HomeMy WebLinkAboutSDP201900023 Correspondence 2019-08-05Tori Kanellopoulos MMM=O From: Tori Kanellopoulos Sent: Monday, August 5, 2019 4:51 PM To: Andrew Allison Cc: John Hash; Adam Moore, Richard Nelson Subject: RE: SDP201900023 UVA Encompass Final Site Plan Submission Hi Andrew, That is correct for the digital submittal! Please note that this application will be officially distributed based on the date it is received. I believe if it is received and the fee is paid tomorrow, we would distribute it during tomorrow's meeting. We can continue to review and provide comments, and as you said, would need to wait to sign the plan until the CCP and the plat are approved. Best, Tori From: Andrew Allison <Andrew.Allison@timmons.com> Sent: Monday, August 5, 2019 3:29 PM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Cc: John Hash <John.Hash@timmons.com>; Adam Moore <Adam. Moore @vdot.virgin ia.gov>; Richard Nelson <rnelson@serviceauthority.org> Subject: SDP201900023 UVA Encompass Final Site Plan Submission Tori, i wanted to let you know we submitted a tinal site plan application for this project. Adam Moore has requested 2 hard copies, Richard Nelson has requested 3 hard copies and I believe C.D. requires 1 hard copy. This totals to 6 hard copies. Please let me know if this is accurate and I will deliver the plans (6 copies), application and associated fee check to your attention tomorrow morning. I am aware that this plan cannot be approved until UVA Foundation receives CCP approval and the subdivision plat is recorded. Thank you, Andrew Allison Project Engineer il! TIMMONS GROUP I www.timmons.com 608 Preston Ave, Suite 200 1 Charlottesville, VA 22903 Office: 434.327.1683 1 Fax 434.295.8317 Mobile: 704.941.4097 1 And rew.AIIison timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. Tori Kanellopoulos From: Andrew Allison <Andrew.Allison@timmons.com> Sent: Monday, August 5, 2019 3:29 PM To: Tori Kanellopoulos Cc: John Hash; Adam Moore; Richard Nelson Subject: SDP201900023 UVA Encompass Final Site Plan Submission Attachments: Digital Submission.pdf Tori, I wanted to let you know we submitted a final site plan application for this project. Adam Moore has requested 2 hard copies, Richard Nelson has requested 3 hard copies and I believe C.D. requires 1 hard copy. This totals to 6 hard copies. Please let me know if this is accurate and I will deliver the plans (6 copies), application and associated fee check to your attention tomorrow morning. I am aware that this plan cannot be approved until UVA Foundation receives CCP approval and the subdivision plat is recorded. Thank you, Andrew Allison Project Engineer M TIMMONS GROUP I www.timmons.com 608 Preston Ave, Suite 200 1 Charlottesville, VA 22903 Office: 434.327.1683 Fax 434.295.8317 Mobile: 704.941.4097 j Andrew.Allison(cDtimmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. Tori Kanellopoulos From: Todd Marshall <tarshall@uvafoundation.com> Sent: Tuesday, July 23, 2019 2:57 PM To: Tori Kanellopoulos; Mann, Elizabeth; John Hash; ecruz@uvafoundation.com Subject: RE: SDP2019-23 Action Letter Thanks Tori. Todd From: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Sent: Tuesday, July 23, 2019 8:31 AM To: Todd Marshall <tarshall@uvafoundation.com>; Mann, Elizabeth <Elizabeth.Mann @encompasshealth.com>; John Hash <John.Hash @timmons.com>; Elise Cruz <ecruz@uvafoundation.com> Subject: RE: SDP2019-23 Action Letter Hi Todd, That is correct —you can submit the final site plan, and we can review, but cannot approve until the CCP is completed (and the final subdivision plat, I believe). Please note that no further initial site plan submissions are needed —and we cannot accept them. The initial site plan was already approved. Any review comments need to be addressed with the final site plan, which has its own application and fee. Best, Tori From: Todd Marshall <tmarshall uvafoundation.com> Sent: Monday, July 22, 2019 4:21 PM To: Tori Kanellopoulos <vkanellopoulos@albemarle.ore>; Mann, Elizabeth <Elizabeth. Mann 9encompasshealth.com>; John Hash <John.Hash @timmons.com>; ecruz@uvafoundation.com Subject: RE: SDP2019-23 Action Letter Hi Tori, Just wanted to confirm that the CCP has to be completed prior to final site plan APPROVAL, is that correct? I assume they can still submit for review but final approval would be pending the completion of the CCP. Please confirm. Thanks. Todd From: Tori Kanellopoulos <vkanello oulos albemarle.or > Sent: Friday, July 12, 2019 3:31 PM To: Todd Marshall <tmarshall@uvafoundation.com>; Mann, Elizabeth <Elizabeth.Mann Pencom passhealth.com>; John Hash <John.Hash Ptimmons.com>; Elise Cruz <ecruz uvafoundation.com> Subject: SDP2019-23 Action Letter Hi All, Please see attached action letter (conditional approval) of SDP2019-23, Initial Site Plan for Encompass Health. The next steps for this project are to complete the Consistency with the Comprehensive Plan (CCP) and subdivision plat approval, prior to final Site Plan. I appreciate how efficient you were completing the proffer! Best, Tod Tori Kanellopoulos, AICP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 Tori Kanellopoulos From: Tori Kanellopoulos Sent Tuesday, July 23, 2019 8:31 AM To: Todd Marshall; Mann, Elizabeth; John Hash; ecruz@uvafoundation.com Subject: RE: SDP2019-23 Action Letter Hi Todd, That is correct — you can submit the final site plan, and we can review, but cannot approve until the CCP is completed (and the final subdivision plat, I believe). Please note that no further initial site plan submissions are needed —and we cannot accept them. The initial site plan was already approved. Any review comments need to be addressed with the final site plan, which has its own application and fee. Best, Tori From: Todd Marshall <tasshall@uvafoundation.com> Sent: Monday, July 22, 2019 4:21 PM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org>; Mann, Elizabeth <Elizabeth.Mann @encompasshealth.com>, John Hash <John.Hash @timmons.com>; ecruz@uvafoundation.com Subject: RE: SDP2019-23 Action Letter Hi Tori, Just wanted to confirm that the CCP has to be completed prior to final site plan APPROVAL. is that correct? ][ assume they can still submit for review but final approval would be pending the completion of the CCP. Please confirm. Thanks. Todd From: Tori Kanellopoulos <vkanellopoulos(@aibemarle.org> Sent: Friday, July 12, 2019 3:31 PM To: Todd Marshall <tmarshall uvafoundation.com>; Mann, Elizabeth <_Elizabeth. Mann@encompasshealth.com>; John Hash <John.Hash @timmons.com>; Elise Cruz <ecruz@uvafoundation.com> Subject: SDP2019-23 Action Letter Hi All, Please see attached action letter (conditional approval) of SDP2019-23, Initial Site Plan for Encompass Health. The next steps for this project are to complete the Consistency with the Comprehensive Plan (CCP) and subdivision plat approval, prior to final Site Plan. i appreciate how efficient you were completing the proffer! Best, Tori Tori Kanellopoulos, AICP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 Tori Kanello oulos From: Todd Marshall <tarshall@uvafoundation.com> Sent: Monday July 22, 2019 4:21 PM To: Tori Kanellopouios; Mann, Elizabeth; John Hash; ecruz@uvafoundation.com Subject: RE: SDP2019-23 Action Letter Hi Tori, Just wanted to confirm that the CCP has to be completed prior to final site plan APPROVA! , is that correct? I assume they can still submit for review but final approval would be pending the completion of the CCP. Please confirm. Thanks. Todd From: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Sent: Friday, July 12, 2019 3:31 PM To: Todd Marshall <tmarshall@uvafoundation.com>; Mann, Elizabeth <Elizabeth.Mann @encompasshealth.com>; John Hash <John.Hash@t!mmons.com>; Elise Cruz <ecruz@uvafoundation.com> Subject: SDP2019-23 Action Letter Hi All, Please see attached action letter (conditional approval) of SDP2019-23, Initial Site Plan for Encompass Health. The next steps for this project are to complete the Consistency with the Comprehensive Plan (CCP) and subdivision plat approval, prior to final Site Plan. I appreciate how efficient you were completing the proffer! Best, To ri Tori Kanellopoulos, AICP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 Tori Kaneilo oulos From: Jennifer Smith - CDD - Planning Sent:Monday, July 22, 2019 10:05 AM To- Tod Kanellopoulos Subject: Electronic re -submission SDP2019-23 Good morning Tori: I have uploaded documents into County View for a re -submission for SDP2019-23. Thank you! Jon Smith Intake Support Specialist 11 County of Albemarle 401 McIntire Road Charlottesville, VA 22902 (434) 296-5832 ext. 3835 Jsmith2 albemarle.or Tori Kanellopoulos From: Tori Kanellopoulos Sent: Monday, July 22, 2019 8:18 AM To: Andrew Allison Cc: John Hash; adam.moore@vdot.virginia.gov; Richard Nelson (rnelson@serviceauthority.org) Subject: RE: SDP201900023 UVA Encompass Initial Site Plan Submission Hi Andrew, The resubmission for this site plan should actually wait until final site plan submission. The initial site plan has been conditionally approved —that is, it is approved with the conditions of revising per the review comments. Therefore, we do not need any additional initial site plan submittals. The final site plan should be submitted as a final site plan (that is, with a final site plan application and fee). However, this final site plan cannot be submitted (or would need to be deferred) until a Consistency with the Comprehensive Plan application has been submitted, reviewed, and approved. I know the representatives at the UVA Foundation are aware of this process as well. Please let me know if you have any questions. Best, To ri Tori Kanellopoulos, AICP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 From: Andrew Allison <And rew.Al lison @tim mons.com> Sent: Friday, July 19, 2019 5:21 PM To: Tori Kanellopoulos <vkanellopoulos@albemarie.org> Cc: John Hash <John.Hash @timmons.com> Subject: SDP201900023 UVA Encompass Initial Site Plan Submission Tori, I wanted to let you know that I resubmitted the initial site plan for the UVA Encompass Initial Site Plan Submission. VDOT requested 2 hard copies while ACSA requested 3 hard copies. I will turn these in on Monday to your attention unless you would like for me to proceed otherwise. I hope you have a great weekend, Andrew Allison Project Engineer 11i TIMMONS GROUP j www.timmons.com 608 Preston Ave, Suite 200 1 Charlottesville, VA 22903 Office: 434.327.1683 Fax 434.295.8317 Mobile: 704.941.4097 Andrew.Allison timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. 10 Tori Kanello oulos From: Andrew Allison <Andrew.Allison@timmons.com> Sent: Friday, July 19, 2019 5:21 PM To: Tori Kanellopoulos Cc: John Hash Subject SDP201900023 UVA Encompass Initial Site Plan Submission Attachments: Digital Submission.pdf Tori, I wanted to let you know that I resubmitted the initial site plan for the UVA Encompass Initial Site Plan Submission. VDOT requested 2 hard copies while ACSA requested 3 hard copies. I will turn these in on Monday to your attention unless you would like for me to proceed otherwise. I hope you have a great weekend, Andrew Allison Project Engineer iii TIMMONS GROUP I www.timmons.com 608 Preston Ave, Suite 200 ! Charlottesville, VA 22903 Office: 434.327.1683 Fax 434.295.8317 Mobile: 704.941.4097 Andrew.Allison timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. 11 Tor! Kanello oulos From: Laserfiche-Notification@albemarle.org Sent:Friday, July 19, 2019 5:12 PM To: Tori Kanellopoulos Cc: CDD Submittal Subject: Re -Submission from CDD Portal - Transaction #00002937 Re -Submission was made to CDD Portal. Please review. Summary of Submission: Project. UVA ENCOMPASS REHABILITATION HOSPITAL - INITIAL App Number., SDP201900023 Name: Andrew Allison Email., andrew.allison@timmons.com Phone: 434-327-1683 Files Submitted., UVA Encompass_Rehab Hospital Page 1-21.pdf, Comment Response Letter to Margaret Maliszewski care of Tori Kanellopoulos. pdf, Comment Response Letter to RINSA Dyon Vega.pdf, Comment Response to Albemarle County Tori Kanellopoulos.pdf, Comment Response to VDOTAdam Moore.pdf View Files Submitted: http://cob-ifiche03/WebLinkWA/Search.aspx?dbid=2&searchcommand={[CDD- WebSubmissions]:[ReceiptNumber]="00002937"} 12 Tori Kanellopoulos From: Craig Kotarski <Craig.Kotarski@timmons.com> Sent: Monday, July 15, 2019 10:21 PM To: Tim Padalino; John Anderson; Tori Kanellopoulos; Matthew Wentland; Lea Brumfield; Frank Pohl; Bart Svoboda; Bill Fritz Cc: Todd Marshall; ecruz@uvafoundation.com; Jonathan Showalter Subject: RE: UVA Research Park/Encompass Plans Meeting Summary Tim, thanks for this ... I have several questions and may need to request a meeting to ensure I understand, but there is one item where i am unclear below. I've highlighted it, but am not sure if it is a reference to the Road Plan or the Encompass Site plan. Thanks, Craig From: Tim Padalino <tpadalino@albemarle.org> Sent: Monday, July 15, 201910:07 PM To: Craig Kotarski <Craig. Kota rski @timmo ns.co m >; John Anderson <janderson2@albemarle.org>; Tori Kanellopoulos <vkanellopoulos@albemarle.org>; Matthew Wentland <mwentland@albemarle.org>; Lea Brumfield <lbrumfield@albemarle.org>; Frank Pohl <fpohl@albemarle.org>; Bart Svoboda <bsvoboda@albemarle.org>; Bill Fritz <BFRITZ@albemarle.org> Cc: Todd Marshall <tarshall@uvafoundation.com>; ecruz@uvafoundation.com; Jonathan Showalter <Jonathan.Showalter@timmons.com> Subject: RE: UVA Research Park/Encompass Plans Meeting Summary Hello again everyone, Thanks once more for meeting last week and for talking through the many different consideration in play at UVARP. I'm writing to provide the update that several CDD staff members who attended the meeting on Friday met for a subsequent de -briefing meeting this morning. Bill Fritz (Development Process Manager) was invited to join, discuss the circumstances, and review the proposed sequence. A new (streamlined) approach was identified, as follows. Guidance re: Content of Applications: Final Plat of Division and Adjustment (SUB201900106) can remain one document o (does not need to be separated into two steps) Final Plat SUB201900106 must have a note added that states "No construction is permitted within the drainfield area until such time that the public sewer line is installed, connected via lateral to the Fire Station, and operational." (or similar) o ("drainfield area" to be identified on Final Plat and on corresponding Final Site Plan) Final Plat SUB201900106 must include an easement to the County for the existing drainfield, as well as all other components of the private septic system that are located between the drainfield and the Fire Station, to ensure continued use of entire private septic system until such time that the public sewer service is operational. o An existing drainfield easement currently is referenced on Final Plat SUB201900106; this will need to be modified (expanded) as described above o Modified easement will require corresponding Deed Note: Final Plat only references "Drain Field Easement (10,695 Sq. Ft,)" but provides no DB/PG reference or other details; without information about+ access to existing easement, it is difficult 13 for County staff to determine the best approach (Le. modify the existing easement and update the existing deed vs. create a new easement and prepare a separate, new deed for County review). Either way, this necessary easement can be included on the final plat (SUB201900106). Guidance re: Sequence of Application Review A royals: Final Plat SUB201900106 cannot be approved until after Road Plans (SUB201800049) and corresponding WPO Plan (WP0201900021) are approved. Final Plat SUB201900106 cannot be approved until after road bond and water/sewer bonds are posted. Final Plat SUB201900106 must be held for approval until after approval of Final Site Plan. o (But the resubmittal, review, etc. of Final Plat can occur simultaneously, and be signed immediately after Final Site Plan is signed/approved) o (County can provide letter stating our intent to approve the Final Plat immediately after approval of Final Site Plan, provided that the signed and notarized owners' signatures are on the Final Plat, etc.) Since this is a different approach than what was discussed on Friday and what Craig summarized in writing (thanks again, Craig), please let us know if you'd like to discuss this update, or talk through any questions or concerns this may create. Thanks very much - Tim Padalino, AICP Albemarle County I Community Development Dept. (434)-296-5832 x. 3088 From: Tim Padalino Sent: Friday, July 12, 2019 11:21 AM To: Craig Kotarski <Crai .Kotarski timmons.com>; John Anderson <ianderson2 albemarle.org>; Tor! Kanellopoulos <vkaneilo oulos albemarle.or >; Matthew Wentland <mwentland albemarie.or >; Lea Brumfield <Ibrumfield albemarie.or >; Frank Pohl <f ohl albemarle.or >; Bart Svoboda <bsvoboda albemarle.or > Cc: Todd Marshall <tmarshall uvafoundation.com>; ecruz uvafoundation.com• Jonathan Showalter <Jonathan.Showalter timmons.com> Subject: RE: UVA Research Park/Encompass Plans Meeting Summary You're welcome, Craig: and thanks to each of you for coming in to discuss all the moving parts face to face. That was really constructive. And thank you for summarizing the preferred approach to the overall permitting sequence that we discussed this morning. This sounds like the most effective path forward, but let us also take just a little bit of time to think and talk through this overall sequence once more (with a little bit of extra time } space to think about any potential issues 1 questions that weren't identified during the meeting this morning). So although 1 don't anticipate any problems with what's been discussed this morning or what you've summarized below, we do want to re -review those steps to best ensure that we all avoid any foreseeable snags or problems — and either re -confirm this approach, or (if necessary) recommend any minor modifications to the process you've outlined. Thanks once again to each of you (County staff and UVAF and Timmons) for getting together and talking through everything. And I will follow up with everyone in 1-2 days re: moving forward as discussed and as summarized. Enjoy the weekend - - - 14 Tim Padalino, AICP Albemarle County I Community Development Dept. (434)-296-5832 x. 3088 From: Craig Kotarski <Craig.Kota rski@timmons.com> Sent: Friday, July 12, 201911:10 AM To: Tim Padalino <tpadalino@albemarle.org>; John Anderson <ianderson20albemarle.org>; Tori Kanellopoulos <vkanello oulos albemarle.or >; Matthew Wentland <mwentland@albemarle.org>; Lea Brumfield <lbrumfieid albemarle.or >; Frank Pohl 4yohl0albemarle.org>; Bart Svoboda <bsvoboda albern r .o > Cc. Todd Marshall <tmarshall@uvafoundation.com>; ecruz uvafoundation.com• Jonathan Showalter <Jonathan.Showalter@timmons.com> Subject: UVA Research Park/Encompass Plans Meeting Summary All, thanks for taking the time to just meet with us regarding the UVA Research Park projects. In summary, we will move forward as follows: • Adjust Subdivision Plat, keeping drain field on the existing fire station parcel. • Loop Road — Road Plan can be approved with a note of construction sequence for portion that is over drain field. • Subdivision Plat 2 (showing extension of private road parcel) will be submitted, reviewed, signed, and then held for approval. • Encompass Final Site Plan can be approved with a note of construction sequence for connection that is over drain field. o Both road connections to Loop Road must be in place for Certificate of Occupancy to be issued. Subdivision Plat 2 is recorded once Sanitary Sewer is installed and Fire Department is connected to it. Let me know if you all have any questions. Best, Craig Craig Kotarski, P.E., LEED AP Principal TIMMONS GROUP I www.timmons.com 608 Preston Avenue, Suite 200 I Charlottesville, VA 22903 Office: 434.327.1688 1 Fax: 434.295.8317 Mobile: 434.964.71481 craig.kotarski aRtimmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. is Tori Kanello oulos From: Tim Padalino Sent: Monday, July 15, 2019 10:07 PM Craig Kotarski; John Anderson; Tori Kanellopoulos; Matthew Wentland; Lea Brumfield; To: Frank Pohl; Bart Svoboda; Bill Fritz Cc: Todd Marshall; ecruz@uvafoundation.com; Jonathan Showalter Subject: RE: UVA Research Park/Encompass Plans Meeting Summary Hello again everyone, Thanks once more for meeting last week and for talking through the many different consideration in play at UVARP. I'm writing to provide the update that several CDD staff members who attended the meeting on Friday met for a subsequent de -briefing meeting this morning. Bill Fritz (Development Process Manager) was invited to join, discuss the circumstances, and review the proposed sequence. A new (streamlined) approach was identified, as follows; Guidance re: Content of Applications: Final Plat of Division and Adjustment (SUB201900106) can remain one document o (does not need to be separated into two steps) Final Plat SUB201900106 must have a note added that states "No construction is permitted within the drainfield area until such time that the public sewer line is installed, connected via lateral to the Fire Station, and operational." (or similar) o ("drainfield area" to be identified on Final Plat and on corresponding Final Site Plan) Final Plat SUB201900106 must include an easement to the County for the existing drainfield, as well as all other components of the private septic system that are located between the drainfield and the Fire Station, to ensure continued use of entire private septic system until such time that the public sewer service is operational. o An existing drainfield easement currently is referenced on Final Plat SUB201900106; this will need to be modified (expanded) as described above o Modified easement will require corresponding Deed 31 Note: Final Plat only references "Drain Field Easement (10,695 Sq. Ft.)" but provides no DB/PG reference or other details; without information about + access to existing easement, it is difficult for County staff to determine the best approach (Le. modify the existing easement and update the existing deed vs. create a new easement and prepare a separate, new deed for County review). Either way, this necessary easement can be included on the final plat (SUB201900106). Guidance re: Sequence of Application Review/Approvals: Final Plat SUB201900106 cannot be approved until after Road Plans (SUB201900049) and corresponding WPO Plan (WPO201900021) are approved. Final Plat SUB201900106 cannot be approved until after road bond and water/sewer bonds are posted. Final Plat SUB201900106 must be held for approval until after approval of Final Site Plan. o (But the resubmittai, review, etc. of Final Plat can occur simultaneously, and be signed immediately after Final Site Plan is signed/approved) o (County can provide letter stating our intent to approve the Final Plat immediately after approval of Finai Site Plan, provided that the signed and notarized owners' signatures are on the Final Plat, etc.) 16 Since this is a different approach than what was discussed on Friday and what Craig summarized in writing (thanks again, Craig), please let us know if you'd like to discuss this update, or talk through any questions or concerns this may create. Thanks very much - - - Tim Padalino, AICP Albemarle County I Community Development Dept. (434)-296-5832 x. 3088 From: Tim Padalino Sent: Friday, July 12, 2019 11:21 AM To: Craig Kotarski <Craig. Kota rski @timmo ns.co m>; John Anderson <janderson2@albemarle.org>; Tori Kanellopoulos <vkanellopoulos@albemarle.org>; Matthew Wentland <mwentiand@albemarle.org>; Lea Brumfield <lbrumfield@aibemarle.org>; Frank Pohl <fpohl@albemarle.org>; Bart Svoboda <bsvoboda@albemarle.org> Cc: Todd Marshall <tarshall@uvafoundation.com>; ecruz@uvafoundation.com; Jonathan Showalter <Jonathan.Showalter@tlmmons.com> Subject: RE: UVA Research Park/Encompass Plans Meeting Summary You're welcome, Craig; and thanks to each of you for coming in to discuss all the moving parts face to face. That was really constructive. And thank you for summarizing the preferred approach to the overall permitting sequence that we discussed this morning. This sounds like the most effective path forward, but let us also take just a little bit of time to think and talk through this overall sequence once more (with a little bit of extra time + space to think about any potential issues 1 questions that weren't identified during the meeting this morning). So although I don't anticipate any problems with what's been discussed this morning or what you've summarized below, we do want to re -review those steps to best ensure that we all avoid any foreseeable snags or problems — and either re -confirm this approach, or (if necessary) recommend any minor modifications to the process you've outlined. Thanks once again to each of you (County staff and UVAF and Timmons) for getting together and talking through everything. And I will follow up with everyone in 1-2 days re: moving forward as discussed and as summarized. Enjoy the weekend - - - Tim Padalino, AICP Albemarle County I Community Development Dept. (434)-296-5832 x. 3088 From: Craig Kotarski <Craig.Kota rski@timmons.com> Sent: Friday, July 12, 2019 11:10 AM To: Tim Padalino <tpadalino@albemarle.o>; John Anderson <ia� nderson2@albemarle.orR>, Tori Kanellopoulos <vkanellonoulos@albemarle.org>; Matthew Wentland <mwentland@albemarie.ore>; Lea Brumfield <lbrumfield@albemarle.org>; Frank Pohl <f ohl albemarle.or >; Bart Svoboda <bsvoboda@?albemarle.org> Cc: Todd Marshall <tarshall@uvafoundation.com>; ecruzPuvafoundation.com; Jonathan Showalter <Jonathan.Showalter timmons.com> Subject: UVA Research Park/Encompass Plans Meeting Summary 17 All, thanks for taking the time to just meet with us regarding the UVA Research Park projects. In summary, we will move forward as follows: • Adjust Subdivision Plat, keeping drain field on the existing fire station parcel. Loop Road — Road Plan can be approved with a note of construction sequence for portion that is over drain field. • Subdivision Plat 2 (showing extension of private road parcel) will be submitted, reviewed, signed, and then held for approval. • Encompass Final Site Plan can be approved with a note of construction sequence for connection that is over drain field. o Both road connections to Loop Road must be in place for Certificate of Occupancy to be issued. • Subdivision Plat 2 is recorded once Sanitary Sewer is installed and Fire Department is connected to it. Let me know if you all have any questions. Best, Craig Craig Kotarski, P.E., LEED AP Principal TIMMONS GROUP I www.timmons.com 608 Preston Avenue, Suite 200 1 Charlottesville, VA 22903 Office: 434.327.1688 Fax: 434.295.8317 Mobile:434.964.7148 craig.kotarskiCa7timmons.com Your Vision Achieved Through Ours To send me flies greater than 20MB click here. 18 Tori Kanelloaoulos From: Tori Kanellopoulos Sent Friday, July 12, 2019 3:31 PM To: Todd Marshall; Mann, Elizabeth; John Hash; ecruz@uvafoundation.com Subject SDP2019-23 Action Letter Attachments: SDP201900023 Action Letter.docx; SDP2019-23 Health Review Comments.doc; SDP2019-23 RWSA Comments.pdf; SDP2019-23 VDOT Comments.pdf; SDP201900023 Review Comments Architectural Review Board Approval 2019-06-14.pdf Hi All, Please see attached action letter (conditional approval) of SDP2019-23, Initial Site Plan for Encompass Health. The next steps for this project are to complete the Consistency with the Comprehensive Plan (CCP) and subdivision plat approval, prior to final Site Plan. I appreciate how efficient you were completing the profferl Best, Tori Tori Kanellopoulos, AICP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 19 Tori Kanellopoulos From: Mann, Elizabeth <Elizabeth.Mann@encompasshealth.com> Sent: Friday, July 12, 2019 1:35 PM To: Tori Kanellopoulos; Todd Marshall Subject: RE: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane Thank you!!! From: Tori Kanellopoulos [ma!Ito:vkanellopoulos@albemarle.org] Sent: Friday, July 12, 2019 8:50 AM To: Todd Marshal! Cc: Mann, Elizabeth Subject: RE: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane **WARNING::This email originated outside Encompass Health::WARNING** DO NOT CLICK links or attachments unless you recognize the sender and know the content is safe. Proffer is satisfied! Will send an action letter shortly. Tori From: Todd Marshall <tmarshall@uvafoundation.com> Sent: Wednesday, July 10, 201910:29 AM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Cc: Mann, Elizabeth <Elizabeth.Mann@encompasshealth.com> Subject: FW: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane Tori, Well that was fast. DHR has approved and the final package/email approval is attached. Todd From: Catherine Easterling <catherine @sadlerandwhitehead.com> Sent: Wednesday, July 10, 201910:07 AM To: Todd Marshal! <tmarshall uvafoundation.com>; Elise Cruz <ecruz@ uvafoundation.com> Cc: Mimi Sadler <sadler sadlerandwhitehead.com> Subject: RE: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane Hi, Todd — We received word this morning that DHR has approved the updated VCRIS entries. Congratulations! I've attached updated copies of the VCRIS packages for your records. Now that they are approved, we will submit a hard copy to DHR and mail you two hard copies. Kind regards, Catherine Catherine Easterling, Project Manager 20 Sadler & Mitehead ARCI IITH ; rs, IILC 804.231-5299 v Confidentiality Notice: This e-mail communication and any attachments may contain confidential and privileged information for the use of the designated recipients named above. If you are not the intended recipient, you are hereby notified that you have received this communication in error and that any review, disclosure, dissemination, distribution or copying of it or its contents is prohibited. If you have received this communication in error, please notify me immediately by replying to this message and deleting it from your computer. Thank you. 21 Tori Kanellopoulos From: Todd Marshall <tarshall@uvafoundation.com> Sent: Friday, July 12, 2019 1:33 PM To: Tori Kanellopoulos Subject: RE: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane Thanks Tori. From: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Sent: Friday, July 12, 2019 9:50 AM To: Todd Marshall <tmarshall@uvafoundation.com> Cc: Mann, Elizabeth <Elizabeth.Mann@encompasshealth.com> Subject: RE: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane Proffer is satisfied! Will send an action letter shortly. Tori From: Todd Marshall <tmarshall uvafoundation.com> Sent: Wednesday, July 10, 201910:29 AM To: Tori Kanellopoulos <vkanello oulos albemarle.or > Cc: Mann, Elizabeth <Elizabeth.Mann Pencom asshealth.com> Subject: FW: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane Tori, Well that was fast. DHR has approved and the final package/email approval is attached. Todd From: Catherine Easterling <catherine sadlerandwhitehead.com> Sent: Wednesday, July 10, 2019 10:07 AM To: Todd Marshall gmarshall@uvafoundation.com>; Elise Cruz <ecruz uvafoundation.com> Cc: Mimi Sadler <sad lerC@sad lerandwhitehead.com> Subject: RE: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane Hi, Todd — We received word this morning that DHR has approved the updated VCRIS entries. Congratulations! I've attached updated copies of the VCRIS packages for your records. Now that they are approved, we will submit a hard copy to DHR and mail you two hard copies. Kind regards, Catherine Catherine Easterling, Project Manager Sadler & Whitehead ARCI 804.231.5299 v 22 Tori Kanellopoulos From: Tim Padalino Sent Friday, July 12, 2019 11:21 AM To: Craig Kotarski; John Anderson; Tori Kanellopoulos; Matthew Wentland; Lea Brumfield; Frank Pohl; Bart Svoboda Cc: Todd Marshall; ecruz@uvafoundation.com; Jonathan Showalter Subject: RE: UVA Research Park/Encompass Plans Meeting Summary You're welcome, Craig; and thanks to each of you for coming in to discuss all the moving parts face to face. That was really constructive. And thank you for summarizing the preferred approach to the overall permitting sequence that we discussed this morning. This sounds like the most effective path forward, but let us also take just a little bit of time to think and talk through this overall sequence once more (with a little bit of extra time + space to think about any potential issues 1 questions that weren't identified during the meeting this morning). So although I don't anticipate any problems with what's been discussed this morning or what you've summarized below, we do want to re -review those steps to best ensure that we all avoid any foreseeable snags or problems — and either re -confirm this approach, or (if necessary) recommend any minor modifications to the process you've outlined. Thanks once again to each of you (County staff and UVAF and Timmons) for getting together and talking through everything. And I will follow up with everyone in 1-2 days re: moving forward as discussed and as summarized. Enjoy the weekend - - Tim Padalino, AICP Albemarle County I Community Development Dept. (434)-296-5832 x. 3088 From: Craig Kotarski <Craig.Kotarski@timmons.com> Sent: Friday, July 12, 2019 11:10 AM To: Tim Padalino <tadalino@albemarle.org>; John Anderson <janderson2@albemarle.org>; Tori Kanellopoulos <vkanellopoulos@albemarle.org>; Matthew Wentland <mwentland@albemarle.org>; Lea Brumfield <Irumfield@albemarle.org>; Frank Pohl <fpohl@albemarle.org>; Bart Svoboda <bsvoboda@albemarle.org> Cc: Todd Marshall <tmarshall@uvafoundation.com>; ecruz@uvafoundation.com; Jonathan Showalter <Jonathan.Showalter@timmons.com> Subject: UVA Research Park/Encompass Plans Meeting Summary All, thanks for taking the time to just meet with us regarding the UVA Research Park projects. In summary, we will move forward as follows: • Adjust Subdivision Plat, keeping drain field on the existing fire station parcel. • Loop Road — Road Plan can be approved with a note of construction sequence for portion that is over drain field. Subdivision Plat 2 (showing extension of private road parcel) will be submitted, reviewed, signed, and then held for approval. 