Loading...
HomeMy WebLinkAboutSDP201900035 Review Comments 2019-09-05 W,ard ENGINEERS SURVEYORS PLANNERS ASSOCIATES September 5,2019 anellopoulosilik anner County of Albemarle Department of Community Development 401 McIntire Road,North Wing Charlottesville, VA 22902-4596 Re: C&F Bank Final Site Plan Amendment WWA Project No. 217036.04 Dear Ms. Kanellopoulos: I have prepared the following summary in response to your comments and concerns dated August 28, 2019: Planning (Tori Kanellopoulos) 1. To note: the most important design comment is that the drive-thru needs to be moved in order to address both Planning and Engineering comments. Response: Please see responses below. REV 1: Addressed. Staff determined that the distance of the drive-thru is measured from the middle of the intersection, not the edge of the intersection. Therefore, the drive-thru can remain in its originally proposed location. 2. 118-5.1.60] Drive-thru requirements: a. [18-5.1.60(e)]: "Each drive-through lane shall be separated from any pedestrian travelway, except where a pedestrian travelway crosses the drive-through lane as provided in subsection (f), and any vehicular travel areas, by a planting strip at least five (5)feet in width. " Provide a 5-foot or greater planting strip between the drive-through lane and travelway. Response: A 5'planting strip has been provided between the drive-through lane and travelway as requested. REV 1: Landscaping/plantings have not been provided in the planting strip. Please show the plantings provided on at least the landscape plan(SP14). Response (Rev 1): Landscaping has been added in the planting strip as requested. b. [18-5.1.60(i)] "Each entrance to a drive-through lane shall be more than fifty (50)feet from any intersection with a public or private street or travelway without parking. " Design changes are needed to meet this requirement. It is 3040 Avemore Square Place •Charlottesville,VA 22911 Telephone(434)984-2700 •Fax(434)978-1444 Charlottesville•Lynchburg recommended to move the drive-thru lane to the other side, so that it is farther from the intersection and queuing concerns are reduced. Response: As discussed it was determined that the distances referred to in the drive-through ordinance are measured from the .centerline of the travelway. The paved area behind the bank is provided for the existing loading space and dumpsters and does not serve as a travelway. REV 1: Addressed. Staff has determined that the measurement is taken from the Middle of the intersection, not the edge c_. [18=5.1.60(j)] "Each drive-through lane shall be a minimum of one hundred(100) feet in length measured from the center of the first window:or service point. This . length may be reduced if a study is submitted and approved by the director of community development or his designee.demonstrating that a.shorter.length will be sufficient for .a particular:use. " Either increase the length of the drive-thru , lane, or provide justification for a shorter drive-thru lane:For example, use other comparableexistmg uses to show that queuing will not create an issue: Response: As discussed it was determined that the distances referred to in the drive-through.ordinance are:measured from.the centerline of the. travelway. .The 100:'distance is provided accordingly: .,. • REV 1 Not addressed: This measurement is taken from the center of the first window or service point and measured to the end of the drive-thru lane, Please provide justification as to why this drive-thru lane should be less than 100 feet. : Response (Rev 1): Per our discussions. with Bill Fritz on'.9-3-19 it was determined that this distance is measured from:the,centerline of the adjacent roadway and that the drive-thru meets this requirement.as 'shown on the plans. . d [18-5.1.60(k)] "Each drive-through lane shall extend at least twenty (20) feet beyond the drive-through window. Extend the:drive=thru lane at least 20 :feet beyond the window. Response: The drive-thru lane has been extended as requested REV 1: Addressed. 3. [18-4.12] and [Code of Development] Parking requirements: a.. [18-4.12.6] and [COD] Number of spaces: The previously approved site plan for this Block (SDP2014-65) shows 157 required spaces and 226 provided spaces. This,site plan amendment shows 172 required spaces and 224 provided spaces. Please indicate if spaces are being removed, or were not completed. Response: No spaces are being removed with this site plan amendment. Parking spaces were removed as part of the minor site plan amendment for BJ's Restaurant(SDP 2016-00002). 