calculation. Rev. 1: The quantities of Allee Elm and Eastern
Red Cedar do not match the drawings. Please revise the table as necessary. See ARB comment #5
for further information.
16. [32.7.9.5 (b)] Street trees must be provided 35' O.C. along 5' Street. See ARB comments for additional details, and
revise Sheet C-204 as necessary. Rev. 1: Comment not fully addressed, see ARB comment #4 for additional details.
17. [32.7.7.9 (c)] Please add a note to the landscape plan that states "All landscaping and screening shall be maintained in
a healthy condition by the current owner or property owners' association and replaced when necessary. Replacement
material shall comply with the approved landscape plan." Rev. 1: Comment addressed.
Please contact Cameron Langille at the Department of Community Development at blan 7illeLalbemarle.org or 296-5832
ext. 3432 for further information.
Albemarle County Architectural Review Board — Margaret Maliszewski, mmaliszewski&albemarle.org — Requested
Changes, see attached.
Albemarle County Building Inspections — Michael Dellinger, mdellin er&albemarle.org — No objection, see attached.
Albemarle County Engineering Services — Emily Cox, ecox2galbemarle.org — Requested Changes, see attached.
Albemarle County Fire Rescue — Shawn Maddox — smaddox(kalbemarle.org — No objection, see attached.
Albemarle County Service Authority — Richard Nelson, rnelsongserviceauthority.org — Review not yet complete,
comments or approvals will be sent to the applicant upon receipt.
Virginia Department of Transportation — Willis Bedsaul — willis.bedsaul@vdot.vir ig nia.gov — Review not yet
complete, comments or approvals will be sent to the applicant upon receipt.
4
Cameron Langille
From: Margaret Maliszewski
Sent: Friday, October 11, 2019 3:04 PM
To: Cameron Langille
Subject: Planning Application Review for SDP201900045 5th Street Development - Minor.
1. Submit an ARB application for a Countywide Certificate of Appropriateness for a minor amendment. Submit a revised plan
addressing the comments below.
2. Parking lot pole light fixtures differ from those previously approved. Parking lot pole lights must have a consistent appearance
throughout the development. If lighting changes are proposed in this minor amendment, lighting on the entire site must be
addressed with this amendment. If Phase 2 lighting changes can't be shown on this plan, include notes on this plan indicating that
with this amendment all Phase 2 lighting is eliminated. When you submit your Phase 2 amendment, you can add lighting back
that matches Phase 1 approved lighting.
3. The photometric plan shows maximum light levels exceeding 20 footcandles. 20 footcandles is the maximum approvable to meet
EC guidelines. Revise the plan accordingly.
4. Revise the quantity and spacing of the large trees along 5th Street to 35' on center all along the frontage.
5. Inconsistencies remain between the plant schedule and the plan in the quantities of Allee Elm and Eastern Red Cedar.
6. Revise the landscape plan to include the 4 serviceberry trees along the south perimeter of the site that were approved with the
previous plan.
7. Identify light pole/fixture color on the lighting plan. Bronze, dark brown or black are recommended and approvable.
8. Include a note on the lighting plan that maximum light pole height is 20', including any base that may be proposed.
The Review for the following application has been completed:
Application Number = SDP201900045
Reviewer = Margaret Maliszewski
Review Status = Requested Changes
Completed Date = 10/11/2019
This email was sent from County View Production.
Review Comments for SDP201900045 MinorAmendment
Project Name: 5th Street Development - Minor
Date Completed: Tuesday, October 08. 2019 DepartmentfDivisionfAgency: Review Status:
Reviewer: Michael Dellinger CDD Inspections No Objection
Page: County of Albemarle
Printed On: 11012912019
County of Albemarle
Department of Community Development
Memorandum
To: Cameron Langille
From: Emily Cox
Date: 05 Sept 2019
Rev. 1 Date: 28 Oct 2019
Subject: 51 Street Commercial — Final Site Plan -Minor Amendment (SDP201900045)
The minor final site plan for 51h Street Commercial has been reviewed by Engineering. The following
comments will need to be addressed before approval:
1. Show compliance with the approved WPO Plan (impervious areas, etc). Rev 1: Sheet C-504 is
confusing. There is not 3.64 lb/yr of phosphorus removal available.... it is what is required to
be removed? The approved plan shows an overall CN. You can simply show that you aren't
changing the approved overall curve number with this revision (which would mean the
original WPO plan is still compliant).
2. [C-204] Trees and shrubs should not be installed over storm pipes. They should also be kept out of
easements. Rev. 1: There is still landscaping that is too close the pipe.
3. [C-206&207] The improvements are not shown. The plan needs to show that the easements
encompass the utilities. Rev. 1: Comment addressed.
Review Comments for SDP201900045 MinorAmendment
Project Name: 5th Street Development - Minor
Date Completed: Thursday, October 10. 2019 DepartmentfDivisionfAgency: Review Status:
Reviewer: Shawn Maddox Fire Rescue No Objection
Page: County of Albemarle
Printed On: 11012912019