23 Encompass Final Site Plan can be approved with a note of construction sequence for connection that is over drain field. o Both road connections to Loop Road must be in place for Certificate of Occupancy to be issued. Subdivision Plat 2 is recorded once Sanitary Sewer is installed and Fire Department is connected to it. Let me know if you all have any questions. Best, Craig Craig Kotarski, P.E., LEED AP Principal TIMMONS GROUP I www.timmons.com 608 Preston Avenue, Suite 200 1 Charlottesville, VA 22903 Office: 434.327.1688 Fax: 434.295.8317 Mobile: 434.964.7148 crai .kotarski timmons.com Your Vision Achieved Through Ours To send me files greater than 20M6 click here. 24 Tori Kanello oulos From: Craig Kotarski <Craig.Kotarski@timmons.com> Sent: Friday, July 12, 2019 11:10 AM To: Tim Padalino; John Anderson; Tori Kanellopoulos; Matthew Wentiand; Lea Brumfield; Frank Pohl; Bart Svoboda Cc: Todd Marshall; ecruz@uvafoundation.com; Jonathan Showalter Subject: UVA Research Park/Encompass Plans Meeting Summary All, thanks for taking the time to just meet with us regarding the UVA Research Park projects. In summary, we will move forward as follows: • Adjust Subdivision Plat, keeping drain field on the existing fire station parcel. • Loop Road — Road Plan can be approved with a note of construction sequence for portion that is over drain field. • Subdivision Plat 2 (showing extension of private road parcel) will be submitted, reviewed, signed, and then held for approval. • Encompass Final Site Plan can be approved with a note of construction sequence for connection that is over drain field. o Both road connections to Loop Road must be in place for Certificate of Occupancy to be issued. • Subdivision Plat 2 is recorded once Sanitary Sewer is installed and Fire Department is connected to it. Let me know if you all have any questions. Best, Craig Craig Kotarski, P.E., LEED AP Principal TIMMONS GROUP I www.timmons.com 608 Preston Avenue, Suite 200 1 Charlottesville, VA 22903 Office: 434.327.1688 1 Fax: 434.295.8317 Mobile: 434,964.7148 J craig.kotarskiRtimmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. 25 Tori Kanellopoulos From: Tori Kanellopoulos Sent: Friday, July 12, 2019 9:50 AM To: Todd Marshall Cc: Mann, Elizabeth Subject: RE: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane Proffer is satisfied! Will send an action letter shortly. Tori From: Todd Marshall <tmarshail@uvafoundation.com> Sent: Wednesday, July 10, 201910:29 AM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Cc: Mann, Elizabeth <Elizabeth.Mann@encompasshealth.com> Subject: FW: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane Tori, Well that was fast. DHR has approved and the final package/email approval is attached. Todd From: Catherine Easterling <catherine sadlerandwhitehead.com> Sent: Wednesday, July 10, 201910:07 AM To: Todd Marshal! <tmarshall uvafoundation.com>; Elise Cruz <ecruzL@uvafoundation.com> Cc: Mimi Sadler <sadler sadlerandwhitehead.com> Subject: RE: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane Hi, Todd — We received word this morning that DHR has approved the updated VCRIS entries. Congratulations'. I've attached updated copies of the VCRIS packages for your records. \ ow that they are approved, we will submit a hard copy to DHR and mail you two hard copies. Kind regards, Catherine Catherine Easterling, Project Manager Sadler & %X1itehead ARC-1�i'rrc'_'S' PIE 804 231.5299 v 26 Tori Kanell000ulos From: Rebecca Ragsdale Sent: Friday, July 12, 2019 9.48 AM To: Tori Kanellopoulos Subject RE: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane We can consider that proffer satisfied now. Thanks! From: Tori Kanellopoulos Sent: Wednesday, July 10, 2019 11:19 AM To: Rebecca Ragsdale <ragsdale@albemarle.org> Subject: FW: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane H! Rebecca, I just wanted to make sure that this satisfies the Proffer IX for UVA Research Park? They updated the VCRIS database and got DHR approval, which is what we had asked/required. Margaret and Heather helped me coordinate. If this satisfies the proffer, I can send the action letter for the initial site plan. Thanks! Tor! From: Todd Marshall <tmarshall uvafoundation.com> Sent: Wednesday, July 10, 201910:29 AM To: Tori Kanellopoulos <vkanello oulos albemarle.or > Cc: Mann, Elizabeth <Elizabeth.Mann@encompasshealth.com> Subject: FW: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane Tori, Well that was fast. DHR has approved and the final package/email approval is attached. Todd From: Catherine Easterling<catherine@sadlerandwhitehead.com> Sent: Wednesday, July 10, 2019 10:07 AM To: Todd Marshall <tmarshall uvafoundation.com>, Elise Cruz <ecruz@uvafoundation.com> Cc: Mimi Sadler <sadler sadlerandwhitehead.com> Subject: RE: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane Hi, Todd — We received word this morning that DHR has approved the updated VCRIS entries_ Congratulations! I've attached updated copies of the VCRIS packages for your records. Now that they are approved, we will submit a hard copy to DHR and mail you two hard copies. Kind regards, 27 Catherine Catherine Easterling, Project Manager Sadler & Whitehead AllZCHIT7 CT5, PLC 804.231.5299 v 28 Tori Kanellomulos From: Tori Kanellopoulos Sent: Thursday, July 11, 2019 7.45 AM To: Todd Marshall Cc: Mann, Elizabeth Subject: RE: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane Hi Todd, Thank you — that was fast! I've sent this along to Zoning and am waiting for their approval of the proffer being completed. I will let you know once I hear back, and then will send the action letter approving the initial site plan. Best, Tori From: Todd Marshall <tarshall@uvafoundation.com> Sent: Wednesday, July 10, 201910:29 AM To: Tori Kanellopoulos <vkaneliopoulos@albemarle.org> Cc: Mann, Elizabeth <Elizabeth.Mann @encompasshealth.com> Subject: FW: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane Tori, Well that was fast. DHR has approved and the Final package/email approval is attached. Todd From: Catherine Easterling<catherine@sadlerandwhitehead.com> Sent: Wednesday, July 10, 2019 10:07 AM To: Todd Marshall <tmarshall uvafoundation.com>; Elise Cruz <ecruz uvafo u ndation. co m> Cc: Mimi Sadler <sadlie r sad le ra ndwhite head.co m > Subject: RE: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane 114 Todd — We received word this morning that DHR has approved the updated VCRIS entries. Congratulations! I've attached updated copies of the VCRIS packages for your records. Now that they are approved, we will submit a hard copy to DHR and mail you two hard copies. Kind regards, Catherine Catherine Easterling, Project Manager Sadler & W%itehead . RCI [rr[?CrS, 804.231.5299 v 29 Tori Kanellopoulos From: Tim Padalino Sent: Wednesday, July 10, 2019 11:26 AM To: Craig Kotarski; John Anderson; Tod Kanellopoulos; Matthew Wentland; Steven Hoffmann; Shawn Maddox; Lea Brumfield Todd Marshall; ecruz@uvafoundation.com; Jonathan Showalter; Frank Pohl Cc: Subject: RE: UVA Research Park/Encompass Plans Great. You're certainly welcome, and we'll see you Friday morning. Thanks very much - - - Tim Padalino, AICP Albemarle County I Community Development Dept. (434)-296-5832 x. 3088 From: Craig Kotarski <Craig. Kotarski @ ti m mons.com> Sent: Tuesday, July 09, 2019 7:27 PM To: Tim Padalino <tpadalino@albemarle.org>; John Anderson <janderson2@albemarle.org>; Tor! Kanellopoulos <vkanellopoulos@albemarle.org>; Matthew Wentland <mwentland@albemarle.org>; Steven Hoffmann <shoffmann@albemarle.org>; Shawn Maddox <smaddox@albemarle.org>; lea Brumfield <lbrumfield@albemarle.org> Cc: Todd Marshall <tarshall@uvafoundation.com>; ecruz@uvafoundation.com; Jonathan Showalter <Jonathan.Showalter@timmons.com>; Frank Pohl <fpohl@albemarle.org> Subject: RE: UVA Research Park/Encompass Plans This works for us ... Thanks, Tim! Best, Craig From: Tim Padalino <tDadalino albemarle.org> Sent: Tuesday, July 9, 2019 1:57 PM To: John Anderson <janderson2 abemarle.>; Craig Kotarski <Crai Kotarski timmons.com>; Tor! Kanellopoulos <vkanellooulos albemarle.org>; Matthew Wentland <mwentland albemarle.or >; Steven Hoffmann <shoffmann albemarle.or >; Shawn Maddox <smaddox@albemarle.org>; Lea Brumfield <lbrumfieldPalbemarle.or > Cc: Todd Marshall <tmarshall uvafoundation.com>; ecruz uvafoundation.com; Jonathan Showalter <Jonathan.Showalter@timmons.com>; Frank Pohl <# ohl albemarle.or > Subject: RE: UVA Research Park/Encompass Plans Hello Craig, Jonathan, Todd, and Elise, I've coordinated with other County staff and it looks like (almost) all of us are available to meet this Friday from 10:00 - 11:00.1 have reserved Room 214 in the CDD offices while we wait for your confirmation. Please let us know if this date/time works; if not, we'll look further out on the calendar. Thanks in advance - - - 30 Tim Padalino, AICP Albemarle County j Community Development Dept. (434)-296-5832 x. 3088 From: Tim Padalino Sent: Monday, July 08, 2019 4:00 PM To: John Anderson <'anderson2 albemarle.or >; Craig Kotarski <crai .kotarski Vmmons.com>; Tori Kanellopoulos <vkanello oulos albemarle.or >; Matthew Wentland <mwentland@albemarle.org> Cc: Todd Marshall <tmarshall@uvafoundation.com>; ecru z@uvafoundation.com; Jonathan Showalter <Jonathan.Showalter timmons.com>; Frank Pohl 4pohl@albemarle.ore> Subject: RE: UVA Research Park/Encompass Plans Yes: thank you, Craig, for suggesting that we pull together all involved reviewers and look at these numerous projects comprehensively. And thank you, John, for providing your availability. I'm currently communicating with a few other County staff members who should attend such a meeting, and l will follow up shortly with some possible meeting datesltimes after I hear back from Zoning staff and Facilities & Environmental Services staff. Thanks for your patience, and I'll follow up ASAP - - - Tim Padalino, AICP Albemarle County I Community Development Dept. (434)-296-5832 x. 3088 From: John Anderson Sent: Monday, July 08, 2019 3:56 PM To: Craig Kotarski <cra1g.kotarsk1@t1mmons.com>; Tori Kanellopoulos <vkanelio oulos albemarlg.or >; Tim Padalino <tpadalino@albemarle.ore>; Matthew Wentland <mwentiand@albemarle.ore> Cc: Todd Marshall <tmarshall@uvafoundation.com>, ecruz uvafoundation.com; Jonathan Showalter <Jonathan.Showalter@timmons.com>; Frank Pohl <fpohl@albemarle.ore> Subject: RE: UVA Research Park/Encompass Plans Craig, Thanks for your note. I am not involved with EH. With last week's digital re -submittal for 3 projects, Engineering portion of reviews for SUB201800171 (LC Dr Ext Road Plan), WP0201800073 (Road Plan WPO) and WPO201800091 (sewer ext.) plan reviews is nearly complete. I will try to attend any meetings scheduled this week, but have Wed-Thurs AM conflicts, and telework all day, tomorrow. Also, I will be away 18-30 Jul, unable to work or respond to email, and have a number of review commitments prior to 17-Jul. I regret any inconvenience, and hope to be available to meet this week. Thanks, best, J. Anderson 434.296-5832 -x3069 From: Craig Kotarski <Crai .Kotarski Otimmonsxom> Sent: Monday, July 08, 2019 12:10 PM To: Tori Kanellopoulos <vkanello oulos aibemarie.or >; Tim Padalino <t adalina albemarle.or >; John Anderson <'anderson2 albemarle.or >; Matthew Wentland <mwentland albemarle.o > Cc: Todd Marshall <tmarshall uvafoundaVon.com>; ecruz@uvafoundation.com; Jonathan Showalter 31 <lonathan.Showalter timmons.com>; Frank Pohl <fpohl albemarle.org> Subject: UVA Research Park/Encompass Plans Albemarle Co. Team, I am reaching out to schedule a meeting to discuss the best path forward, as related to the four projects that Timmons is working on at the UVA Research Park. The four projects are the Lewis & Clark Road Extension (LC), Sanitary line Extenion (SL), Loop Road (LR) and Encompass Health (EH). There are several chicken and the egg type elements to all of these projects, but we have a way forward, that we want to discuss and ensure everyone agrees upon. It should be noted that the UVA Foundation wants to move forward, as fast as possible, with the subdivision plat, as that then allows them to sell the parcel to EH, which is a priority for them. To make this happen, we propose the following: • We will amend the current subdivision plat, so that the neither the new parcel associated with the LR or EH encroaches into the septic field associated with the fire station. o Subdivision Plat can be approved* The plans for LR will be updated to reflect that that portion of the road that encroaches into the drain field will not be installed until the sanitary line is installed, the fire station connected to it, and the drain field abandoned. o LR and EH site plans can be approved o Subdivision Plat can be updated (Boundary Line Adjustment) to incorporate the road. *There also was a comment on the EH plans about issues of proffers suggesting the Loop Road needs to be a public road. This is not inline with the proffers as the proffers reference the Internal Road Network Plan (Exhibit L), which does not show any public roads through this section of the Research Park. Furthermore, this was the interpretation for other areas of the Research Park, such as the parcels off of Hunterstand Court, where Hunterstand Court is the access road for several subdivided parcels and is not a VDOT road. I could meet to further discuss almost anytime before noon this week, Tuesday— Friday. Would there be a time that would fit for you all? Best, Craig Craig Kotarski, P.E., LEED AP Principal TIMMONS GROUP j www.timmons.com 608 Preston Avenue, Suite 200 1 Charlottesville, VA 22903 Office: 434.327.1688 1 Fax: 434.295.8317 Mobile: 434.964.7148 1 craig.kotarski(@-timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. 32 Tori Kanellopoulos From: Tori Kanellopoulos Sent Wednesday, July 10, 2019 11:19 AM To: Rebecca Ragsdale Subject: FW: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane Attachments: VCRIS package_364O Lonesome Pine _OO2-5OO4_Final.pdf; VCRIS package_3655 Lonesome Pine_OO2-5323_Final.pdf, FW: VCRIS - Project 'Lonesome Pine' Final QC was Approved Hi Rebecca, I just wanted to make sure that this satisfies the Proffer IX for UVA Research Park? They updated the VCRIS database and got DHR approval, which is what we had asked/required. Margaret and Heather helped me coordinate. If this satisfies the proffer, I can send the action letter for the initial site plan. Thanks! Tori From: Todd Marshall <tarshall@uvafoundation.com> Sent: Wednesday, July 10, 2019 10:29 AM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Cc: Mann, Elizabeth <Elizabeth.Mann@encompasshealth.com> Subject: FW: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane Tori, Well that was fast. DHR has approved and the final package/email approval is attached. Todd From: Catherine Easterling<catherine@sadlerandwhite head.com> Sent: Wednesday, July 10, 2019 10:07 AM To: Todd Marshall<tmarshallCa@uvafoundation.com>; Elise Cruz <ecruz@uvafoundation.com> Cc: Mimi Sadler <sadler@sadlerandwhitehead.com> Subject: RE: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane Hi, Todd — We received word this morning that DHR has approved the updated VCRIS entries. Congratulationsl I've attached updated copies of the VCRIS packages for your records. Now that they are approved, we will submit a hard copy to DHR and mail you two hard copies. Kind regards, Catherine Catherine Easterling, Project NIRnager Sadler & ��'hitehead .�1zc:ilrrr:c r�, r)i.r, 804.231.5299 v 33 Tori Kanello oulos From: Todd Marshall <tmarshall@uvafoundation.com> Sent: Wednesday, July 10, 2019 10:29 AM To: Tori Kanellopoulos Cc: Mann, Elizabeth Subject: FW: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane Attachments: VCRIS package_3640 Lonesome Pine _002-5004_Final.pdf, VCRIS package_3655 Lonesome Pine_002-5323_Final.pdf; FW: VCRIS - Project 'Lonesome Pine' Final QC was Approved Tori, Well that was fast. DHR has approved and the final package/email approval is attached. Todd From: Catherine Easterling<catherine@sadlerandwhitehead.com> Sent: Wednesday, July 10, 2019 10:07 AM To: Todd Marshall <tmarshall@uvafoundation.com>; Elise Cruz <ecruz@uvafoundation.com> Cc: Mimi Sadler <sadler@sadierandwhitehead.com> Subject: RE: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane Hi, Todd — We received word this morning that DHR has approved the updated VCRIS envies. Congratulations! I've attached updated copies of the VCRIS packages for your records. Now that they are approved, we will submit a hard copy to DHR and mail you rwo hard copies. Kind regards, Catherine Catherine Easterling, Project Manager Sadler & Whitehead ARCI ij'l� :cis, PLC 804.231.5299 v 34 Tod Kanellopoulos From: Tod Kanellopoulos Sent: Wednesday, July 10, 2019 9:06 AM To: Todd Marshall Cc: ecruz@uvafoundation.com Subject: RE: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane H i Todd, Thank you for the update! Once DHR has approved the submittal, the proffer will be satisfied. If you could provide me with DHR's approval and the final submittal, that would be great. Best, Tor! From: Todd Marshall <tmarshall@uvafoundation.com> Sent: Wednesday, July 10, 2019 8:36 AM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Cc: ecruz@uvafoundation.com Subject: FW: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane Tori, The DHR survey is complete and the draft has been submitted to DHR for review/approval. The drafts that were submitted are attached. Can you let me know at what point the proffer is considered satisfied? What do you need for your riles? Todd From: Catherine Easterling <catherine sadlerandwhitehead.com> Sent: Tuesday, July 9, 2019 4:25 PM To: Todd Marshall <tarshall@uvafoundation.com>; Elise Cruz <ecruz@uvafoundation.com> Cc: Mimi Sadler <sadler sadlerandwhitehead.com> Subject: RE: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane Hi, Todd and Elise — We updated the VCRIS entries with reconnaissance level survey information, and have submitted our reports to the Virginia Department of Historic Resources for QC review. DHR required us to create a new VCRIS entry for the brick rancher at 3655 Lonesome Fine Lane. The VCRIS records will not be made public until DHR has approved the changes. I've attached the draft copies of the reports along with updated site plans and photographs labeled in accordance with DHR requirements. We will send you two hard copies and updated digital versions once DHR has approved the changes. Please let us know if you have any questions. Kindregards, Catherine 35 Catherine Easterling, Project Manager Sadler & Whitehead ARCI11TECTS, PLC 804.231.5299 v 36 Tod Kanello oulos From: Todd Marshall <tarshall@uvafoundation.com> Sent: Wednesday, July 10, 2019 8:36 AM To: Tor! Kanellopoulos Cc: ecruz@uvafoundation.com Subject: FW: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane Attachments: VCRIS package_3640 Lonesome Pine_002-5004_.pdf; VCRIS package_3655 Lonesome Pine 002-5323_ pdf Tori, The DHR survey is complete and the draft has been submitted to DHR for review/approval. The drafts that were submitted are attached. Can you let me know at what point the proffer is considered satisfied? What do you need for your files? Todd From: Catherine Easterling<catherine@sadierandwhitehead.com> Sent: Tuesday, July 9, 2019 4:25 PM To: Todd Marshall <tmarshall@uvafoundation.com>; Elise Cruz <ecruz@uvafoundation.com> Cc: Mimi Sadler <sadler@sadlerandwhitehead.com> Subject: RE: Proposal for UVA Foundation- VCRIS database update for 3640 Lonesome Pine Lane III Todd and Elise — We updated the VCRIS entries with reconnaissance level survey information, and have submitted our reports to the Virginia Department of Historic Resources for QC review. DHR required us to create a new VCRIS entry for the brick rancher at 3655 Lonesome Pine Lane. The VCRIS records will not be made public until DHR has approved the changes. I've attached the draft copies of the reports along with updated site plans and photographs labeled in accordance with DHR requirements. We will send you two hard copies and updated digital versions once DHR has approved the changes. Please let us know if you have any questions. Kind regards, Catherine Catherine Easterling, Project Rianager Sadler & XKnutehead ARCI [rrUc TS, III C 80.1231.5299 v 37 Tori Kanellopoulos From: Craig Kotarski <Craig.Kotarski@timmons.com> Sent: Tuesday, July 9, 2019 7:27 PM To: Tim Padalino; John Anderson; Tori Kanellopoulos; Matthew Wentland; Steven Hoffmann; Shawn Maddox; Lea Brumfield Cc: Todd Marshall; ecruz@uvafoundation.com; Jonathan Showalter; Frank Pohl Subject: RE: UVA Research Park/Encompass Plans This works for us ... Thanks, Tim! Best, Craig From: Tim Padalino <tpadaiino@albemarle.org> Sent: Tuesday, July 9, 20191:57 PM To: John Anderson <janderson2@albemarle.org>; Craig Kotarski <Craig.Kotarski@timmons.com>; Tori Kanellopoulos <vkanellopoulos@albemarle.org>; Matthew Wentland <mwentland@albemarle.org>; Steven Hoffmann <shoffmann@albemarle.org>; Shawn Maddox <smaddox@albemarle.org>; Lea Brumfield <Ibrumfield@albemarle.org> Cc: Todd Marshall <tarshall@uvafoundation.com>; ecruz@uvafoundation.com; Jonathan Showalter <Jonathan.Showalter@timmons.com>; Frank Pohl <fpohl@albemarle.org> Subject: RE: UVA Research Park/Encompass Plans Hello Craig, Jonathan, Todd, and Elise, I've coordinated with other County staff and it looks like (almost) all of us are available to meet this Friday from 10:00 -- 11:00.1 have reserved Room 214 in the CDD offices while we wait for your confirmation. Please let us know if this date/time works; if not, we'll look further out on the calendar. Thanks in advance --- Tim Padalino, AICP Albemarle County j Community Development Dept. (434)-296-5832 x. 3088 From: Tim Padalino Sent: Monday, July 08, 2019 4:00 PM To: John Anderson <ianderson2@albemarle.org>; Craig Kotarski <craig.kotarsk!@timmons.com>; Tori Kanellopoulos <vkanello oulos albemarle.or >; Matthew Wentland <mwentland albemarle.or > Cc: Todd Marshall <tmarshall uvafoundation.com>; ecruz uvafoundation.com; Jonathan Showalter <Jonathan.Showalter timmons.com>; Frank Pohl <fpohl@albemarle.org> Subject: RE: UVA Research Park/Encompass Plans Yes: thank you, Craig, for suggesting that we pull together all involved reviewers and look at these numerous projects comprehensively. And thank you, John, for providing your availability. 38 I'm currently communicating with a few other County staff members who should attend such a meeting, and I will follow up shortly with some possible meeting dates/times after I hear back from Zoning staff and Facilities & Environmental Services staff. Thanks for your patience, and I'll follow up ASAP - - - Tim Padalino, AICP Albemarle County I Community Development Dept. (434)-296-5832 x. 3088 From: John Anderson Sent: Monday, July 08, 2019 3:56 PM To: Craig Kotarski <craig,kotarski _timmons.com>; Tor! Kanellopoulos <vkanellopoulos@albemarle.org>; Tim Padalino <tpadalino@albemarle.ore>; Matthew Wentland <mwentland@albemarie.ore> Cc: Todd Marshall <tmarshall@uvafoundation.com>: ecruz@uvafoundation.com; Jonathan Showalter <Jonathan.Showalter@timmons,com>; Frank Pohl <fpohl@albemarle.ong> Subject: RE: UVA Research Park/Encompass Plans Craig, Thanks for your note. I am not involved with EH. With last week's digital re -submittal for 3 projects, Engineering portion of reviews for STJB201800171 (LC Dr Ext Road Plan), WP0201800073 (Road Plan WPO) and WPO201800091 (sewer ext.) plan reviews is nearly complete. I will try to attend any meetings scheduled this week, but have Wed-Thurs AM conflicts, and telework all day, tomorrow. Also, I will be away 18-30 Jul, unable to work or respond to email, and have a number of review commitments prior to 17-Jul. I regret any inconvenience, and hope to be available to meet this week. Thanks, best, J. Anderson 434.296-5832 -x3069 From: Craig Kotarski <Craig.Kota rski@timmons.com> Sent: Monday, July 08, 2019 12:10 PM To: Tor! Kanellopoulos <vkanellopoulos@albemarle.org>; Tim Padalino <tpadalino@albemarle.ore>; John Anderson <ianderson2@albemarle.ore>; Matthew Wentland <mwentland@albemarle.org> Cc: Todd Marshall <tarshall uvafoundation.com>; ecruz uvafoundation.com• Jonathan Showalter <Jonathan.Showalter@timmons.com>; Frank Pohl <fpohl@albemarle.ore> Subject: UVA Research Park/Encompass Plans Albemarle Co. Team, I am reaching out to schedule a meeting to discuss the best path forward, as related to the four projects that Timmons is working on at the UVA Research Park. The four projects are the Lewis & Clark Road Extension (LC), Sanitary Line Extenion (SL), Loop Road (LR) and Encompass Health (EH). There are several chicken and the egg type elements to all of these projects, but we have a way forward, that we want to discuss and ensure everyone agrees upon. It should be noted that the UVA Foundation wants to move forward, as fast as possible, with the subdivision plat, as that then allows them to sell the parcel to EH, which is a priority for them. To make this happen, we propose the following: • We will amend the current subdivision plat, so that the neither the new parcel associated with the LR or EH encroaches into the septic field associated with the fire station. 39 o Subdivision Plat can be approved* • The plans for LR will be updated to reflect that that portion of the road that encroaches into the drain field will not be installed until the sanitary line is installed, the fire station connected to it, and the drain field abandoned. o LR and EH site plans can be approved o Subdivision Plat can be updated (Boundary Line Adjustment) to incorporate the road. *There also was a comment on the EH plans about issues of proffers suggesting the Loop Road needs to be a public road. This is not inline with the proffers as the proffers reference the Internal Road Network Plan (Exhibit L), which does not show any public roads through this section of the Research Park. Furthermore, this was the interpretation for other areas of the Research Park, such as the parcels off of Hunterstand Court, where Hunterstand Court is the access road for several subdivided parcels and is not a VDOT road. I could meet to further discuss almost any time before noon this week, Tuesday — Friday. Would there be a time that would fit for you all? Best, Craig Craig Kotarski, P.E., LEED AP Principal TIMMONS GROUP I www.timmons.com 608 Preston Avenue, Suite 200 1 Charlottesville, VA 22903 Office: 434.327.1688 Fax: 434.295.8317 Mobile: 434.964.7148 craig.kotarskiAltimmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. 40 Toni Kanello oulos From: Matthew Wentland Sent Tuesday, July 9, 2019 2:28 PM To: Tim Padalino Cc: Tori Kanellopoulos; John Anderson Subject: UVA Encompass Tim, I expanded some on my ISP comments. I'm unfamiliar with the other plans or plats, but I'll try to get with John in case I'm out Friday. I. The UVa Research Park Loop Road VSMP and Road Plans will need to be approved and bonded before the Final Site Plan can be approved, or any plats using the LR as access/frontage. If the Loop Road is off the L&C extension, it (RP and VSMP) will need to be approved and bonded (bonded to at least where the LR comes off). The sanitary extension may need to be approved and bonded also (depending on location). All this is to ensure access can be provided to the proposed EH parcel and building. 2. The EH VSMP plans will need to be approved before Final Site Plan or plat approval. 41 Tor! Kanellopoulos From: Tim Padalino Sent: Tuesday, July 9, 2019 1:57 PM To: John Anderson; Craig Kotarski; Tori Kanellopoulos; Matthew Wentland; Steven Hoffmann; Shawn Maddox; Lea Brumfield Cc: Todd Marshall; ecruz@uvafoundation.com; Jonathan Showalter; Frank Pohl Subject: RE: UVA Research Park/Encompass Plans Hello Craig, Jonathan, Todd, and Elise, I've coordinated with other County staff and it looks like (almost) all of us are available to meet this Friday from 10:00 — 11:00.1 have reserved Room 214 in the CDD offices while we wait for your confirmation. Please let us know if this date/time works; if not, we'll look further out on the calendar. Thanks in advance - - - Tim Padalino, AICP Albemarle County I Community Development Dept. (434)-296-5832 x. 3088 From: Tim Padalino Sent: Monday, July 08, 2019 4:00 FIM To: John Anderson <janderson2@albemarle.org>; Craig Kotarski <craig.kotarski@timmons.com>; Tod Kanellopoulos <vkanellopoulos@albemarle.org>; Matthew Wentland <mwentland@albemarle.org> Cc: Todd Marshall <tmarshall@uvafoundation.com>; ecruz@uvafoundation.com; Jonathan Showalter <Jonathan.Showalter@timmons.com>; Frank Pohl <fpohl@albemarle.org> Subject: RE: UVA Research Park/Encompass Plans Yes: thank you, Craig, for suggesting that we pull together all involved reviewers and look at these numerous projects comprehensively. And thank you, John, for providing your availability. I'm currently communicating with a flew other County staff members who should attend such a meeting, and I will follow up shortly with some possible meeting dates/times after I hear back from Zoning staff and Facilities & Environmental Services staff. Thanks for your patience, and I'll follow up ASAP - - Tim Padalino, AICP Albemarle County y Community Development Dept. (434)-296-5832 x. 3088 From: John Anderson Sent: Monday, July 08, 2019 3:56 PM 42 To: Craig Kotarski <craig.kotarski@timmons.com>; Tori Kanellopoulos <vkanello oulos albemarle.or >; Tim Padalino <tpadalino@albemarle.org>; Matthew Wentland <mwentiand albemarle.or > Cc: Todd Marshall <tmarshall@uvafoundation.com>; ecruz@uvafoundation.com: Jonathan Showalter <Jonathan.Showalter timmons.com>; Frank Pohl <fpohl@albemarle.org> Subject: RE: UVA Research Park/Encompass Plans Craig, Thanks for your note. I am not involved with EH. With last week's digital re -submittal for 3 projects, Engineering portion of reviews for SUB201800171 (LC Dr Ext Road Plan), WPO201800073 (Road Plan WPO) and WPO201800091 (sewer ext.) plan reviews is nearly complete. I will try to attend any meetings scheduled this week, but have Wed-Thurs AM conflicts, and telework all day, tomorrow. Also, I will be away 18-30 Jul, unable to work or respond to email, and have a number of review commitments prior to 17-Jul. I regret any inconvenience, and hope to be available to meet this week. Thanks, best, J. Anderson 434.296-5832 -0069 From: Craig Kotarski <Craig.Kotarski@timmons.com> Sent: Monday, July 08, 201912:10 PM To: Tor! Kanellopoulos <vkanello oulos albemarle.or >; Tim Padalino <ttDadalino@albemarle.org>; John Anderson <ianderson2@albemarle.ore>; Matthew Wentland <mwentiand@albemarle.org> Cc: Todd Marshall <tarshall@uvafoundation.com>; ecruz@uvafoundation.com: Jonathan Showalter <Jonathan.Showalter timmons.com>; Frank Pohl <fpohl@albemarle.org> Subject: UVA Research Park/Encompass Plans Albemarle Co. Team, I am reaching out to schedule a meeting to discuss the best path forward, as related to the four projects that Timmons is working on at the UVA Research Park. The four projects are the Lewis & Clark Road Extension (LC), Sanitary Line Extenion (SL), Loop Road (LR) and Encompass Health (EH). There are several chicken and the egg type elements to all of these projects, but we have a way forward, that we want to discuss and ensure everyone agrees upon. It should be noted that the UVA Foundation wants to move forward, as fast as possible, with the subdivision plat, as that then allows them to sell the parcel to EH, which is a priority for them. To make this happen, we propose the following: + We will amend the current subdivision plat, so that the neither the new parcel associated with the LR or EH encroaches into the septic field associated with the fire station. o Subdivision Plat can be approved* • The plans for LR will be updated to reflect that that portion of the road that encroaches into the drain field will not be installed until the sanitary line is installed, the fire station connected to it, and the drain field abandoned. o LR and EH site plans can be approved o Subdivision Plat can be updated (Boundary Line Adjustment) to incorporate the road. *There also was a comment on the EH plans about issues of proffers suggesting the Loop Road needs to be a public road. This is not inline with the proffers as the proffers reference the Internal Road Network Plan (Exhibit L), which does not show any public roads through this section of the Research Park. Furthermore, this was the interpretation for other areas of the Research Park, such as the parcels off of Hunterstand Court, where Hunterstand Court is the access road for several subdivided parcels and is not a VDOT road. I could meet to further discuss almost anytime before noon this week, Tuesday— Friday. Would there be a time that would fit for you all? 43 Best, Craig Craig Kotarski, P.E., LEED AP Principal TIMMONS GROUP i www.timmons.com 608 Preston Avenue, Suite 200 j Charlottesville, VA 22903 Office:434.327.1688 Fax:434.295.8317 Mobile: 434.964.7148 crai .kotarski timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. 