3040 Avemore Square Place •Charlottesville,VA 22911 Telephone(434)984-2700 •Fax(434) 978-1444 Charlottesville•Lynchburg Page 2 of 16 REV 1: Addressed: 224 spaces are being provided with this.submittal. Include the note(if still applicable)that"Includes 48 spaces from Block F+G Site Plan)". Response (Rev 1): The note has been added to the cover sheet as requested. b. [18-4.12.6] and [COD] Number of spaces: The addition of the Bank adds a requirement of an additional 16 spaces. Since the parking for Block G was previously calculated using all of the buildings in the Block, it appears that there is a shared parking agreement. Please indicate how the Bank required parking is being met, as there are not 16 spaces shown on this site plan amendment. Response: Additional parking for the bank is provided within the existing Block G parking lot. . . . REV 1: The parking calculations for the new use need to be shown separately. These spaces can be counted with the total.spaces, if there.is a shared parking agreement between the uses in Block G. Response(Rev 1):. Separate parking calculations for the bank have been added to the cover sheet: . c.: [18-4.12.10] Shared parking; If shared parking is being provided, please include the shared parking agreement. This may need to be updated to include the Bank and site plan amendment, depending on how it is worded and where it currently covers. Response: The bank is part of the overall Stonefield development and parking is provided within the existing Block G parking lot The buildings and parking lot are both:owned and maintained by O'Connor Capital: REV 1: Include.the shared parking agreement for Block G of Stonefield. Include . Deed Book/Page Number as applicable. Staff needs to review a copy of the shared parking agreement The agreement should be updated to include C+F Bank. Response(Rev 1):. C&F Bank will be.leasing this property located in Block G. This is not a division of land so therefore a shared parking agreement is not required for this proposed use. Block G parking is summarized.as . follows:. Parking Spaces Available: 224 spaces Existing Parking Use: 159 spaces C&F Parking Use: . 13 spaces . Total Parking Use: . , '172 spaces The total parking use is less than the parking spaces available so therefore the parking for C&F Bank is accommodated by Block G. This data is summarized on sheet C-1. 3040 Avemore Square Place•Charlottesville,VA 22911 Telephone(434)984-2700 •Fax(434) 978-1411. Charlottesville■Lynchburg Page 3 of 16 4. 118-4.12,17(c)] Travel lanes: Defer to Engineering comments: Travelway width needs to be increased to 16 feet. This requirement may change depending on how the drive-thru is rearranged to meet 18-5.1.60 standards: Response: The plans have been revised to provide a 16 foot wide travel lane as requested REV:1:.Addressed. 5. [18-4,12.13] and [18=4.12.18] Loading spaces: It appears there are four existing loading spaces on the approved site plan SDP2015-65,•one for each of the buildings. It is unclear where the loading space approved with building G4 is now located or if it remains. Please label the loading space and clarify if it is for both buildings. Response: The existing loading space will remain and serve both buildings. The loading space has been labeled on the plans.. . . . REV 1: Addressed: 6. [18-4.12,19] Dumpster pads: It is unclear where the existing dumpster pad for G4 is now . located: Please.label'and indicate if building G4 and: the proposed building will be' sharing a dumpster: Ensure dumpster pad meets design standards:. Response: The.: existing .dumpster .pad will.*remain and serve both buildings. The dumpster pad has been labeled on the plans: REV 1: Addressed. . 7. [18-32.5] and [18-32.6]:Notes required:: a:: Include the height of the proposed building (bank). Response: The height of the proposed building has been added to the cover sheet b. Add the approved rezonings to Sheet 1, which are listed on:the approved site plan SDP2014-65. These include •ZMA2001-7 and the rezoning amendments that followed. Response: The requested information has been added to the cover sheet. c. Add a note that the site is subject to proffers per ZMA2001-7. Response: The note has been added to the cover sheet as requested. d: There are various• waivers and modifications that have been approved for the Stonefield development, which are printed on sheets on site plan SDP2014-65. Either include -these waivers/modifications, or reference that there are waivers/modifications approved for this development. Response: A note .has been added to the cover sheet referencing the waivers/modifications cations approved for this development: e. There was a special exception request on the Board's consent agenda for July 17, 2019, which was. approved. This is to allow for the drive-thru use for this particular site only in Stonefield. Please