Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201900010 VSMP - SWPPP 2019-11-07
of�8� COUNTY OF ALBEMARLE Department of Community Development $11-111-1-s. ' �1 I! "r 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 �£., ' - Tel.(434)296-5832 •Fax(434)972-4126 Stormwater Pollution Prevention Plan (SWPPP) For Construction Activities At: Project Name: Earlysville Road Subdivision Address: Earlysville Road Charlottesville, VA 22902 Prepared by: Timmons Group 608 Preston Avenue, Suite 200 Charlottesville,VA 22903 434.327.1690 Prepared for: Bella Signature Homes LLC 1410 Rialto Street Charlottesville, VA 22902 Contact: Luke Kitelinger 434.960.3085 SWPPP Preparation Date: February 19, 2019 Revision Date: November 5, 2019 APPROVED by the Albemarle County Community Drvplopai:entt Department tment Date__ . 1 7 I q __�._.__.-__.Y.-__ File (J 0_- i air �t 0 (This document is to be made publicly available according to 9VAC25-880-70, Part II, section D) Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County CONTENTS: (from Albemarle County Code Sec. 17-405) 1. Registration statement 2. Notice of general permit coverage 3. Nature of activity 4. Erosion and Sediment Control Plan. 5. Stormwater Management Plan 6. Pollution Prevention Plan. 7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload allocation, and exceptional waters. 8. Qualified personnel 9. Signed Certification 10. Delegation of authority. 11. General permit copy 12. Inspection logs Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 1. Registration statement (Provide a signed completed copy of the DEQ registration statement) Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY FOR OFFICE USE ONLY GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM ID Number: CONSTRUCTION ACTIVITIES(VAR10) Technical Criteria: IIB ❑ IIC ❑ ( REGISTRATION STATEMENT 2019 NEW ISSUANCE ® RE-ISSUANCE ❑ MODIFICATION WITH ACREAGE INCREASE ❑ MODIFICATION WITHOUT ACREAGE INCREASE ❑ Existing Permit Coverage Number(if applicable,VAR10####): Section I. Operator/Permittee Information. A. Construction Activity Operator(Permittee). The person or entity that is applying for permit coverage and will have operational control over construction activities to ensure compliance with the general permit. A person with signatory authority for this operator must sign the certification in Section VI. (per Part III. K. of the VAR10 Permit). Construction Activity Operator Name: Bella Homes LLC Contact person: Luke,Kitelinger Address: Bella Homes LLC City,State,Zip Code: 1410 Rialto Street, Charlottesville, VA 22902 Phone Number: 434-960-3085 Primary Email: kitelingerl @yahoo.com :C Email: B. Billing Information(leave blank if same as the Operator identified in Section I.A. above). This entity will receive Annual Permit Maintenance and Permit Modification Fee invoices (if applicable). Name: // Contact Person: ,LG//fie J4i 7//4/5e Address: /.4//0 go Ira SD City,State Zip Code: ('/j A c/G S f/`1e_ v4 Phone Number: G/3dl 9'C195c Primary Email: g/7 1-1//vse., p //a he,-a ' GG"--7 CC Email: C. May we transmit correspondence electronically? You must choose YES and include a valid email in order to pay by credit card and to receive your permit coverage approval letter via email: YES ® NO L Rev 04/2019 PAGE 1 17 CONSTRUCTION GENERAL PERMIT(VAR10) REGISTRATION STATEMENT 2019 Section II. Construction Activity Location Information. Project site information. _ 'A. Include a site map showing the location of the existing or proposed land-disturbing activities,the limits of land disturbance,construction entrances and all water bodies receiving stormwater discharges from the site. B. Construction Activity Name: Property of Bella Signature Homes, LLC Address: Earlysville Road City and/or County and Zip Code: Charlottesville, VA 22902 Latitude and Longitude (6-digit, decimal degrees format): 38.11719 N, 78.47184 W C. Construction Activity Entrance Location (description,street address and/or latitude/longitude in decimal degrees): at street entrance Section III. Offsite Support Activity Location Information. List all offsite support activities to be included under this permit registration. Enter additional areas on a separate page.Offsite areas not included on this registration may need to obtain coverage under a separate VPDES permit. A. Offsite Activity Name: N/A Address: City and/or County and Zip Code: Latitude and Longitude (6-digit, decimal degrees format): B. Offsite Activity Entrance Location (description,street address and/or latitude/longitude in decimal degrees): Section IV. Site Information. A. Acreage totals for all land-disturbing activities to be included under this B. Estimated Project Dates permit coverage. Report to the nearest one-hundredth of an acre. (MM/DD/YYYY) Total land area of development(including the entire area to be disturbed as approved in the Stormwater 6.36 AC. Start date: 11/2019 Management Plan): Primary estimated area to be disturbed (portions with 6.36 AC. Erosion and Sediment Control Plan approval only): Completion date: 11/2020 Offsite estimated area to be disturbed (if applicable): C. Property Owner Status: FEDERAL ❑ STATE ❑ PUBLIC XI PRIVATE D. Nature of the Construction Activity Description(i.e. commercial, industrial, residential,agricultural, environmental): Residential E. Municipal Separate Storm Sewer System (MS4) name(if discharging to a MS4): Rev 04/2019 PAGE 2 17 CONSTRUCTION GENERAL PERMIT(VAR10) REGISTRATION STATEMENT 2019 F. Is this construction activity part of a common plan of development or sale? YES ❑ NO ZI 'G. 6th Order Hydrologic Unit Code (HUC) and Receiving Water Name(s). Attach a separate list if needed. HUC RECEIVING WATERBODY(S) 02080204 Rivanna Section V. Other Information. A. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the General VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting the Registration Statement. By signing the Registration Statement,the operator is certifying that the SWPPP has been prepared. B. Has an Erosion and Sediment Control Plan been submitted to the VESCP Authority for review? YES IN NO ❑ Erosion and Sediment Control Plan Approval Date(for estimated area to be disturbed).: C. Has land disturbance has commenced? YES ® i O"re D. If this project is using approved Annual Standards and Specifications(AS&S),attach the completed AS&S Entity Form. AS&S Entity Name(if different from the Operator identified in Section II.A.): SEE THE FOLLOWING PAGE FOR SIGNATURE AND CERTIFICATION REQUIREMENTS AND INFORMATION Rev 04/2019 PAGE 3 j 7 CONSTRUCTION GENERAL PERMIT(VAR10) REGISTRATION STATEMENT 2019 Section VI. Certification. A person representing the operator as identified in Section I.A.and meeting the requirements of 9VAC25-880-70. Part III. K must physically sign this certification. A typed signature is not acceptable. Please note that operator is defined in 9VAC25-870-10 as follows: "Operator"means the owner or operator of any facility or activity subject to the Act and this chapter.In the context of storm water associated with a large or small construction activity,operator means any person associated with a construction project that meets either of the following two criteria:(i)the person has direct operational control over construction plans and specifications,including the ability to make modifications to those plans and specifications or(ii)the person has day-to-day operational control of those activities at a project that are necessary to ensure compliance with a storm water pollution prevention plan for the site or other state permit or VSMP authority permit conditions(i.e.,they are authorized to direct workers at a site to carry out activities required by the storm water pollution prevention plan or comply with other permit conditions).In the context of storm water discharges from Municipal Separate Storm Sewer Systems(MS4s),operator means the operator of the regulated MS4 system. 9VAC25-880-70. Part III.K.Signatory Requirements.Registration Statement.All Registration Statements shall be signed as follows: a.For a corporation:by a responsible corporate officer.For the purpose of this chapter,a responsible corporate officer means:(i)a president,secretary,treasurer,or vice-president of the corporation in charge of a principal business function,or any other person who performs similar policy-making or decision-making functions for the corporation;or(ii)the manager of one or more manufacturing,production,or operating facilities,provided the manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations,and initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations;the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for state permit application requirements;and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures; b.For a partnership or sole proprietorship:by a general partner or the proprietor,respectively;or c.For a municipality,state,federal,or other public agency:by either a principal executive officer or ranking elected official. For purposes of this chapter,a principal executive officer of a public agency includes:(i)the chief executive officer of the agency or(ii)a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency. )Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information,the information submitted is to the best of my knowledge and belief true, accurate,and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." Printed Name: 1 L/ R'd 7t _/11405,,.l Signature(signed in ink): Date: // Section VII.Submittal Instructions. Submit this form to the Virginia Stormwater Management Program (VSMP) Authority. If the locality is the VSMP Authority, please send your Registration Statement submittal directly to the locality;do NOT send this form to DEQ. A list of local VSMP Authorities is available here: VSMP Authorities. If DEQ is the VSMP Authority, please send to: If the locality is the VSMP Authority, please send to: Department of Environmental Quality The Local VSMP Authority(insert address below) Office of Stormwater Management Suite 1400 Albemarle County Community Development PO Box 1105 401 McIntire Road Richmond VA 23218 Charlottesville, VA 22902 constructiongp@deq.virginia.gov • Rev 04/2019 PAGE 4 17 Section 2. Notice of general permit coverage (This notice is to be posted near the main entrance according to 9VAC25-880-70, Part II, section C.) (Provide a copy of the DEQ coverage letter when obtained) Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 3. Nature of activity (Provide a detailed narrative of the construction activities. Include or reference a construction schedule and sequence. Include any phasing.) This project is a residential development that includes 5 single family lots with associated road, and private utility facilities. Limits of clearing and grading are 6.36 acres. These improvements are being made within the property boundary. The property is bounded by residential properties on the northeast and southwest,woods on the southeast, and Earlysville Road on the northwest. All construction shall take place in accordance with the Erosion and Sediment Control Sequence of Installation on plan sheet C4.0. Estimated construction dates are as indicated on the Registration Statement. Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 4. Erosion and Sediment Control Plan. (Provide a reduced, 1 1 x 17 copy of the latest Erosion and Sediment Control Plan. Do not reference only.) Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County EROSION AND SEDIMENT CONTROL NARRATIVE: MINIMUM STANDARDS: GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL: Se. .LALTN G�LI Z O PROJECT DESCRIPTION AN EROSION AND SEDIMENT CONTROL PROGRAM ADOPTED BY A DISTRICT OR LOCALITY MUST BE 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE-CONSTRUCTION i y�'S THIS PROJECT IS A RESIDENTIAL DEVELOPMENT THAT INCLUDES THE ADDITION OF 5 SINGLE FAMILY LOTS, CONSISTENT WITH THE FOLLOWING CRITERIA,TECHNIQUES AND METHODS: CONFERENCE,ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY,AND ONE :0 CLINT W. y: ALONG WITH ASSOCIATED ROAD,CULVERTS AND STORMWATER MANAGEMENT FACILITIES. LIMITS OF MS-1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN :I. Sill_FFL ET >� WEEK PRIOR THE FINALT INSPECTION.ONTR : L.CLEARING AND GRADING ARE 6.36 ACRES. SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE.TEMPORARY SOIL 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED Lic.N STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT 51180 ���i ADJACENT PROPERTY AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL gG,� I 1/5/11 G,� THESE IMPROVEMENTS ARE BEING MADE WITHIN THE PROPERTY BOUNDARY.THE PROPERTY IS BOUNDED BY STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN REGULATIONS, RESIDENTIAL PROPERTIES ON THE NORTHEAST AND SOUTHWEST,WOODS ON THE SOUTHEAST AND ONE YEAR. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP �...., OAAL.-...'� EARLYSVILLE ROAD ON THE NORTHWEST. MS-2. DURING CONSTRUCTION OF THE PROJECT,SOIL STOCKPILES AND BORROW AREAS SHALL BE IN CLEARING. -_ STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES.THE APPLICANT IS 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE EXISTING SITE CONDITIONS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL AT ALL TIMES. THE SITE IS CURRENTLY A MOSTLY WOODED PROPERTY WITH A STREAM RUNNING THROUGH THE STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE o c SOUTHWEST REGION OF THE PROPERTY. THE PROJECT SITE. PLANS(INCLUDING,BUT NOT LIMITED TO,OFF-SITE BORROW OR WASTE AREAS),THE CONTRACTOR ry MS-3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND a E OFF-SITE AREAS PERMANENTLY STABILIZED.PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED APPROVAL BY THE PLAN APPROVING AUTHORITY. -E A NEW ENTRANCE ROAD WILL BE CONNECTED TO EARLYSVILLE ROAD. UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM,MATURE ENOUGH TO SURVIVE AND 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL -- WILL INHIBIT EROSION. MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN CRITICAL EROSION AREAS MS-4. SEDIMENT BASINS AND TRAPS,PERIMETER DIKES,SEDIMENT BARRIERS AND OTHER MEASURES APPROVING AUTHORITY. C'" LL o a PROPOSED SLOPES STEEPER THAN 3:1 WILL BE STABILIZED WITH BLANKET MATTING. INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES .pi,o A.^. LAND-DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION ¢ `u m z EROSION AND SEDIMENT CONTROL MEASURES DISTURBANCE TAKES PLACE. IS ACHIEVED, w' -a, O UNLESS OTHERWISE INDICATED,ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL MS-5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS,DIKES 8. DURING DEWATERING OPERATIONS,WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. a-a,ry- a PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH SPECIFICATIONS OF THE CURRENT ADDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL MS-6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON RUNOFF-PRODUCING EVENT.ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS Sow'x HANDBOOK.THE MINIMUM STANDARDS OF THE VESCH SHALL BE ADHERED TO UNLESS OTHERWISE WAIVED THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. • OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 1 c v' W ur OR APPROVED BY A VARIANCE BY LOCAL AUTHORITIES HAVING JURISDICTION. A.THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED,DESIGNATED BORROW AREA. pia 0 w S OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA.EARTH FILL SHALL BE INERT T�'a'N 0 F STORMWATER QUALITY CONSIDERATIONS ACRES. MATERIALS ONLY,FREE OF ROOTS,STUMPS,WOOD,RUBBISH,AND OTHER DEBRIS. - U b O STORMWATER QUALITY REQUIREMENTS ARE BEING MET BY THE USE OF SWM FOREST AND OPEN SPACE. B.SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. ORDINANCE SECTION 5.1.28. ico.n z 5 5 5 STORMWATER RUNOFF CONSIDERATIONS THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF v ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED IN ACCORDANCE WITH VESCH AND OF DRAINAGE AREA.THE OUTFALL SYSTEM SHALL,AT A MINIMUM,MAINTAIN THE STRUCTURAL ALBEMARLE. e R' 8 8 8 THE CONSTRUCTION SEQUENCE,INCLUDING THE INSPECTION OF ALL MEASURES AFTER ALL RAIN EVENTS. INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION.RUNOFF 14. BORROW,FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL-TYPE POWER EQUIPMENT SHALL BE w w w COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH LIMITED TO THE HOURS OF 7:00AM TO 9:50PM. - a A.A, STRUCTURAL PRACTICES: CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS 15. BORROW,FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAT MAINTAINS c y 1. TEMPORARY CONSTRUCTION ENTRANCE-3.02 A TEMPORARY CONSTRUCTION ENTRANCE SHALL BE UTILIZED. LATERAL SUPPORT,OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS,PHYSICAL DAMAGE TO p Zp ZO PROVIDED AT THE LOCATION INDICATED ON THE PLANS.IT IS IMPERATIVE THAT THIS MEASURE BE MS-7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL ADJACENT LAND AND STRUCTURES/IMPROVEMENTS,AND DAMAGE TO ANY PUBLIC STREET BECAUSE OF x 4 H W MAINTAINED THROUGHOUT CONSTRUCTION.ITS PURPOSE IS TO REDUCE THE AMOUNT OF MUD MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR SLIDES,SINKING,OR COLLAPSE. 5 TRANSPORTED ONTO PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF. OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL,MAINTAIN,REMOVE OR CONVERT TO 5 ¢z z 2. SILT FENCE BARRIER-3.05 SILT FENCE SEDIMENT BARRIERS SHALL BE INSTALLED DOWNSLOPE OF MEASURES UNTIL THE PROBLEM IS CORRECTED. PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL AREAS WITH MINIMAL GRADES TO FILTER SEDIMENT-LADEN RUNOFF FROM SHEET FLOW AS INDICATED. MS-8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT,UNIT,BUILDING OR OTHER p ITS PURPOSE IS TO INTERCEPT SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS AND PREVENT WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL,FLUME OR SLOPE DRAIN PORTION OF THE PROPERTY. w o CZ SEDIMENT FROM LEAVING THE SITE. STRUCTURE. 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING.SEEDING IS TO BEAT 75 i < 3. STORM DRAIN INLET PROTECTION-3.07 STONE FILTERS SHALL BE PLACED AT THE INLET OF ALL MS-9. WHENEVER WATER SEEPS FROM A SLOPE FACE,ADEQUATE DRAINAGE OR OTHER PROTECTION LBS/ACRE,AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL ¢ p o a DRAINAGE STRUCTURES AS INDICATED ON PLANS.ITS PURPOSE IS TO PREVENT SEDIMENT FROM SHALL BE PROVIDED. RYEGRASS AND CEREAL WINTER RYE,OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE,OR MAY ENTERING THE STORM DRAINAGE SYSTEM PRIOR TO PERMANENT STABILIZATION. MS-10.ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE THROUGH AUGUST TO CONSIST OF GERMAN MILLET.STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. 