44 Tori Kanellopoulos From: Andrew Allison <Andrew.Allison@timmons.com> Sent: Tuesday, July 9, 2019 12:44 PM To: Kevin McCollum Cc: John Hash; Tor! Kanellopoulos Subject RE: SDP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination Kevin, Thank you for the update and this is great news! We don't anticipate any changes to this number or calculation but will reach out if needed. Best, Andrew Allison Project Engineer 111 TIMMONS GROUP J www.timmons.com 608 Preston Ave, Suite 200 J Charlottesville, VA 22903 Office: 434.327.1683 j Fax 434.295.8317 Mobile: 704.941.4097 Andrew.Allison@timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. From: Kevin McCollum <kmccollum@albemarle.org> Sent: Tuesday, July 9, 201910:11 AM To: Andrew Allison <Andrew.AlIison@timmons.com>; Tor! Kanellopoulos <vkanellopoulos@albemarle.org> Cc: John Hash <John.Hash@timmons.com> Subject: RE: SDP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination H! All, Zoning has no objection and approves the applicant's proposed parking minimum of 160 spaces. Explanation: In accordance with Section 4.12.6 of the Zoning Ordinance the Zoning Administrator has final say over the total required parking spaces for a hospital. Given that Encompass Health operates 131 physical rehabilitation hospitals across the United States (see letter titled "RE: UVA Encompass Health Rehabilitation Hospital Parking Requirements" dated July 3, 2018) and has an understanding of the parking demand these types of facilities generate, Zoning has no problem with their proposed calculation of 80 beds equaling 160 required parking spaces. If this number or calculation significantly changes Zoning asks that the applicant re -submit a parking request for Zoning approval. Let me know if you have questions. KvtriA+. MtCoUAww Planner, Zoning 45 Albemarle County Community Development kmccollum@albemarle.org 434-296-5832 x 3141 From: Andrew Allison <Andrew.Allison@timmons.com> Sent: Monday, July 08, 20191:19 PM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org>; Kevin McCollum <kmccollum@albemarle.org> Cc: John Hash <John.Hash timmons.com> Subject: RE: SDP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination Tori/Kevin, Encompass provided us with the attached letter for your use and review. Please let me know if this is enough information to qualify as a parking study. If not, I can circle back and obtain more data as necessary. Thank you! Andrew Allison Project Engineer 111 TIMMONS GROUP j www.timmons.com 608 Preston Ave, Suite 200 1 Charlottesville, VA 22903 Office: 434.327.1683 Fax 434.295.8317 Mobile: 704.941.4097 And rew.Allison timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. From: Tori Kanellopoulos <vkanell000ulos@albemarle.org> Sent: Thursday, June 27, 2019 11:49 AM To: Kevin McCollum <kmccolium albemarle.or >; Andrew Allison <Andrew.AlI!son timmons.com> Cc: John Hash <John.Hash timmons.com> Subject: RE: SDP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination Hi All, Thank you, Kevin! This just needs to be done before the final site plan, so no rush. We don't expect any significant changes in parking needed — it's just a requirement of the Zoning Ordinance. Best, Tori From: Kevin McCollum Sent: Thursday, June 27, ZU19 11:42 AM To: Andrew.Allison@timmons.com; Tori Kanellopoulos <vkanellogoulos@albemarle.org>; Bart Svoboda <bsvoboda@albemarle.org>; Francis MacCall <FMACCALL albemarle.or > Cc: John.Hash@tirrmons.com Subject: FW: SDP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination 46 Good Morning Andrew, I'd be happy to make a determination regarding the required number of spaces for the Rehab Hospital. As 4.12.6 indicates you will need to send me a "parking study" that justifies the number of parking spaces you are proposing. Basically, what I need is some information that explains how you came up with the number of spaces whether it is Industry standards, number of employees, proposed number of patients, etc. I just need some way to confirm what you are proposing is adequate. As for a determination request, I think your email shall suffice. Once I receive the parking study J can make my determination and attach it as Zoning Review Comments on the Site Plan. These review comments will in essence be a Zoning Administrator determination of the parking requirements. Feel free to send me any parking related documents by email and let me know if you have questions! From 4.12.6 Parking Requirements Hospital: The number of proposed spaces shall be shown in a parking study submitted by the hospital. The number of required spaces shall be determined by the zoning administrator. In making the determination, the zoning administrator shall consider the recommendations in the parking study, traffic generation figures either known to the industry or estimated by the Institute of Transportation Engineers, peak parking demands, and other relevant information. (Amended 2- 5-03). Also, I will be out all next week on vacation, so if it is urgent I could certainly get someone else to review it next week. I'm not familiar with this site plan or its deadlines. Kwiw McCoU,u.►w Planner, Zoning Albemarle County Community Development kmccollum albemarle.or 434-296-5832 x 3141 From: Bart Svoboda Sent: Tuesday, June 25, 2019 12:19 PM To: Francis MacCall <FMACCALL@albemarle.org>; Kevin McCollum <kmccollum@albemarle.ore> Subject: FW: SDP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination fy! From: Andrew Allison <Andrew.Allison timmons.com> Sent: Tuesday, June 25, 2019 12:03 PM To: Bart Svoboda <bsvoboda@a!bemarle.org>; Tor! Kanellopoulos <vkanellopoulos@albemarle.orQ> Cc: John Hash <John.Hash @timmons.com> Subject: SDP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination Ba rt/Tori, Following up on a comment received referencing Section 18-4.12.6 on the Parking requirements for the proposed UVA Encompass Rehabilitation Hospital. At this time we have proposed 70 beds with a future expansion to include 10 47 additional beds (80 beds total). Our first initial site plan submission provided 128 regular spaces with 32 ADA spaces (10 van spaces). I would like to formally request a determination be made for the required number of parking spaces associated with this public use hospital. Please let me know if you require a formal letter or any other documentation to issue a determination. Thank you, Andrew Allison Project Engineer iil TIMMONS GROUP I www.timmons.com 608 Preston Ave, Suite 200 1 Charlottesville, VA 22903 Office: 434.327.1683 j Fax 434.295.8317 Mobile: 704.941.4097 1 Andrew.Allisonc@—timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. 48 Tori Kanellopoulos From: Kevin McCollum Sent Tuesday, July 9, 2019 10:11 AM To: Andrew Allison; Tori Kanellopoulos cc: John Hash Subject RE: SDP201900023 UVA Encompass Rehab Hospital Parking Requirement Determination Hi All, Zoning has no objection and approves the applicant's proposed parking minimum of 160 spaces. Explanation: In accordance with Section 4.12.6 of the Zoning Ordinance the Zoning Administrator has final say over the total required parking spaces for a hospital. Given that Encompass Health operates 131 physical rehabilitation hospitals across the United States (see letter titled "RE: UVA Encompass Health Rehabilitation Hospital Parking Requirements" dated July 3, 2018) and has an understanding of the parking demand these types of facilities generate, Zoning has no problem with their proposed calculation of 80 beds equaling 160 required parking spaces. if this number or calculation significantly changes Zoning asks that the applicant re -submit a parking request for Zoning approval. Let me know if you have questions. Kwi#+. McCoU.u.wi. Planner, Zoning Albemarle County Community Development kmccollum@albemarle.ore 434-296-5832 x 3141 From: Andrew Allison <Andrew.Allison@timmons.com> Sent: Monday, July 08, 2019 1:19 PM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org>; Kevin McCollum <kmccollum@albemarle.org> Cc: John Hash <John.Hash @timmons.com> Subject: RE: SDP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination Tori/Kevin, Encompass provided us with the attached letter for your use and review. Please let me know if this is enough information to qualify as a parking study. If not, I can circle back and obtain more data as necessary. Thank yowl Andrew Allison Project Engineer 111 TIMMONS GROUP J www.timmons.com 608 Preston Ave, Suite 200 1 Charlottesville, VA 22903 49 Office: 434.327.1683 Fax 434.295.831 7 Mobile: 704.941.4097 Andrew.Allison@timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. From: Tor! Kanellopoulos <vkanello oulos albemarle.or > Sent: Thursday, June 27, 201911:49 AM To: Kevin McCallum <kmccollum aibemarle.or >; Andrew Allison <Andrew.Allison@timmons.com> Cc: John Hash <John.Hash timmons.com> Subject: RE: SDP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination Hi All, Thank you, Kevin! This just needs to be done before the final site plan, so no rush. We don't expect any significant changes in parking needed it's just a requirement of the Zoning Ordinance. Best, Tori From: Kevin McCollum Sent: Thursday, June 27, zU19 11:42 AM To: Andrew.Allison timmons.com• Tori Kanellopoulos <vkaneilopoulos@albemarie.org>; Bart Svoboda <bsvoboda@albemarle.org>; Francis MacCall <FMACCALL albemarle.or > Cc: John. Hash @tirnmons.com Subject: FW: SDP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination Good Morning Andrew, I'd be happy to make a determination regarding the required number of spaces for the Rehab Hospital. As 4.12.6 indicates you will need to send me a "parking study" that justifies the number of parking spaces you are proposing. Basically, what I need is some information that explains how you came up with the number of spaces whether it is industry standards, number of employees, proposed number of patients, etc. I just need some way to confirm what you are proposing is adequate. As for a determination request, I think your email shall suffice. Once I receive the parking study I can make my determination and attach it as Zoning Review Comments on the Site Plan. These review comments will in essence be a Zoning Administrator determination of the parking requirements. Feel free to send me any parking related documents by email and let me know if you have questions! From 4.12.6 Parking Requirements Hospital: The number of proposed spaces shall be shown in a parking study submitted by the hospital. The number of required spaces shall be determined by the zoning administrator. In making the determination, the zoning administrator shall consider the recommendations in the parking study, traffic generation figures either known to the industry or estimated by the Institute of Transportation Engineers, peak parking demands, and other relevant information. (Amended 2- 5-03). Also, I will be out all next week on vacation, so if it is urgent I could certainly get someone else to review it next week. I'm not familiar with this site plan or its deadlines. so KenriA+-1 McloU.u.w,. Planner, Zoning Albemarle County Community Development kmccollumC@albemarle.org 434-296-5832 x 3141 From: Bart Svoboda Sent: Tuesday, June 25, 2019 12:19 PM To: Francis MacCall <FMACCALL@albemarle.org>; Kevin McCollum <kmccollum@albemarle.ore> Subject: FW: SDP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination fyi From: Andrew Allison <Andrew.AlI!son @timmons.com> Sent: Tuesday, June 25, 2019 12:03 PM To: Bart Svoboda <bsvoboda albemarle.or >; Tor! Kanellopoulos <vkanellopoulos@albemarle.org> Cc: John Hash <John.Hash@timmons.com> Subject: SDP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination Ba rt/Tori, Following up on a comment received referencing Section 18-4.12.6 on the Parking requirements for the proposed UVA Encompass Rehabilitation Hospital. At this time we have proposed 70 beds with a future expansion to include 10 additional beds (80 beds total). Our first initial site plan submission provided 128 regular spaces with 32 ADA spaces (10 van spaces). I would like to formally request a determination be made for the required number of parking spaces associated with this public use hospital. Please let me know if you require a formal letter or any other documentation to issue a determination. Thank you, Andrew Allison Project Engineer IN TIMMONS GROUP I www.timmons.com 608 Preston Ave, Suite 200 J Charlottesville, VA 22903 Office: 434.327.1683 Fax 434.295.8317 Mobile:704.941.4097 Andrew. AlIison[rD_timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. 51 Tori Kanellopoulos From: Kevin McCollum Sent: Tuesday, July 9, 2019 10:06 AM To: Tori Kanellopoulos Subject: RE: UVA Encompass Rehab Hospital Ok, will do. From: Tor! Kanellopoulos Sent: Tuesday, July 09, 2019 1U:ub AM To: Kevin McCollum <kmccollum@albemarle.org> Subject: RE: UVA Encompass Rehab Hospital That would be great if you could send them to the applicant, if you don't mind! Mostly because there are so many steps before final site plan, so I'd rather them have it now. Thanks! ! From: Kevin McCollum Sent: Tuesday, July 9, 201910:02 AM To: Tori Kanellopoulos <vkanellopoulos@albemarle.ore> Subject: RE: UVA Encompass Rehab Hospital I have not. I figured you could just attach my comments when you send out your next review comments. But, I can if that works best. Kevin From: Tori Kanellopoulos Sent: Tuesday, July 09, 201910:00 AM To: Kevin McCollum <kmccollum@albemarle.org> Subject: RE: UVA Encompass Rehab Hospital Hi Kevin, Great, thank you for doing that! As long as you've also sent a copy to the applicant, I think we're all set. Thanks! Tori From: Kevin McCollum Sent: Monday, July 8, 2019 2:24 PM To: Tori Kanellopoulos <vkanellopoulos@albemarle.or > Subject: UVA Encompass Rehab Hospital Tori, I have included a review for SDP201900023 in CountyView that shows Zoning's approval of their proposed parking requirement. Let me know if you need anything more. 57 Thanks, Kwi.... Mc!.o��. Planner, Zoning Albemarle County Community Development kmccollum@albemarle.org 434-296-5832 x 3141 53 Tori Kanellopoulos From: Kevin McCollum Sent: Tuesday, July 9, 2019 10:02 AM To: Tori Kanellopoulos Subject: RE: UVA Encompass Rehab Hospital I have not. i figured you could just attach my comments when you send out your next review comments. But, I can if that works best. Kevin From: Tori Kanellopoulos Sent: Tuesday, July 09, 2019 10:00 AM To: Kevin McCollum <kmccollum@albemarle.org> Subject: RE: UVA Encompass Rehab Hospital Hi Kevin, Great, thank you for doing that! As long as you've also sent a copy to the applicant,' think we're all set. Thanks! Tori From: Kevin McCollum Sent: Monday, July 8, 2019 2:24 Pm To: Tori Kanellopoulos <vkanello oulos albemarle.or > Subject: UVA Encompass Rehab Hospital Tori, I have included a review for SDP201900023 in CountyView that shows Zoning's approval of their proposed parking requirement. Let me know if you need anything more. Thanks, Kw�w McCoU04W Planner, Zoning Albemarle County Community Development kmccollum@albemarle.org 434-296-5832 x 3141 54 Tori Kanellopoulos From: Tori Kanellopoulos Sent Tuesday, July 9, 2019 10:00 AM To: Kevin McCollum Subject: RE: UVA Encompass Rehab Hospital Hi Kevin, Great, thank you for doing that! As long as you've also sent a copy to the applicant, I think we're all set. Thanks! Tori From: Kevin McCollum Sent: Monday, July 8, 2019 2:24 PM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Subject: UVA Encompass Rehab Hospital Tori, I have included a review for SDP201900023 in CountyView that shows Zoning's approval of their proposed parking requirement. Let me know if you need anything more. Thanks, Kwi.... McCoLLwwv Planner, Zoning Albemarle County Community Development kmccollum@albemarle.ore 434-296-5832 x 3141 55 Tori Kanellopoulos From: Tim Padalino Sent: Monday, July 8, 2019 4:00 PM To: John Anderson; Craig Kotarski; Tori Kanellopoulos; Matthew Wentland Cc: Todd Marshall; ecruz@uvafoundation.com; Jonathan Showalter; Frank Pohl Subject: RE: UVA Research Park/Encompass Plans Yes: thank you, Craig, for suggesting that we pull together all involved reviewers and look at these numerous projects comprehensively. And thank you, John, for providing your availability. I'm currently communicating with a few other County staff members who should attend such a meeting, and I will follow up shortly with some possible meeting dates/times after - hear back from Zoning staff and Facilities & Environmental Services staff. Thanks for your patience, and I'll follow up ASAP - Tim Padalino, AICP Albemarle County i Community Development Dept. (434)-296-5832 x. 3088 From: John Anderson Sent: Monday, July 08, 2019 3:56 PM To: Craig Kotarski <craig.kotarski@timmons.com>; Tor! Kanellopoulos <vkanellopoulos@albemarle.org>; Tim Padalino <tpadalino@albemarle.org>; Matthew Wentland <mwentland@albemarle.org> Cc: Todd Marshall <tmarshall@uvafoundation.com>; ecruz@uvafoundation.com; Jonathan Showalter <Jonathan.Showalter@timmons.com>; Frank Pohl <fpohl@albemarle.org> Subject: RE: UVA Research Park/Encompass Plans Craig, Thanks for your note. I am not involved with EH. With last week's digital re -submittal for 3 projects, Engineering portion of reviews for SUB201800171 (LC Dr Ext Road Plan), WP0201800073 (Road Plan WPO) and WP0201800091 (sewer ext.) plan reviews is nearly complete. I will try to attend any meetings scheduled this week, but have Wed-Thurs AM conflicts, and telework all day, tomorrow. Also, I will be away 18-30 Jul, unable to work or respond to email, and have a number of review commitments prior to 17-Jul. I regret any inconvenience, and hope to be available to meet this week. Thanks, best, J. Anderson 434.296-5832 -0069 From: Craig Kotarski <Crai .Kotarski@timmons.com> Sent: Monday, July 08, 2019 12:10 PM To: Tori Kanellopoulos <vkanell000ulos@albemarle.ore>; Tim Padalino <toadalino@albemarle.org>; John Anderson <"anderson2 albemarle.or >; Matthew Wentland <mwentland albemarle.or > Cc: Todd Marshall <tmarshall@ uvafoundation.com>; ecruz uvafoundation.com; Jonathan Showalter <Jonathan.Showalter timmons.com>; Frank Pohl <fpohl@albemarle..org> Subject: UVA Research Park/Encompass Plans Albemarle Co. Team, 56 I am reaching out to schedule a meeting to discuss the best path forward, as related to the four projects that Timmons is working on at the UVA Research Park. The four projects are the Lewis & Clark Road Extension (LC), Sanitary Line Extenion (SL), Loop Road (LR) and Encompass Health (EH). There are several chicken and the egg type elements to all of these projects, but we have a way forward, that we want to discuss and ensure everyone agrees upon. It should be noted that the UVA Foundation wants to move forward, as fast as possible, with the subdivision plat, as that then allows them to sell the parcel to EH, which is a priority for them. To make this happen, we propose the following: • We will amend the current subdivision plat, so that the neither the new parcel associated with the LR or EH encroaches into the septic field associated with the fire station. o Subdivision Plat can be approved* • The plans for LR will be updated to reflect that that portion of the road that encroaches into the drain field will not be installed until the sanitary line is installed, the fire station connected to it, and the drain field abandoned. o LR and EH site plans can be approved o Subdivision Plat can be updated (Boundary Line Adjustment) to incorporate the road. *There also was a comment on the EH plans about issues of proffers suggesting the Loop Road needs to be a public road. This is not inline with the proffers as the proffers reference the Internal Road Network Plan (Exhibit L), which does not show any public roads through this section of the Research Park. Furthermore, this was the interpretation for other areas of the Research Park, such as the parcels off of Hunterstand Court, where Hunterstand Court is the access road for several subdivided parcels and is not a VDOT road. I could meet to further discuss almost anytime before noon this week, Tuesday— Friday. Would there be a time that would fit for you all? Best, Craig Craig Kotarski, P.E., LEED AP Principal TIMMONS GROUP I www.timmons.com 608 Preston Avenue, Suite 200 1 Charlottesville, VA 22903 Office: 434.327.1688 Fax: 434.295.8317 Mobile:434.964.7148 craig.kotarskiAtimmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. 57 Tor! Kanellopoulos From: John Anderson Sent: Monday, July 8, 2019 3:56 PM To: Craig Kotarski; Tori Kanellopoulos; Tim Padalino; Matthew Wentland Cc: Todd Marshall; ecruz@uvafoundation.com; Jonathan Showalter; Frank Pohl Subject: RE: UVA Research Park/Encompass Plans Craig, Thanks for your note. I am not involved with EH. With East week's digital re -submittal for 3 projects, Engineering portion of reviews for SUB201800171 (LC Dr Ext Road Plan), WPO201800073 (Road Plan WPO) and WPO201800091 (sewer ext.) plan reviews is nearly complete. I will try to attend any meetings scheduled this week, but have Wed-Thurs AEI conflicts, and telework all day, tomorrow. Also, I will be away 18-30 Jul, unable to work or respond to email, and have a number of review commitments prior to 17-Jul. I regret any inconvenience, and hope to be available to meet this week. Thanks, best, J. Anderson 434.296-5832 -0069 From: Craig Kotarski <Craig.Kotarski @timmons.com> Sent: Monday, July 08, 2019 12:10 PM To: Tor! Kanellopoulos <vkanellopoulos@albemarle.org>; Tim Padalino <tpadalino@albemarle.org>; John Anderson <janderson2@albemarle.org>; Matthew Wentland <mwentland@albemarle.org> Cc: Todd Marshall <tmarshali@uvafoundation.com>; ecruz@uvafoundation.com; Jonathan Showalter <Jonathan.Showalter@timmons.com>; Frank Pohl <fpohl@albemarle.org> Subject: UVA Research Park/Encompass Plans Albemarle Co. Team, I am reaching out to schedule a meeting to discuss the best path forward, as related to the four projects that Timmons is working on at the UVA Research Park. The four projects are the Lewis & Clark Road Extension (LC), Sanitary Line Extenion (SL), Loop Road (LR) and Encompass Health (EH). There are several chicken and the egg type elements to all of these projects, but we have a way forward, that we want to discuss and ensure everyone agrees upon. It should be noted that the UVA Foundation wants to move forward, as fast as possible, with the subdivision plat, as that then allows them to sell the parcel to EH, which is a priority for them. To make this happen, we propose the following: We will amend the current subdivision plat, so that the neither the new parcel associated with the LR or EH encroaches into the septic field associated with the fire station. o Subdivision Plat can be approved* The plans for LR will be updated to reflect that that portion of the road that encroaches into the drain field will not be installed until the sanitary line is installed, the fire station connected to it, and the drain field abandoned. o LR and EH site plans can be approved o Subdivision Plat can be updated (Boundary Line Adjustment) to incorporate the road. *There also was a comment on the EH plans about issues of proffers suggesting the Loop Road needs to be a public road. This is not inline with the proffers as the proffers reference the Internal Road Network Plan (Exhibit L), which does not show any public roads through this section of the Research Park. Furthermore, this was the interpretation for other areas of the Research Park, such as the parcels off of Hunterstand Court, where Hunterstand Court is the access road for several subdivided parcels and is not a VDOT road. 58 I could meet to further discuss almost any time before noon this week, Tuesday — Friday. Would there be a time that would fit for you all? Best, Craig Craig Kotarski, P.E., LEED AP Principal TIMMONS GROUP j www.timmons.com 608 Preston Avenue, Suite 200 1 Charlottesville, VA 22903 Office: 434.327.1688 1 Fax: 434.295.8317 Mobile: 434.964.7148 J crai4.kotarski@timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. 59 Tori Kanellopoulos From: Kevin McCollum Sent: Monday, July 8, 2019 2:24 PM To: Tori Kanellopoulos Subject: UVA Encompass Rehab Hospital Tori, I have included a review for SDP201900023 in CountyView that shows Zoning's approval of their proposed parking requirement. Let me know if you need anything more. Thanks, Kwi^, McCoUuww Planner, Zoning Albemarle County Community Development kmccollum@albemarle.org 434-296-5832 x 3141 60 Tori Kanellopoulos From: Kevin McCollum Sent: Monday, July 8, 2019 1.57 PM To: Andrew Allison; Tori Kanellopoulos Cc: John Hash Subject: RE: SDP201900023 UVA Encompass Rehab Hospital Parking Requirement Determination have looked over your parking requirements request and it appears that there is sufficient information for me to make a determination. Thank you. KuiAU McGoL(.uvw Planner, Zoning Albemarle County Community Development kmccoilum(&albemarle.ore 434-296-5832 x 3141 From: Andrew Allison <Andrew.Allison@timmons.com> Sent: Monday, July 08, 2019 1:19 PM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org>; Kevin McCollum <kmccollum@albemarle.org> Cc: John Hash <John.Hash @timmons.com> Subject: RE: SDP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination Tori/Kevin, Encompass provided us with the attached letter for your use and review. Please let me know if this is enough information to qualify as a parking study. If not, I can circle back and obtain more data as necessary. Thank you! Andrew Allison Project Engineer M TIMMONS GROUP I www.timmons.com 608 Preston Ave, Suite 200 1 Charlottesville, VA 22903 Office: 434.327.1683 Fax 434.295.8317 Mobile:704.941.4097 Andrew.AllisonCcD-timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. From: Tori Kanellopoulos <vkanellopoulos@albemarle.ore> Sent: Thursday, June 27, 2019 11:49 AM To: Kevin McCollum <kmccollumCcDalbemarle.org>; Andrew Allison <Andrew.Allison timmons.com> 61 Cc: John Hash <John.Hash timmons.com> Subject: RE: SDP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination Hi All, Thank you, Kevin! This just needs to be done before the final site plan, so no rush. We don't expect any significant changes in parking needed — it's just a requirement of the Zoning Ordinance. Best, Tori From: Kevin McCollum Sent: Thursday, June 27, 2019 11:42 AM To: And rew.Allison@timmons.comI Tori Kanellopoulos <vkanellopoulos@albemarle.ore>; Bart Svoboda <bsvoboda@albemarle.orjZ>; Francis MacCall <FMACCALL@albemarle.ore> Cc: John.Hash@timmons.com Subject: FW: SDP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination Good Morning Andrew, I'd be happy to make a determination regarding the required number of spaces for the Rehab Hospital. As 4.12.6 indicates you will need to send me a "parking study" that justifies the number of parking spaces you are proposing. Basically, what I need is some information that explains how you came up with the number of spaces whether it is industry standards, number of employees, proposed number of patients, etc. I just need some way to confirm what you are proposing is adequate. As for a determination request, I think your email shall suffice. Once I receive the parking study I can make my determination and attach it as Zoning Review Comments on the Site Plan. These review comments will in essence be a Zoning Administrator determination of the parking requirements. Feel free to send me any parking related documents by email and let me know if you have questions! From 4.12.6 Parking Requirements Hospital: The number of proposed spaces shall be shown in a parking study submitted by the hospital. The number of required spaces shall be determined by the zoning administrator. In making the determination, the zoning administrator shall consider the recommendations in the parking study, traffic generation figures either known to the industry or estimated by the Institute of Transportation Engineers, peak parking demands, and other relevant information. (Amended 2- 5-03). Also, i will be out all next week on vacation, so if it is urgent I could certainly get someone else to review it next week. I'm not familiar with this site plan or its deadlines. Kwiftl McCollwvw Planner, Zoning Albemarle County Community Development kmccollum@albemarle.org 434-296-5832 x 3141 62 From: Bart Svoboda Sent: Tuesday, June 25, 201912:19 PM To: Francis MacCall <FMACCALL albemarle.or >; Kevin McCollum <kmccollum@albemarle.ore> Subject: FW: SDP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination fyi From: Andrew Allison <Andrew.Ailison@timmons.com> Sent: Tuesday, June 25, 2019 12:03 PM To: Bart Svoboda <bsvoboda@albemarle.ore>, Tori Kanellopoulos <vkanellopoulos@albemarle.ore> Cc: John Hash <John.Hash timmons.com> Subject: SDP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination Bart/Tod, Following up on a comment received referencing Section 18-4.12.6 on the Parking requirements for the proposed UVA Encompass Rehabilitation Hospital. At this time we have proposed 70 beds with a future expansion to include 10 additional beds (80 beds total). Our first initial site plan submission provided 128 regular spaces with 32 ADA spaces (10 van spaces). I would like to formally request a determination be made for the required number of parking spaces associated with this public use hospital. Please let me know if you require a formal letter or any other documentation to issue a determination. Thank you, Andrew Allison Project Engineer 111 TIMMONS GROUP I www.timmons.com 608 Preston Ave, Suite 200 1 Charlottesville, VA 22903 Office: 434.327.1683 j Fax 434.296.8317 Mobile:704.941.4097 Andrew.Allison(M-timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. 63 Tod Kanellopoulos From: Andrew Allison <Andrew.Allison@timmons.com> Sent: Monday, July 8, 2019 1:19 PM To: Tori Kanellopoulos; Kevin McCollum Cc: John Hash Subject: RE: SDP201900023 UVA Encompass Rehab Hospital Parking Requirement Determination Attachments: 07.03.19 UVA-EH Parking Letter.pdf Tori/Kevin, Encompass provided us with the attached letter for your use and review. Please let me know if this is enough information to qualify as a parking study. If not, I can circle back and obtain more data as necessary. Thank you! Andrew Allison Project Engineer iil TIMMONS GROUP I www.timmons.com 608 Preston Ave, Suite 200 1 Charlottesville, VA 22903 Office: 434.327.1683 Fax 434.295.8317 Mobile:704.941.4097 Andrew.Allison(cDtimmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. From: Tor! Kanellopoulos <vkanellopoulos@albemarle.org> Sent: Thursday, June 27, 2019 11:49 AM To: Kevin McCollum <kmccollum@albemarle.org>; Andrew Allison <Andrew.Allison@timmons.com> Cc: John Hash <John.Hash@timmons.com> Subject: RE: SDP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination Hi All, Thank you, Kevin! This just needs to be done before the final site plan, so no rush. We don't expect any significant changes in parking needed — it's just a requirement of the Zoning Ordinance. Best, Tor! From: Kevin McCollum Sent: Thursday, June 27, 2019 11:42 AM To: Andrew.Allison(@timmons.com Tod Kanellopoulos <vkanellopoulos@albemarle.org>; Bart Svoboda <bsvoboda albemarle.or >; Francis MacCall <FMACCALL albemarle.or > Cc: John.Hash@timmons.com Subject: FW: SDP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination 64 Good Morning Andrew, I'd be happy to make a determination regarding the required number of spaces for the Rehab Hospital. As4.12.6 indicates you will need to send me a "parking study" that justifies the number of parking spaces you are proposing. Basically, what I need is some information that explains how you came up with the number of spaces whether it is industry standards, number of employees, proposed number of patients, etc. I just need some way to confirm what you are proposing is adequate. As fora determination request, I think your email shall suffice. Once I receive the parking study I can make my determination and attach it as Zoning Review Comments on the Site Plan. These review comments will in essence be a Zoning Administrator determination of the parking requirements. Feel free to send me any parking related documents by email and let me know if you have questions! From 4.12.6 Parking Requirements Hospital: The number of proposed spaces shall be shown in a parking study submitted by the hospital. The number of required spaces shall be determined by the zoning administrator. In making the determination, the zoning administrator shall consider the recommendations in the parking study, traffic generation figures either known to the industry or estimated by the Institute of Transportation Engineers, peak parking demands, and other relevant information. (Amended 2- 5-03). Also, I will be out all next week on vacation, so if it is urgent I could certainly get someone else to review it next week. I'm not familiar with this site plan or its deadlines. Kcviw McCo-U.uv� Planner, Zoning Albemarle County Community Development kmccollum@albemarle.org 434-296-5832 x 3141 From: Bart Svoboda Sent: Tuesday, June 25, 2019 12:19 PM To: Francis MacCall <FMACCA!_I-@albemarle.ore>; Kevin McCollum <kmccollum albemarle.or > Subject: FW: SDP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination fy1 From: Andrew Allison <Andrew.Allison@timmons.com> Sent: Tuesday, June 25, 201912:03 PM To: Bart Svoboda <bsvoboda@albemarle.org>; Tori Kanellopoulos <vkanello oulos albemarle.or > Cc: John Hash <John.Hash @timmons.com> Subject: SDP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination Bart/Tod, Following up on a comment received referencing Section 18-4.12.6 on the Parking requirements for the proposed UVA Encompass Rehabilitation Hospital. At this time we have proposed 70 beds with a future expansion to include 10 65 additional beds (80 beds total). Our first initial site plan submission provided 128 regular spaces with 32 ADA spaces (10 van spaces). would like to formally request a determination be made for the required number of parking spaces associated with this public use hospital. Please let me know if you require a formal letter or any other documentation to issue a determination. Thank you, Andrew Allison Project Engineer /it TIMMONS GROUP I www.timmons.com 608 Preston Ave, Suite 200 1 Charlottesville, VA 22903 Office: 434.327.1683 Fax 434.295.8317 Mobile: 704.941.4097 j Andrew.Allison@timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. 