reference on the site plan as a note. Such as: "Drive-thru use permitted through special exception request, approved by the 3040 Avemore Square Place •Charlottesville,VA 22911 Telephone(434)984-2700 •.Fax(434)978-1444 Charlottesville•Lynchburg Page 4 of 16 Board of Supervisors on July 17, 2019". You may also include a sheet showing the approved/signed resolution. Staff will provide this signed resolution. Response: A note has been added to the cover sheet referencing the special exception approved for this development. f. Include an updated uses table 'for Storiefield. This was shown on Sheet 3 on SDP2014-65. Please note that while there are pending applications for Blocks C and D of Stonefield,those site plans have not yet been approved. Response: An updated use table is provided on Dwg. C-2. g. Add the Airport Impact Area to the "Overlays Response: The cover sheet has been revised to include the requested information. h: Add a note that the utilities are ACSA. Response: A note has.been added to the cover sheet for the.utilities. REV 1:.Addressed..All notes have been provided. 8. [18-4.17] Lighting: Please indicate if any lights have been added,:removed, or modified since the approved site plan SDP2014-65... .If so, please submit a new .lighting plan showing the changes. . Response: Additional:lighting will be provided for the:building. 'A photometric plan.is provided with this submittal. . • REV 1: Planning comments addressed. .Please see ARB:comments below. 9. [18-32.5.2(i)] Streets: Include the ROW and Deed Book/Page Number (if applicable) for all existing streets. Response: The deed book and page number for the ingress/egress easement has been added to the plans as requested. Please refer to Dwg. C-2. :.REV 1:Not addressed: Comment persists.. Response (Rev 1): The deed book and page number for the ingress/egress easement is provided on Dwg. C-4 of the plans: 10. [18-32:5:2(1)] Utilities: There do not appear to be any new easements shown on the plan. Please confirm. If there are any new non-ACSA easements, an easement plat will be required prior to site plan approval: Response: A new easement is provided for.the relocated waterline. We are currently working with the City of Charlottesville for relocation of and new easement for the gas line. REV 1: Addressed, Applicant will coordinate with ACSA and the City of Charlottesville on adjusted easements. 11. [18-32.7.2.3] Sidewalks: Please show the sidewalks/materials more clearly. It is difficult to see where sidewalks are proposed. Sidewalks should provide safe access and 3040 Avemore Square Place •Charlottesville,VA 22911 Telephone(434) 984-2700 •Fax(434) 978-1444 Charlottesville•Lynchburg Page 5 of 16 connectivity to this building and to:existing buildings in this Block. Crosswalks should • also be provided, as indicated in Engineering comments. Response: Hatching and labels have been added to the plans for the sidewalk REV 1: Addressed. 12. [18-32.7.9.4] Landscape'plan: Include the conservation checklist. Response: The conservation checklist has been added to the plans as requested Please refer to Dwg. C=12: REV 1: Addressed. 13. [18-32.7.9] Landscape plan: Please indicate which requirement(e.g. landscaping parking areas)the two new trees are.meeting.. . Response: The two new trees :are. provided to meet the landscaping parking requirements. REV 1: Addressed. . 14. [18-32.7.9.6] Landscaping within parking areas: Include the area of the proposed parking • lot. For parking:areas of 5 or more spaces, at least 5 percent must be landscaped.. Response: Landscaping parking calculations are provided on Dwg. C-13. REV:1: Addressed. 15. [18-32.7.9.8] Tree : canopy: Show how this requirement is being met (10% for commercial uses). It appears to have already been more than met on the SDP2014-65 site .lan,h p ,owever that,needs to be shown on thiS site plan. Response:. The requested information has been added to the plans. : REV 1: Addressed. 16. [18-32.7.9] Landscape plan: Please include full updated landscape tables on this site plan (Sheet 23 :on SDP2014-65). This is to ensure that canopy and parking landscaping requirements are being met; as they were previously calculated for the entire Block G. Response: The requested information has been added to the plans. . . . . REV 1: Addressed. . . . . . Engineering(John Anderson) Cl 1. Recommend revise site plan title to include SDP201900035. Response: The information has been added to the cover sheet as requested. 3040 Avemore Square Place•Charlottesville,VA 22911 Telephone(434)984-2700 •Fax(434) 978-1444 . . Charlottesville•Lynchburg Page 6 of 16 REV 1: Addressed. 2. Remove sheets C-7 thru C-10 (ESC-related, VMP Analysis Area). Revise index: . Response: The sheets have been removed this submittal. REV 1: Addressed. C5: . 