8 DATE 4. CULVERT INLET PROTECTION-3.08 A SEDIMENT FILTER LOCATED AT THE INLET TO A CULVERT TO PROTECTED SO THAT SEDIMENT-LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM ALTERNATIVES ARE SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. Si PREVENT SEDIMENT FROM ENTERING THE SYSTEM PRIOR TO PERMANENT STABILIZATION. WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER,PERMANENT SEEDING,AND MULCH. s 01/19/I9 5. DUST CONTROL-3.39 DUST CONTROL IS TO BE USED THROUGH THE SITE IN AREAS SUBJECT TO MS-II.BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS/1000SF,INCORPORATED INTO THE TOP o SURFACE AND AIR MOVEMENT. OPERATIONAL,ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT 4-6 INCHES OF SOIL FERTILIZER SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST OF A 10-20-10 DRAWN BY CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEMNG NUTRIENT MIX.PERMANENT SEEDING SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95% VEGETATIVE PRACTICES: CHANNEL KENTUCKY 31 OR TALL FESCUE AND 0-5%PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS.STRAW C.GAYNER 6. TOPSOIL(TEMPORARY STOCKPILE)-3.30 TOPSOIL SHALL BE STRIPPED FROM AREAS TO BE GRADED MS-12.WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED,PRECAUTIONS SHALL BE TAKEN TO MULCH IS TO BE APPLIED AT BOLBS/100SF.ALTERNATIVES ARE SUBJECT TO APPROVAL BY THE COUNTY AND STOCKPILED FOR LATER SPREADING.STOCKPILE LOCATIONS SHALL BE LOCATED ONSITE AND MINIMIZE ENCROACHMENT,CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO EROSION CONTROL INSPECTOR. • DESIGNED BY SHALL BE STABILIZED WITH TEMPORARY SILT FENCE AND VEGETATION. THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION.NONERODIBLE MATERIAL SHALL BE 19. MAINTENANCE:ALL MEASURES SHALL BE INSPECTED WEEKLY AND AFTER EACH RAINFALL EVENT.ANY 7. TEMPORARY SEEDING-3.31 ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MORE THAN 30 USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS.EARTHEN FILL MAY BE USED DAMAGE OR CLOGGING TO STRUCTURAL MEASURES SHALL BE REPAIRED IMMEDIATELY.SILT TRAPS • C.SHIFFLETT DAYS SHALL BE SEEDED WITH FAST GERMINATING TEMPORARY VEGETATION IMMEDIATELY FOLLOWING FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS. SHALL BE CLEANED WHEN 50%OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT.ALL SEEDED • CHECKED BY GRADING OF THOSE AREAS.SELECTION OF THE SEED MIXTURE SHALL DEPEND ON THE TIME OF YEAR IT MS-13.WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE AREAS SHALL BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS.SILT FENCE AND IS APPLIED. IN ANY SIX-MONTH PERIOD,A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF DIVERSION DYKES WHICH COLLECT SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND • 0 C.SHIFFLETT 8. PERMANENT SEEDING-3.32 FOLLOWING GRADING ACTIVITIES,ESTABLISH PERENNIAL VEGETATIVE NONERODIBLE MATERIAL SHALL BE PROVIDED. REPAIRED IMMEDIATELY. COVER BY PLANTING SEED TO REDUCE EROSION,STABILIZE DISTURBED AREAS,AND ENHANCE NATURAL MS-14.ALL APPLICABLE FEDERAL,STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS OF 0 SCALE BEAUTY. CROSSING LIVE WATERCOURSES SHALL BE MET. FINAL SITE STABILIZATION,WHEN MEASURES ARE NO LONGER NEEDED,SUBJECT TO APPROVAL BY THE • N.A. 9. SOIL STABILIZATION BLANKETS&MATTING-3.36 A PROTECTIVE COVERING BLANKET OR SOIL MS-15.THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN COUNTY EROSION CONTROL INSPECTOR. STABILIZATION MAT SHALL BE INSTALLED ON PREPARED PLANTING AREAS OF CHANNELS TO PROTECT THE WATERCOURSE IS COMPLETED. 21. THIS PLAN SHALL BE VOID IF THE OWNER DOES NOT OBTAIN A PERMIT WITHIN 1 YEAR OF THE DATE OF • AND PROMOTE VEGETATION ESTABLISHMENT AND REINFORCE ESTABLISHED TURF. MS-16.UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING APPROVAL(WATER PROTECTION ORDINANCE SECTION 17-204G.) STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: 22. PERMANENT VEGETATION SHALL BE INSTALLED ON ALL DENUDED AREAS WITHIN NINE(9)MONTHS MANAGEMENT STRATEGIES A.NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. AFTER THE DATE THE LAND DISTURBING ACTIVITY COMMENCED.(WATER PROTECTION ORDINANCE 0 1. PROVIDE SEDIMENT TRAPPING MEASURES AS A FIRST STEP IN GRADING,SEED AND MULCH B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. SECTION 17-207B) IMMEDIATELY FOLLOWING INSTALLATION. C.EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN 2. PROVIDE TEMPORARY SEEDING OR OTHER STABILIZATION IMMEDIATELY AFTER GRADING. APPROVED SEDIMENT TRAPPING DEVICE,OR BOTH,AND DISCHARGED IN A MANNER THAT C . 3. ISOLATE TRENCHING FOR UTILITIES AND DRAINAGE FROM DOWNSTREAM CONVEYANCES IN ORDER TO DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF-SITE PROPERTY. OM MINIMIZE PERIMETER CONTROLS. D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO SOILS INFORMATION 0 F 4. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED UNTIL THEY ARE NO LONGER MINIMIZE EROSION AND PROMOTE STABILIZATION. 36B-HAYESVILLE LOAM-2 TO 7 PERCENT SLOPES,MORE THAN 80 REQUIRED TO COMPLY WITH THE CONTRACT DOCUMENTS OR STATE LAW. E.RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. INCHES TO RESTRICTIVE FEATURE.WELL DRAINED,HYDROLOGIC H . F.APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. SOIL GROUP B. ? PERMANENT STABILIZATION MS-17.WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, H i= ALL NON-PAVED AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT SEEDING PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR 47C-LOUISBURG SANDY LOAM-7 TO 15 PERCENT SLOPES,MORE ( ) lJ„( IMMEDIATELY FOLLOWING FINISHED GRADING.SEEDING SHALL BE IN ACCORDANCE WITH STD.&SPEC. TRACKING ONTO THE PAVED SURFACE.WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR THAN 80 INCHES TO RESTRICTIVE FEATURE.WELL DRAINED, I 3.32,PERMANENT SEEDING.SEED TYPE SHALL BE AS SPECIFIED FOR'MINIMUM CARE LAWNS'AND PUBLIC ROAD SURFACE,THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF HYDROLOGIC SOIL GROUP A. H' J B °GENERAL SLOPES'IN THE HANDBOOK FOR SLOPES LESS THAN 3:1. FOR SLOPES GREATER THAN 3:1,SEED EACH DAY.SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND J qS t TYPE SHALL BE AS SPECIFIED FOR'LOW MAINTENANCE SLOPES"IN TABLE 3.32-D OF THE HANDBOOK. FOR TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA.STREET WASHING SHALL BE ALLOWED 47D-LOUISBURG SANDY LOAM-15 TO 25 PERCENT SLOPES, MULCH(STRAW OR FIBER)SHALL BE USED ON ALL SEEDED SURFACES.IN ALL SEEDING OPERATIONS SEED, ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER.THIS PROVISION SHALL APPLY TO MORE THAN 80 INCHES TO RESTRICTIVE FEATURE.WELL DRAINED, .ri Li.) 8 FERTILIZER AND LIME SHALL BE APPLIED PRIOR TO MULCHING. INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND-DISTURBING ACTIVITIES. HYDROLOGIC SOIL GROUP A. 0 II/ q MS-18.ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 w O E`SEQUENCE OF INSTALLATION DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER 94B-WEDOWEE SANDY LOAM-2 TO 7 PERCENT SLOPES,MORE C NEEDED,UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY.TRAPPED THAN 80 INCHES TO RESTRICTIVE FEATURE.WELL DRAINED, Cle G 5 1. A PRE-CONSTRUCTION MEETING IS REQUIRED WITH ALBEMARLE COUNTY E&S INSPECTOR,CONTRACTOR, SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY HYDROLOGIC SOIL GROUP B. 08 OWNER,AND ENGINEER.THIS MEETING SHALL TAKE PLACE AT THE COUNTY OFFICE BUILDING. MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND T Q -1CLEARING LIMITS MUST BE FLAGGED PRIOR TO THE MEETING WITH ONE(1)WEEK OF NOTICE. SEDIMENTATION. 94C-WEDOWEE SANDY LOAM-7 TO 15 PERCENT SLOPES,MORE J... > Q 2. INSTALL CONSTRUCTION ENTRANCE. MS-19.PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED THAN BE INCHES TO RESTRICTIVE FEATURE.WELL DRAINED, 1. Ce 4 3. INSTALL SILT FENCE AND TREE PROTECTION FENCING. FROM SEDIMENT DEPOSITION,EROSION AND DAMAGE DUE TO INCREASES IN VOLUME,VELOCITY HYDROLOGIC SOIL GROUP B. III2LL�//I a m g 4. ONCE THE PERIMETER CONTROL MEASURES ARE IN PLACE,BEGIN CONSTRUCTION ON BROOKES LANE. AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF I..L D Z .5• 5. ROUGH GRADE PROJECT AREA. 24-HOUR DURATION IN ACCORDANCE WITH THE STANDARDS AND CRITERIA LISTED IN SECTION ID Q s 6. INSTALL BROOKES LANE,THE CULVERT,AND STORMWATER UTILITIES.INSTALL INLET,CULVERT INLET 19 OF THE VIRGINIA ADMINISTRATIVE CODE 9VAC25-640-40 MINIMUM STANDARDS. AND OUTLET PROTECTION. I-Q U - : 7. INSTALL SWM-1 WHEN CONTRIBUTING DRAINAGE AREA IS STABILIZED. GENERAL EROSION AND SEDIMENT CONTROL NOTES: Q LP F, s 8. ONCE UPSLOPE AREAS ARE PERMANENTLY STABILIZED,AND WITH THE COUNTY INSPECTOR APPROVAL, 7 0 z a . REMOVE CULVERT INLET PROTECTION AND INLET PROTECTION. ES-1: UNLESS OTHERWISE INDICATED,CONSTRUCT AND MAINTAIN ALL VEGETATIVE AND STRUCTURAL L y o 9. REMOVE REMAINING EROSION AND SEDIMENT CONTROL MEASURES AS CONTRIBUTING DRAINAGE AREA EROSION AND SEDIMENT CONTROL PRACTICES ACCORDING TO MINIMUM STANDARDS AND 0z w s i7 m IS STABILIZED. SPECIFICATIONS OF THE LATEST EDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL 11,-^1 5 10. SEED ALL DENUDED AREAS PER VESCH STANDARDS. HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL V) OU 1--( 1-'3 REGULATIONS. R s o W F 3 ES-2: THE CONTROLLING EROSION AND SEDIMENT CONTROL AUTHORITY WILL MAKE A CONTINUING (f) b a REVIEW AND EVALUATION OF THE METHODS AND EFFECTIVENESS OF THE EROSION CONTROL PLAN. J Q o 8 d ES-3: PLACE ALL EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO OR AS THE FIRST STEP IN LLMI z De` _9 CLEARING,CLEARING,GRADING,OR LAND DISTURBANCE. 0 Q m 8 ES-4: MAINTAIN A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN ON THE SITE AT ALL Z g m TIMES. 0 Q ES-5: PRIOR TO COMMENCING LAND-DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON II D THESE PLANS(INCLUDING,BUT NOT LIMITED TO,OFFSITE BORROW OR WASTE AREA),SUBMIT A XQ e i 3 • SUPPLEMENTARY EROSION CONTROL PLAN TO THE ARCHITECT/ENGINEER AND THE CONTROLLING EROSION AND SEDIMENT CONTROL AUTHORITY FOR REVIEW AND ACCEPTANCE. i►/ fie] i c g LL ES-6: PROVIDE ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND UJAN SEDIMENTATION AS DETERMINED BY THE RESPONSIBLE LAND DISTURBER.(MODIFIED NOTE) B a • X .ES-7: ALL DISTURBED AREAS SHALL DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES O�.�/ `8 FI..L DURING LAND-DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT. 1 ES-8: DURING DEWATERING OPERATIONS,PUMP WATER INTO AN APPROVED FILTERING DEVICE. f Si' ES-9: INSPECT ALL EROSION CONTROL MEASURES DAILY AND AFTER EACH RUNOFF-PRODUCING RAINFALL TDB ND. 5, EVENT.MAKE ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE 11 41219 EROSION CONTROL DEVICES IMMEDIATELY. 2 E 3 SHEET NO. v3 y C4.0 ri 41,NLTH Op r,, sioH['.. I .70.'VrN. j S 2• Q. :CONSTRUCitJN ( ' - -4 CLINT W. '1 _ACCESS.- 3',SV-2A-ASojlgiT.'lea O OURSE" '"- - Su(n'SN.LFFLET a• IX611HC.. = C,��p' •?^ _ _ •'?^'_ _ rPl1YEMENT A PIPE OUTLET CONDITIONS q ..,.:,:w.. _ , A e*V Lic.N 51380 �� l___I ... G II/5/IQ .�M�: • I., 6',MN.21H AGGRrGAIE.BASE � � ,▪ N � a , ,� � ��� 1PROFILE Mf/ .t6om �iit. - - ado 1Ni_�:� _.SII1NE' - .70''M:H: `1�r�111:10�, PIPE OUTLET TO FLAT AREA 2 E CONSTRUC1I3N ASPHALT DALE➢_ `�`♦/1;*���'�I WITH NO DEFINED CHANNEL H s ACCESS_.. A JJ��WASHRACK�._ �e��;'•�� �f�I �,. : •J� PLAN VIEW ���:�� E ;11 'O1.I• yi 1'-''•J •• i12Z. :12:'MN,_ - -- I <LL e3 Vi•SILT FENCE CULVERT INLET PRO to o%� PROTECTION .�,`wo�z:..a.-��II.. .. •- a w�-m O ENDWALL POSRNC DRNN.:GE /-.,.__-.i_..ZVI:�V:4II=% ry E !kLIST EXTEND.FULL WTJTH_ A o- ry I�`IO,GE0IVENT:_ z _ OY INGRESS?N_D,CGRL6S: ^ 5 M,� ,CPERATiGN, -' TRAPPING.DE>_10E' SECTION A-A FILTER • •/KEY IN 6'-7:RECOMMENDED FOR yP CLOTH ENTIRE PERIMETER ¢aO In=a O [l PLAN- N ~~ �1■- 2 2 — ' --�i7':uiy:._.__._.._._-T. :. :-SRnbwi NacE• m O o O > U U U - Owc-G.vNiE ??j TOE OF ELL `o U 0UU SILT FENCE 'FILTEE CLOTH'.., .._ _ _. A ��.� L o:o:C ���e j • • nil 'SECTION-A--A ii Vi�ti% A 3du(Mm.) '" WADIS •DISTANCE IS 6' LROw "OPTIONAL STONE COMBINATION ,�wuuinun l5at0 tap'ofl"inchiuust in installed pith a UWJSIIIUi linchballcock I..:. ���4:+: x a H In MINIMUM IF I 1,0'I 1.5' 4. do VII5._� __ Ire U. FLOW IS shirtoffLah_e sTrylpl}iug,Siclsh hose niQixdiitueta of l:.-caches foT'adeglyte. , yip 4��V IM ww conetut. } ,�,�;i��'I/o I �: 0 11:It:m EMBANKMENTAND (nesuve,ea to water rectal tamed eda away We ellpreenteaU .�.S'T A•/ - - 'I --1 •����* PIPE OUTLET TO WELL ,F -1� zSIEIRI ed settling atea to Tallal't EC IOC w IlVI6t/1Y11eMLtILIB be P(eVented f(OM7_ f r ���7I` DEFINED CHANNEL M1, 441-, � '4 entai4^s10mTdiluS,iNches OC n'alacoUISCS, LQi�//�y� ��,��_ w m m m PLAW_R��ii�:- I �2.5' I _- PLAN VIEW 4_�E'W�ea�11- i w •-Y.r•' PAVED:_WASH RACK'_ lob �* _____ ---cam_-_—c h., n 5o io ti ..? 