66 Tori Kanellopoulos From: Craig Kotarski <Craig.Kotarski@timmons.com> Sent: Monday, July 8, 2019 12:10 PM To: Tori Kanellopoulos; Tim Padalino; John Anderson; Matthew Wentland Cc: Todd Marshall; ecruz@uvafoundation.com; Jonathan Showalter, Frank Pohl Subject UVA Research Park/Encompass Plans Albemarle Co. Team, I am reaching out to schedule a meeting to discuss the best path forward, as related to the four projects that Timmons is working on at the UVA Research Park. The four projects are the Lewis & Clark Road Extension (LC), Sanitary Line Extenion (SL), Loop Road (LR) and Encompass Health (EH). There are several chicken and the egg type elements to all of these projects, but we have a way forward, that we want to discuss and ensure everyone agrees upon. It should be noted that the UVA Foundation wants to move forward, as fast as possible, with the subdivision plat, as that then allows them to sell the parcel to EH, which is a priority for them. To make this happen, we propose the following: • We will amend the current subdivision plat, so that the neither the new parcel associated with the LR or EH encroaches into the septic field associated with the fire station. o Subdivision Plat can be approved* • The plans for LR will be updated to reflect that that portion of the road that encroaches into the drain field will not be installed until the sanitary line is installed, the fire station connected to it, and the drain field abandoned. o LR and EH site plans can be approved o Subdivision Plat can be updated (Boundary Line Adjustment) to incorporate the road. *There also was a comment on the EH plans about issues of proffers suggesting the Loop Road needs to be a public road. This is not inline with the proffers as the proffers reference the Internal Road Network Plan (Exhibit L), which does not show any public roads through this section of the Research Park. Furthermore, this was the interpretation for other areas of the Research Park, such as the parcels off of Hunterstand Court, where Hunterstand Court is the access road for several subdivided parcels and is not a VDOT road. could meet to further discuss almost any time before noon this week, Tuesday — Friday. Would there be a time that would fit for you all? Best, Craig Craig Kotarski, P.E., LEED AP Principal TIMMONS GROUP I www.timmons.com 608 Preston Avenue, Suite 200 J Charlottesville, VA 22903 Office: 434.327.1688 j Fax: 434.295.8317 Mobile: 434.964.7148 1 craig.kotarskiCcD_timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. 67 Tori Kanello oulos From: Mann, Elizabeth <Elizabeth.Mann@encompasshealth.com> Sent: Monday, July 8, 2019 9:15 AM To: Tori Kanellopoulos Cc: John Hash; Todd Marshall Subject: RE: SDP2019-23 UVA Encompass Hello Tori, Please consider this email a request to defer the initial site plan review. We believe that the historical survey proffer will be completed by next week and we will resubmit at that time. Thank youl Elizabeth Mann From: Tori Kanellopoulos[maiito:vkanellopoulosC@albemarle.org] Sent: Monday, July 08, 2019 7:44 AM To: Mann, Elizabeth Cc: John Hash Subject: SDP2019-23 UVA Encompass **WARNING::This email originated outside Encompass Health::WARNING** DO NOT CLICK links or attachments unless you recognize the sender and know the content is safe. Hi Elizabeth and John, If you could please send me an email deferring the initial site plan, that would be very helpful. An action is due on this site plan ASAP. We can un-defer as soon as the historical survey proffer is completed, but I really do need to take an action on this. I just need an email saying you are deferring the site plan. Best, Tori Tori Kanellopoulos, AICP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 Confidentiality Notice: This e-mail communication and any attachments may contain confidential and privileged information for the use of the designated recipients named above. if you are not the intended recipient, you are hereby notified that you have received this communication in error and that any review, disclosure, dissemination, distribution or copying of it or its contents is prohibited. if you have received this communication in error, please notify me immediately by replying to this message and deleting it from your computer. Thank you. 68 Tori Kanello oulos From: Sent: To: Cc: Subject: Hi Elizabeth and John, Tori Kanellopoulos Monday, July 8, 2019 8:44 AM Elizabeth.Mann@encompassheaith.com John Hash 5DP2019-23 UVA Encompass If you could please send me an email deferring the initial site plan, that would be very helpful. An action is due on this site plan ASAP. We can un-defer as soon as the historical survey proffer is completed, but I really do need to take an action on this. I just need an email saying you are deferring the site plan. Best, Tori Tori Kanellopoulos, A1CP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 69 Tor! Kanellopoulos From: Todd Marshall <tarshall@uvafoundation.com> Sent: Monday, July 8, 2019 8:38 AM To: Tori Kanellopoulos Cc: ecruz@uvafoundation.com; John Hash; Mann, Elizabeth Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Hi Tori, Any questions re: the Encompass site plan should be directed to Elizabeth or Jahn. They will advise on any issues related to the site plan. That said, we should have the final report/info on the historical study this week to satisfy the proffer Todd From: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Sent: Monday, July 8, 2019 8:21 AM To: Todd Marshall <tmarshall@uvafoundation.com> Cc: Elise Cruz <ecruz@uvafoundation.com>; John Hash <John.Hash @timmons.com>; Mann, Elizabeth <Elizabeth.Mann @encompasshealth.com> Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Hi All, Please let me know if you will be deferring ASAP. If you do not defer, then we have to deny the site plan. If you defer, we can un-defer and approve the initial site plan as soon as the proffer is complete. Best, Tori From: Tori Kanellopoulos Sent: Tuesday, July 2, 2019 3:20 PM To: Todd Marshall <tmarshall@uvafoundation.com> Cc: ecruz uvafoundation.com• John Hash <John.Hash @timmons.com>; Mann, Elizabeth <Elizabeth.Mann Pencom asshealth.com> Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Hi All, I just confirmed with Zoning, and you will need to defer the initial site plan until the proffer has been met (VCRIS has been updated). Please send me an email confirming your deferral. We can un-defer and approve the initial as soon as this is complete. Given that there is the CCP to be done before the final, this should not delay moving forward. Best, Tori From: Todd Marshall <tmarshali@uvafoundation.com> Sent: Monday, July 1, 2019 10:14 AM 70 To: Tori Kanellopoulos <vkanell000ulos@albemarle.oro Cc: ecruz uvafoundation.com; John Hash <John.Hash @timmons.com>; Mann, Elizabeth <Elizabeth.Mann @encom Passhealth.com> Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Thanks Tori. This is not a UVAF site plan submission, It's from Encompass Health. I've copied them for info since If they want to defer they would have to be the one to make that request. John/Elizabeth, see below. Todd From: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Sent: Friday, June 28, 2019 3:00 PM To: Todd Marshall <tmarshall uvafoundation.com> Cc: Elise Cruz <ecruz@uvafoundation.com> Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Hi Todd, Thank you for the update. I just checked with Planning staff, and you can defer the initial site plan for a specific amount of time. The maximum is 6 months, but of course you need much less than that. I recommend deferring (maybe a month, just to give plenty of time), since you can always un-defer as soon as the VCRIS work is completed and the proffer is met. I can send you the action letter as soon as that's done. Given that you still need the CCP before the final plan, I don't think deferring for a few weeks holds anything up. I just need in writing that you are deferring the initial plan. Thanks! Tori 71 Tori Kanellopoulos From: Tori Kanellopoulos Sent: Monday, July 8, 2019 8:21 AM To: Todd Marshall Cc: ecruz@uvafoundation.com; John Hash; Mann, Elizabeth Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Hi All, Please let me know if you will be deferring ASAP. If you do not defer, then we have to deny the site plan. If you defer, we can un-defer and approve the initial site plan as soon as the proffer is complete. Best, Tori From: Tori Kanellopoulos Sent: Tuesday, July 2, 2019 3:20 PM To: Todd Marshall <tmarshall@uvafoundation.com> Cc: ecruz@uvafoundation.com; John Hash <John.Hash@timmons.com>; Mann, Elizabeth <Elizabeth.Mann@encompasshealth.com> Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Hi All, I just confirmed with Zoning, and you will need to defer the initial site plan until the proffer has been met (VCRIS has been updated). Please send me an email confirming your deferral. We can un-defer and approve the initial as soon as this is complete. Given that there is the CCP to be done before the final, this should not delay moving forward. Best, Tori From: Todd Marshall <tmarshall uvafoundation.com> Sent: Monday, July 1, 2019 10:14 AM To: Tori Kanellopoulos <vkanello oulos albemarle.or > Cc: ecruz uvafoundation.com• John Hash <John.Hash @timmons.com>; Mann, Elizabeth <Elizabeth.Mann encom asshealth.com> Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Thanks Tori. This is not a UVAF site plan submission, it's from Encompass Health. I've copied them for info since if they want to defer they would have to be the one to make that request. John/Elizabeth, see below. Todd From: Tori Kanellopoulos <vkanellopoulos@albemarle.00r > Sent: Friday, June 28, 2019 3:00 PM 72 To: Todd Marshall <tmarshall@uvafoundation.com> Cc: Elise Cruz <ecruz(@uvafoundation.com> Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Hi Todd, Thank you for the update. I just checked with Planning staff, and you can defer the initial site plan for a specific amount of time. The maximum is 6 months, but of course you need much less than that. I recommend deferring (maybe a month, just to give plenty of time), since you can always un-defer as soon as the VCRIS work is completed and the proffer is met. I can send you the action letter as soon as that's done. Given that you still need the CCP before the final plan, I don't think deferring for a few weeks holds anything up. 1 just need in writing that you are deferring the initial plan. Thanks! Tor! 73 Tori Kanellopoulos From: Tori Kanellopoulos Sent: Tuesday, July 2, 2019 11:39 AM To: Scott Collins Subject: RE: SDP2019-32 and SUB2019-86 Lochlyn Hills Attachments: SDP2019-32 Health Rev Comments.doc Hi Scott, Attached are Health Department comments I just received. I still do not have Engineering, F/R, or VDOT comments, unfortunately. However I have emailed the reviewers (David James, Shawn Maddox, Adam Moore) to let them know they should send review comments directly to you and cc me, since I will be out tomorrow. Megan will make sure someone from Planning covers my comments, and hopefully David/Shawn/Adam will all be at SRC. It looks like a fairly full schedule, so I expect they will be. Best, Tori From: Scott Collins <scott@collins-engineering.com> Sent: Friday, June 28, 20191:01 PM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Subject: RE: SDP2019-32 and SUB2019-86 Lochlyn Hills Thanks Tori. Hope you have a good vacation. Scott From: Tori Kanellopoulos <vkanello oulos albemarle.or > Sent: Friday, June 28, 201912:59 PM To: Scott Collins <scott collins-en ineerin .com> Subject: SDP2019-32 and SUB2019-86 Lochlyn Hills Hi Scott, My name is Tori, and I am the lead reviewer for SDP2019-32 and SUB2019-86 Lochlyn Hills initial plan and preliminary plat. SRC is next Wednesday, July 3Id. I wanted to let you know that I will be out of the office July 3-5, so another colleague (likely Chris Perez or Megan Nedostup) will cover these items for me at the meeting. I've mostly completed my review, and I don't see any significant review comments, so hopefully the Planner covering the meeting for me is able to answer any Planning questions you may have. I will send you my Planning review comments today, and send the rest once I have them. if any reviewers do not get their comments to me before I go on vacation, r will have them send them directly to you. Best, Tori Tori Kanellopoulos, AICP Candidate Planner 74 Community Development Department Phone: 434-296-5532 ext. 3270 75 Tori Kanellopoulos From: Todd Marshall <tarshall@uvafoundation.com> Sent: Monday, July 1, 2019 10:14 AM To: Tori Kanellopoulos Cc: ecruz@uvafoundation.com; John Hash; Mann, Elizabeth Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Thanks Tori. This is not a UVAF site plan submission, it's from Encompass Health. I've copied them for info since if they want to defer they would have to be the one to make that request. John/Elizabeth, see below. Todd From: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Sent: Friday, June 28, 2019 3:00 PM To: Todd Marshall <tmarshall@uvafoundation.com> Cc: Elise Cruz <ecru z@ uvafoundation.com> Subject: RE: SDP2019-23 UVA Encompass Health Proffer IX Hi Todd, Thank you for the update. I just checked with Planning staff, and you can defer the initial site plan for a specific amount of time. The maximum is 6 months, but of course you need much less than that. I recommend deferring (maybe a month, just to give plenty of time), since you can always un-defer as soon as the VCRIS work is completed and the proffer is met. i can send you the action letter as soon as that's done. Given that you still need the CCP before the final plan, I don't think deferring for a few weeks holds anything up. I just need in writing that you are deferring the initial plan. Thanks! Tori 76 Tori Kanellopoulos From: Kevin McCollum Sent: Thursday, June 27, 2019 11:42 AM To: Andrew.Allison@timmons.com; Tod Kanellopoulos; Bart Svoboda; Francis MacCall Cr. John.Hash@timmons.com Subject: FW: SDP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination Good Morning Andrew, I'd be happy to make a determination regarding the required number of spaces for the Rehab Hospital. As 4.12.6 indicates you will need to send me a "parking study" that justifies the number of parking spaces you are proposing. Basically, what I need is some information that explains how you came up with the number of spaces whether it is industry standards, number of employees, proposed number of patients, etc. I just need some way to confirm what you are proposing is adequate. As for a determination request, I think your email shall suffice. Once I receive the parking study I can make my determination and attach it as Zoning Review Comments on the Site Plan. These review comments will in essence be a Zoning Administrator determination of the parking requirements. Feel free to send me any parking related documents by email and let me know if you have questions! From 4.12.6 Parking Requirements Hospital: The number of proposed spaces shall be shown in a parking study submitted by the hospital. The number of required spaces shall be determined by the zoning administrator. In making the determination, the zoning administrator shall consider the recommendations in the parking study, traffic generation figures either known to the industry or estimated by the Institute of Transportation Engineers, peak parking demands, and other relevant information. (Amended 2- 5-03). Also, i will be out all next week on vacation, so if it is urgent I could certainly get someone else to review it next week. I'm not familiar with this site plan or its deadlines. Kw.L... MCC&UAAwW Planner, Zoning Albemarle County Community Development kmccollumoalbemarle.ore 434-296-5832 x 3141 From: Bart Svoboda Sent: Tuesday, June 25, 2019 12:19 PM To: Francis MacCall <FMACCALL@albemarle.org>; Kevin McCollum <kmccollum@albemarle.org> Subject: FW: 5DP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination fyi 77 From: Andrew Allison <Andrew.Allison@timmons.com> Sent: Tuesday, June 25, 2019 12:03 PM To: Bart Svoboda <bsvoboda@albemarle.org>; Tori Kanellopoulos <vkaneilopoulos@albemarle.org> Cc: John Hash <John.Hash @timmons.com> Subject: SDP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination Bart/Tor!, Following up on a comment received referencing Section 18-4.12.6 on the Parking requirements for the proposed UVA Encompass Rehabilitation Hospital. At this time we have proposed 70 beds with a future expansion to include 10 additional beds (80 beds total). Our first initial site plan submission provided 128 regular spaces with 32 ADA spaces (10 van spaces). I would like to formally request a determination be made for the required number of parking spaces associated with this public use hospital. Please let me know if you require a formal letter or any other documentation to issue a determination. Thank you, Andrew Allison Project Engineer iii TIMMONS GROUP ! www.timmons.com 608 Preston Ave, Suite 200 1 Charlottesville, VA 22903 Office: 434.327.1683 Fax 434.295.8317 Mobile: 704.941.4097 Andrew.Allison timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. 78 Tor! Kanellopoulos From: Rebecca Ragsdale Sent Thursday, June 27, 2019 10:27 AM To: Tim Padalino; Bart Svoboda; Francis MacCall; Tori Kanellopoulos Subject: Re: Legal Agenda today I'm out of the office today. We had this on legal last week but I haven't caught up with you and Tori since then. We sort of brainstormed what we needed to discuss in a broader internal meeting with other county staff. think we need to decide who needs to attend and who will work to get that set up. From: Tim Padalino Sent: Thursday, June 27, 2019 10:22:15 AM To: Bart Svoboda; Rebecca Ragsdale; Francis MacCall; Tori Kanellopoulos Subject: Legal Agenda today Hello Bart, Francis, Rebecca, and Tori --- Just wanted to let you know I've added an agenda item to the Legal Agenda meeting this afternoon that you might want to participate in. It's a question about the proffers for the UVA Research Park ZMA that we discussed last week, particularly relating to proffer Vlll ("Fire Station"). You may already be planning to go, but I wanted to bring this to your attention and hope that this Legal Agenda meeting can help move things forward (as it relates to coordination with other County Departments/officials, as well as how it relates to the review of ongoing applications). Legal Agenda link: https://ia2010.albemarle.org/CDD/Lists/Legal%2OAeenda/ScheduleDateTime.aspx?lnitialTabld=Ribbon%2EListitem&Visi bilityContext=WSSTabPersistence Tim Padalino, AICP Senior Planner I Community Development Department County of Albemarle, Virginia httos://www.albemarle.ora/deDartment.asD?department=cdd (434)-296-5832 x. 3088 79 Tori Kanello oulos From: Tim Padalino Sent: Thursday, June 27, 2019 10:22 AM To: Bart Svoboda; Rebecca Ragsdale; Francis MacCall; Tori Kanellopoulos Subject: Legal Agenda today Hello Bart, Francis, Rebecca, and Tori - Just wanted to let you. know I've added an agenda item to the Legal Agenda meeting this afternoon that you might want to participate in. It's a question about the proffers for the UVA Research Park ZMA that we discussed last week, particularly relating to proffer VIII ("Fire Station"). You may already be planning to go, but I wanted to bring this to your attention and hope that this Legal Agenda meeting can help move things forward (as it relates to coordination with other County Departments/officials, as well as how it relates to the review of ongoing applications). Legal Agenda link: htt s: ia2010.albemarle.or CDD Lists Le al%20A enda ScheduleDateTime.as x?lnitialTabld=Ribbon%2EListitem&Visi bilitvContext=WSSTabPersistence Tim Padalino, AICP Senior Planner I Community Development Department County of Albemarle, Virginia hftps://www.albemarle.or_q/department.asp?department=cdd (434)-296-5832 x. 3088 80 Tort Kanellopoulos From: Todd Marshall <tarshall@uvafoundation.com> Sent: Wednesday, June 26, 2019 2:33 PM To: Tori Kanellopoulos Cc ecruz@uvafoundation.com Subject: RE: SDP2019-23 LIVA Encompass Health - Proffer 1X Tori We hired :; consultant today to begin work on this immediately, but she won't be done by July 2. She gave a 2 week timeline but may end up completing sooner. Todd From: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Sent: Wednesday, June 26, 201911:21 AM To: Todd Marshall <tmarshali@uvafoundation.com> Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Also, please keep me posted on the status of updating VCRIS. I have asked Zoning whether I can approve the initial site plan if you are in the process of updating VCRIS, or if it needs to be fully updated, and am waiting to hear back. I need to take an action by July 2"d (since I will be off the rest of the week, and 60 days is July 5th). If we need to defer briefly that is also an option. From: Todd Marshall <tarshall@uvafoundation.com> Sent: Wednesday, June 26, 2019 9:01 AM To: Tori Kanellopoulos <vkanellopoulos(aalbemarle.ore> Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Perfect, thank you. From: Tori Kanellopoulos <vkanellopoulos@albemarle.ors> Sent: Wednesday, June 26, 2019 8:46 AM To: Todd Marshall <tarshall@uvafoundation.com>; Elise Cruz <ecruz@uvafoundation.com> Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Hi Todd, Sure — please see attached action letter for the rezoning, which contains all of the proffers for this development (that is, the whole research park). Best, Tori From: Todd Marshall <tmarshall@uvafoundation.com> Sent: Wednesday, June 26, 2019 8:31 AM To: Tori Kanellopoulos <vkanello oulos albemarle.or >; ecruzC�uvafoundation.com Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX 81 Tori, Can you forward me the document that section "IX. Historic Resources" below came from? Thanks. Todd From: Tori Kanellopoulos <vkanello oulos(@albemarle.or > Sent: Wednesday, June 19, 2019 5:07 PM To: Elise Cruz <ecruz uvafoundation.com>; Todd Marshall <tmarshall@uvafoundation.com> Subject: SDP2019-23 UVA Encompass Health - Proffer IX Hi Elise and Todd, My name is Tori Kanellopoulos, and i am the lead reviewer for SDP2019-23 UVA Encompass Health, which goes to SRC tomorrow. I know Tim Padalino normally reviews UVA projects, however given his workload I took this project. I have been coordinating with Tim and Zoning on this site plan and the proffers. After meeting with Zoning today, there is one proffer that, based on our Proffer Tracking System, has not yet been met and is required prior to initial site plan approval: X.WSTORIC RESOURCES mor to approval of the first preliminary subdivision plat or preliminary site playa or an within Tract 1 on Exhibit J (except for the Fire Station property), the Owner shall pro) level survey performed by an architectural historian or other qualified individual to a archival record of the existing buildings within Tract 1. The survey shall meet the Virginia Department of Historic Resources (VD) and be provided on the VDHE. Re Field Form. i was wondering if you all have any background on this, and maybe it has already been submitted? Or could be submitted prior to my action letter due date (July 5, although I will be off, so really July 2 or 3)? Zoning determined that this needs to be done prior to initial site plan approval. Separately, we are also meeting with legal tomorrow to determine the timing of the CCP, although we expect that the initial can be approved conditionally before the CCP. Please let me know if you have any additional insight or any questions. I have sent John Hash at Timmons all review comments except those related to the proffers. This appeared to be the only proffer that would hold up the initial site plan, and my other proffer comments are just for information purposes (and relate to other projects Tim is reviewing). Best, Tori Tori Kanellopoulos, AICP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 82 Tori Kanellopoulos From: Tim Padalino Sent: Wednesday, June 26, 2019 11:23 AM To: Tori Kanellopoulos; Bill Fritz Subject: RE: CCP for UVA Encompass Health - timing? Hey Bill — did you happen to get clear direction on this question (about the timinglsequencing of a CCP and Initial Site Plan conditional approval) during last week's Legal Agenda? Tim Padalino, AICP Albemarle County I Community Development Dept. (434)-296-5832 x. 3088 From: Tori Kanellopoulos Sent: Wednesday, June 19, 20191:33 PM To: Tim Padalino <tpadalino@albemarle.org>; Bill Fritz <BFRITZ@albemarle.org> Subject: RE: CCP for UVA Encompass Health - timing? Thank you, Bill! 1 will also be at that Breezy Hill site visit, and we appreciate you taking this to legal! I am also meeting with Bart/Lea/Rebecca on the proffers at 3:30 today (Tim, you're welcome to join if you can). . I agree that I think it can be conditionally approved. It still needs plat approval and final site plan approval before it can be built (authorized?). I know there are some other conditionally approved plans for SPs and I believe also compliance with proffers. Tori From: Tim Padalino Sent: Wednesday, June 19, 2019 11:50 AM To: Bill Fritz <BFRITZ aibemarle.or >; Tori Kanellopoulos <vkanelloaoulos@albemarle.org> Subject: RE: CCP for UVA Encompass Health - timing? I tend to think the Initial Site Plan can be (conditionally) approved, since a conditional approval of Initial SDP does not "authorize" the public structure. This is somewhat similar (but with important distinctions) to the conditional approval of the Initial SDP for EcoVillage prior to the SP approval for the steep slope disturbance. So, if the approval (with conditions) of an initial site plan only authorizes applicants to submit an application for a final site plan, and does not authorize/permit/approve construction, than I don't think that is in conflict with the prohibitions against "authoriz(ing]" a use prior to 2232 review. I cannot attend the Legal Agenda meeting this week; I'll be on a site visit at Breezy Hill with the applicants. I think Tori will be joining me, as well, but i won't speak definitively for her. Thanks for the assistance and coordination, Bill - - - 83 Tim Padalino, AICP Albemarle County I Community Development Dept. (434)-296-5832 x. 3088 From: Bill Fritz Sent: Wednesday, June 19, 2019 9:34 AM To: Tim Padalino <t adalino albemarle.or >; Tori Kanellopoulos <vkanellopoulos@albemarle.org> Subject: RE: CCP for UVA Encompass Health - timing? I reviewed 2232 and want to consult Ntidth Andy. I put it on legal. Here is my issue. No public structure "shall be constructed, established or authorized, unless and until the general location or approximate location, character, and extent thereof has been submitted to and approved by the commission as being substantially in accord with the adopted comprehensive plan or part thereof." Initial approval does not authorize the construction but it does vest some rights. I welcome your thoughts also. William D. Fritz, AICP Development Process Manager/Ombudsman 434-296-5823 ext 3242 From: Tim Padalino Sent: Tuesday, June 18, 2019 3:13 PM To: Bill Fritz <BFRITZ@albemarle.org>; Tor! Kanellopoulos <vkanellopoulos@albemarle.org> Subject: CCP for UVA Encompass Health - timing? Initial Site Plan SDP201900023 (under review: SRC 6/20; action required no later than July 5) LOD 201900006 (determination: public use) Can Tod issue a letter of conditional approval for SDP201900023, prior to review and approval of this CCP for the proposed public use (which (presumably) is permissible by right in PDIP)? Tim Padalino, AICP Senior Planner I Community Development Department County of Albemarle, Virginia hops://www.albemade.orq/department.aso?department=cdd (434)-296-5832 x. 3088 84 Tori Kanellopoulos From: Todd Marshall <tmarshail@uvafoundation.com> Sent Wednesday, June 26, 2019 9:01 AM To: Tori Kanellopoulos Subject RE: SDP2019-23 UVA Encompass Health - Proffer IX Perfect, thank you. From: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Sent: Wednesday, June 26, 2019 8:46 AM To: Todd Marshall <tmarshall@uvafoundation.com>; Elise Cruz <ecruz@uvafoundation.com> Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Hi Todd, Sure — please see attached action letter for the rezoning, which contains all of the proffers for this development (that is, the whole research park). Best, Tori From: Todd Marshall <tmarshall@uvafoundation.com> Sent: Wednesday, June 26, 2019 8:31 AM To: Tori Kanellopoulos <vkanellonoulos@albemarle.ore>; ecruz@uvafoundation.com Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Tori, Can you forward me the document that section "IX. Historic Resources" below came from? Thanks. Todd From: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Sent: Wednesday, June 19, 2019 5:07 PM To: Elise Cruz <ecruz uvafoundation.com>; Todd Marshall <tmarshall uvafoundation.com> Subject: SDP2019-23 UVA Encompass Health - Proffer IX Hi Elise and Todd, My name is Tori Kanellopoulos, and I am the lead reviewer for SDP2019-23 UVA Encompass Health, which goes to SRC tomorrow. I know Tim Padalino normally reviews UVA projects, however given his workload I took this project. I have been coordinating with Tim and Zoning on this site plan and the proffers. After meeting with Zoning today, there is one proffer that, based on our Proffer Tracking System, has not yet been met and is required prior to initial site plan approval: 85 IX. HISTORIC RESOURCES Prior to approval of the First preliminary subdivision plat or preliminary site plan or an within 'Tract 1 on Exhibit I (except for the Fire Station property), the Owner skull pro, level survey performed by an architectural historian or other qualified individual to a archival record of the existing buildings within Tract 1. The survey shall meet the Virginia Department of Historic Resources (VDHR) and be provided on the VDHR Re Field. Forrm i was wondering if you all have any background on this, and maybe it has already been submitted? Or could be submitted prior to my action letter due date (July 5, although I will be off, so really July 2 or 3)? Zoning determined that this needs to be done prior to initial site plan approval. Separately, we are also meeting with legal tomorrow to determine the timing of the CCP, although we expect that the initial can be approved conditionally before the CCP. Please let me know if you have any additional insight or any questions. I have sent John Hash at Timmons all review comments except those related to the proffers. This appeared to be the only proffer that would hold up the initial site plan, and my other proffer comments are just for information purposes (and relate to other projects Tim is reviewing). Best, Tori Tori Kanellopoulos, AICP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 86 Tori Kanellopoulos From: Todd Marshall <tarshall@uvafoundation.com> Sent: Wednesday, June 26, 2019 8:31 AM To: Tori Kanellopoulos; ecruz@uvafoundation.com Subject RE: SDP2019-23 UVA Encompass Health - Proffer IX Tori, Can you forward me the document that section "IX. Historic Resources" below came from? Thanks. Todd From: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Sent: Wednesday, June 19, 2019 5:07 PM To: Elise Cruz <ecruz@uvafoundation.com>, Todd Marshall <tarshall@uvafoundation.com> Subject: SDP2019-23 UVA Encompass Health - Proffer IX Hi Elise and Todd, My name is Tori Kanellopoulos, and I am the lead reviewer for SDP2019-23 UVA Encompass Health, which goes to SRC tomorrow. I know Tim Padalino normally reviews UVA projects, however given his workload I took this project. I have been coordinating with Tim and Zoning on this site plan and the proffers. After meeting with Zoning today, there is one proffer that, based on our Proffer Tracking System, has not yet been met and is required prior to initial site plan approval: IX. FUTDRK RESOURCES Prior to approval of the first preliminary subdivision plat or preliminaiy site plan or an within Tract l on Exhibit J (except for the Eire Station property), the Owner shall pro` level survey perfonned by an architectural historian or other qualified individual to a archival record of the existing buildings within Tract 1. The survey shall meet the Virginia Department of Historic Resources (VDHR) and be provided on the VDHR Re Field Form. I was wondering if you all have any background on this, and maybe it has already been submitted? Or could be submitted prior to my action letter due date (July 5, although I will be off, so really July 2 or 3)? Zoning determined that this needs to be done prior to initial site plan approval. Separately, we are also meeting with legal tomorrow to determine the timing of the CCP, although we expect that the initial can be approved conditionally before the CCP. Please let me know if you have any additional insight or any questions. I have sent John Hash at Timmons all review comments except those related to the proffers. This appeared to be the only proffer that would hold up the initial site plan, and my other proffer comments are just for information purposes (and relate to other projects Tim is reviewing). Best, 87 Tori Tori Kaneilopoulos, AICP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 88 Tori Kanellopoulos From: Andrew Allison <Andrew.Allison@timmons.com> Sent: Tuesday, June 25, 2019 12:03 PM To: Bart Svoboda; Tori Kanellopoulos Cc: John Hash Subject: SDP201900023 UVA Encompass Rehab Hospital - Parking Requirement Determination Bart/Tori, Following up on a comment received referencing Section 18-4.12.6 on the Parking requirements for the proposed UVA Encompass Rehabilitation Hospital. At this time we have proposed 70 beds with a future expansion to include 10 additional beds (80 beds total). Our first initial site plan submission provided 128 regular spaces with 32 ADA spaces (10 van spaces). I would like to formally request a determination be made for the required number of parking spaces associated with this public use hospital. Please let me know if you require a formal letter or any other documentation to issue a determination. Thank you, Andrew Allison Project Engineer Ill TIMMONS GROUP I www.timmons.com 608 Preston Ave, Suite 200 1 Charlottesville, VA 22903 Office: 434.327.1683 Fax 434.295.8317 Mobile:704.941.4097 And rew.Allisonfttimmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. 