3. Provide dumpster/dumpster pad, if site requires solid waste disposal. Response. The existing dumpster pad at G4 will serve both the existing building and the bank. . . REV 1: Addressed. . . . 4. Provide concrete pad(section)detail and gate/enclosure details if on-site dumpster proposed. Response: No new dumpster is proposed with this site plan.. REV 1: Addressed. 5. Site constraints present design challenge (18-5.1.60, 18-4.12. 15, 18-4.12.17): .. a. 4.12.15.d.:' Provide 100' sight distance (show sight line) from HC parking space near SE :comer of proposed building in direction of drive-thru /bypass lanes. Proposed design does not provide Min. 100' sight distance. Response: The available sight distance has been provided for the proposed handicap space.. The:section referenced appears to only apply to travel ways and it is unclear how it applies to parking Please clarify. REV 1: Item discussed with county engineer. 18-4.12.15.d. applies to `access aisles,' as well as `access aisles around buildings.' Provide stop.condition.for both drive-thru aisle (on exit) and at pedestrian crosswalk from 4 parallel parking spaces. Ensure stop sign is located prior:to pedestrian crosswalk markings, is,to right of travel path(both for drive-thru, and site access), and .is not located in pavement. It may be .necessary to revise /replace a portion of pavement striping east of parallel parking, and.include concrete island, or curb radius east of east-most parallel parking space so that site access aisle stop sign has refuge located outside of asphalt pavement. Response (Rev 1): Stop bars and signs have been provided to, create a stop condition at the pedestrian crosswalk as requested. . b. 4.12.17.c.2.(a):Provide 16'bypass width. Response: The bypass lane has been revised to provide a 16'width as requested. REV 1: Addressed. 3040 Avemore Square Place •Charlottesville,VA 22911 Telephone(434)984-2700 •,Fax(434)978-1444 . . - Charlottesville•Lynchburg Page 7 of 16 c. 4.12.13 b. Revise (assumed) loading space on west side of building so that truck, when reversing, does not impede site vehicular circulation. Note: Reversing from the loading space is a blind maneuver with proposed design. Response Deliveries will not occur during normal/peak operating hours for the bank This was discussed with Bill Fritz prior to submittal and was not considered to be an issue. REV 1:'Addressed. d. Label loading space. Response: The existing loading space has been labeled as requested.. REV 1: Addressed. e. :Eastern-most.:of four:parallel parking spaces on south side of site, does not allow a driver to pull forward parallel with the next (non-existent fifth space) to east to properly position a:vehicle prior to performing reverse maneuver required to park a typical vehicle in a standard 20' •parking space. Larger vehicles (light duty trucks /SUVs) may require even more space. Revise design so that each parallel space may be utilized, else stripe or remove eastern-most parallel parking. space. Response.: The parking spaces have been revised to provide more area to pull forward for the eastern most space. REV 1: Addressed. f. 18-5.1.60-Drive-thru window is 5.1.60.c.: Engineering defers to Planning whether site zoning (NMD) triggers 50' minimum ':separation: drive-through lane to RA, ' or 'any planned . development district allowing residential uses. Response: Please refer to responses to Planning above. REV 1:'Engineering defers to Planning on 5.f._comments with drive-thru length component, but is skeptical that drive-thru design meets ordinance requirements in all respects, especially re. item 5.f.v., below(:100'). . Response (Rev 1): Per our discussions with Bill Fritz on 9-3-19 it was determined that this distance is measured from the centerline of the adjacent•roadway and that the drive-thru meets this requirement as shown on the.plans. Please refer to responses to Planning above. ii.Note:ZMAs for parcel predate 18-5.1.60 (Eff. 3-2-16). Exhibit A, ZMA2001- 00007 and subsequent ZMAs do not appear to propose a use with a drive-thru 3040 Avemore Square Place •Charlottesville,VA 22911 Telephone(434)984-2700'■Fax(434)978-1444 Charlottesville•Lynchburg Page 8 of 16 aisle. . This may be a first proposed drive-thru use on this parcel, or at Stonefield.. Engineering defers to Planning which drive-thru standards apply in this situation, if 18-5.1.60. does not apply. Exhibit A, excerpt I bank location, blue circle: Response: Noted. : REV 1• Addressed. iii. 5.1.60:f: Revise design to provide a five (5) foot wide raised.pedestrian travelway or a five (5) foot wide pedestrian travelway containing a • . change in texture