1'. "!� `'n. SCnLE-=— - o ••VDOT #357,g5.#56 OR 157 CLASS I II`^-.-� DATE COARSE AGGREGATE TO REPLACE SILT RIPRAP CE -�-�:����►����-�:. 0 FENCE IN'HORSESHOE'WHEN HIGH CIO �.i!..•!_.R.M.ii ii II II tl 02/19/19 VELOCITY OF FLOW IS EXPECTED [ 3, ---•�- ® 0&71) STONE CONSTRUCTION ENTRANCE SECTION A-A o FILTER KEY IN 6'-B•;RECOMMENDED FOR DRAWN BY CULVERT INLET PROTECTION No Scale CLOTH ENTIRE PERIMETER • NOTES: C.GAYNER No Scale I.APRON LINING MAYBE RIPRAP,GROUTED RIPRAP,GABION BASKET.OR CONCRETE. • DESIGNED BY 2 I.,IS THE LENGTH OF THE RIPRAP APRON AS CALCULATED USING PLATES 1.SET THE STAKES. 2.EXCAVATE AC'X 4'TRENCH UPSLOPE 3.183 AND 3.16J. • C.SHIFFLE7T ALONG THE LINE OF STAKES. 3 d=1.5 TIMES THE MAXIMUM STONE DIAMETER,BUT NOT LESS THAN 6 1-•-•1 INCHES • V ® CHECKED BY i 1 '• OP TABLE 3.31-B 4.E j "'!JI , j • C.SHIFFLEIT ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS /�/'� 9 -"J'4, IP OUTLET PROTECTION 0 V - SCALE 'QUICK REFERENCE FOR ALL REGIONS' FLOW , � _I(v.1,,,' ....E._�4 No Scale • AS SHOWN PLANTING DATES SPECIES RATE(LBSJACREI • 3.STAPLE FILTER MATERIAL TO STAKES AND 4.BACKFILL AND COMPACT THE SEPT.1-FEB.15 50/50 MIX OF EXTEND IT INTO THE TRENCH. EXCAVATED SOIL. 2 X 4'WOOD SILT FENCE DROP INLET PROTECTION DROP INLET WITH • 7 ANNUAL RYEGRASS FRAME GRATE • (LOLIUM MULTI-FLORUM) j j l FRAME 8 50-100 I.5' CEREAL(WINTER)RYE _ x _ MAX - _ ` 11 Q_ (SECALE CEREALS) _ 1-1 FLOW ��III II II I111 FEB.16-APR.30 ANNUAL RYEGRASS 60-100 SHEET FLOW INSTALLATION 3' O J (LOLIUM MULTI-FLORUM) QQQ (PERSPECTIVE VIEW) 3 ��Fi MIN. �- �^ EXTM55 Q i • MAY 1-AUG.31 GERMAN MILLET 50 A " FLOW ,.,yam•MAX A U U ^ CORNERS D W o (SETARIA ITALICA) 4 .rtiBB "7 • U s - - - PERSPECTIVE MEWS . 0 m J o/�c////� - �G\\� STAKE O J' at i . /- c -.II FABRIC III L./.. W o POINTS A SHOULD BE HIGHER THAN POINT B. .- Mil 1' O CO O -III_�Ilan IIIII- MIN. O TS SF DRAINAGEWAY INSTALLATION (CDI III�m ...,I IIII) LLI m (FRONT ELEVATION) II - .- TEMPORARY SEEDING PLANT MATERIALS SILT FENCE(W/O WIRE SUPPORT) - ''�-' DETAIL Are O Z B No Scale No Scale Q -I ELEVATION OF STAKE AND FABRIC ORIENTATION => O -- g SPFITIFIC APPIICATION W CZ 2 SPACING BETWEEN CHECK DAMS THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE THE INLET LL1' TABLE 3.32-D I- 9 SITE SPECIFIC SEEDING MIXTURES FOR PIEDMONT AREA DRNNS A RHEET OR FLAT AREA(SLOPE NO GREATER TITAN 5R)WHD2E Q 7HE INLET SHEET OR OVERLAND FLOWS(NOT EXCEEDING 1 GF.S.)ARE0 f 2 n IP TYPICAL THE METHOD SHALL NOT APPLY TO INLETS RECEDING 3.07-1 m O 5 TOTAL LBS.PER ACRE CONCENTRATED FLOWS,SUCH AS IN STREET OR HIGHWAY MEDIANS. J `' .t MINIMUM CARE LAWN A e Q V I— o COMMERCIAL OR RESIDENTIAL 175-200 LBS. L Q I F- 3 A KENTUCKY 31 OR TURF-TYPE TALL FESCUE 90-100 I STORM DRAIN INLET PROTECTION z IMPROVED PERENNIAL RYEGRASS 0-5% I I6 No Scale in Z E 3 0 KENTUCKY BLUEGRASS 0-5% 'e GENERAL SLOPE(31 OR LESS) L=THE DISTANCE SUCH THAT POINTSA I I TYPICAL ORIENTATION OF TREATMENT- 1 SOIL(STABILIZATION BLANKET) ^ OU eo REDT OP G 31 FESCUE 122 LBS. Cr) W g AND B ARE OF EQUAL ELEVATION SHALLOW Q RED TOP GRASS 2 LBS. SLOPE .,- SEASONAL NURSE CROP•• 20 LBS. e ";fif."/"°CA- Z VI a -C' 150 LBS. ON SHALLOW SLOPES,STRIPS NETTING B..T.,,,,,..„,,,..„= ,_S PROTECTIVE COVERINGS NAY BE J 0 ?3 g LOW-MAINTENANCE SLOPE(STEEPER THAN 3:11 =___.__ APPLIED ACROSS THE SLOPE. b KENTUCKY 31 FESCUE 108 LBS. 2 ACRES OR LESS OF DRAINAGE AREA: 2-10 ACRES OF DRAINAGE AREA: RED TOP GRASS 2 LBS. WHERE THERE IS A BERM AT THE TOP ;-x BERM W Q S I SEASONAL NURSE CROP• 20 LBS. + r` + OF THE SLOPE.BRING THE MATERIAL +51T(.T7; [LI '^ CROWNVETCH•• 20 LBS. 6' _; - - l OVER THE BERM AND ANCHOR IT .1=e_T=c_e�Ty_•_ o 5 .�11 :•�M!:2�."l• STEEP BEHIND THE BERM. O Z 5 0 150 LBS. 3„ �:IH�.•���. 3,• SLOPE 0 FILTER 3 O 1--1 FILTER - I :s;;4 i4:,•` �:::T'£,,.i.. If. I n'USE SEASONAL NURSE CROP SEEDING DATESCLOTH 1 :�ON STEEP SLOPES APPLYPROTEC VE O O IN ACCORDANCE WITH S -- :tS,"4;.,KI CLOTH .._... 1 V) AS STATED BELOW: (OPTIONAL) -- COVERING PARALLEL TO THE DIRECTION P AL /(DOWNSTREAM VIEW) p (OPTIONAL) DOWNSTREAM VIEW) ` -=�`. OF FLOW AND ANCHOR SECURELY. 0 °• 3 MAY 1S T 16TH THROUGH 15TH ANNUAL RYE ( tWBNt�. E .21 m S MAY 1ST THROUGH AUGUST 15TH FOXTAIL MILLET BRING MATERIAL DOWN TO A .3 AUGUST 16TH THROUGH OCTOBER ANNUAL RYE AREA BEFORE _ W a' NOVEMBER THROUGH FEBRUARY I5TH WINTER RYE TERMINATING THE 4�; `-`^ •,Xr`- LL VDOT#1 COARSE VDOT#1 COARSE INSTALLATION,ERN THE END s - " ••SUBSTITUTE SERICEA LESPEDEZA FOR CROWNVETCH EAST OF AGGREGATE } AGGREGATE } DITCH• - .,,,• •w s.=, UNDER a'AND STAPLE AT 12' 2 O m FARMVILLE,VA(MAY THROUGH SEPTEMBER USE HULLED SERICEA,ALL I I ,,:.a,,`?.;;;`F INTERVALS- FLOW =:... FLOW ...i'!.?7E �/ 3' 3' E_• 7 U 7 lc OTHER PERIODS, BE O B USE INCREASE E IS D I D SERI EA. F 7PEA N LIEU C I FLA cc OF CROWNLEGUME - •/-�VETCH ALL "IN DITCHES,APPLY PROTECTIVE COVERING TD.TO3SEED 0 LBS./ACRE. .._................ ....... .. THE F W K - MUST BE PROPERLYMAY PAR ALLEL TO E 0 RO.USE CHEC E INOCULATED. S B LATED.WEEPINGRAS E ,'^�':?'4'•iii LOVEG SLOTS AS REQUIRED THE AVOID JOINING MATERIAL IN m8 mI ADDED TO ANY SLOPE OR LOW-MAINTENANCEMI MIX DURING WARMER CLASS I RIPRAP we TIiTTCE:'o;^'' a. THE CENTER OF THE DITCH IF AT ALL POSSIBLE. F. a SEEDING PERIODS,ADD 10-20 LBS./ACRE IN MIXES. ® CD ••OR 3/4 OF DITCH HEIGHT ® BM ® JOB No. c r Ps 41219 .E PERMANENT SEEDING MIX FOR PIEDMONT AREA ROCK CHECK DAM SOIL STABILIZATION BLANKET(EC-2) SHEETNO. ag o No Scale No Scale No Scale C4.1 EE S.1103141219-Eadyeedle_SubdwsionIDWGIShee11CD1WPO PLAMC42-ESC dwg I Planed on 1115/20191.59 PM I by Anna Fontaine _ 11 — --- -,\ _FAR SV2[E ROAD-STATE \ __:_________:__ _ ___..',.. ll--------------________-11"--.1 : 1 at O l` ri.i.7_,.„...lreoir '' :1_-_ - z ▪m - 1Tuiii'4j7fN 1 � 1 m/ �,' / ____ _ _ _ - - iJ0 i . 1��- / r titiI /" ® — I• / 8 et ICI I // • I• O / �n1. o � s,. F ���_,` • '1• / / �,, , _ _ - - - �� T �, . ,rot-� ,°'4' / I /"- ' :. ------------------- ----__ .."*--1.--- ---___ - - - ----_ ---•:14,„, s7z. 4 1,06-?.„ rnr,"1. /, , ,i, r9 i , ,- , 4,, „„0., . ———— - - --.. .—_,„_.-..