89 Tori Kanellopoulos From: McDonald, Blake<blake.mcdonald@dhr.virginia.gov> Sent: Monday, June 24, 2019 3:15 PM To: Tori Kanellopoulos Subject: Re: VDIHR Form for reconnaissance level survey Many thanks, Tori! Just wanted to make sure I understood the background on this project. Have a good one, Blake On Mon, Jun 24, 2019 at 12:51 PM Tori Kanellopoulos <vkanellopoulos@albemarie.ore> wrote: Hi Blake, Attached is the action letter for the rezoning ZMA2005-3, which contains the historic preservation proffer language (Proffer IX, I think page 12). This link contains all of the documents for the staff report for that rezoning, which includes the brief reasoning behind the proffer. The staff report is very long, but you can ctrl+F to search for "historic" which should get you all the background. Please let me know if you think of anything else! Sounded like the applicant was going to be in contact with you soon. Best, Tori From: McDonald, Blake <blake.mcdonald@dhr.vir inia. ov> Sent: Monday, June 24, 2019 12:02 PM To: Tori Kanellopoulos <vkanellopoulos@albemarle.ore> Subject: Re: VDHR Form for reconnaissance level survey Hi Tori, Not a problem thanks forgetting in touch! When you have a moment, can you please send me a copy of the 2005 MOA from which you sent the snippet in your first email? 90 Thanks! Blake On Fri, Jun 21, 2019 at 10:36 AM Tori Kanellopoulos <vkanellopoulos@albemarle.ore> wrote: Hi Blake, Thank you so much for all of your help this morning! I have sent your instructions below and my notes from our conservation to the applicant. They should be contacting you shortly to follow up. Best, Tori From: McDonald, Blake<blake.mcdonald@dhr.virginia.sov> Sent: Friday, June 21, 201910:24 AM To: Tor! Kanellopoulos <vkanellopoulos@albemarle.ore> Subject: Re: VDHR Form for reconnaissance level survey Hi Tori, Nice to talk to you this morning. Here's exactly what we require for a reconnaissance level survey submission - let me know if you have any questions. Reconnaissance Documentation The following materials shall be provided for each recorded property: 1. One (1) hard copy reconnaissance -level documentation form utilizing V-CRIS for the data entry, 2.One (1 ) set of 3X" x 5" or 4"x 6" color photographs placed in neatly labeled photo transparent sheets and labeled according to DflR requirements; 91 3. One (1) set of digital images saved on a CD-ROM or shared via large file transfer system as an uncompressed .JPG file,1600x1200, at 300 dpi. individual digital images shall be named and organized according to the convention found in DHR's Survey Photograph Policy (2016); and 4. One (1 ) site plan sketch of each property indicating the relationship between the primary resource(s) and any secondary resource(s), the public sidewalk and street or road and neighboring properties, significant landscape features and any significant natural features such as creeks and rivers. Thanks again! Blake On Fri, Jun 21, 2019 at 9:35 AM Tor! Kanellopoulos<vkanellopoulosCa@albemarle.org> wrote: Great! I will plan to give you a call at 10 AM, if that sounds good. My number is 585-734-0764. Tori From: McDonald, Blake<blake.mcdonald@dhr.virginia.eov> Sent: Friday, June 21, 2019 9:27 AM To: Tori Kanellopoulos <vkanello oulos albernarle.or > Subject: fie: VDHR Form for reconnaissance level survey No problem! Figured it might be easier to make a plan over the phone - I'm at 804-482-6086 and will be available until 11AM or after 2PM. Blake On Fri, Jun 21, 2019 at 8:10 AM Tor! Kanellopoulos <vkanello oulos aibemarle.or > wrote: Hi Blake, 92 Apologies I missed your call yesterday — my work voicemalls actually come through to my email, so I was able to 1 listen to it this morning. I am working from home but could call on my cell phone sometime this morning, if you are available. i r Best, Tor! From: McDonald, Blake<biake.mcdonald@dhr.vireinia.eov> Sent: Thursday, June 20, 2019 4:24 PM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Subject: Re: VDHR Form for reconnaissance level survey �k i( i I Hi Tori, Thanks for reaching out! Yes, we should have something on file here - what's the address of the property/properties in question? Blake On Thu, Jun 20, 2019 at 4:18 PM Tor! Kanellopoulos <vkanellopoulos@albemarle.org> wrote: Good Afternoon Blake, My name is Tori, and I am a Planner with Albemarle County. Heather McMahon gave me your contact information, and I am hoping you can help me with a VDHR question. It is in regard to a proffer for a rezoning, which was submitted in 2005 and approved in 2010. Below is the language: 93 IX. HISTORIC RRSOURCES Friar to approval of the first preliminary subdivision plat or preliminary site plan or ai within Tract 1 on Exhibit J (except far the Fire Station property), the Owner shall pro level survey perfon ed by an architectural historian or other qualified individual to ;- archival record of the existing buildings within Tract 1. The survey shall meet th Virginia Department of Historic Resources (VDHR) and be provided on the VDHR R Field Farm. Heather and I could not find this form on VDHR, and are thinking it no longer exists. We were wondering if VDHR did have an actual "Reconnaissance Field Survey Form" in 2005 or as recently as 2010, and what would be the substitute now? We were thinking it would be the VCRIS database. Any guidance you have on this is greatly appreciated. Best, Tori Tori Kanellopoulos, AICP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 Blake McDonald, Architectural Survey and Cost Share Program Manager Division of Survey and Register Department of Historic Resources 2801 Kensington Avenue, Richmond, VA 23221 Phone: (804) 482-6086 Email. Blake. McDonaidCaD-dhr.virginia,gov 94 Blake McDonald, Architectural Survey and Cost Share Program Manager Division of Survey and Register Department of Historic Resources 2809 Kensington Avenue, Richmond, VA 23221 Phone: (804) 482-6086 Email: Blake.McDonald@dhr.vircrinia.gov Blake McDonald, Architectural survey and Cost Share Program Manager Division of Survey and Register Department of Historic Resources 2801 Kensington Avenue, Richmond, VA 23221 Phone: (804) 482-6086 Email. Blake. McDonald(cDdhr.virainia.yov Blake McDonald, Architectural Survey and Cost Share Program Manager Division of Survey and Register Department of Historic Resources 2809 Kensington Avenue, Richmond, VA 23221 Phone: (804) 482-6086 Email: Blake_McDonalClo_dhr.virainia.gov Blake McDonald, Architectural Survey and Cost Share Program Manager Division of Survey and Register Department of Historic Resources 2809 Kensington Avenue, Richmond, VA 23229 Phone: (804) 482-6086 Email., Blake. McDonald@dhr.jit inia.gov 95 Tori Kanellopoulos From: Tori Kanellopoulos Sent: Monday, June 24, 2019 12:51 PM To: McDonald, Blake Subject: RE: VDHR Form for reconnaissance level survey Attachments: ZMA200500003 Action Letter (2).pdf Hi Blake, Attached is the action letter for the rezoning ZMA2005-3, which contains the historic preservation proffer language (Proffer IX, I think page 12). This link contains all of the documents for the staff report for that rezoning, which includes the brief reasoning behind the proffer. The staff report is very long, but you can ctrl+F to search for "historic" which should get you all the background. Please let me know if you think of anything else! Sounded like the applicant was going to be in contact with you soon. Best, Tor! From: McDonald, Blake <blake.mcdonald@dhr.virginia.gov> Sent: Monday, June 24, 201912.02 PM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Subject: Re: VDHR Form for reconnaissance level survey Hi Tori, Not a problem - thanks for getting in touch! When you have a moment, can you please send me a copy of the 2005 MOA from which you sent the snippet in your first email? Thanks! Blake On Fri, Jun 21, 2019 at 10:36 AM Tori Kanellopoulos <vkanellopoulos@albemarle.org> wrote: Hi Blake, Thank you so much for all of your help this morning! I have sent your instructions below and my notes from our conservation to the applicant. They should be contacting you shortly to follow up. Best, Tori 96 From: McDonald, Blake <blake.mcdonald dhr.vir inia. ov> Sent: Friday, June 21, 2019 10:24 AM To: Tori Kanellopoulos <vkanellopoulostmalbemarle.ors> Subject: Re: VDHR Form for reconnaissance level survey Hi Tori, Nice to talk to you this morning. Here's exactly what we require for a reconnaissance level survey submission - let me know if you have any questions. Reconnaissance Documentation The following materials shall be provided for each recorded property. 1. One (1) hard copy reconnaissance -level documentation form utilizing V-CRIS for the data entry; 1. One (1) set of 3Y" x 5" or 4"x 6" color photographs placed in neatly labeled photo transparent sheets and labeled according to DHR re uirements• 3. One (1) set of digital images saved on a CD-ROM or shared via large file transfer system as an uncompressed .1PG file, 1600x1200, at 300 dpi. Individual digital images shall be named and organized according to the convention found in DHR's Survey Photograph Policy (2016); and 4. One (1) site plan sketch of each property indicating the relationship between the primary resource(s) and any secondary resource(s), the public sidewalk and street or road and neighboring properties, significant landscape features and any significant natural features such as creeks and rivers. Thanks again! Blake On Fri, Jun 21, 2019 at 9:35 AM Tori Kanellopoulos<vkanellopoulosCalalbemarle.ore> wrote: Greatl I will plan to give you a call at 10 AM, if that sounds good. My number is 585-734-0764. 97 Tori From: McDonald, Blake <blake.mcdonald dhr.vir inia. ov> Sent: Friday, June 21, 2019 9:27 AM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Subject: Re: VDHR Form for reconnaissance level survey No problem! Figured it might be easier to make a plan over the phone - I'm at 804-482-6086 and will be available until 11AM or after 2PM. Blake On Fri, Jun 21, 2019 at 8:10 AM Tori Kanellopoulos <vkanellopoulos@albemarle.ore> wrote: Hi Blake, Apologies I missed your call yesterday —my work voicemails actually come through to my email, so I was able to listen to it this morning. I am working from home but could call on my cell phone sometime this morning, if you are available. Best, Tori From: McDonald, Blake <Blake.mcdonald@dhr.viffiinia.gov> Sent: Thursday, June 20, 2019 4:24 PM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Subject: Re: VDHR Form for reconnaissance level survey Hi Tori, Thanks for reaching out! Yes, we should have something on file here - what's the address of the property/properties in question? 98 Blake On Thu, Jun 20, 2019 at 4:18 PM Tor! Kanellopoulos <vkanellopoulos@albemarle.orp wrote: Good Afternoon Blake, My name is Tod, and I am a Planner with -Albemarle County. Heather McMahon gave me your contact information, and I am hoping you can help me with a VDHR question. It is in regard to a proffer for a rezoning, which was submitted in 2005 and approved in 2010. Below is the language: ICL. HISTORIC RESOURCES Prior to approval of the first preliminary subdivision plat or preliminary site plan or an within Tract 1 on Ex uffilt 3 (except for the Fire Station property), the Owner shall pros level survey performed by an architectural historian or other qualified individual to a archival record of the existing buildings within Tract 1. The survey shall meet the Virginia Department of Historic Resources (VDHR) and be provided on the VDHR Re Field Farm. Heather and I could not find this form on VDHR, and are thinking it no longer exists. We were wondering if VDHR did have an actual "Reconnaissance Field Survey Form" in 2005 or as recently as 2010, and what would be the substitute now? We were thinking it would be the VCR15 database. Any guidance you have on this is greatly appreciated. Best, Tori Tor! Kanellopoulos, AICP candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 99 Blake McDonald, Architectural Survey and Cost Share Program Manager Division of Survey and Register Department of Historic Resources 2801 Kensington Avenue, Richmond, VA 23221 Phone: (804) 482-6086 Email: Blake. McDonald(a)-dhr.virpinia.goov Blake McDonald, Architectural Survey and Cost Share Program Manager Division of Survey and Register Department of Historic Resources 2801 Kensington Avenue, Richmond, VA 23221 Phone: (804) 482-6086 Email: Blake.McDonag@dhr.vir.ginia.aov Blake McDonald, Architectural Survey and Cost Share Program Manager Division of Survey and Register Department of Historic Resources 2801 Kensington Avenue, Richmond, VA 23221 Phone: (804) 482-6086 Email. Blake. McDonald(ccD_dhr.virainia.gov Blake McDonald, Architectural Survey and Cost Share Program Manager Division of Survey and Register Department of Historic Resources 2801 Kensington Avenue, Richmond, VA 23221 Phone: (804) 482-6086 Email: Blake. McDonaldC�dhr.virginia.gov 100 Tori Kanellopoulos MW From: McDonald, Blake <blake.mcdonald@dhr_virginia.gov> Sent: Monday, June 24, 2019 12:02 PM To: Tori Kanellopoulos Subject Re: VDHR Form for reconnaissance level survey Hi Tori, Not a problem - thanks forgetting in touch! When you have a moment, can you please send me a copy of the 2005 MOA from which you sent the snippet in your first email? Thanks! Blake On Fri, Jun 21, 2019 at 10:36 AM Tor! Kanellopoulos <vkanello oulos albemarle.or > wrote: Hi Blake, Thank you so much for all of your help this morning! I have sent your instructions below and my notes from our conservation to the applicant. They should be contacting you shortly to follow up. Best, Tori From: McDonald, Blake <blake.mcdonald@dhr.virginia.gov> Sent: Friday, June 21, 201910:24 AM To: Tor! Kanellopoulos <vkanell000ulos@albemarle.org> Subject: Re: VDHR Form for reconnaissance level survey Hi Tori, Nice to talk to you this morning. Here's exactly what we require for a reconnaissance level survey submission - let me know if you have any questions. 101 Reconnaissance Documentation The following materials shall be provided for each recorded property: 1. One (1) hard copy reconnaissance -level documentation form utilizing V-CRIS for the data entry; 2. One (1) set of 334" x 5" or 4"x 6" color photographs placed in neatly labeled photo transparent sheets and labeled according to DHR requirements; 3. One (1) set of digital images saved on a CD-ROM or shared via large file transfer system as an uncompressed .1PG file, 1600x1200, at 300 dpi. Individual digital images shall be named and organized according to the convention found in DHR's Survey Photograph Policy 2016 and 4. One (1) site plan sketch of each property indicating the relationship between the primary resource(s) and any secondary resource(s), the public sidewalk and street or road and neighboring properties, significant landscape features and any significant natural features such as creeks and rivers. Thanks again! Blake On Fri, Jun 21, 2019 at 9:35 AM Tor! Kanellopoulos <vkanello oulos@albemarlg.ore> wrote: Greatl i will plan to give you a call at 10 AM, if that sounds good. My number is 585-734-0764. Tori From: McDonald, Blake<blake.mcdonald@dhr.virginia.gov_> Sent: Friday, June 21, 2019 9:27 AM To: Tor! Kanellopoulos <vkanella oulos albemarle.or > Subject: Re: VDHR Form for reconnaissance level survey No problem! Figured it might be easier to make a plan over the phone I'm at 804-482-6086 and will be available until 11AM or after 2PM. Blake 102 On Fri, Jun 21, 2019 at 8:10 AM Tori Kanellopoulos <vkanellopoulos@albemarle.org> wrote: Hi Blake, Apologies I missed your call yesterday —my work voicemails actually come through to my email, so I was able to listen to it this morning. I am working from home but could call on my cell phone sometime this morning, if you are available. Best, Tori From: McDonald, Blake<blake.mcdonald@dhr.virginia.gov> Sent: Thursday, June 20, 2019 4:24 PM To: Tori Kanellopoulos <vkanellopoulosC@albemarle.ore> Subject: Re: VDHR Form for reconnaissance level survey Hi Tori, Thanks for reaching out! Yes, we should have something on file here what's the address of the property/properties in question? Blake On Thu, Jun 20, 2019 at 4:18 PM Tor! Kanellopoulos <vkanellopoulos@albemarle.ore> wrote: Good Afternoon Blake, My name is Tori, and I am a Planner with Albemarle County. Heather McMahon gave me your contact information, and I am hoping you can help me with a VDHR question. It is in regard to a proffer for a rezoning, which was submitted in 2005 and approved in 2010. Below is the language: 103 Prior to approval of the first preliminary subdivision plat or preliminary site plan or an within Tract 1 on Exhibit 3 (except for the Fire Station property), the Owner shall pros level survey performed by an architectural historian or other qualified individual to a, archival record of the existing buildings within Tract 1. The survey shall meet the Virginia Department of Historic Resources (VDHR) and be provided on the VDHR Re Field Form. Heather and I could not find this form on VDHR, and are thinking it no longer exists. We were wondering if VDHR did have an actual "Reconnaissance Field Survey Form" in 2005 or as recently as 2010, and what would be the substitute now? We were thinking it would be the VCRIS database. Any guidance you have on this is greatly appreciated. Best, Tori Tor! Kanellopoulos, AiCP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 Blake McDonald, Architectural Survey and Cost Share Program Manager Division of Survey and Register Department of Historic Resources 2801 Kensington Avenue, Richmond, VA 23221 Phone: (804) 482-6086 Email. Blake. McDonald dhr.v inia. ov 104 Blake McDonald, Architectural Survey and Cost Share Program Manager Division of Survey and Register Department of Historic Resources 2801 Kensington Avenue, Richmond, VA 23221 Phone: (804) 482-6086 Email., Blake. McDonald(a)-dhr.yirpinia.goov Blake McDonald, Architectural Survey and Cost Share Program Manager Division of Survey and Register Department of Historic Resources 2801 Kensington Avenue, Richmond, VA 23221 Phone: (804) 482-6086 Email: Blake. McDonald@dhr.virpinia.Qov Blake McDonald, Architectural Survey and Cost Share Program Manager Division of Survey and Register Department of Historic Resources 2801 Kensington Avenue, Richmond, VA 23221 Phone: (804) 482-6086 Email Blake_ McDonald(a)_dhr.virainia.gov 105 Tori Kanellopoulos From: Todd Marshall <tmarshall@uvafoundation.com> Sent: Monday, June 24, 2019 10:21 AM To: Tori Kanellopoulos; ecruz@uvafoundation.com Cc: John Hash; Rebecca Ragsdale; Lea Brumfield Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Tori, thanks for the great feedback on this. We'll work to get this survey updated asap. Todd From: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Sent: Friday, June 21, 201910:35 AM To: Todd Marshall <tmarshall@uvafoundation.com>; Elise Cruz <ecruz@uvafoundation.com> Cc: John Hash <John.Hash@timmons.com>; Rebecca Ragsdale <ragsdale@albemarle.org>; Lea Brumfield <Ibrumfield@albemarle.org> Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Hi Todd, I just finished a phone call with Blake McDonald from VDHR to follow up on this proffer. It looks like it is a relatively simple process, and VDHR has a quick turnaround time. I am also copying Rebecca and Lea (Zoning) on this email, since this relates to a proffer and I want to be sure Zoning is updated and is satisfied with how this proffer is being addressed. ARB staff were able to figure out that this site has been surveyed before — please see attached "Hip House VCRIS" report. Blake at VDHR confirmed this survey and that it was done well before the proffers for ZMA2005-3. This survey did not include the outbuildings. However, the staff report for ZMA2005-3 references multiple buildings, which are likely these outbuildings. This is the building at 3640 Lonesome Pine Lane. Please see staff report language below: Redevelopment This principle is largely not applicable because of the large portion of I undeveloped land: however, d small portion of the 30 acre tract proposed I for addition to the parts contains a house. Allhojigh the Virginia Depadment of Historic Resources has not surveyed the subject parcels h the presence of historic architectural andlor archaeological resources, County heal Estate records indicate the presence of a c 1925 single fail dwelling The applicant has been requested to document the buildings of TMP 32-18 prior to derrlolitiom which is provided for in the proffers Proffer language below for reference: 106 IX. 1E111SxORIC RESOURCES Prior to approval of the first preliminary subdivision plat or preliminary site plan or are carly grading permit within Tract 1 on Exhibit 7 (except for the Fire Station property), the Owster shall provide a recommissance level survey performed by an architectural historian or other qualified individual to adequately provide as archival record of the existing buildings within Tract 1. The survey shall meet the requirements of the Virginia Department of Historic Resources (VDHR) and be provided on the VDHR Reconnaissance survey Field Form. Therefore, to satisfy this proffer per VDHR standards, the VCRIS database needs to be updated to include all the outbuildings as well. Blake said this process can be accomplished relatively quickly once the field work is done. From Blake, here is what is needed: Reconnaissance Documentation The following materials shall be provided for each recorded property: 1. One (1 ) hard copy reconnaissance -level documentation form utilizing V-CRIS for the data entry; 2. One (1) set of 3X" x 5" or 4" x 6" color photographs placed in neatly labeled photo transparent sheets and labeled according to DHR requirements; 3. One (1 ) set of digital images saved on a CD-ROM or shared via large file transfer system as an uncompressed .JPG file, 1600x1200, at 300 dpL Individual digital images shall be named and organized according to the convention found in DHR-s Survey Photograph Policy (20161; and 4. One (1 ) site plan sketch of each property indicating the relationship between the primary resource(s) and any secondary resource(s), the public sidewalk and street or road and neighboring properties, significant landscape features and any significant natural features such as creeks and rivers. The buildings only need to be photographed from the exterior. A consultant with a VCRIS license can complete this update. Alternatively, you may contact Blake (804-482-6086 or blake.mcdonaid@dhr.vireinia.gov) to get a free VCRIS license that allows data entry only. Blake encouraged you to contact him directly to compete this process. In summary, I believe updating the VCRIS database per Blake's instructions would satisfy this proffer. I would need Zoning's determination on whether this needs to be fully completed before I can conditionally approve the site plan, or if it just needs to be in the VCRIS queue by the time I need to take an action (July 31) Best, Tori From: Todd Marshall <tarshall@uvafoundation.com> Sent: Thursday, June 20, 2019 9:36 AM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org>; ecruz@uvafoundation.com Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Tod, As an alternative - for our recent Birdwood project that had existing houses on it, I'm told that the County has an architectural historian that looked at those prior to demolition of those houses. Is that something we could do here to satisfy this proffer? 107 Todd From: Todd Marshall Sent: Thursday, June 20, 2019 9:04 AM To: 'Tori Kanellopoulos' <vkanellopoulos@albemarle.org>; Elise Cruz <ecru z(a) uvafou n d atio n.com> Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Tori, Thanks for your email. There are some existing houses located on this property that are actually in the process of being scheduled for demolition. Would we still need to go through the process and expense of a study if these houses are planned to be removed? They are not historical, 60s-70s era construction I believe. Todd From: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Sent: Wednesday, June 19, 2019 5:07 PM To: Elise Cruz <ecruz@uvafoundation.com>; Todd Marshall <tmarshall uvafoundation.com> Subject: SDP2019-23 UVA Encompass Health - Proffer IX Hi Elise and Todd, My name is Tori Kanellopoulos, and I am the lead reviewer for SDP2019-23 UVA Encompass Health, which goes to SRC tomorrow. I know Tim Padalino normally reviews UVA projects, however given his workload I took this project. I have been coordinating with Tim and Zoning on this site plan and the proffers. After meeting with Zoning today, there is one proffer that, based on our Proffer Tracking System, has not yet been met and is required prior to initial site plan approval: E. MSTORIC MSOURCES Prior to approval of the first preliminary subdivision plat or preliminary site plan or an within Tract 1 on Exhibit J f exccpt for the Fire Station property), the Owner shall pros level survey performed by an atchitectuarai historian or other qualified individual to a archival record of the existing buildings within Tract 1. The survey shall meet the Virginia Department of Historic Resources ( DHR) and be provided on the V.DHR Re Field Porte, I was wondering if you all have any background on this, and maybe it has already been submitted? or could be submitted prior to my action letter due date (July 5, although I will be off, so really July 2 or 3)? Zoning determined that this needs to be done prior to initial site plan approval. Separately, we are also meeting with legal tomorrow to determine the timing of the CCP, although we expect that the initial can be approved conditionally before the CCP. Please let me know if you have any additional insight or any questions. I have sent John Hash at Timmons all review comments except those related to the proffers. This appeared to be the only proffer that would hold up the initial site plan, and my other proffer comments are just for information purposes (and relate to other projects Tim is reviewing). 108 Best, Tori Tor! Kanellopoulos, AiCP candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 109 Tori Kanellopoulos From: Todd Marshall <tarshall@uvafoundation.com> Sent: Friday, June 21, 2019 2:07 PM To: Tori Kanellopoulos Cc: ecruz@uvafoundation.com Subject: Re: SDP2019-23 UVA Encompass Health Proffer IX Thank you Tori this is very helpful. We will address this ASAP. Todd On Jun 21, 2019, at 10:35 AM, Tori Kanellopoulos <vkanello oulos albemarle.or > wrote: Hi Todd, I just finished a phone call with Blake McDonald from VDHR to follow up on this proffer. It looks like it is a relatively simple process, and VDHR has a quick turnaround time. I am also copying Rebecca and Lea (Zoning) on this email, since this relates to a proffer and I want to be sure Zoning is updated and is satisfied with how this proffer is being addressed. ARB staff were able to figure out that this site has been surveyed before — please see attached "Hip House VCRIS" report. Blake at VDHR confirmed this survey and that it was done well before the proffers for ZMA2005-3. This survey did not include the outbuildings. However, the staff report for ZMA2005-3 references multiple buildings, which are likely these outbuildings. This is the building at 3640 Lonesome Pine Lane. Please see staff report language below: <image003.jpg> Proffer language below for reference: <image005.jpg> Therefore, to satisfy this proffer per VDHR standards, the KRIS database needs to be updated to include all the outbuildings as well. Blake said this process can be accomplished relatively quickly once the field work is done. From Blake, here is what is needed: Reconnaissance Documentation The following materials shall be provided for each recorded property: 1. One (1) hard copy reconnaissance -level documentation form utilizing V-CRIS for the data entry, 2. One (1) set of 3X"x 5" or 4"x 6" color photographs placed in neatly labeled photo transparent sheets and labeled according to DHR re uirements 3. One (1) set of digital images saved on a CD-ROM or shared via large file transfer system as an uncompressed .1PG file,1600x1200, at 300 dpi. Individual digital images shall be named and organized according to the convention found in DHR's Survey Photograph Policy (2015); and 4. One (1) site plan sketch of each property indicating the relationship between the primary resource(s) 110 and any secondary resource(s), the public sidewalk and street or road and neighboring properties, significant landscape features and any significant natural features such as creeks and rivers. The buildings only need to be photographed from the exterior. A consultant with a VCRIS license can complete this update. Alternatively, you may contact Blake (804-482-6086 or blake.mcdonald dhr.vir inia. ov) to get a free VCRIS license that allows data entry only. Blake encouraged you to contact him directly to compete this process. In summary, I believe updating the VCRIS database per Blake's instructions would satisfy this proffer. I would need Zoning's determination on whether this needs to be fully completed before I can conditionally approve the site plan, or if it just needs to be in the VCRIS queue by the time I need to take an action (July 3rd) Best, Tor! From: Todd Marshall <tmarshall@uvafoundation.com> Sent: Thursday, June 20, 2019 9:36 AM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org>; ecruz@uvafoundation.com Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Tori, As an alternative - for our recent Birdwood project that had existing houses on it, I'm told that the County has an architectural historian that looked at those prior to demolition of those houses. Is that something we could do here to satisfy this proffer? Todd From: Todd Marshall Sent: Thursday, June 20, 2019 9:04 AM To:'Tori Kanellopoulos' <vkanellopoulos@albemarle.org>; Elise Cruz <ecruz@uvafoundation.com> Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Tori, Thanks for your email. There are some existing houses located on this property that are actually in the process of being scheduled for demolition. Would we still need to go through the process and expense of a study if these houses are planned to be removed? They are not historical, 60s-70s era construction I believe. Todd From: Tori Kanellopoulos <vkanello oulos albemarle.or > Sent: Wednesday, June 19, 2019 5:07 PM To: Elise Cruz <ecruz@uvafoundation.com>; Todd Marshall <tmarshall@uvafoundation.com> Subject: SDP2019-23 UVA Encompass Health - Proffer IX Hi Elise and Todd, My name is Tori Kanellopoulos, and i am the lead reviewer for SDP2019-23 UVA Encompass Health, which goes to SRC tomorrow. I know Tim Padalino normally reviews UVA projects, however given his ill workload I took this project. i have been coordinating with Tim and Zoning on this site plan and the proffers. After meeting with Zoning today, there is one proffer that, based on our Proffer Tracking System, has not yet been met and is required prior to initial site plan approval: <image007. jpg> I was wondering it you all nave any background on this, and maybe it has already been submitted? Or could be submitted prior to my action letter due date (July 5, although I will be off, so really July 2 or 3)? Zoning determined that this needs to be done prior to initial site plan approval. Separately, we are also meeting with legal tomorrow to determine the timing of the CCP, although we expect that the initial can be approved conditionally before the CCP. Please let me know if you have any additional insight or any questions. I have sent John Hash at Timmons all review comments except those related to the proffers. This appeared to be the only proffer that would hold up the initial site plan, and my other proffer comments are just for information purposes (and relate to other projects Tim is reviewing). Best, Tori Tori Kanellopoulos, AICP Candidate Planner Community Development Department Phone: 434-295-5832 ext. 3270 <Hip House VCRIS report.pdf> 112 Tor! Kanellopoulos From: Tori Kanellopoulos Sent: Friday, June 21, 2019 10:36 AM To: McDonald, Blake Subject: RE: VDHR Form for reconnaissance level survey Hi Blake, Thank you so much for all of your help this morning! I have sent your instructions below and my notes from our conservation to the applicant. They should be contacting you shortly to follow up. Best, Tori From: McDonald, Blake<blake.mcdonald@dhr.virginia.gov> Sent: Friday, June 21, 201910:24 AM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Subject: Re: VDHR Form for reconnaissance level survey Hi Tori, Nice to talk to you this morning. Here's exactly what we require for a reconnaissance level survey submission - let me know if you have any questions. Reconnaissance Documentation The following materials shall be provided for each recorded property: 1. One (1) hard copy reconnaissance -level documentation form utilizing V-CRIS for the data entry, 2. One (1) set of 331" x 5" or 4"x 6" color photographs placed in neatly labeled photo transparent sheets and labeled according to DHR requirements; 3. One (1 ) set of digital images saved on a CD-ROM or shared via large file transfer system as an uncompressed .JPG file, 1600x1200, at 300 dpl. Individual digital images shall be named and organized according to the convention found in DHR's Survey Photograph Policy (2016); and 4. One (1) site plan sketch of each property indicating the relationship between the primary resource(s) and any secondary resource(s), the public sidewalk and street or road and neighboring properties, significant landscape features and any significant natural features such as creeks and rivers. Thanks again! Blake On Fri, Jun 21, 2019 at 9:35 AM Tori Kanellopoulos <vkanell000ulos@albemarle.ore> wrote: Great! I will plan to give you a call at 10 AM, if that sounds good. My number is 585-734-0764. 