and visual markings between parallel parking. along • south side of site, and bank building. Response: AAcrosswalk has been provided from the parallel parking spaces to.the bank building. . . . . REV 1:. Label /identify change in texture of. pedestrian travelway; i.e., crosswalk should be concrete, brick(pavers), etc. . '• :.Response (Rev 1): The plans have been revised to show concrete for the crosswalk at this.location:_ . : iv. 5:1.60.i: Requires entrance to a drive-finu.lane be.at least fifty (50) feet from any intersection with a public or private.street•or travelway without : :parking. :Distance provided from Stoneridge Ave. :is 40': to SW corner : •ing, or 45'. todividing. dri - and bypass.of build curb ve.thru It :would appear, given loading space, that drive-thru lane begins at either SW • cornering,or west end of median curb (drive-thru' /bypass island).:•of build Response.; It was determined by Planning that the distances referred to are :measured from the: centerline of:the adjacent travelway. Please refer to responses above. . REV 1: Addressed. v. 5.I.60:j: Requires a drive-thru lane be a min. of one hundred (100) feet in length measured from the center of the first window or service point. Design: distance' from. EP Stoneridge• Ave. . (pvt.). to. center: of teller window:083', from SW comet of building to center of teller window z043'. Revise. :. . . Response: It was determined by Planning that the distances referred to are measured from the centerline of the adjacent travelway. Please refer to responses above. 3040 Avemore Square Place•Charlottesville,VA 22911 Telephone(434) 984-2700 ■.Fax(434)978-1444 Charlottesville•Lynchburg Page 9 of 16 REV 1:Not addressed, in Engineering opinion. A scaled 100' distance from center of teller window falls in the center of the southbound turn lane (Stoneridge Ave.), for bank customers traveling south, entering the drive- thru. For customers traveling north, distance from center of NBL to center of teller window is 88'. It is unclear why this is not the reference distance. Response (Rev 1): Per our discussions with Bill Fritz on 9-3-19 it was determined that this distance 'is measured from the centerline of the adjacent roadway:and that the drive-thru meets this requirement as shown on the plans. Please refer to responses to Planning above. vi. 5.1.60.k: Requires drive=thru lane•extend at•least twenty (20) feet beyond the drive-thru window. Revise length drive-thru /bypass median curb to . provide min. 20' length. Response: The drive-thru lane has been extended as requested. REV 1: Addressed. vii. Once median curb between bypass./drive-thru extended, provide single- unit truck auto turn .figure to- show wheel path of bypass /delivery vehicles will not strike any parked or fixed object. Ref image, below. (VDOT Road Design Manual,Appx.Bi,p. B (1)-5) Response:. Please refer to the exhibit provided with.this.letter. REV.1: Exhibit may have become separated:. Please send .PDF of exhibit to. Engineering reviewer. Response (Rev 1): A PDF of the turning exhibit was provided to the reviewer via e-mail on 8/29/19 as requested. 6. Vehicles approaching. bank /drive-thru entrance from north. on Stoneridge Ave. require sign indicating 'Bank patrons:if parking,:keep right; teller traffic, keep deft.:' Or clear message, else traffic movement interior and exterior to the site may be disrupted. Response: Signage has been added at the entrance to state "Bank Entrance Only". Additional signage directing patrons to the teller window will be provided on the bank canopy. REV I:Addressed. 7. Label sidewalk material. Response: The sidewalk has been labeled as requested. REV 1: Addressed. 3040 Avemore Square Place •Charlottesville,VA 22911 Telephone(434)984-2700. Fax(434) 978-1444 Charlottesville•Lynchburg Page 10 of 16 8. Provide pavement crosswalk markings (two parallel 6" wide white markings) from CG-12 ramp,to bank, near loading space near west edge of site. . Response A crosswalk has been added as requested. REV 1: Addressed. 9. Ensure ramp from loading space pavement elevation to bank door meets USBC max. grade std.; defer to building inspections. Response: The grade at this area is 2%'and does not exceed standards for maximum REV 1: Addressed. lo. At two locations, east and west of bank, proposed final asphalt grade shows 470' contours that require :spot elevations to ensure positive drainage to storm inlet /conveyance. Provide spot elevations to ensure positive drainage, without nuisance pondingat any location. : . Response: Additional spot elevations have been added to the plans. REV 1: Addressed. 11.. Remove sheets C-7 C-8 C-9 C-10. :Revise plan index. : . . Response: the requested sheets have been removed from the site plan submittal. REV 1:'Addressed. 