-- ——_ , , , , , cu , ,,,,,, / ,,,- , ,. �' ,----- m __ _,.. I 1 I l m Z—— Nol ' - \ , :,__ .. , , , , . , ,,, ,.. ._ ., ,,,.. / , .... 5j, I,. 1 / / , / 1 T— ® ,‘ ;I I _____„_., to . ., pi N 4, . r-7-- ; \ , , , I/ / ,_____ . , ,,, , _II. , • .....• „, , \ g• ,. ‘, 1 i 1: ,.... „ , „ „ „ / . , ' ' 7 - I Ill 1 /, ,., / ,'// , /,'/ /'/ // •// /" ' /'' //vy5 -`— '\ '�.4`i., ,„ ,, / 'gi ,, ` I — I 3 -._�11 iiiie %Il 11I1 1 �O.y II \ " iii 1 i14:., q 1 '',// / ,' I,' %'' ,�y<'n_J/ / ,''/'I 'S��7/�I/t �l 1 \ $ / Co T -rtc° • ,..:.„-.-irir , , 0', ...`N•i , . _•—•--,- , I _ •Pti• x / - -I� I / ' ,I 1v l / ///// ,'''/ / '' e 1 �n l , �I _ l '' 0- L I ti J/ O I / 6 /-I 1 , xl T y / /�/'/ ' , /j , 1 -�P r� / 1 I �Dz�/ 1 1 z F. _r_ 'I 1 I 't ' / / '/I / / / 4 I I 0 �—•1-�1,1 / - ,,11/ k / Om Zr ®.' - ` �.. -�1,' '(�3'OG,1 - m l'' 'I/' '//// • '/ ,/ l / Uf ,' / �z< / -p '� 'IU"I -11' '/� co o6. ' 0 o,' // // ,'� - 8--' I I Yj ' — I -/ m �pgp • / ' / \ \\I 1 ',/ / l/f,J '��/C/ Ii o-1 f---j�- '1'/ I ,� / / L..__ / \ 1 , / ' z°cy n` - - / L/ I / \ \I �L ' / �,` \ , , \ ` r T - 1 I 1 r .A 1 i /' /'/y,\/�I/\,,,,, /l / ► i ' / �— T' ,.' \ , 1 + 1r�O 1 1 I 101 j r l 1 r:I/�'�� //�/�l I l I'r' , II� . / t/' ,, _ram _ / / ' '/ '__, ` \ ' ` \• •, -1 , l '. I I I 1 1 1 �y�/�'�'/'//� 1 1 / 1 I /,T 1 1 / —LT/' t ` \y ` \ \, \, 1 , I I - 1 ' I \ ~I,//✓ �// 1 1 1 I 1 /' ''' // ~, �r__ \ \ \ ' , 1 ', 11 \ '\ 1 �F �_ `, \ �,���%; �`%' ,n,® 1 I 1, F °' '/'/ / • / / �/ , '/ `\ \ , \ \J .. _ - \ ` e>��4%�;/ \ /, , I 1 1 y I , ),,,,m. , „• Ill" \ � \ \ t r `\ `` , 6\ IV d \-- \ \ % ', 1 \u( `, \, \\ `‘‘, N f"-...., . . \\ t? 6>,\ u‘ t )\ ,4 ` -` \, \\ \ 1 1 1 / / —_-- , , +, , 'IL ` \ r \ ` \I ' 1 T !/I/ ` + - ► ` I 1 ` , O , \ , `\ \ \ / / Cn\\\+� \ \, tl , 11 1 r`I +, _ \ + ' l I I ; I {� tl , u N 3 ` \\ I ,' \` \\ \\ `` i // / /// - A \+9, I t1 1, 1\ 1 ` 11 l • \� I 1 v�i / / 11 I P.► II III I��N I \1�p t 't , \ 1 1 , / n I r I //��I / Be' e 1 m y m o 1 1 1 1 1 / / /' ? \ 1 1 I I 1 1 , 1 r 1 i1 / r / . / / 1 I`,1 mg"I + M ,1 ,t I I 1 1 I r , / �\ 1 1 I I 1 1 /' ;1 / , /l / I / I ' , I m \ .. '1 1 I I / // / // \ '\ \\ \ 1� I 1 +1 t1 f / / / / /' / / I t - 1 1 I I • I I I I / ' / + N \ -/ I �i 1 I 1 ` +\ r ` / / 4 ♦.ti , / 1 ' I • I I n r ' I I I i 1 \,,,;,,, I1 \ \ 1 r/ / i 4 s� r 1 I I1 ' f� \ \, d \, \ `\ \\ `\ \` \ I I I I , / 1r l ► I 11 ® ► , i''`In 1 icI I I I I 1 1 , `1 4 1 1 I , 1t t I I 1 I I \ \ \ \ � O i ` �S� I • / 111 `\ , , + \ 1 \ , 1 `T6`4 \` 1 \/ 1I 1 T �1 , \ ¶,,,1 \ \ \ - " I /' / I I I l I I �I 1 I 1 :y �, ��\ \ \O , \ • \ + I , `\ �N�= \I I t ti \ \ --T--- \ \ \ ,',.‘ \ a CO , r: \\I r\ i\\ • \ \ . ,... r- I ' \‘ \ \\ -‹ \ \ \\ \ \ ‘, .:. --I • .. x (It ® I p \ \ \, \\ '\ \ ` \ \\ \ \`\ 1 ►` \• \ \ \ \ • ►' \'i's\ \ a _ A z a Q 0 c .. z 0 a Z \ , \ \ 1 T \ \ '1 as _ m o o ,,, m ` \ • 1 , \ \ I\ 8g ' 1 I I 1 f 1'! z I m ut ti .- o m w .I ,n u \ / \ I ` I I I tl \ N \ REFER TO SHEET C4.3 TimmoNs , GROUP ..N.NI,, THIS DRAWING PREPARED AT THE a---a^CO •••• CHARLORESVILLE OFFICE l OM 1,, M'�,~� � • 0 YOUR VISION ACHIEVED THROUGH OURS. •y y G'I'tiq, • fi08 Preston Avenue,Suite 200 i Charlottesville,VA 22903 -e r• Q TEL Presto Avenue, ,Suite 00 I Charlottesville, www.tirnmons.com VA 22903 :0 �r .1.: PROPERTY OF BELLA SIGNATURE HOMES, LLC WPO PLAN N DATE REVISION DESCRIPTION •coo`01-I•� _ 1n L n c 05/30/19 REVISIONS PER COUNTYCOMMENTS �' 1£ '�. A ," o 11' S T T y i ,\. 08/15/19 REVISIONS PER COUNTY COMMENTS �i��►�• t\�C� H c COUNTY OF ALBEMARLE,VA o m r r 2 w m 11/05/19 REVISIONS PER COUNTY COMMENTS ' l? tFl;Nr- IV 1p EROSION AND SEDIMENT CONTROL PLAN m w A ` e ����� These plans end eeoodated documents ere the exclusrva propedY of TIMMONS GROUP and may not be mpmduced In whole or In part end shall not be used for any purpose whatsoever,Inclusive.but not I/toted to oenettoMon,bidding,and/or constmclwn slaking wl9,out the express w,inan consent of TIMMONS GROUP. S.1103141219-Eeryswlla Subdrvelon1OWGVSheet,CD1WPO PLAMC4.2-ESC.dwg I Plotted on 1115/20191:59 PM I by Anna Fontaine REFER TO SHEET C4.2 I 1 t 1 ' ' 1 / / , ' 11 '\ 'I 1 ', '1 7 MI r •®' •'' . , / / r ' 1� ', I I'1 ' \\ I 1 i i I / ` \ -N ; , I \ I ' / 'r . / / 1 I p' 1 ' \\ I I I 1 I l , \ , L7 ' 1 1 / / , / , , ' I I , , , ,, : , , , , , , \ \-,,, t i \ , I ,/,/ / ' / / I). / I 4 4E4 I, 4 1 • • ' I I , I , , /\ `In \\ \ `\ 77 \ \ \I �%I I , 1 (/' I ', I ', I, '\ ,1 \\ ' /. , I I I I I I I I \ _a \ \ \ \ • \ 1 1 1• , , \ , \ 1 \\ e ► \ I I ` I , /' r I 1 I I I I 1 , Y \\ \ \ \ \ \1 , , 1� � ` 1 \ ` Ssa ` 1 ` 1 1 I I \ T�1. \ \ \ 4 , \ \ �\ I\ \ { \ , , ..„,.. _., s, 1 I i , ir \ , , , \ \ \ \ .__.,,... .,,N —I ....e. I \ \ 1 , o, , I 1 ', ` ` ------.` \ ', % s, \\ • -4-4-----=.404',,, e '• N11\ i , 1 ',I r \ is\ - \\ _,.__ , , , , / 1 \ \ \\ r� , I fig, ., I(/I' I , I ' I ' ' \\ \, \ `I , \ \ \ , `, `\ \\ \ I` ', 1� \ '�\ { \ 1 I I \\ I \ �\\ _ i I I 1 i I I \ \ \ \\ \ I ` ►\\ ` \ \ f ‘ i \ \ i , f ' I I I I I I I r I \ l \ \ ;\` \ \\ 55� y IA r I' \ "/ / // / ,'I / / 1 / 1 I I \ l 1 ` \ , , 1 \ \ `'.ti t `IT\ I , sil // / \ 21 '/ / ,/ , /,/ , / ' ,' ' \, , `, \ ` ` \ 1 \ '\ I , I I I ' '1 , \� 41,552 _t, /'\ „.. I ' / , '' / . , ' I 1 1 , , / \ O \ .., . /• .. . „ ,,,, Ny/, 1 /__ C - • '- �� ,•',I / ,/ '' , 1�1 ' 1 \ , \\ \ ', \ ', .'\k_\, \ 1\ 11 \\I ,: 0 ,'q_, '‘., i'- { I� �' - / /' (.//' ,' / / , , ., I ' \ I \ \, \ \ \ \ \ 4\\ \‘'\ \ I 544 JII1J .' n n '' it I I ,1 �- �� , ` , ,/ \ \ ' ` \ /Hi is ___-. , __ ,_ _ ...._ ___ ,IIr l �°' r /l r' 1 r •I I' :1, l I 1 �'1 � — �� 8E ►. �I \I �11 \�\\ ' / it-/ , I 1 I 1 I I\\ •'� --— if e ' \�' ' • '� . '. /l / II / ; l % �, I I I I I I I I -H O —Ii. 1 / I .'i. i I I l l l ' to I i - 9E9 t A /. / / / / / ' ,I./ , ,. ; r r 1 / il I / r/ / 411 ' ; I t r , 1 \ \ '" I / I: •r I It III / I ; / i 'I I I / / / I I 1 `— _ L"—'":., t 1 1 1 I , I / l ' •I l ' 1 —', ' v r L r,,/'l / Ir rl \` ! I 1 1 , 'l ' ' pm / L - ----_ I \\ J 1 I /'' / .' 'I i I I i I I / II ' o,:i / 9pl �r----_\ _ .�' , \ I , , ' I I I I ' I \ Z \ ' \' \\ II 1 1 I I ' '' \\I\ I1 ,. 