113 Tori From: McDonald, Blake <blake.mcdonald@dhr.virginia.gov> Sent: Friday, June 21, 2019 9:27 AM To: Tori Kanellopoulos <vkanellopoulos@albemarle.ore> Subject: Re: VDHR Form for reconnaissance level survey No problem! Figured it might be easier to make a plan over the phone - I'm at 804-482-6086 and will be available until 11AM or after 213M. Blake On Fri, Jun 21, 2019 at 8:10 AM Tori Kanellopoulos <vkanellopoulos@albemarle.ors> wrote: H! Blake, Apologies i missed your call yesterday — my work voicemails actually come through to my email, so I was able to listen to it this morning. I am working from home but could call on my cell phone sometime this morning, if you are available. Best, Tori From: McDonald, Blake <blake.mcdonald@dhr.vireinia.gov> Sent: Thursday, June 20, 2019 4:24 PM To: Tori Kanellopoulos <vkanello oulos albemarle.or > Subject: Re: VDHR Form for reconnaissance level survey Hi Tori, Thanks for reaching out! Yes, we should have something on file here - what's the address of the property/properties in question? 114 Blake On Thu, Jun 20, 2019 at 4:18 PM Tor! Kanellopoulos<vkanellopoulos(&albemarle.or>n> wrote: Good Afternoon Blake, My name is Tori, and I am a Planner with Albemarle County. Heather McMahon gave me your contact information, and I am hoping you can help me with a VDHR question. It is in regard to a proffer for a rezoning, which was submitted in 2005 and approved in 2010. Below is the language: Ix. MSTOIUC MSOLMCES Prior to approval of the first preliminary subdivision plat or preliminary site plan or an within Tract 1 on Exhibit J (except for the Fire Station property), the Owner shall provi level survey performed by an architectural historian or other qualified individual to ad archival record of the existing buildings within Tract 1. The survey shall meet the Virginia Department of Historic Resources (VDHR) and be provided on the VDHR Rec Field Form. Heather and I could not find this form on VDHR, and are thinking it no longer exists. We were wondering if VDHR did have an actual "Reconnaissance Field Survey Form" in 2005 or as recently as 2010, and what would be the substitute now? We were thinking it would be the VCRIS database. Any guidance you have on this is greatly appreciated. Best, Tor! Tori Kanellopoulos, AiCP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 115 Blake McDonald, Architectural Survey and Cost Share Program Manager Division of Survey and Register Department of Historic Resources 2801 Kensington Avenue, Richmond, VA 23221 Phone: (804) 482-6086 Email. Blake.McDonald(cDdhr.virginia.gov Blake McDonald, Architectural Survey and Cost Share Program Manager Division of Survey and Register Department of Historic Resources 2801 Kensington Avenue, Richmond, VA 23221 Phone: (804) 482-6086 Email. B1ake.McDonald dhr.vir inia. ov Blake McDonald, ArCnftectural Survey and Cost Share Program Manager Division of Survey and Register Department of Historic Resources 2801 Kensington Avenue, Richmond, VA 23229 Phone: (804) 482-6086 Email., Blake. McDonal j@dhr.vir, 6gia.goV 116 Tod Kanello oulos From: Tori Kanellopoulos Sent: Friday, June 21, 2019 10:35 AM To: Todd Marshall; ecruz@uvafoundation.com Cc: John Hash; Rebecca Ragsdale; Lea Brumfield Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Attachments: Hip House VCRIS report.pdf Hi Todd, I just finished a phone call with Blake McDonald from VDHR to follow up on this proffer. It looks like it is a relatively simple process, and VDHR has a quick turnaround time. I am also copying Rebecca and Lea (Zoning) on this email, since this relates to a proffer and I want to be sure Zoning is updated and is satisfied with how this proffer is being addressed. ARB staff were able to figure out that this site has been surveyed before — please see attached "Hip House VCRIS" report. Blake at VDHR confirmed this survey and that it was done well before the proffers for ZMA2005-3. This survey did not include the outbuildings. However, the staff report for ZMA2005-3 references multiple buildings, which are likely these outbuildings. This is the building at 3640 Lonesome Pine Lane. Please see staff report language below: Redevelopment This principle is largely not applicable because of the large portion of undeveloped land; however, a small portion of the 30 acre tract proposed for addition to the parr contains a house Although the Virginia Department of Historic Resources has not surveyed the subject parcels fc the presence of historic architectural and/or archaeological resources, County Real Estate records indicate the presence of a c. 1925 single fain dwelling. The applicant has been requested to document the buildings or TMP 32-18 prior to demolition, which is provided for in the proffers Proffer language below for reference: i. If STORIC RESOURCES Prior to approval of the first preliminary subdivision plat or preliminary site plan or an early grading permit within Tract 1 on Exhibit J (except for the Piro Station property), the Owner shall provide a reconnaissance leval survey performed by an architectural historian or other qualified individual to adequately provide an archival record of the existing buildings within Tract 1, The survey shall meet the requirements of the Virginia Department of Historic Resources (VDHR) and be provided on the VDHR Reoonnaissance Survey Field Form. Therefore, to satisfy this proffer per VDHR standards, the VCRIS database needs to be updated to include all the outbuildings as well. Blake said this process can be accomplished relatively quickly once the field work is done. From Blake, here is what is needed: Reconnaissance Documentation The following materials shall be provided for each recorded property: 1. one (1) hard copy reconnaissance -level documentation form utilizing V-CRIS for the data entry; 117 2. One (1 ) set of 3X" x 5" or 4" x 6" color photographs placed in neatly labeled photo transparent sheets and labeled according to DHR requirements; 3. One (1) set of digital images saved on a CD-ROM or shared via large file transfer system as an uncompressed .1PG file, 1600x1200, at 300 dpi. Individual digital images shall be named and organized according to the convention found in DHR's Survey Photoaraph Policy (2016); and 4. One (1 ) site plan sketch of each property indicating the relationship between the primary resource(s) and any secondary resource(s), the public sidewalk and street or road and neighboring properties, significant landscape features and any significant natural features such as creeks and rivers. The buildings only need to be photographed from the exterior. A consultant with a VCRIS license can complete this update. Alternatively, you may contact Blake (804-482-6086 or biake.mcdonald@dhr.vireinia.gov) to get a free VCRIS license that allows data entry only. Blake encouraged you to contact him directly to compete this process. In summary, I believe updating the VCRIS database per Blake's instructions would satisfy this proffer. I would need Zoning's determination on whether this needs to be fully completed before I can conditionally approve the site plan, or if it just needs to be in the VCRIS queue by the time I need to take an action (July 31). Best, Tor! From: Todd Marshall <tmarshall@uvafoundation.com> Sent: Thursday, June 20, 2019 9:36 AM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org>; ecruz@uvafoundation.com Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Tori, As an alternative - for our recent Birdwood project that had existing houses on it, I'm told that the County has an architectural historian that looked at those prior to demolition of those houses. Is that something we could do here to satisfy this proffer? Todd From: Todd Marshall Sent: Thursday, June 20, 2019 9:04 AM To:'Tori Kanellopoulos' <vkanellopoulos@albemarle.org>; Elise Cruz <ecruzff.@, uvafoundat!on.com> Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Tori, Thanks for your email. There are some existing houses located on this property that are actually in the process of being scheduled for demolition. Would we still need to go through the process and expense of a study if these houses are planned to be removed? They are not historical, 60s-70s era construction I believe. Todd From: Tori Kanellopoulos <vkanellopoulos@albemarle.ors> Sent: Wednesday, June 19, 2019 5:07 PM 118 To: Elise Cruz <ecruzC@uvafoundation.com>; Todd Marshall <tmarshall@uvafoundation.com> Subject: SDP2019-23 UVA Encompass Health - Proffer IX Hi Elise and Todd, My name is Tori Kanellopoulos, ana I am the lead reviewer for SDP2019-23 UVA Encompass Health, which goes to SRC tomorrow. I know Tim Padalino normally reviews UVA projects, however given his workload I took this project. I have been coordinating with Tim and Zoning on this site plan and the proffers. After meeting with Zoning today, there is one proffer that, based on our Proffer Tracking System, has not yet been met and is required prior to initial site plan approval: Imo. HISTORIC RESOURCES Prior to approval of the first preliminary :subdivision plat or preliminary site plan, or an within Tract 1 on Exhibit J (except for the Fire Station property), the Owner shall pros level survey performed by an ardbitwtural historian or tither qualified individual to a archival record of the existing buildings within Tract 1. The survey shall meet the Virginia Department of Historic Resources (VDHR) and be provided on the VDHR Re Field Form. I was wondering if you all have any background on this, and maybe it has already been submitted? Or could be submitted prior to my action letter due date (July 5, although I will be off, so really July 2 or 3)? Zoning determined that this needs to be done prior to initial site plan approval. Separately, we are also meeting with legal tomorrow to determine the timing of the CCP, although we expect that the initial can be approved conditionally before the CCP. Please let me know if you have any additional insight or any questions. ' have sent John Hash at Timmons all review comments except those related to the proffers. This appeared to be the only proffer that would hold up the initial site plan, and my other proffer comments are just for information purposes (and relate to other projects Tim is reviewing). Best, Tor! Tor! Kanellopoulos, AICP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 119 Tori Kanellopoulos From: McDonald, Blake <blake.mcdonald@dhr.virginia.gov> Sent: Friday, June 21, 2019 10:24 AM To: Tori Kanellopoulos Subject: Re: VDHR Form for reconnaissance level survey Hi Tori, Nice to talk to you this morning. Here's exactly what we require for a reconnaissance level survey submission - let me know if you have any questions. Reconnaissance Documentation The following materials shall be provided for each recorded property: 1. One (1) hard copy reconnaissance -level documentation form utilizing V-CR1S for the data entry; 2. One (1) set of 3W x S" or 4" x 6" color photographs placed in neatly labeled photo transparent sheets and labeled according to DHR requirements; 3. One (1) set of digital images saved on a CD-ROM or shared via large file transfer system as an uncompressed .JPG file, 1600x1200, at 300 dpi. Individual digital images shall be named and organized according to the convention found in DHR's Survey Photoaranh Policy (2016), and 4. One (1) site plan sketch of each property indicating the relationship between the primary resource(s) and any secondary resource(s), the public sidewalk and street or road and neighboring properties, significant landscape features and any significant natural features such as creeks and rivers. Thanks again! Blake On Fri, Jun 21, 2019 at 9:35 AM Tori Kanellopoulos <ykanellopoulos@albemarle.ore> wrote: Great! I will plan to give you a cal! at 10 AM, if that sounds good. My number is 585-734-0764. Tori From: McDonald, Blake<biake.mcdonald@dhr.virgina.gov_> Sent: Friday, June 21, 2019 9:27 AM To: Tori Kanellopoulos <ykanellopoulos@albemarle.ore> Subject: Re: VDHR Form for reconnaissance level survey 120 No problem! Figured it might be easier to make a plan over the phone - I'm at 804-482-6086 and will be available until HAM or after 2PM. Blake On Fri, Jun 21, 2019 at 8:10 AM Tori Kanellopoulos <vkanellogoulos@albemarle.org> wrote: Hi Blake, Apologies I missed your call yesterday— my work voicemails actually come through to my email, so I was able to listen to it this morning. I am working from home but could call on my cell phone sometime this morning, if you are available. Best, Tori From: McDonald, Blake<blake.mcdonald@dhr.virainia.gov> Sent: Thursday, June 20, 2019 4.24 PM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Subject: Re: VDHR Form for reconnaissance level survey Hi Tori, Thanks for reaching out! Yes, we should have something on file here - what's the address of the property/properties in question? Blake On Thu, Jun 20, 2019 at 4:18 PM Tori Kanellopoulos <vkanello oulos albemarle.or > wrote: Good Afternoon Blake, 121 My name is Tori, and' am a Planner with Albemarle County. Heather McMahon gave me your contact information, and I am hoping you can help me with a VDHR question. It is in regard to a proffer for a rezoning, which was submitted in 2005 and approved in 2010. Below is the language: IX. HISTORIC RESOURCES Prior to approval of the first preliminary subdiv sion plat or preliminary site plan or an within Tract I on Exhibit J (except for the Fire Station property), the Owner shall provi level survey performed by an architectural historian or other qualified individual to ad archival record of the existing buildings within Tract 1. The survey shall meet the Virginia Department of Historic Resources (VDHR) and be provided on the VDHR Rec Field Form. Heather and I could not find this form on VDHR, and are thinking it no longer exists. We were wondering if VDHR did have an actual "Reconnaissance Field Survey Form" in 2005 or as recently as 2010, and what would be the substitute now? We were thinking it would be the KRIS database. Any guidance you have on this is greatly appreciated. Best, Tori Tor! Kanellopoulos, AICP candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 Blake McDonald, Architectural Survey and Cost Share Program Manager Division of Survey and Register 122 Department of Historic Resources 2801 Kensington Avenue, Richmond, VA 23221 Phone: (804) 462-6086 Email., Blake.McDonaLgL@dhr.virpinia.gov Blake McDonald, Architectural Survey and Cost Share Program Manager Division of Survey and Register Department of Historic Resources 2801 Kensington Avenue, Richmond, VA 23221 Phone: (804) 482-6086 Email: Blake.MCDonaldQdhr.yirainia.go Blake McDonald, Architectural Survey and Cost Share Program Manager Division of Survey and Register Department of Historic Resources 2801 Kensington Avenue, Richmond, VA 23221 Phone: (804) 482-6086 Email. Blake.McDonald(cDdhr._virainia.Qov 123 Tod Kanellopoulos From: John Hash <John.Hash@timmons.com> Sent: Friday, June 21, 2019 10:18 AM To: Tori Kanellopoulos Subject: Encompass Historic Survey Tori Do you know when you can have the requirements for the historic survey to me. The Encompass folks are asking. John 124 Tori Kanellopoulos From: McDonald, Blake <blake.mcdonald@dhr.virginia.gov> Sent Friday, June 21, 2019 9:27 AM To: Tori Kanellopoulos Subject Re: VDHR Form for reconnaissance level survey No problem! Figured it might be easier to make a plan over the phone - I'm at 804-482-6086 and will be available until 11AM or after 2PM. Blake On Fri, Jun 21, 2019 at 8:10 AM Tori Kanellopoulos <vkanellopoulos@albemarle.org> wrote: Hi Blake, Apologies I missed your call yesterday— my work voicemails actually come through to my email, so I was able to listen to it this morning. I am working from home but could call on my cell phone sometime this morning, if you are available. Best, Tor! From: McDonald, Blake <blake.mcdonald@dhr.vireinia.sov> Sent: Thursday, June 20, 2019 4:24 PM To: Tori Kanellopoulos <vkanellopoulos@albemarle•org> Subject: Re: VDHR Form for reconnaissance level survey HITori, Thanks for reaching out! Yes, we should have something on file here - what's the address of the property/properties in question? Blake On Thu, Jun 20, 2019 at 4:18 PM Tori Kanellopoulos <vkanello oulos albemarle,or > wrote: 125 Good Afternoon Blake, My name is Tori, and I am a Planner with Albemarle County. Heather McMahon gave me your contact information, and I am hoping you can help me with a VDHR question. It is in regard to a proffer for a rezoning, which was submitted in 2005 and approved in 2010. Below is the language: M MSTORUC RESOURCES Prior to approval of the flr-st preliminary subdivision plat or preliminary site plan or an e within Tract 1 on Exhibit J (except for the Fire Station property), the Owner shall provic level survey performed by an architemral historian or other qualified individual to ade archival record of the existing buildings within Tract 1. The surrey shall meet the r Virginia Department of Historic Resources (VDHR) and be provided on the VDHR Reci Field Form. Heather and I could not find this form on VDHR, and are thinking it no longer exists. We were wondering if VDHR did have an actual "Reconnaissance Field Survey Form" in 2005 or as recently as 2010, and what would be the substitute now? We were thinking it would be the VCRiS database. Any guidance you have on this is greatly appreciated. Best, Tori Tori Kanellopoulos, AiCP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 126 Blake McDonald, Architectural Survey and Cost Share Program Manager Division of Survey and Register Department of Historic Resources 2801 Kensington Avenue, Richmond, VA 23221 Phone: (804) 482-6086 Email. Blake. McDonald[&-dhr.virainia.gov Blake McDonald, Architectural survey and Cost Share Program Manager Division of Survey and Register Department of Historic Resources 2801 Kensington Avenue, Richmond, VA 23221 Phone: (804) 482-6086 Email. Blake. McDonald dhr. vir inia. ov 127 Tori Kanellopoulos From: Tori Kanellopoulos Sent: Thursday, June 20, 2019 4:32 PM To: McDonald, Blake Subject: RE: VDHR Form for reconnaissance level survey Attachments: UVA Houses Map.pdf, Hip House VCRIS report.pdf Hi Blake, Great, thank you! To be honest, we are not totally sure what the address is, or which one is the 1925 house if it still exists. Attached is "UVA Houses Map" which shows the three tax map/parcels that were included with the proffers. didn't see which house it was in the staff report, so I am not sure which one is the 1925 house that the staff report refers to. Heather found the attached VCRIS report, but that was done before the proffers. We didn't see anything more recent, but maybe we missed something! The only addresses I have would be 3655 Lonesome Pine Lane and 3640 Lonesome Pine Lane. I've reached out to UVA to see if they have more information as well — apologies I don't have much! If they haven't done a survey yet, would the VCRIS database be the best option for meeting this requirement? Heather mentioned a spreadsheet with data to fill out. Best, Tori From: McDonald, Blake<blake.mcdonald@dhr.virginia.gov> Sent: Thursday, June 20, 2019 4:24 PM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Subject: Re: VDHR Form for reconnaissance level survey Hi Tori, Thanks for reaching out! Yes, we should have something on file here what's the address of the property/properties in question? Blake On Thu, Jun 20, 2019 at 4:18 PM Tori Kanellopoulos <vkanellopoulos@albemarle.org> wrote: Good Afternoon Blake, My name is Tori, and 1 am a Planner with Albemarle County. Heather McMahon gave me your contact information, and I am hoping you can help me with a VDHR question. It is in regard to a proffer for a rezoning, which was submitted in 2005 and approved in 2010. Below is the language: 128 IX. HrSTORIC RESOURCES Prior to approval of the fast preliminary subdivision plat or preliminary site plan or an es within Tract 1 on Exhibit J (except for the Fire Station property), the Owner shall provid, level survey performed by an architectural historian or oilier qualified individual to adei archival record of the existing buildings within Tact 1. The survey shall meet the re Virginia Department of Historic Resources(VDHR) and be provided on the VDHR R.eco Field Form. Heather and I could not find this form on VDHR, and are thinking it no longer exists. We were wondering if VDHR did have an actual "Reconnaissance Field Survey Form" in 2005 or as recently as 2010, and what would be the substitute now? We were thinking it would be the VCRIS database. Any guidance you have on this is greatly appreciated. Best, Tori Tori Kanellopoulos, AICP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 Blake McDonald, Architectural Survey and Cost Share Program Manager Division of Survey and Register Department of Historic Resources 2801 Kensington Avenue, Richmond, VA 23221 Phone_ (804) 482-6086 Email- B1ake.McDonald dhr.vir inia. ov 129 Tor! Kanellopoulos From: McDonald, Blake <Blake.mcdonald@dhr.virginia.gov> Sent: Thursday, June 20, 2019 4:24 PM To: Tori Kanellopoulos Subject: Re: VDHR Form for reconnaissance level survey Hi Tori, Thanks for reaching out! Yes, we should have something on file here - what's the address of the property/properties in question? Blake On Thu, Jun 20, 2019 at 4:18 PM Tori Kanellopoulos <vkanellopoulos@albemarle.ore> wrote: Good Afternoon Blake, My name is Tori, and I am a Planner with Albemarle County. Heather McMahon gave me your contact information, and I am hoping you can help me with a VDHR question. It is in regard to a proffer for a rezoning, which was submitted in 2005 and approved in 2010. Below is the language: IX. MSTOIUC RUOuRcES Prior to approval of the first preliminary subdivision plat or preliminary site plan or an ea within Tract 1 on Exhibit d (except for the Fire Station property), the Owner shall pjrovid+ level survey performed by an architectural historian or other qualified individual to aft archival record of the existing buildings within Tract t. The survey shall meet the re Virginia Department of Historic Resources (VDHR) and be provided on. the VDHR Reco Field Form. Heather and I could not find this form on VDHR, and are thinking it no longer exists. We were wondering if VDHR did have an actual "Reconnaissance Field Survey Form" in 2005 or as recently as 2010, and what would be the substitute now? We were thinking it would be the VCRIS database. Any guidance you have on this is greatly appreciated. Best, Tori 130 Tori Kanellopoulos, AICP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 Blake McDonald, Architectural Survey and Cost Share Program Manager Division of Survey and Register Department of Historic Resources 2801 Kensington Avenue, Richmond, VA 23221 Phone: (804) 482-6086 Email: Blake.McDonald@dhr.virainia.gov 131 Tor! Kanello oulos From: Tod Kanellopoulos Sent: Thursday, June 20, 2019 4:20 PM To: John Hash; Shawn Maddox Subject: SDP2019-23 UVA Encompass Health HI John and Shawn, wanted to start this email to follow up on the SRC meeting today. Shawn, John would like to follow up on the Fire/Rescue comment on the building height, and has some supplementary elevation drawings to send along. Best, Tori Tor! Kanellopoulos, AICP Candidate Planner Community Development Department Phone: 434-296-5532 ext. 3270 132 Tori Kanellopoulos From: Tori Kanellopoulos Sent Thursday, June 20, 2019 4:19 PM To: blake.mcdonald@dhr.virginia.gov Subject VDHR Form for reconnaissance level survey Good Afternoon Blake, My name is Tori, and I am a Planner with Albemarle County. Heather McMahon gave me your contact information, and I am hoping you can help me with a VDHR question. It is in regard to a proffer for a rezoning, which was submitted in 2005 and approved in 2010. Below is the language: IX. MSTORiC RESOURCES Prior t4 approval of the first preliminary subdivision plat or preliminary site plan or an eat within 'Tract 1 on Exhibit d (except for the Fire Station property), the Owner shall provide level survey performed by an architectural historian or other qualified individual to adeq archival record of the existing buildings within Tract 1. The survey shall meet the re( Vhi -ginia Department of Historic Resources (VDHR) and be provided on the VDHR Recon Field Form. Heather and I could not find this form on VDHR, and are thinking it no longer exists. we were wondering if VDHR did have an actual "Reconnaissance Field Survey Form" in 2005 or as recently as 2010, and what would be the substitute now? We were thinking it would be the VCRIS database. Any guidance you have on this is greatly appreciated. Best, Tori Tori Kanellopoulos, AICP Candidate Planner Community Development Department Phone: 434-296-5532 ext. 3270 133 Tori Kanellopoulos From: Tori Kanellopoulos Sent: Thursday, June 20, 2019 4:14 PM To: Todd Marshall; ecruz@uvafoundation.com Subject: RE: SDP2019-23 UVA Encompass Health Proffer IX Attachments: Hip House VCRIS report.pdf Hi Todd, I've been coordinating with Zoning and ARB staff here. This would be something that the applicant would need to complete. Based on language in the ZMA2005-3 Staff Report, it appears there was/is a 1925 house on the site that staff wanted to be documented, with potentially other buildings associated with this house as well: :red l n# Frhis win.ci le is �I rgely not applicaiNe becsu i cindevefiO M IOnd; h0luveve , a small purblan al for A d tilm Flo the park . lth ePar'Wr�ient of lirastortc esourceh -,% not sL�,� the Presence of hisla'.) ar,-chitectura-11, a! tworz_if County Real Estate � cut-(.j s indicate the prese dwelling- ` '�­a apla and h s baen requested ti Historic • Provide reconnsisatme .gavel documendation of hi ARB staff think that the form has likely changed, so I will contact VDHR and see what is equivalent now. Likely it is inputting data into VCRIS. I will double check with Zoning as well, but I think that would satisfy the proffer. Do you know if that 1925 single-family house is still there? I've attached the only VCRIS report we could find on the TMP32-18 sites, but it is before the proffers went into effect. Best, Tori From: Todd Marshall <tmarshall@uvafoundation.com> Sent: Thursday, June 20, 2019 9:36 AM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org>; ecruz@uvafoundation.com Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Tori, 134 As an alternative - for our recent Birdwood project that had existing houses on it, I'm told that the County has an architectural historian that looked at those prior to demolition of those houses. Is that something we could do here to satisfy this proffer? Todd From: Todd Marshall Sent: Thursday, June 20, 2019 9:04 AM To:'Tori Kanellopoulos' <vkanello oulos albemarle.or >; Elise Cruz <ecruz@uvafoundation.com> Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Tori, Thanks for your email. There are some existing houses located on this property that are actually in the process of being scheduled for demolition. Would we still need to go through the process and expense of a study if these houses are planned to be removed? They are not historical, 60s-70s era construction I believe. Todd From: Tod Kanellopoulos <vkanellopoulos@albemarle.ore> Sent: Wednesday, June 19, 2019 5:07 PM To: Elise Cruz <ecruz@uvafoundation.com>; Todd Marshall <tmarshall@uvafoundation.com> Subject: SDP2019-23 UVA Encompass Health - Proffer IX Hi Elise and Todd, My name is Tor! Kanellopoulos, and I am the lead reviewer for SDP2019-23 UVA Encompass Health, which goes to SRC tomorrow. I know Tim Padalino normally reviews UVA projects, however given his workload I took this project. I have been coordinating with Tim and Zoning on this site plan and the proffers. After meeting with Zoning today, there is one proffer that, based on our Proffer Tracking System, has not yet been met and is required prior to initial site plan approval: IX. HISTORIC RESOURCES Prior to approval of the first preliminary subdivision plat or preliminary site plan or an within Tract 1 on Exhibit J (except for the Fire Station property), the Owner shall pror level survey performed by an architectural historian or other qualified individual to a archival record of the existing buildings within Tract 1. The survey shall meet the Virginia Department of Historic Resources (VDHR) and be provided on the VDHR Re Field Form. I was wondering if you all have any background on this, and maybe it has already been submitted? Or could be submitted prior to my action letter due date (July 5, although I will be off, so really July 2 or 3)? Zoning determined that this needs to be done prior to initial site plan approval. Separately, we are also meeting with legal tomorrow to determine the timing of the CCP, although we expect that the initial can be approved conditionally before the CCP. 135 Please let me know if you have any additional insight or any questions. i have sent John Hash at Timmons all review comments except those related to the proffers. This appeared to be the only proffer that would hold up the initial site plan, and my other proffer comments are just for information purposes (and relate to other projects Tim is reviewing). Best, Tor! Tori Kanellopoulos, AICP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 136 Tori Kanellopoulos From: Margaret Maliszewski Sent: Thursday, June 20, 2019 11:28 AM To: Tori Kanellopoulos Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX I agree - the applicant should do this work From: Tori Kanellopoulos Sent: Thursday, June 20, 2019 10:30 AM To: Margaret Maliszewski <MMaliszewski@albemarle.org> Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Good call to check the staff report — I'm going to ask Heather about the form as well. They mentioned in their email below that a County (?) staff person checked the historic resources there, but the proffer seems like the applicant should be doing so here. Redevelopment This principle is largely not Pica l( for addition to the park contains a hoi DepaOanent of HJ*Wic Resources ha the presence of, historic archli emral, County Real Estate recerd , indica e i dwelling, "T a applicant has been fec T R 1 Spnot to demolition.. which • ProWde reconnof"S49 ce- levei ec, e-pwar1an of hrl From: Todd Marshall <tmarshali uvafoundation.com> Sent: Thursday, June 20, 2019 9:36 AM To: Tori Kanellopoulos <vkanellopoulos@albemarle.ore>; ecruz@uvafoundation.com Subject: RE: SOP2019-23 UVA Encompass Health - Proffer IX Tori, As an alternative - for our recent Birdwood project that had existing houses on it, I'm told that the County has an architectural historian that looked at those prior to demolition of those houses. Is that something we could do here to satisfy this proffer? 137 Todd From: Todd Marshall Sent: Thursday, June 20, 2019 9:04 AM To:'Tori Kanellopoulos' <vkanello oulos albemarle.or >; Elise Cruz <ecruz uvafoundation.com> Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Tori, Thanks for your email. There are some existing houses located on this property that are actually in the process of being scheduled for demolition. Would we still need to go through the process and expense of a study if these houses are planned to be removed? They are not historical, 60s-70s era construction I believe. ZTrd From: Tori Kanellopoulos <vkanello oulos albemarle.or > Sent: Wednesday, June 19, 2019 5:07 PM To: Elise Cruz <ecru z0 uvafoundation,com>; Todd Marshall <tmarshali uvafoundation.com> Subject: SDP2019-23 UVA Encompass Health - Proffer IX Hi Elise and Todd, My name is Tori Kanellopoulos, and I am the lead reviewer for SDP2019-23 UVA Encompass Health, which goes to SRC tomorrow. I know Tim Padalino normally reviews UVA projects, however given his workload I took this project. I have been coordinating with Tim and Zoning on this site plan and the proffers. After meeting with Zoning today, there is one proffer that, based on our Proffer Tracking System, has not yet been met and is required prior to initial site plan approval: prior to approval of the .filr preliminary subdivision plat or prelim'inary site plan or an within Tract 1 on Exhibit I (exccpt for the Fire Station property) the Owner shall paroi level Survey performed y In architectural historian or other qualified individual to a archival record of the existing buildings within Tract 1. The survey sball Meet the fit^ * is Department of Historic, Resource (VDHR) and be provided on the VD1 e Field Form. was wondering if you all have any background on this, and maybe it has already been submitted? Or could be submitted prior to my action letter due date (July 5, although I will be off, so really July 2 or 3)? Zoning determined that this needs to be done prior to initial site plan approval. Separately, we are also meeting with legal tomorrow to determine the timing of the CCP, although we expect that the initial can be approved conditionally before the CCP. Please let me know if you have any additional insight or any questions. I have sent John Hash at Timmons all review comments except those related to the proffers. This appeared to be the only proffer that would hold up the initial site plan, and my other proffer comments are just for information purposes (and relate to other projects Tim is reviewing). 