12.Transfer C-10.Stormwater Narrative'to a plan sheet that remains. . . Response: The stormwater narrative has been provided on Dwg. C-2. REV 1: Addressed. 13.Although SWM quantity and quality requirements are met, submit a separate VSMP /WPO plan for this development Site plans may not include ESC, SWM details. • •. Ref. Final Site Plan review checklist,p. 1, Overall Content, item 3. Response: A separate VSMP submittal has been provided as requested. REV 1: Comment persists. 3040 Avemore Square Place •Charlottesville,VA 22911 Telephone(434) 984-2700 'Fax(434) 978-1444 Charlottesville•Lynchburg Page 11 of 16 Response (Rev 1): A separate VSMP plan has been submitted and is currently under review by David James of the Engineering Department. WPO 201900033. 14.With separate VSMP /WPO Application, include sheets from SDP201900035, any sheets from prior- approved WPO plans, index, vicinity map, narrative (ESC /SWM), and LOD.=0.45 Ac. Provide.S WPPP: Response: Noted. . REV 1: Comment persists. . Response (Rev 1): A separate VSMP plan has been submitted and is currently under review by David James of the Engineering Department WPO 201900033.. .15.List (C710) reference WPO plan numbers on sheet C-1 of this Site Plan. Response: The WPO number has been added to the cover sheet.as requested. : REV 1::Addressed. C-i 1 16:Label drainage structures on this plan_sheet: Response:. The drainage structures have been labeled as.requested. REV 1: Addressed.: 17.Ensure inlet/outlet invert elevation difference >0.10' at Str. 237. Response: The profile has been revised to provide a 0.10 difference for the proposed pipe. The inverts for the existing pipe at the doghouse MH are: dependent on the existing pipe slope. . REV 1: Addressed. 18.Label 'Inlet Str.'230. 'Confirm 9.36' T:(spread) is not excessive and.does not pose risk. . : ' . : ' Response: Inlet Str. 230 has been labeled as requested The ponding in this area does not pose a risk as no parking is:provided Within this area. Please note that this is an existing inlet and the calculation.is provided for reference purposes. . REV 1:'Addressed. 19.Provide IS-1 detail (inlet shaping) Response: The requested detail has been added to the plans. REV 1: Addressed. 3040 Avemore Square Place • Charlottesville,VA 22911 Telephone(434)984-2700,'■Fax(434) 978-1444 .' Charlottesville•Lynchburg Page 12 of 16 20. Provide doghouse detail that shows a cast or poured concrete bottom in this structure Response: The requested detail has been added to the plans. REV 1: Addressed. 21. REV 1: C-6/other sheets: Reverse NBL pavement marking arrow, Stoneridge Ave. Response(Rev 1):. The pavement marking arrow has been revised accordingly. VDOT (Adam Moore) . . 1. A VDOT Land Use Permit will be required prior to any work within the right-of-way: The owner/developer must contact the Charlottesville Residency Transpiration and Land Use Section at(434)422-9399 for information pertaining to this process. Response. No work is being proposed within the VDOT right-of-way. REV 1: No objection: ACSA(Richard Nelson) 1. •Submit 3 hard copies and 1 PDF copy to ACSA for:review, ATTN: Alex Morrison. Response:A separate submittal will be provided.to ACSA as.requested. 2. Submit water and sewer data sheets. Response:Noted. Fire/Rescue (Shawn Maddox) 1. Travel way must be 20' of unobstructed travel width. This must be increased to 26' if the height of the building will exceed 30'. Response: As discussed the building will be sprinkled and.a 16'. travelway will be sufficient to meet this requirement. . 2. Move the hydrant closer to the FDC on the site, or relocate the FDC to the area of the hydrant. The current configuration will require emergency apparatus to drive past the building to connect to a water supply then the FDC. Response: The FDC and the hydrant have been relocated to provide a shorter distance. Please refer to the plans for details: 3. A knox box will be required. A note on the plans indicating this.requirement and that location can be coordinate with the fire marshal's office will suffice. Response. The requested note has been added to the plans. Please refer to the Coordination Notes on Dwg. C-2. 4. A fire flow test will be required prior to final acceptance. Response: Noted. 3040 Avemore Square Place •Charlottesville,VA 22911 Telephone(434)984-2700 Fax Fax(434)978-1444 Charlottesville•Lynchburg Page 13 of 16 • REV 1: All previous comments have been addressed: No objection: Inspections (Michael Dellinger) 1. Due to distance proximity between buildings, fire rated construction may be required. Coordinate with architect of record. Response: Noted. 