138 Best, Tori Tori Kanellopoulos, AiCP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 139 Tori Kanello oulos From: Heather McMahon Sent: Thursday, June 20, 2019 11:11 AM To: Tori Kanellopoulos Subject: Proffer question TMP 32-18 Attachments: Hip House VCRIS report.pdf Hi Tori, Please find the report for the one house already surveyed on the TMP 32-18 attached. Contact Blake McDonald about whether in 2005 the VDHR had an actual "Reconnaissance Field Survey Form" and what would be the substitute now. I have a feeling input into the VDHR database, VCRIS is the substitute. Blake McDonald — Richmond Manager of Architectural Survey & Cost Share Grant Program Survey & Register Division (804) 482-6086 Thanks, Heather McMahon, Senior Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3278 hmcmahon@albemarle.00r 140 Tor! Kanello oulos From: Todd Marshall <tarshall@uvafoundation.com> Sent: Thursday, June 20, 2019 9:36 AM To: Tori Kanellopoulos; ecruz@uvafoundation.com Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Tori, As an alternative - for our recent Birdwood project that had existing houses on it, I'm told that the County has an architectural historian that looked at those prior to demolition of those houses. Is that something we could do here to satisfy this proffer? Todd From: Todd Marshall Sent: Thursday, June 20, 2019 9:04 AM To:'Tori Kanellopoulos' <vkanellopoulos@albemarle.org>; Elise Cruz <ecruz@uvafoundation.com> Subject: RE: SDP2019-23 UVA Encompass Health - Proffer IX Tori, Thanks for your email. There are some existing houses located on this property that are actually in the process of being scheduled for demolition. Would we still need to go through the process and expense of a study if these houses are planned to be removed? They are not historical, 60s-70s era construction I believe. Todd From: Tori Kanellopoulos <vkanello oulos albemarle.or > Sent: Wednesday, June 19, 2019 5:07 PM To: Elise Cruz <ecruz@uvafoundation.com>; Todd Marshall <tmarshall@uvafoundation.com> Subject: SDP2019-23 UVA Encompass Health - Proffer iX H1 Elise and Todd, My name is Tori Kanellopoulos, and I am the lead reviewer for SDP2019-23 UVA Encompass Health, which goes to SRC tomorrow. I know Tim Padalino normally reviews UVA projects, however given his workload I took this project. I have been coordinating with Tim and Zoning on this site plan and the proffers. After meeting with Zoning today, there is one proffer that, based on our Proffer Tracking System, has not yet been met and is. required prior to initial site plan approval: 141 IX. HISTORIC RESOURCES Prior to approval of the first preliminary subdivision plat or preliminary site plan or an within Tract I on Exhibit I (except for the Dire Station property), the Owner shall pro) level survey performed by an architectural historian or other qualified individual to a archival record of the existing buildings within Tract 1. The survey shall meet the Virginia Department of Historic Resources (VDHFL) and be provided on the VDHR Re Field Form, I was wondering if you all have any background on this, and maybe it has already been submitted? Or could be submitted prior to my action letter due date (July 5, although I will be off, so really July 2 or 3)? Zoning determined that this needs to be done prior to initial site plan approval. Separately, we are also meeting with legal tomorrow to determine the timing of the CCP, although we expect that the initial can be approved conditionally before the CCP. Please let me know if you have any additional insight or any questions. 1 have sent John Flash at Timmons all review comments except those related to the proffers. This appeared to be the only proffer that would hold up the initial site plan, and my other proffer comments are just for information purposes (and relate to other projects Tim is reviewing). Best, Tor! Tori Kanellopoulos, AiCP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 142 Tor! Kanellopoulos From: Todd Marshall <tarshall@uvafoundation_com> Sent Thursday, June 20, 2019 9:04 AM To: Tori Kanellopoulos; ecruz@uvafoundation.com Subject RE: SDP2019-23 UVA Encompass Health - Proffer IX Tor!, Thanks for your email. There are some existing houses located on this property that are actually in the process of being scheduled for demolition. Would we still need to go through the process and expense of a study if these houses are planned to be removed? They are not historical, 60s-70s era construction I believe. Todd From: Tor! Kanellopoulos <vkanellopoulos@albemarle.org> Sent: Wednesday, June 19, 2019 5:07 PM To: Elise Cruz <ecruz@uvafoundation.com>; Todd Marshall <tmarshall@uvafoundation.com> Subject: SDP2019-23 UVA Encompass Health - Proffer IX Hi Elise and Todd, My name is Tori Kanellopoulos, and I am the lead reviewer for SDP2019-23 UVA Encompass Health, which goes to SRC tomorrow. I know Tim Padalino normally reviews UVA projects, however given his workload I took this project. I have been coordinating with Tim and Zoning on this site plan and the proffers. After meeting with Zoning today, there is one proffer that, based on our Proffer Tracking System, has not yet been met and is required prior to initial site plan approval: IX. IRSSTORIC RESOURCES Prior to approval of the first preliminary subdivision plat or preliminary site plan or an within Tract 1 on Exhibit J (except for the Fire Station property), the Owner shall pros level survey performed by an architectural historian or other qualified individual to a archival record of the existing buildings within Tract 1. The survey shall meet the Virginia Department of Historic Resources (VDHR) and be provided on the VDHR Re Field Form. I was wondering if you all have any background on this, and maybe it has already been submitted? Or could be submitted prior to my action letter due date (July 5, although I will be off, so really July 2 or 3)? Zoning determined that this needs to be done prior to initial site plan approval. Separately, we are also meeting with legal tomorrow to determine the timing of the CCP, although we expect that the initial can be approved conditionally before the CCP. Please let me know if you have any additional insight or any questions. I have sent John Hash at Timmons all review comments except those related to the proffers. This appeared to be the only proffer that would hold up the initial site plan, and my other proffer comments are just for information purposes (and relate to other projects Tim is reviewing). 143 Best, Tori Tori Kanellopoulos, AICP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 144 Tori Kanell000ulos From: Tori Kanellopoulos Sent Thursday, June 20, 2019 8:30 AM To; John Hash Cc: ecruz@uvafoundation.com; tmarshall@uvafoundation.com Subject: SDP2019-23 UVA Encompass Health Attachments: SDP2019-23 Health Review Comments.doc; SDP2019-23 Review Comments 06-20-19.docx; SDP2019-23 RWSA Comments.pdf; SDP2019-23 VDOT Comments.pdf, SDP201900023 Review Comments Architectural Review Board Approval 2019-06-14.pdf Hi John, Please see full attached review comments for SDP2019-23 UVA Encompass Health. The only changes since I previously sent you comments are the comments on proffers (there are no new or changed site plan comments). I wanted to make sure you had all of the comments in one email. After meeting with Zoning, the only proffer that needs to be addressed prior to initial site plan approval is Proffer 9, historic resources survey. This site plan may need to be deferred in order to comply with this proffer. Best, Tori Tori Kanellopoulos, AICP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 145 Tori Kanellopoulos From: Tori Kanellopoulos Sent: Wednesday, June 19, 2019 5:07 PM To: ecruz@uvafoundation.com; tmarshall@uvafoundation.com Subject: SDP2019-23 UVA Encompass Health - Proffer IX Hi Elise and Todd, My name is Tori Kanellopoulos, and I am the lead reviewer for SDP2019-23 UVA Encompass Health, which goes to SRC tomorrow. I know Tim Padalino normally reviews UVA projects, however given his workload I took this project. I have been coordinating with Tim and Zoning on this site plan and the proffers. After meeting with Zoning today, there is one proffer that, based on our Proffer Tracking System, has not yet been met and is required prior to initial site plan approval: IX. ORJC RESOURCRS Prior to approval of the first preliminary subdivision plat or preliminaly site plan or an within Tract 1 on Exhibit J (except for the Fire Station property), the Owner shall pros level survey performed by an architecturaJ historian or other qualified individual to a archival record of the existing buildings within Tract 1. The survey shall meet the Virginia Department of Historic Resources HR) and be provided on the VDHR RE Field Form. I was wondering if you all have any background on this, and maybe it has already been submitted? Or could be submitted prior to my action letter due date (July 5, although I will be off, so really July 2 or 3)? Zoning determined that this needs to be done prior to initial site plan approval. Separately, we are also meeting with legal tomorrow to determine the timing of the CCP, although we expect that the initial can be approved conditionally before the CCP. Please let me know if you have any additional insight or any questions. ' have sent John Hash at Timmons all review comments except those related to the proffers. This appeared to be the only proffer that would hold up the initial site plan, and my other proffer comments are just for information purposes (and relate.to other projects Tim is reviewing). Best, Tori Tori Kanellopoulos, ,vCP Candidate Planner Community Development Department Phone: 434-296-5532 ext. 3270 146 Tori Kanellopoulos From: Tim Padalino Sent. Wednesday, June 19, 2019 11:50 AM To: Bill Fritz; Tori Kanellopoulos Subject: RE: CCP for UVA Encompass Health - timing? I tend to think the Initial Site Plan can be (conditionally) approved, since a conditional approval of Initial SDP does not "authorize" the public structure. This is somewhat similar (but with important distinctions) to the conditional approval of the Initial SDP for EcoVillage prior to the SP approval for the steep slope disturbance. So, if the approval (with conditions) of an initial site plan only authorizes applicants to submit an application for a final site plan, and does not authorize/permitlapprove construction, than I don't think that is in conflict with the prohibitions against "authoriz[ing]" a use prior to 2232 review. I cannot attend the Legal Agenda meeting this week; I'll be on a site visit at Breezy Hill with the applicants. ' think Tori will be joining me, as well, but I won't speak definitively for her. Thanks for the assistance and coordination, Bill Tim Padalino, AICP Albemarle County I Community Development Dept. (434)-296-5832 x. 3088 From: Bill Fritz Sent: Wednesday, June 19, 2019 9:34 AM To: Tim Padalino <tpadalino@albemarle.org>; Tori Kanellopoulos <vkanellopoulos@albemarle.org> Subject: RE: CCP for UVA Encompass Health - timing? I reviewed 2232 and want to consult with Andy. I put it on legal. Here is my issue. No public structure "shall be constructed, established or authorized, unless and until the general location or approximate location, character, and extent thereof has been submitted to and approved by the commission as being substantially in accord with the adopted comprehensive plan or part thereof." Initial approval does not authorize the construction but it does vest some rights. I welcome your thoughts also. William D. Fritz, AICP Development Process Manager/Ombudsman 434-296-5823 ext 3242 From: Tim Padalino Sent: Tuesday, June 18, 2019 3:13 PM 147 To: Bill Fritz <BFRITZ@albemarle.orp; Tori Kaneliopoulos <ykanellopoulos@albemarle.orp Subject: CCP for UVA Encompass Health - timing? Initial Site Plan SDP201900023 (under review: SRC 6120; action required no later than July 5) LOD 201900006 (determination: public use) Can Tori issue a letter of conditional approval for SDP201900023, prior to review and approval of this CCP for the proposed public use (which (presumably) is permissible by right in PDIP)? Tim Padalino, AICP Senior Planner I Community Development Department County of Albemarle, Virginia hftps://www.albemarle.org/department.asp?department=cdd (434)-296-5832 x. 3088 148 Tod Kanellopoulos From: Tori Kanellopoulos Sent Wednesday, June 19, 2019 9:44 AM To: John Hash Cc: Andrew Allison Subject RE: Encompass Albemarle Attachments: SDP2019-23 Health Review Comments.doc, SDP2019-23 Review Comments 06-20-19.docx Hi John, Please see attached review comments from Health — no objection. I wanted to let you know that we are tomorrow afternoon with the County Attorney's Office at 2 PM to determine whether or not the CCP is needed first or If conditional approval of the initial site plan is possible. I know Tim Padalino has been coordinating with Elise Cruz, Fred Missel and Todd Marshall at the UVA Foundation on the CCP. I will let you know what the determination is. My action letter on this site plan is due July Sth, so we will have the determination well before that date. I am also meeting with Zoning this afternoon to discuss the proffers per ZMA2005-3 to see the status of those and what remains. Please see my attached comments minus the CCP determination and minus the proffers — i will send updated comments once we have reviewed the proffers fully! Best, Tor! From: Tor! Kanellopoulos Sent: Tuesday, June 18, 2019 4:27 PM To: John Hash <John.Hash @timmons.com> Cc: Andrew Allison <Andrew.Allison@timmons.com> Subject: RE: Encompass Albemarle Hi John, I will definitely send you full comments before the meeting (it is Planning and Health missing at this time, based on what I sent you a bit ago). I have not finished Planning comments yet but will send as soon as I have them. I apologize for being behind in my review, but I am doing my best to finish the review as soon as possible. I am also getting a determination from staff on whether or not the CCP (Consistency with the Comprehensive Plan) needs to be approved first or whether the initial site plan can be conditionally approved. Best, To ri From: John Hash <John.Hash timmons.com> Sent: Tuesday, June 18, 2019 4:22 PM 149 To: Tori Kanellopoulos <vkanellogoulos@albemarle.ore> Cc: Andrew Allison <Andrew.Allison@timmons.com> Subject: Encompass Albemarle T Tor! We have the meeting this Thursday to go over the County comments. Would it be possible to get r copy of the comments before the meeting. John 150 Tod Kanellopoulos From: Bill Fritz Sent: Wednesday, June 19, 2019 9:34 AM To: Tim Padalino; Tod Kanellopoulos Subject RE: CCP for UVA Encompass Health - timing? I reviewed 2232 and want to consult with Andy. I put it on legal. Here is my issue. No public structure "shall be constructed, established or authorized, unless and until the general location or approximate location, character, and extent thereof has been submitted to and approved by the commission as being substantially in accord with the adopted comprehensive plan or part thereof." Initial approval does not authorize the construction but it does vest some rights. I welcome your thoughts also. William D. Fritz, AICP Development Process Manager/Ombudsman 434-296-5823 ext 3242 From: Tim Padalino Sent: Tuesday, June 18, 2019 3:13 PM To: Bill Fritz <BFRITZ@albemarle.org>; Ton Kanellopoulos <vkanellopoulos@albemarle.org> Subject: CCP for UVA Encompass Health - timing? Initial Site Plan SDP201900023 (under review: SRC 6/20; action required no later than July 5) LOD 201900006 (determination: public use) Can Tod issue a letter of conditional approval for SDP201900023, prior to review and approval of this CCP for the proposed -public use (which (presumably) is permissible by right in PDIP)? Tim Padalino, AICP Senior Planner I Community Development Department County of Albemarle, Virginia httm//www.albemade.orq/degartment.asa?department=cdd (434)-296-5832 x. 3088 151 Tor! Kanellopoulos From: Mazurowski, Alan<alan.mazurowski@vdh.virginia.gov> Sent: Wednesday, June 19, 2019 8:53 AM To: Tori Kanellopoulos Subject: Re: UVA Encompass Rehab Hospital initial plan review Attachments: UVA Encompass Rehab Hospital, Initial, SDP20.1900023.doc Tori, Thanks for that link, it worked fine - review comment letter attached. Alan Alan Mazurowski Environmental Health Supervisor Onsite Sewage & Private Well Programs Thomas Jefferson Health District 1138 Rose Hill Drive Charlottesville, VA 22906 434-972-4306 office 434-972-4310 fax On Mon, Jun 17, 2019 at 9:29 AM Tori Kanellopoulos <vkanellopoulos@albemarle.ore> wrote: Hi Alan, Unfortunately the file is too large to attach —can you access it with the public County link below? htt s: lfweb.albemarle.or weblink search.as x?dbid=3&searchcommand=%7b%SbCDD- planning%5d: 5bAppl1cationNumber%5d=%22SDP201900023%22%7d Otherwise I can try to shrink the file. Thanks! Tori 157 From: Mazurowski, Alan<alan.mazurowski@vdh.virginia.gov> Sent: Friday, June 14, 2019 4:06 PM To: Tori Kanellopoulos <vkanello oulos@albemarle.ore> Subject: UVA Encompass Rehab Hospital initial plan review Tori, Just realized this was a digital submittal, could you send that to me as a PDF? Thanks, Alan Alan Mazurowski Environmental Health Supervisor Onsite Sewage & Private Well Programs Thomas Jefferson Health District 1138 Rose Hill Drive Charlottesville, VA 22906 434-972-4306 office 434-972-4310 fax 153 Tori Kanellopoulos From: Tori Kanellopoulos Sent: Tuesday, June 18, 2019 4:27 PM To: John Hash Cc: Andrew Allison Subject: RE: Encompass Albemarle Hi John, I will definitely send you full comments before the meeting (it is Planning and Health missing at this time, based on what sent you a bit ago). I have not finished Planning comments yet but will send as soon as I have them. I apologize for being behind in my review, but I am doing my best to finish the review as soon as possible. I am also getting a determination from staff on whether or not the CCP (Consistency with the Comprehensive Plan) needs to be approved first or whether the initial site plan can be conditionally approved. Best, Tori From: John Hash <John.Hash @timmons.com> Sent: Tuesday, June 18, 2019 4:22 PM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Cc: Andrew Allison <Andrew.Allison@timmons.com> Subject: Encompass Albemarle Tod We have the meeting this Thursday to go over the County comments. Would it be possible to get a copy of the comments before the meeting. John 154 Tod Kanello oulos From: John Hash <John.Hash@timmons.com> Sent Tuesday, June 18, 2019 4:22 PM To: Tod Kaneilopoulos Cc: Andrew Allison Subject: Encompass Albemarle Tod We have the meeting this Thursday to go over the County comments. Would it be possible to get a copy of the comments before the meeting. John 155 Tori Kanellopoulos From: Tim Padalino Sent: Tuesday, June 18, 2019 3:13 PM To: Bill Fritz; Tori Kanellopoulos Subject: CCP for UVA Encompass Health - timing? Attachments: LOD2019-14.pdf Initial Site Plan SDP201900023 (under review: SRC 6120; action required no later than July 5) LOD 201900006 (determination: public use) Can Tori issue a letter of conditional approval for SDP201900023, prior to review and approval of this CCP for the proposed public use (which (presumably) is permissible by right in PDIP)? Tim Padalino, AICP Senior Planner I Community Development Department County of Albemarle, Virginia htti)s://www.albemarie.oraldei)artment.asp?department=cdd (434)-296-5832 x. 3088 156 Tori Kanello oulos From: Tim Padalino Sent: Tuesday, June 18, 2019 3:10 PM To: Bart Svoboda Cc: Rebecca Ragsdale; Lea Brumfield; Tori Kanellopoulos Subject: SUB201900106 Hello Bart, I am reviewing a final plat of division and adjustment for several parcels in the UVA Research Park (SUB201900106). This final plat correlates to Road Plan SUB201900049 and Initial Site Plan SDP201900023 (under review by Tori, going to SRC Thursday). There are some outstanding questions I have related to how the proffers for this area (ZMA200500003) might affect construction of the road and development of the UVA Encompass Health project. Those questions primarily relate to the proffers connected to the Hollymead Fire Station. I transmitted this plat to you and noted that we should probably sit down to think through this situation together. I'm also wondering if you're the most appropriate point of contact for Zoning (considering your ongoing involvement with the monthly UVAF/CDD meetings), or if I should potentially be communicating with Lea (considering her participation in the same meetings) and/or with Rebecca (considering her role with proffers). Any thoughts? Once we figure out who I (and possibly Toll) should be coordinating with, I can move forward from there. Thanks very much - - - Tim Padalino, AICP Senior Planner I Community Development Department County of Albemarle, Virginia https://www.albemarle.ora/department.asp?department=cdd (434)-296-5832 x. 3088 157 Tori Kanellopoulos From: Tim Padalino Sent: Tuesday, June 18, 2019 1:56 PM To: Tori Kanellopoulos Subject: RE: Message from VIRGINIA CALL (94344140354) Thanks for the update I confirmation. And no problem. Good luck! Tim Padalino, AICP Albemarle County I Community Development Dept. (434)-296-5832 x. 3088 From: Tori Kanellopoulos Sent: Tuesday, June 18, 20191:47 PM To: Tim Padalino <tpadalino@albemarle.org> Subject: ICE: Message from VIRGINIA CALL (94344140354) Hi Tim, Thanks for the heads up — I believe that's John Hash, the contact for the project. I still have not finished my review yet, but I've sent him all of the other reviewer comments. I'm guessing he reached out since you've been on most UVA projects, and I'm behind on getting these comments out. Anyway, hopefully he will reply to me now! Thanks! Tori From: Tim Padalino Sent: Tuesday; June 18, 2019 1:42 PM To: Tori Kanellopoulos <vkanello oulos albemarle.or > Subject: FW: Message from VIRGINIA CALL (94344140354) Tori, I got this voicemail (attached) from John Hand (?) with Timmons, regarding the SRC meeting on Thursday. He didn't provide much details, other than asking for the review comment letter to be sent to him. I'm wondering if he's contacting me about the UVA Encompass Health Initial Site Plan, without realizing he should be contacting you? Does that theory make sense? (if not; I'll bring this up at Distribution...) Thanks — Tim Albemarle County I Community Development Dept. (434)-296-5832 x. 3088 158 From: Cisco Unity Connection Messaging System <unit connection cobm�cucxn ub.albemarle.or > Sent: Tuesday, June 18, 2019 1:23 PM To: t adalino cobm-cucxn ub.albemarle.or Subject: Message from VIRGINIA CALL (94344140354) 159 Tori Kanellopoulos From: Tim Padalino Sent: Tuesday, June 18, 2019 1:55 PM To: Tori Kanellopoulos Subject: Fw: UVA Encompass Health: Initial Site Plan Just fyi! Tim Padalino, AICP Albemarle County I Community Development Dept. (434)-296-5832 x. 3088 From: Tim Padalino Sent: Tuesday, June 18, 20191:55 PM To:'John Hash' <John.Hash@timmons.com> Subject: UVA Encompass Health: initial Site Plan Hi John, Thanks for your voicemail earlier this afternoon re: SRC comment letter for the initial site plan for UVA Encompass Health (SDP201900023). As it turns out, I'm not the lead reviewer for that site plan. You'll need to contact Ms. Tori Kanellopoulos at vkanello oulos albemarle.or or (434)-296-5832 x 3270. i hope this helps. Thanks --- Tim Padalino, AICP Senior Planner I Community Development Department County of Albemarle, Virginia https://www.albemade.org/de artment.as ?de artment=cdd (434)-296-5832 x. 3088 160 TorilKane From: Tori Kane!lopoulos Seat: Tuesday, June 18, 2019 1:47 PM To: Tim Padalino Subject: RE: Message from VIRGINIA CALL (94344140354) Hi Tim, Thanks for the heads up — I believe that's John Hash, the contact for the project. I still have not finished my review yet, but I've sent him all of the other reviewer comments. I'm guessing he reached out since you've been on most UVA projects, and I'm behind on getting these comments out. Anyway, hopefully he will reply to me now! Thanks! Tor! From: Tim Padalino Seat: Tuesday, June 18, 20191:42 PM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Subject: FW: Message from VIRGINIA CALL (94344140354) Too, I got this voicemail (attached) from John Hand (?) with Timmons, regarding the SRC meeting on Thursday. He didn't provide much details, other than asking for the review comment letter to be sent to him. I'm wondering if he's contacting me about the UVA Encompass Health Initial Site Plan, without realizing he should be contacting you? Does that theory make sense? (If not, I'll bring this up at Distribution...) Thanks --- Tim Padalino, AICP Albemarle County I Community Development Dept. (434)-296-5832 x. 3088 From: Cisco Unity Connection Messaging System <unit connection cobm-cucxn ub.albemarle.or > Sent: Tuesday, June 18, 20191:23 PM To: Joadalino.@cobm-cucxnpub.albemarle ore Subject: Message from VIRGINIA CALL (94344140354) 161 Tori Kanello oulos From: Tori Kanellopoulos Sent•Tuesday, June 18, 2019 1 A PM To: john.hash@timmons.com Subject: SDP2019-23 UVA Encompass Initial Site Plan Attachments•. SDP2019-23 Review Comments 06-20-19.docx, SDP2019-23 RWSA Comments.pdf; SDP2019-23 VDOT Comments.pdf, SDP201900023 Review Comments Architectural Review Board Approval 2019-06-14.pdf Good Afternoon John, I received a message from my colleague Tim Padalino that you had reached out regarding SDP2019-23 UVA Encompass Health, which is going to SRC on Thursday. i am the lead reviewer for this project and have checked in with Tim about it as well (since he has done most UVA Foundation projects). I am in the process of completing the Planning review, and I believe at this point it is just the Health Department and I that have not yet finished review comments. I have attached the comments I have so far. Apologies my review is not yet complete — I was at a conference all last week and am catching up. I hope to have my comments to you by midday tomorrow. Best, Tori Tori Kanellopoulos, AICP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 162 Tori Kanello oulos From: Tim Padalino Sent: Tuesday, June 18, 2019 1:42 PM To: Tod Kanellopoulos Subject: FW. Message from VIRGINIA CALL (94344140354) Attachments: VoiceMessage.wav Tod, I got this voicemail (attached) from ,loan Hand (?) with Timmons, regarding the SRC meeting on Thursday. He didn't provide much details, other than asking for the review comment letter to be sent to him. I'm wondering if he's contacting me about the UVA Encompass Health Initial Site Plan, without realizing he should be contacting you? Does that theory make sense? (If not, I'll bring this up at Distribution...) Thanks --- Tim Padalino, AICP Albemarle County I Community Development Dept. (434)-296-5832 x. 3088 From: Cisco Unity Connection Messaging System <unityconnection@cobm-cucxnpub.albemarle.org> Sent: Tuesday, June 18, 20191:23 PM To: tadalino@cobm-cucxnpub.albemarle.org Subject: Message from VIRGINIA CALL (94344140354) 163 Tor! Kanello oulos From: Tim Padalino Sent: Monday, June 17, 2019 3:03 PM To: Tori Kanellopoulos Subject: just in case / fyi - comment references for required approvals ■ (Advisory 2): The following remaining (separate) applications and approvals are required prior to approval of Major Site Plan Amendment SDP021900017: o [Z.O. Sections 32.7.4.2 and 32.7.5.3]: Easement Plat o [Z.O. Section 32.7.2 and County Code Chapter 14]: Road Plans o [Z.O. Section 32.7.4.1 and County Code Chapter 17]: Water Protection Ordinance Plan ■ Note' Staff acknowledge that Water Protection Ordinance Plan Amendment NVP0201900011 was approved by CDD-Engineering on 4/1/2019. ■ (Advisory / For Future Reference): Please note that the Final Site Plan cannot be approved unless and until a complete application for a Countywide Certificate of Appropriateness is submitted, reviewed, and approved by Staff in the Community Development Department. Please reference review comments from Margaret Maliszewski, Chief of Planning — Resource Management, provided with this comment letter. Tim Padalino, AICP Senior Planner I Community Development Department County of Albemarle, Virginia httos://www.albemarle.orci/department.asp?department=cdd (434)-296-6832 x. 3088 164 Tori From: Tim Padalino Sent: Monday, June 17, 2019 2:46 PM To: Tori Kanellopoulos Subject FW: Time for a call today? 6U Tim Padalino, AICP Albemarle County I Community Development Dept. (434)-296-5832 x. 3088 From: Tim Padalino Sent: Friday, June 14, 2019 4:38 PM To: Elise Cruz <ecruz@uvafoundatlon.com>; Todd Marshall <tmarshall@uvafoundation.com> Subject: RE: Time for a call today? Hello Elise, Thanks for your patience re. your inquiry about the CCP process. I recently handled a CCP that was processed in exactly 2 months; however, that CCP application from Albemarle County Public Schools was probably processed faster than most. And it was a slightly different "2232" review associated with public uses (public school, public funding, etc). I briefly spoke to David Benish about the CCP process for Encompass Health, and he estimated that a 90-day review period should be considered the (likely) minimum time frame, and that a general range of 3-6 months could potentially be a more accurate estimate (depending on the particular details of the CCP, the applicable Comp Plan/Master Plan recommendations, etc). So you know, the CCP process is somewhat similar to a SP or ZMA review, with some important differences. My understanding is that a CCP process involves the following steps: ■ The applicant prepares and submits a -complete application, and the County would distribute those app materials for review and then provide a review comment letter. ■ During that review process, my understanding is that a community meeting would need to be held. ■ Eventually, Planning staff would prepare a staff report for a PC public hearing, and the PC would either o a.) complete the CCP review process by finding that the proposed use is consistent/compliant with the Comp Plan, or o b.) conclude that the proposed use is not consistent/compliant with the Camp Plan and refer the CCP to the BOS for Board review and action. The CCP application form can be downloaded at: htt www.albemarle.or u load ima1112slfforms center de all I I'llc Communit Develo men t forms a lications C om rehensive Plan Compliance Application pcif 165 l recognize that the form available at that link indicates an approximately 45-day review period, but that doesn't seem realistic to me (based on my limited experience) and that doesn't seem accurate (based on my brief discussion with David). So l wouldn't plan/schedule according to that; it could much more likely be closer to 90 days (or longer, depending on application -specific details). I hope this is at least somewhat helpful. And please let me know if we should discuss this further; III generally be more available in the coming weeks and months than' have been in April - May. Thanks very much --- Tim Padalino, A1CP Albemarle County I Community Development Dept. (434)-296-5832 x. 3088 From: Elise Cruz <ecruz uvafoundation.com> Sent: Friday, June 14, 20191:46 PM To: Tim Padalino <tpadalino albemarle.or�>; Todd Marshall com> <tmarshall uvafoundation. Subject: Re: Time for a call today? Hi Tim, Another follow up question re: Encompass. What us the typical review time for a CCP process? I know that our process with Morven has been a little different than most. From what I can understand from the County's website, the CCP does require a notice to neighbors and is approved at a Planning Commission meeting. Is that correct? Thanks, ELISE CRUZ Rea! Estate Project Coordinator ecruz@uvafoundabon.com OFFICE (434) 924-2365 MOBILE (434) 270-1502 University of Virginia Foundation PO Box 400218 Charlottesville, VA 22904 From: Tim Padalino <tpadalino@albemarle.or > Sent: Tuesday, May 21, 2019 9:53:54 AM To: Elise Cruz Cc: Fred Missel Subject: RE: Time for a call today? 