2. Add the following note to the general notes page: Accessible:parking spaces and access isles shall not have a surface slope greater than 1:48. Access isles shall be at the same level as the parking space they serve. Response: The requested note has been added to the plans. Please refer to the Coordination Notes.on Dwg. C-2. 3. Add the following note to the general.notes page: ALL water.lines,.sewer lines, and fire lines from the main to the structure MUST have a visual inspection performed by the building department. Response: The requested note.has been added to.the plans.. Please refer to the Coordination Notes on Dwg.,C-2. 4' Add the following. to:the:general notes page: All roof drains. shall discharge: in a manner Pg .. .. not to cause.a public nuisance and not over sidewalks. Response: The requested note has been added to the plans. Please refer to the Coordination Notes on Dwg. C-2. REV 1: All previous comments have been addressed: No objection. ARB (Heather McMahon) Note that. a Certificate of Appropriateness is required prior to approval of this Major The ARB reviewed the Final Site Plan/Major Amendment at its meeting on June 17, 2019 and made the following comments: 1. Note that the approved landscape plan for Block G (as shown on SDP2014-65) is in violation until the approved landscaping is planted. Response: Noted. REV 1:.Addressed: 2. Revise the"exterior finishes" sheet to name the color of the Hardie Panel. . Response: Comment will be addressed with architectural plans. REV 1: Addressed. 3. Provide window-glass specifications for review. 3040 Avemore Square Place•Charlottesville,VA 22911 Telephone(434)984-2700•Fax(434)978-1444 Charlottesville•Lynchburg Page 14 of 16 Response: Comment will be addressed with architectural plans. REV 1: Addressed. 4. Note that.a full site plan(for ARB review)will be required with a Major Amendment to a Site Plan application. • Response: Noted. REV:l: Addressed: 5. Provide the standard mechanical equipment note to future site plans: Visibilityof all P. . mechanical equipment from the Entrance Corridor shall be eliminated. : Response: The note has been added to the cover sheet of the site.plans. ,REV:1: Addressed. • 6: Rectify discrepancies;between the.luminaire schedule:and manufacturer's:cut sheets for • "each model in terms'of lumens output and color temperatures: Response: A:revised lighting plan has been:included as part the site plan submittal. : REV 1: Addressed. :. 7: Provide the standard light note on a revised lighting plan: Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff : : luminaire and shall .be arranged or shielded to reflect light away :from adjoining residential districts; and away from adjacent roads: The spillover of lighting from : luminaires onto public roads and,property in residential or rural:areas zoning districts : shall not exceed one half footcandle: :Response... The requested note:is provided on the photometric plan and:the cover sheet of • the site plan. • REV 1: Addressed. 8: . Revise the landscape schedule to accurately reflect the total number of trees;proposed in Block G. ." • Response: .The:landscaping schedule has been revised to show the total number of trees for.Block G REV 1: Addressed. 9. Note that a separate sign application will be required and sign design is subject to the approved criteria in the Stonefield Block G Comprehensive Sign Plan. Response:. Noted REV 1: Addressed. 3040 Avemore Square Place •Charlottesville,VA 22911 Telephone(434) 984-2700 •.Fax(434)978-1444 Charlottesville•Lynchburg Page 15 of 16 In addition, staff provides the following comments to this submission: 1. Include the.revised lighting plan with this civil site plan set. . Response: The photometric plan has been included with this site plan submittal as requested. REV:I:.Addressed. 2. REV 1: Add a sheet(s) to the civil site plan set that includes the manufacturer's specifications for all of the lighting fixtures proposed for the.building and the site and which were approved by the ARB with the issuance of a CoA. Response. (Rev 1): . A separate sheet. .has. been added that includes the manufacturer's specifications for the lighting fixtures:as requested. E911 (Andrew Slack) 1. No objection: Health Department(Alan Mazurowski) No objection: All water and sanitation are to.utilize ACSA utilities, and therefore I have no concerns and recommend approval: We trust that the above responses.and revised plans properly address the outstanding items. If you have any questions,please do not hesitate to contact me.. Sincerely, WW Associates,Inc. John D. Beirne,_Jr., P.E. Senior Project Engineer 3040 Avemore Square Place •Charlottesville,VA 22911 Telephone(434) 984-2700.•.Fax(434)978-1444 Charlottesville•Lynchburg Page 16 of 16