166 Hello Elise, I'm not sure if you're still in the office, or if your time away has begun. As such, I'm copying Fred to ensure this info is available to anyone who needs to know. I'm writing with a partial update on the items identified below. Re -confirming that the 5123 collab meeting is cancelled. Can you confirm that everyone at UVAF (including consultants/partners) know that this meeting has been cancelled? I just want to ensure everyone avoids any miscoordination. - Zoning confirmed that a CCP is required for Encompass Health (as a "public use"). This CCP process would precede site plan approval. (I acknowledge that the County has already received the Initial Site Plan for Encompass Health; that application # is SDP201900023, and is under review by Tod Kanellopoulos.) Additionally, regarding the interpretation and enforcement of the SP condition of approval #8 for SP-2017- 00032 (Birdwood Connector Road 1 UVA Tennis 1 Birdwood Golf Course Addition): the applicants' compliance with, and the County's enforcement of, condition of approval #8 has been interpreted as follows (with the important caveat that, at this time, the dates in red are only conceptual/recommended, and still need to be finalized): o The warrant analyses described in condition #8 do not necessarily need to be (fully) conducted, prepared, and submitted on August 1, 2019, provided that UVAF commences their conducting of the required warrant analyses by doing the following: .e UVAF and the County meet prior to August 1, 2019 to scope the warrant analyses and produce a scoping agreement (and otherwise clarify in detail the specific requirements and subsequent review processes required to satisfy condition #8); and ,K UVAF agrees to cause a licensed professional to formally conduct the required warrant analyses at the required locations sometime between September 1, 2019 and September 30, 2019, and provides the County with documentation that such an agreement has been formally made; and ,e UVAF provides the County with the required warrant analyses (per the terms of the scoping agreement) no later than October 31, 2019. I hope all of this is helpful. Please let me know (now or later) if anything needs to be discussed, clarified, etc. Hopefully we can all use one of the upcoming monthly collab meetings (July? August?) to begin coordination on the Boar's Head Drive and Ednam Drive warrant analyses, and perhaps even complete the formal project scoping (if VHB, Kevin McDermott, David Benish, etc. happen to be available on one of those pre -determined meeting dates). Also, please confirm that the 5123 meeting cancellation has been conveyed to everyone who needs to know on your side, if you can. Thanks. Enjoy your trip! - - - Tim Padalino, AICP Albemarle County I Community Development Dept. (434)-296-5832 x. 3088 167 From: Elise Cruz <ecruz uvafoundation.com> Sent: Thursday, May 16, 2019 11:29 AM To: Tim Padalino <tpadalino albemarle.org> Subject: Re: Time for a call today? Tim, Yes- let's go ahead and cancel that May 23 meeting- that was my first item to cover with you. I spoke with Todd and I don't think that he's needing to speak with Bart or anyone at this point about fire station proffers, etc. We have a few other balls in the air related to the Lewis & Clark Dr. project, but those can be addressed separately. I'll just give you a quick rundown of my questions for you- you can respond via email when it's convenient for you or pick up the phone if that's easier. I'm wide open tomorrow. -Connector Rd. warrant analysis: when did you expect to have an answer about when this is due? I know you said a meeting got rescheduled when you hoped to bring this up. -Lewis & Clark Dr: we spoke about having a maintenance agreement in place for the landscaping along the new road. When will this need to be in place (prior to construction completion? prior to road plan approval?) -We now have our Letter of Determination in hand for Encompass. Will a CCP be needed for this project as well? If so, when will this be needed (prior to site plan approval)? I think that's the main outstanding questions right now. When do you leave for your trip out west? Sounds like an awesome place. I think I told you we're headed west as well for Memorial Day weekend.... haven't seen the Pacific in a long time. Looking forward to that! Thanks, as always, ELISE CRUZ Rea! Estate Project Coordinator 168 ecruz(@_uvafoundation .corn OFFICE (434) 924-2365 MOBILE (434) 270-1502 University of Virginia Foundation PO Box 400218 Charlottesville, VA 22904 From: Tim Padalino <tpadalino@albemarle.ore> Sent: Thursday, May 16, 201911:17:05 AM To: Elise Cruz Subject: RE: Time for a call today? Hi Elise, I actually don't have time today, I'm sorry. I +might+ be able to talk tomorrow, but I'm really scrambling light now to stay in front of several deadlines But high on my to-do list is coordinating with you re: the 5/23 collab meeting. Considering that both you and I will not be available to attend next Thursday, and unless there are urgent issues to be discussed in person, I'm wondering if we should cancel the collab meeting this month, and then get back to our monthly collab meeting schedule in June? Tim Padalino, AICP Albemarle County I Community Development Dept. (434)-296-5832 x. 3088 From: Elise Cruz <ecruz@uvafoundation.com> Sent: Thursday, May 16, 201911:00 AM To: Tim Padalino <tpadalino@albemarle.ore> Subject: Time for a call today? Hi Tim, Do you have some time for a phone call today or tomorrow to discuss a few miscellaneous items and next week's UVAf/CDD meeting? Let me know when might work for you. Thanks, ELISE CRUZ Real Estate Project Coordinator ecruzCatuvafoundation.com OFFICE (434) 924-2365 MOBILE (434) 270-1502 University of Virginia Foundation 169 PO Box 400218 Charlottesville, VA 22904 170 Tori Kanellopoulos From: Sean Tubbs <stubbs@pecva.org> Sent: Monday, June 17, 2019 2:38 PM To: Tori Kanellopoulos Subject: Re: confirming site plan review for June 20 Tori, Thanks - that's all I needed to know. I'm going to try to attend to learn more. Sean On Mon, Jun 17, 2019 at 8:49 AM Tori Kanellopoulos <vkanello oulos albemarle.or > wrote: Hi Sean, Yes, that is correct! I'm catching up from being out all week at a conference, so I don't have much additional information at the moment, but that's on the agenda. Best, Tori From: Sean Tubbs <stubbs ecva.o > Sent: Friday, June 14, 2019 1:30 PM To: Tori Kanellopoulos <vkanellopoulos(malbemarle org> Subject: confirming site plan review for June 20 Tori, Hello! I have in my notes that the site review committee for the "UVA Encompass Rehabilitation Hospital — Initial Site Plan" is on June 20. Do I have that right? Thanks! 171 Sean Tubbs Field Representative, Piedmont Environmental Council Albemarle, Charlottesville and Greene 434-977-2033, ext. 7046 434-422-2375 (cell) Contributions like yours make the work PEC does possible. Become a member or donate today to continue to restore and protect this beautiful place we love! Sean Tubbs Field Representative, Piedmont Environmental Council Albemarle, Charlottesville and Greene 434-977-2033, ext. 7046 434-422-2375 (cell) Contributions like yours make the work PEC does possible. Become a member or donate today to continue to restore and protect this beautiful place we love! 172 Tori Kanellopoulos From: Tim Padalino Sent: Monday, June 17, 2019 9:42 AM To: Tori Kanellopoulos Subject RE: SDP2019-23 UVA Encompass - CCP? Hi Tori, Welcome back! And yes — let's discuss UVA Encompass Health sometime; I'm generally available later today after you get your more pressing things addressed. I've had some recent communication with UVAF re: CCP but they have not yet submitted any application (at least as of last Friday). Thanks for checking in on this — let's talk later - - - Tim Padalino, AICP Albemarle County] Community Development Dept. (434)-296-5832 x. 3088 From: Tori Kanellopoulos Sent: Monday, June 17, 2019 9:32 AM To: Tim Padalino <tpadalino@albemarle.org> Subject: SDP2019-23 UVA Encompass - CCP? Hi Tim, I am catching up after the conference and finally reviewing SDP2019-23 (UVA Encompass), which goes to SRC this Thursday. Someone in the office (can't remember who now! — maybe Megan) mentioned in passing that UVA needs a CCP for the proposed use at this site, and that you may be working on that. Just wondering because I don't think we can approve the (at least final) site plan until that's approved by the PC. I've got my door closed while 1 get some more high priority things done, but I'm happy to stop by later if it's easier to explain in person. Thanks! Tori Tori Kanellopoulos, AJCP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 173 Tori Kanellopoulos From: Mazurowski, Alan<alan.mazurowski@vdh.virginia.gov> Sent: Friday, June 14, 2019 4:06 PM To: Tori Kaneliopoulos Subject: UVA Encompass Rehab Hospital initial plan review Tori, Just realized this was a digital submittal, could you send that to me as a PDF? Thanks, Alan Alan Mazurowski Environmental Health Supervisor Onsite Sewage & Private Well Programs Thomas Jefferson Health District 1138 Rose Hill Drive Charlottesville, VA 22906 434-972-4306 office 434-972-4310 fax 174 Tori Kanellopoulos From: Margaret Maliszewski Serer Friday, June 14, 2019 4:00 PM To: Tori Kanellopoulos Subject: Planning Application Review for SDP201900023 UVA ENCOMPASS REHABILITATION HOSPITAL. The Review for the following application has been completed: Application Number = SDP201900023 Reviewer = Margaret Maliszewski Review Status = Administrative Approval Completed Date = 06/14/2019 This email was sent from County View Production. 175 Tori Kaneko oulos From: Sean Tubbs <stubbs@pecva.org> Sent: Friday, June 14, 2019 1:30 PM To: Tori Kanellopoulos Subject: confirming site plan review for June 20 Tori, Hello! i have in my notes that the site review committee for the "UVA Encompass Rehabilitation Hospital — Initial Site Plan" is on June 20. Do I have that right? Thanks! Sean Tubbs Field Representative, Piedmont Environmental Council Albemarle, Charlottesville and Greene 434-977-2033, ext. 7046 434-422-2375 (cell) Contributions like yours make the work PEC does possible. Become a member or donate today to continue to restore and protect this beautiful place we love! 176 Tori Kanello oulos From: Bedsaul, Willis<willis.bedsaul@vdot.virginia.gov> Sent: Friday, June 14, 2019 10:17 AM To: Tori Kanellopoulos Cc: Adam Moore Subject: SDP-2019-00023-UVA Encompass Health -Initial Site Plan Attachments: SDP-2019-00023-R1-UVA-Encompass Health -Initial Site Plan-06-14-19.pdf Hello Tori, Attached you'll find the review letter on the above subject, if you have any questions please call. Thanks, Willis C. Bedsaul Land Development Engineer Virginia Department of Transportation Land Use-Albemarle/Green/Madison 701 VDOT Way Charlottesville Residency Ph# 434-422-9866 Cell# 540-219-5492 177 Tod Kanello oulos From: Dyon Vega <DVega@rivanna.org> Sent: Thursday, June 13, 2019 9:39 AM To: Tod Kaneilopoulos Cc: vfort@rivanna.org; Richard Nelson Subject: UVA Encompass Rehabilitation Hospital comments Tori, RWSA has reviewed the Initial Site Plan for UVA Encompass Rehabilitation Hospital as prepared by Timmons Group and dated 05/06/2019 and has the following comments: General Plan Comments: An RWSA sewer flow acceptance letter may be required prior to final site plan approval, please provide estimates of sewer flows for the development with the final site plan. Dyon Vega Civil Engineer R AN�NA �l AITERdf ERA0TH0F11'l' Rivanna Water & Sewer Authority (434) 977-2970, Ext. 170 695 Moores Creek Lane Charlottesville, VA 22902 www .rivanna.org 178 Tori Kanellopoulos From: Richard Nelson <rnelson@serviceauthority.org> Sent: Friday, May 17, 2019 2:08 PM To: Tori Kanellopoulos Subject: SDP201900023 UVA Encompass Rehabilitation Hospital - Initial Tori, I recommend approval for SDP201900023 UVA Encompass Rehabilitation Hospital — Initial with the following conditions: Submit 3 copies to ACSA for review. Final approval will not be given until final approval of the UVA Loop Road. Final approval will not be given for Lewis and Clark designs until ACSA receives an updated master plan. Confirm if the second water meter is a redundant feed to the hospital. If so it will need to be relocated to the other side of the site. RWSA Sewer capacity certification will be required. Confirm uses and licensing agency to ACSA to determine capacity fees. North Fork South Zone Special Rate Fees apply. Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434) 977-4511 179 Tori Kanelloaoulos From: Megan Nedostup Sent: Friday, May 10, 2019 10:00 AM To: Andy Reitelbach; Cameron Langille, Christopher Perez, David James; Emily Cox; Frank Pohl; Justin Deel; Mariah Gleason; Matthew Wentland; Patricia Saternye; Richard Nelson; Tori Kanellopoulos; Shawn Maddox; Adam Moore; Justin Deel; Richard Nelson; Willis Bedsaul Cc: Francis MacCall Subject: SRC agenda for 6/6 and 6/20 Attachments: Site Review Committee Meeting Agenda-06-06-19.pdf, Site Review Committee Meeting Agenda-06-20-19.pdf See attached SRC agendas for June. Please note: SRC for June 6th will be in Community Development Rm 214. Francis, can you please upload these to the website? Thank you! Megan Nedostup, AICP (pronounced nuh-DAHST-up) Principal Planner Community Development Department Planning Services ph: 434.296.5832 ext. 3004 180 Tod Kanello oulos From: Andy Reitelbach Sent Thursday, May 9, 2019 12:31 PM To: Tori Kanellopoulos Subject: FW: SRC Distribution Memo for May 6, 2019 submittal Attachments: SRC Distribution Memo 2019-05-06.docx SRC Memo From: Marsha Alley Sent: Thursday, May 9, 2019 10:02 AM Subject: SRC Distribution Memo for May 6, 2019 submittal Hello everyone! Recently, the direct links to Building & Planning Applications derived from CountyV!ew have changed. Laserfiche WebLink has moved to a new (and faster!) server. Attached you will find the Memo for the SDP -SUB (SRC) Projects for the 5/6/19 Submittal. If you experience any issues, or if you would like to access files from previous submittals, please contact the lead reviewers for the project. Please remember to Ctrl + Click to open the links. Some of the files do load slower than others due to size. Thank you! Hope you all have a wonderful day! Marsha Alley Community Development Assistant - zoning 401 McIntire Road, North Wing Charlottesville, VA 22902 (434) 296-5832 ext. 3417 181 Tori Kanello oulos From: Elise Kiewra Sent: Thursday, May 9, 2019 10:25 AM To: Tori Kanel!opoulos; Andrew Slack Subject: RE: You're invited to Studio Session: 'SDP2019-23 UVA Encompass Health Initial Site Plan' No prob, better safe than sorry. Right now it is Andy's year for site plans. I'm not sure at what point we will rotate or if getting Brian up to speed will change anything. Elise From: Tori Kanellopouios Sent: Thursday, May 9, 201910:21 AM To: Elise Kiewra <ekiewra@albemarle.org>; Andrew Slack <aslack@albemarle.org> Subject: RE: You're invited to Studio Session: 'SDP2019-23 UVA Encompass Health Initial Site Plan' I sent it to both of you (I hope!). Sorry —wasn't sure who would be reviewing it! From: Elise Kiewra Sent: Thursday, May 9, 201910:19 AM To: Tori Kane!lopoulos <vkanellopoulos@albemarle.org>; Andrew Slack <aslack@albemarle.org> Subject: FW: You're invited to Studio Session:'SDP2019-23 UVA Encompass Health Initial Site Plan' Tori, Did you mean to send this to Andy? He is doing the site plan review right now. Or maybe he also got it. Elise From: Bluebeam Studio <studio@bluebeamops.com> Sent: Thursday, May 9, 2019 9:54 AM To: Elise Kiewra <ekiewra@albemarle.org> Subject: You're invited to Studio Session:'SDP2019-23 UVA Encompass Health Initial Site Plan' You're Invited 182 vkanellopoulos@albemarle.org has invited you to a Bluebeam Studio collaboration Session. Please click the Session link below to join: Session (dame: SDP2019-23 UVA Encompass Health Initial Site Plan Session ID: 463-255-165 Server: studio. bluebeam.com SDP2019-23 UVA Encompass Health: Initial Site Plan Comments due: 06/17/19 SRC Date:06/20/19 Please distribute to and assign to other reviewers as needed. The session should be open. Please let me know if I should add anyone. New to Studio? To join Studio, you must install one of the following applications to your device: Bluebeam Vu, a free professional PDF viewer that allows you to markup PDFs with colleagues in real time in Studio Sessions and view files stored in Studio Projects. Bluebeam Revu, a powerful PDF solution that lets you store and manage an unlimited number of files in the cloud using Studio Projects and collaborate in real time by adding 2D and 3D PDFs into online Studio Sessions. To learn more about Studio, visit our website. a Copyright 2002 - 2019 Bluebeam, Inc. All Rights Reserved. 183 Tori Kanellopoulos From: Elise Kiewra Sent: Thursday, May 9, 2019 10:19 AM To: Tori Kanellopoulos; Andrew Slack Subject: FW: You're invited to Studio Session: 'SDP2019-23 UVA Encompass Health Initial Site Plan' Tod, Did you mean to send this to Andy? He is doing the site plan review right now. Or maybe he also got it. Elise From: Bluebeam Studio <studio@bluebeamops.com> Sent: Thursday, May 9, 2019 9:54 AM To: Elise Kiewra <ekiewra@albemarle.org> Subject: You're invited to Studio SessiOn:'SDP2019-23 UVA Encompass Health Initial Site Plan' You're Invited vkaneliopoulos@albemarle.org has invited you to a Bluebeam Studio collaboration Session. Please click the Session link below to join: Session Name: SDP2019-23 UVA Encompass Health Initial Site Plan Session ID: 463-255-165 Server: studio. bluebeam.com SDP2019-23 UVA Encompass Health: Initial Site Plan Comments due: 06/17/19 SRC Date: 06/20/19 Please distribute to and assign to other reviewers as needed. The session should be open. Please let me know if I should add anyone. 184 New to Studio? To join Studio, you must install one of the following applications to your device: Bluebeam Vu, a free professional PDF viewer that allows you to markup PDFs with colleagues in real time in Studio Sessions and view files stored in Studio Projects. Bluebeam Revu, a powerful PDF solution that lets you store and manage an unlimited number of files in the cloud using Studio Projects and collaborate in real time by adding 2D and 3D PDFs into online Studio Sessions. To learn more about Studio, visit our website. @ Copyright 2002 - 2019 Bluebeam, Inc. All Rights Reserved. 185 Tori Kanellopoulos From: Moore, Adam <adam.moore@vdot.virginia.gov> Sent: Thursday, May 9, 2019 10:08 AM To: Tori Kanellopoulos Subject: Re: SDP2019-23 UVA Encompass - Initial Site Plan SRC - Electronic Review Ok cool thanks. Adam J. Moore, P.E. I Assistant Resident Engineer — Land Use VDOT - Charlottesville Residency 701 VDOT Way I Charlottesville I NTA main 434.422.9782 On Thu, May 9, 2019 at 10:00 AM Tori Kanellopoulos <vkanello oulos albemarle.or > wrote: You should have received an email from BlueBeam inviting you to the studio for the electronic review of SDP201900023 (UVA Encompass Health) Initial Site Plan. This is a SRC item going to SRC on June 2&, meaning comments are due June 171h to me (lead reviewer). Please find the CountyView link for the documents here. These documents are also uploaded to the BlueBeam studio session. Please let me know if you have any issues accessing the site plan. Please distribute to other reviewers as needed (e.g. Engineering), and let me know if you need me to add anyone to the Session (I hopefully set it up so we can all add people, but this is new for me too). Adam, VDOT has been transmitted one paper copy of the site plan today. Best, Tori Tori Kanellopoulos, AICP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 186 187 Tori Kanelloaoulos From: Moore, Adam <adam.moore@vdot.virginia.gov> Sent: Thursday, May 9, 2019 10:08 AM To: Tori Kanellopoulos Subject: Fwd: You're invited to Studio Session: 'SDP2019-23 UVA Encompass Health Initial Site Plan' Hey Tori, I am unable to do electronic reviews for the time being. i either need a hard copy or someone to send me a Of file fore review. Thanks. Adam J. Moore, P.E. I Assistant Resident Engineer — Land Use VDOT - Charlottesville Residency 701 VDOT Wag I Charlottesville NTA main 434.422.9782 ----- Forwarded message From: Bluebeam Studio <studio@ bluebeamo s.com> Date: Thu, May 9, 2019 at 9:54 AM Subject: You're invited to Studio Session:'SDP2019-23 UVA Encompass Health Initial Site Plan' To: <adam.moore@ydot.vireinia.gov> You're Invited vkanellopoulos@albemarle.org has invited you to a Bluebeam Studio collaboration Session. Please click the Session link below to join: Session dame: SDP2019-23 UVA Encompass Health Initial Site Plan Session ID: 463-255-165 Server: studio. bluebeam. com SDP2019-23 UVA Encompass Health: Initial Site Plan Comments due: 06117119 SRC Date: 06120119 188 Please distribute to and assign to other reviewers as needed The session should be open. Please let me know if 1 should add anyone. New to Studio? To join Studio, you must install one of the following applications to your device: Bluebeam vu, a free professional PDF viewer that allows you to markup PDFs with colleagues in real time in Studio Sessions and view files stored in Studio Projects. Bluebeam Revu, a powerful PDF solution that lets you store and manage an unlimited number of files in the cloud using Studio Projects and collaborate in real time by adding2D and 3D PDFs into online Studio Sessions. To learn more about Studio, visit our website. ® Copyright 2002 -1019 Bluebeam, InC. All Rights Reserved. M- 189 Tori Kanello oulos From: Tori Kanellopoulos Sent: Thursday, May 9, 2019 10:00 AM To: Frank Pohl; adam.moore@vdot.virginia.gov; Richard Nelson (rnelson@serviceauthority.org); Shawn Maddox; Michael Dellinger; Margaret Maliszewski; Elise Kiewra; Andrew Slack Subject: SDP2019-23 UVA Encompass - Initial Site Plan - SRC Electronic Review Hi All, You should have received an email from BlueBeam inviting you to the studio for the electronic review of SDP201900023 (UVA Encompass Health) Initial Site Plan. This is a SRC item going to SRC on June 204, meaning comments are due June 171 to me (lead reviewer). Please find the CountyView link for the documents here. These documents are also uploaded to the BlueBeam studio session. Please let me know if you have any issues accessing the site plan. Please distribute to other reviewers as needed (e.g. Engineering), and let me know if you need me to add anyone to the Session (I hopefully set it up so we can all add people, but this is new for me too). Adam, VDOT has been transmitted one paper copy of the site plan today. Best, Tor! Tori Kanellopoulos, AiCP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 190 Tor! Kanellopoulos From: Marsha Alley Sent: Thursday, May 9, 2019 7:55 AM To: Tori Kanellopoulos Subject: RE: SDP2019-23 UVA Encompass SRC Thanks! From: Tori Kanellopoulos Sent: Thursday, May 09, 2019 7:54 AM To: Marsha Alley <malley3@albemarle.org> Subject: RE: SDP2019-23 UVA Encompass SRC I JUST updated it11 PROJECT: SDP201900023 UVA Encompass Health Rehab Hospital — Initial Site Plan MAGISTERIAL DISTRICT: Rio TAX MAP/PARCEL(S): 03200000001800, 032000000018B0 LOCATION: UVA Research Park, adjacent to Hollymead Fire Rescue Station. PROPOSAL: Construction of a new medical rehabilitation facility. ZONING: PD-IP Planned Development— Industrial Park, which allows industrial and ancillary commercial and service uses (no residential use). OVERLAY DISTRICT(S): Airport Impact Area; Steep Slopes — (Managed) and (Preserved). ENTRANCE CORRIDOR (EC): Yes. COMPREHENSIVE PLAN: TMP 03200000001800: Office/R&D/Flex/Light Industrial — commercial, professional office; research and development, design, testing of prototypes; manufacturing, assembly, packaging; residential is a secondary use (no maximum density); Uptown —commercial, retail, and employment uses with supporting residential (6.01-80 units/acre); Urban Mixed Use (in Centers) —commercial and retail uses that are accommodated in Centers and residential (3 — 34 units/ acre); Privately Owned Open Space; Environmental Features — privately owned recreational amenities and open space; floodplains, steep slopes, wetlands, and other environmental features. In the Development Area in Hollymead — Places29. TMP 032000000018BO: Institutional — civic uses, parks, recreational facilities, and similar uses on County -owned property. In the Development Area in Hollymead — Places29. Still in CV — I added some CP designations because I want to be extra sure this covers it. Thanks! I! From: Marsha Alley Seat: Thursday, May 9, 2019 7:43 AM To: Tor! Kanellopoulos <vkanellopoulos@albemarle.ore> Subject: RE: SDP2019-23 UVA Encompass SRC Thanks, Tori, for letting me know! I'll grab the legal ad out of CV. Hopefully, the SRC memo will go out today or tomorrow! Have a great day! Marsha From: Tori Kanellopoulos Sent: Wednesday, May 08, 2019 4:11 PM 191 To: Marsha Alley <malley3@albemarle.org> Subject: SDP2019-23 UVA Encompass SRC Hi Marsha, I Just wanted to let you know that I am taking over this initial SRC site plan (SDP2019-23 UVA Encompass) from Tim! can send you the legal ad if you haven't gotten it already (Tim also put it in CountyView). Please let me know if you need anything else from me. I am going to distribute it electronically in BlueBeam tomorrow morning. Thanks! Tori Tori KaneilopoUloS, AICP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 192 Tori Kanellopoulos From: Marsha Alley Sent: Thursday, May 9, 2019 7A3 AM To: Tori Kanellopoulos Subject: RE: SDP2019-23 UVA Encompass SRC Thanks, Tori, for letting me know! I'll grab the legal ad out of CV. Hopefully, the SRC memo will go out today or tomorrow! Have a great day! Marsha From: Tori Kanellopoulos Sent: Wednesday, May 08, 2019 4:11 PM To: Marsha Alley <malley3@albemarle.org> Subject: SDP2019-23 UVA Encompass SRC Hi Marsha, I just wanted to let you know that I am taking over this initial SRC site plan (SDP2019-23 UVA Encompass) from Tim! I can send you the legal ad if you haven't gotten it already (Tim also put it in CountyView). Please let me know if you need anything else from me. I am going to distribute it electronically in BlueBeam tomorrow morning. Thanks! Tor! Tori Kanellopoulos, AICP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 193 Tori Kanellopoulos From: Tori Kanellopoulos Sent: Wednesday, May 8, 2019 4:11 PM To: Marsha Alley Subject: SDP2019-23 UVA Encompass SRC Hi Marsha, I just wanted to let you know that i am taking over this initial SRC site plan (SDP2019-23 UVA Encompass) from Tim! i can send you the legal ad if you haven't gotten it already (Tim also put it in CountyView). Please let me know if you need anything else from me. I am going to distribute it electronically in BlueBeam tomorrow morning. Thanks! Tori Tori Kanellopoulos, AICP Candidate Planner Community Development Department Phone: 434-296-5832 ext. 3270 194 Tori Kanellopoulos From: Tim Padalino Sent: Wednesday, May 8, 2019 3.40 PM To: Tori Kanellopoulos Subject: RE: Encompass Health Attachments: Legal Ad_SDP201900023_UVA Encompass Health Rehab Hospital.docx Legal Ad attached. Thanks again! Feel free to share any questions that might come up during the course of the review, I may be able to help with some of the ZMA or UVARP Master Plan background info. (Lea is also well -versed in the ZMA and zoning context/background at UVARP, as well, if you're looking for Zoning assistance she would probably be the go to person.) Tim Padalino, AICP Albemarle County I Community Development Dept. (434)-296-5832 x. 3088 From: Tim Padalino Sent: Wednesday, May 08, 2019 1:07 PM To: Tori Kanellopoulos <vkanellopoulos@albemarle.org> Subject: RE: Encompass Health "two thumbs up" 1 sounds great! Tim Padalino, AICP Albemarle County I Community Development Dept. (434)-296-5832 x. 3088 From: Tori Kanellopoulos Sent: Wednesday, May 08, 2019 1:06 PM To: Tim Padalino <t adalino albemarle.or > Subject: RE: Encompass Health Thanks for doing the legal ad! I haven't seen Megan yet to ask her if I can task this over, but I am going to see if I can. I'd like to practice electronic review. Also, considering my BlueBeam is working fine and yours is not, that seems reasonable. And I haven't gotten to do anything with industrial zoning yet. I went into CV and downloaded all the documents onto my computer. Based on Paty's SOP, I think that's what we do. We then upload them into the BlueBeam studio session. I think the link is just the public docs link in CV, although given it doesn't work for VDOT anyway I'm not sure it matters. We can just email Adam a PDF and transmit a paper copy. When you have more time, I'm happy to do a quick tutorial of BlueBeam, since setting up a session is pretty straightforward. I feel like the SOP sounds really complex, but it didn't take me long to get my Minor Amendment set up. We'll see how it goes actually getting review comments! I'll let you know once I have a chance to ask Megan about this! Tori 195 From: Tim Padalino Sent: Wednesday, May 8, 2019 11:45 AM To: Tori Kanellopoulos <vkanello oulos albemarle.or > Subject: Encompass Health Just FYI I in the event SDP201900023 gets re -assigned from me to you: i entered the Legal Ad in CV. But the following steps have not been done yet: Transmit paper copy to VDOT (one of us needs to get this prepared by SRC meeting tomorrow morning) • Reduce PDF file size and email attachment to VDOT • Fallow Electronic Review SOPs and share Bluebeam Session invitation (my Bluebeam is currently mired in wackitude) I haven't received any electronic review info/links yet, so this bluebeam session can't be set up yet, and the PDF can't be reducedlemailed yet. I`m guessing that electronic review info (links) will be provided today or tomorrow...? Regardless, I'm glad you spoke up and expressed interest in the initial site plan review — both for your sake and mine, as that shift could possibly be mutually beneficial. But I can certainly handle it if this doesn't get reassigned, for ANY reasons(s). I'll mostly proceed as usual, unless you or Megan inform me of any change in plans. Thanks - - - Tim Padalino, AICP Senior Planner I Community Development Department County of Albemarle, Virginia https://www.albemarle.or-q/depaftment.asi)?department=cdd (434)-296-5832 x. 3088 196 Tori Kanellopoulos From: Tim Padalino Sent: Wednesday, May 8, 2019 1:07 PM To: Tod Kanellopoulos Subject: RE: Encompass Health "two thumbs up" / sounds great! Tim Padalino, AICP Albemarle County J Community Development Dept. (434)-296-5832 x. 3088 From: Tori Kanellopoulos Sent: Wednesday, May 08, 20191:06 PM To: Tim Padalino <tpadalino@albemarle.org> Subject: RE: Encompass Health Thanks for doing the legal ad! I haven't seen Megan yet to ask her if I can task this over, but I am going to see if I can. I'd like to practice electronic review. Also, considering my BlueBeam is working fine and yours is not, that seems reasonable. And I haven't gotten to do anything with industrial zoning yet. I went into CV and downloaded all the documents onto my computer. Based on Paty's SOP, I think that's what we do. We then upload them into the BlueBeam studio session. I think the link is just the public docs link in CV, although given it doesn't work for VDOT anyway I'm not sure it matters. We can just email Adam a PDF and transmit a paper copy. When you have more time, I'm happy to do a quick tutorial of BlueBeam, since setting up a session is pretty straightforward. I feel like the SOP sounds really complex, but it didn't take me long to get my Minor Amendment set up. We'll see how it goes actually getting review comments! I'll let you know once I have a chance to ask Megan about this! Tor! From: Tim Padalino Sent: Wednesday, May 8, 2019 11:45 AM To: Tod Kanellopoulos <vkanellogoulos@albemarle.org> Subject: Encompass Health Just FYI l in the event SDP201900023 gets re -assigned from me to you: I entered the Legal Ad in CV. But the following steps have not been done yet: • Transmit paper copy to VDOT (one of us needs to get this prepared by SRC meeting tomorrow morning) • Reduce PDF file size and email attachment to VDOT • Follow Electronic Review SOPs and share Bluebeam Session invitation (my Bluebeam is currently mired in wackitude) 197 I haven't received any electronic review info/links yet, so this Bluebeam session can't be set up yet, and the PDF can't be reducedlemailed yet. I'm guessing that electronic review info (links) will be provided today or tomorrow...? Regardless, I'm glad you spoke up and expressed interest in the initial site plan review — both for your sake and mine, as that shift could possibly be mutually beneficial. But I can certainly handle it if this doesn't get reassigned, for ANY reasons(s). I'll mostly proceed as usual, unless you or Megan inform me of any change in plans. Thanks - - - Tim Padalino, A1CP Senior Planner I Community Development Department County of Albemarle, Virginia https://www.albemarle.org/department.asp?department=cdd (434)-298-5832 x. 3088 198 Tori Kanellopoulos From: Tim Padalino Sent Wednesday, May 8, 2019 11:45 AM To: Tori Kanellopoulos Subject Encompass Health Just FYI 1 in the event SDP201900023 gets re -assigned from me to you: I entered the Legal Ad in CV. But the following steps have not been done yet: • Transmit paper copy to VDOT (one of us needs to get this prepared by SRC meeting tomorrow morning) • Reduce PDF file size and email attachment to VDOT • Follow Electronic Review SOPS and share Bluebeam Session invitation (my Bluebeam is currently mired in wackitude) i haven't received any electronic review info/links yet, so this Bluebeam session can't be set up yet, and the PDF can't be reducedlemailed yet. I'm guessing that electronic review info (links) will be provided today or tomorrow...? Regardless, I'm glad you spoke up and expressed interest in the initial site plan review — both for your sake and mine, as that shift could possibly be mutually beneficial. But I can certainly handle it if this doesn't get reassigned, for ANY reasons(s). I'll mostly proceed as usual, unless you or Megan inform me of any change in plans. Thanks --- Tim Padalino, AICP Senior Planner I Community Development Department County of Albemarie, Virginia httos:llwww.albemade.ora/deDartment.asp?department=cdd (434)-296-5832 x. 3088 199