't I 1 I I I I IIl 'r n. �`- \• `------- - / / \\ _ __,,. \ 1\\ I I ; , 1 \I 'I o I 1 I I I I I`. `--- - \`— — — — — — � — ----_ '--S— - � � 1`I I / / / / — I \\ ' ---\ I\. P / •r , , r,-. ,,, , , , , 1 , / r / /' ,A / ,' I , , ,' I/ cz? r m I n q / 1 m I g9 It I ' , I I Amp / n / A ' I , ' I II , I , , m n m Al N / / ' J I .. c�Ai ®O ` O m OO OOO I I / / / II II /11 I r I , i I `, \\ O x lei - I I- c 41 / / I 1 , a� r o I 1 \ I I ' I IIm 1 1 ' \ o I 11'.I fi' I / 1 I I ' ' \ x elf.' p0 i I' I 1 ; ,1 11 '1 / 1 ni '\ \\ ', 3 S A x m r7. 2 O . E o p O m O ' 1 / ' , I I , 1 ' 1 O ' \ \, \ Lk i AO 3 O 5m sn D ° I ' ` \, \, , \ 1 -< I ICI 6, I '▪ rri ik m I ' 1 , \ \ \ \ x m m I. Z I II 'I r '\ \I \` \\1 \ \' \\ \\ ao H N o W \ \ F. I \ '\ \ TIMMONS C R O V P _""��/Nl~� THIS DRAWING PREPARED AT THE ��R CO,y m, • • ••• YOUR VISION ACHIEVED THROUGH OURS, CH DRAWING VILLE OFFICE ;�j0 y MUD 608 Preston Avenue,Suite 200 I Charlottesville,VA 22903 w b r .k TEL 434.295.5624 FAX 434.295.6317 www.timmons.com A. n r te,S :y \2 .1; ri •1 �i• Ito PROPERTY OF BELLA SIGNATURE HOMES LLC WPO PLAN _ _ DDAT0;19 REVISIONS PER COUNTY REVISION DESCRIPTION a �� _: L q N m COUNTY OF ALBEMARLE,VA I w S „ r ' P. i ; 08/15/19 REVISIONS PER COUNTY COMMENTS ':'p .l1`.% l41 r c m < w m 11/05/19 REVISIONS PER COUNTY COMMENTS .•��44 ";?;14 1+ o o m 1O EROSION AND SEDIMENT CONTROL PLAN m a m - - These plans end associated documents we the exclusive property of TIMMONS GROUP and may not be reproduced In whole or In part and shell not be used for any purpose whatsoever,InclusNe.but not IIm11ed to conslnrttion,bidding,andler construction staking without the express written consent of TIMMONS GROUP. , Section 5. Stormwater Management Plan (Provide a reduced I 1 x 17 copy of the latest Stormwater management plan. Do not reference only.) • Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Sa10214121g EarS,vdle Subdwebn9DWG,SheenCD,WPO PLAN1C6.1-STORMWATER SUMMARY PLAN.dwg I Plotted on 11/5/2018 2.00 PM I by Anna Fontaine \ \ \ \\ ���♦ n _-- -----'-- - \ \ \•\\\\\\ J 1 r % \ \ _ ��' I \ 'U ` \ /---JIT: €9 �`` /li.o [•r - , %cE rcc a} >� / \ \ \ rn o,; i �� �"'__;.------- .E'A Y.�1'TCZF`F7tjA ,�7zfE-1 J / \ \\ \ ♦ % \ \ 1 \\ \\ \\ omn.o - __ c -c --fl --. ___RTE 431 I 1...�_...rJ... \\ \\ �1- / \ \ \ 1 \ \ -,=: om \\`I yzb'nl ,"--- sT,, -_ �" '\ L;i.�:4t,...'1yJ,�`� \\\ \\\ \\ // ♦♦♦♦ i \ / I I \1 \ %s m a m m Cam _ ,%� -- .- __ - . _ -__ - I�. �.�.. _ \ yl I n2 v moo , ���\ �\ I /// / 1 vicilfiri.,:lmi—m--1-1' T 4Ta \q A�' S',by' V / / -_ \ 'RRgS RGF ptiF'NT2:f,0 �\ \�-�-(.l II .. ! s I' wi ;a, ; • �� I y\ Rug y^'Fn?�" \ I I I .„- , , 9- -C.ir -- ° -'' ' # (- 14o,-.1 -. '/JJII• // e, ` �p/php1//�.---------- - - I @(}T,.r qi,,,, .\ `\\` `\` \\\ \s 4�1p\\ \ �� I\ , ir__-----:‘, , , ., \, . . . ., . , N ... , , , , , ,....____ „. , _._, ,,, , ,.. -,., ..,,, „. ,,,.,..„ , ,,,‘, .., ,,, , , , . . . ,, .. \ ,‘ ,‘ , ‘, \\ , . N N , , , , , , , , . ,,,, , ,,, ,,,,,,,,,/,./ ,, 7—.7 _____,_„, ,. . ,. ,s, , ,,, , ......, ., . , 1, 7,, .\\ 4,....) ,,, s, . :.,,\ s \ \. , N , , , \ ,,, , „ , \ --,- ,,,,,,,, /,,,,, ,t,' , � %• ,ra :f , i %z2 , J y I \ , //'b''T'/',�, '�'�� , I ', 1 / I I I /�/ II II If."III 'I'''',!/. / / /l l I,/ f i 1 r l / •,\ k' -... ,' ' // / / / zy A ! 1--, ' co�fx // \, ' ' / •' ' alit ,-) -- �' 'f J / 1 '''U'' '// ' / /'// \ 1\ \,I i /, '// r!' ' / , ,--' �/ - _-/ / I ''/ / - --- _ 1/,,�/',�// , ',• / ,�/ / \ \\ +\ `\ \` `i` �� I\ 1r {—L I c> I } ICI m w -/ , I/ I r �'' `\-- _- ilida' • II I I I I/ /r 'I' / `, \ \ ` I \ ` rD \ \`c- qS -•Ss ` ' 1,1 1 Q,F5 /' / I 1' I I I I / / — \ \ \ I \ \ ` \ n, ` P0 , I 1 . ---, -- _/ IJ f- \ I -' _ 1 Io 1 1 ` 1 11\‘' `,\\�1\ /' , ///f ` \\\ \ 1 11 11 pt 1 1, \ \ 1 / 1 I I iI II I/Iv \i `.\ // '\\ /\\ / / / //' 11', 11i ' r / / / / \ \ , 1' II I ' 1 \' l / Apt / / I f Ir` \ �\ \ (x h / / / i i lir, , i / ;;%\\ „�� , I r� \ 'I 11 , ,'/ /, ' , / I 1 'i i �1f '\ \ \ • �r/ / ,/' '' ; , /---- i 1 I r I l 1\*1>y \ni I '1 I \ II , ' / / ', ' //'1 n ' : I \ \ \ / /' / / / - l 1 , i 1 _ '\.r , \ ,1 ,11 `\ \ `I I 1 / ( , r r I 1 1' it , , • �'\ \ \\ \ ` - �`\ \ \ / ,r ,',% ,,' j , ` / / I , i l , , , , \ \ ,\\ \ , ��i tikp fjil 1 �\ 1 / / / ,' / y , �I ' ' I i " ' \,\ \, \ \�\\ \ + I�+�\' 1 ` \ 1 III, `\ `\111, ,,,,iii-,'.,. 2, maim i 11 , ‘, _ --\„\\._''---„, - : / ,'/ / ' / , ,//,� : ,:,,'' ,' / ,, ,, , I, ', , I /r.;;I , \,.1-,,,,,,‘\`‘\-7--,-7 \\,\, \ \,14._ ',, ,, ,,, , , 7., 17.14.7. 17,71-,\:11!./itill ,___________________::---_--1:1 --_____, N',, `,\.,, 2—_____, / , , , ,/ , , ‘, ‘, ,\: \ ______:-- - - ---_ -, ''' t ----1 / / /' /I /I 1' .; 1 / ' \\ ' \ \ \\ ‘, \ s ‘,\\\ \\\ . ' '' ' ' s' ' ' till ,1‘‘,11"'S \\ _2'1,- - - - ---=li IT i , / / i ',1 rr ,, ' 1 \ \ 1 \\ " 1 ' ' ` ' \ \ ` 1 J �\ --- - \ '\ I I 1 11 \ _ ,J / / ,/'::////'://:;;;/:::::, ir I' ' / , / / ,'///,', ,l \ , \ \\ \ , \ , \ \ I ,,/ ..,,..1,..,,,...„,.,:::,..,,_:".., ` , ,\ , 1 1 \ \ \ I I I ' :, ' \ ' ' \ \ \ ‘, \ , , ', \ ', ern ,,, , . .. , ___ ----- I I „ \ Ty , / I , , , ' \ \ \ ` \ ` , ice. '1`� ` .',/ ' ) I I I • _ �/ � / III r, , ,ZL \ \ \ \ , ,.ft` I r l / , I 1 \ • _ — ' i '_ IPq / I 1 1 G , ' ', \�`1 ` ` \ ` ' rj� r� \ / I I I 1 ` ------ - _/_ -�! '/% -f, - 1Y0 ;' /' 1 1 1 ,' , I , )\, \i \II ' \\`\ 1 . �`�ileo I ,,, • \I` �,, I'1111I 11' 1 \____ - . "---- - � \--��1 \J)-// -_% ,..„ , • 66666 1 ' I ` , I I , I / , ' _- f 1 .\ . N \\\ ./ — — // /i ('i ,'ll' 1 I 1 I I 1 1 I ' ' mm/ Il " J_._.. \I • ;\\ / \`� i ' I 'III^', I I I I 1 1 I ' LI Iv, W m ' ` _ \I \ \1 \ \\ \1 \ \ / _ / ' / I I1 I,1_" `. I • l 1 I I , 1 I�';-•11An.,. >Tr\ - �\ `I \ I j 1 1 + \ L. — / - • _ _i '',/ ' / 1 , i I {,,,I \ I s l , 1 , Ipym�cp`n,2 11:::: — — — — � / ---_ l/�/ _ _ , , , 1 \ — r -' ,'i I 11 + \ ll C-mom - J1/I: ' / 1 I/'I1I Ij11 II , ,I I , \ I\ I \ \I\m`fAs1 D \- -_ / / ,./ % / 1 I I ________- -' / I 'III \ 1, \I \ \ I ` f/1 bx Ql -----j / W . , /' , / ,- / I ( ---_- '�'� I I 1 S, \\`ti<I � - ---- /' ''/ ' ,-rnY // - / ' — % --' • I ---� �/ I / I��/ \ n`, \\` -__/[, - --_---- � �y .-I 1 -•�'',•'/i',' I i '/',,'' / // ,' ,/ �/ 1, 11 II 111, I ----------- --/ /_ `\\, )„ ,5 till. I / / • l I I\111, I {' ' I / / ' / ' 444/ / ,/ ',/// �/ /I I /' �' 1 // , %/ /, / ��11 ' /'// r' `-_' ' l I I , 1 / / , r / \\\ i / ' l / / ' ''f I , l ---' ' 11 I ' i l ' l \I / ,of ' / , ' \ --'I j , /' I l '' ,/ ,/ , . I i I • lii �i I I o r i I I i / ' l '/ ,' //^I I r l ^r' " 1 I ' 1 1 1 f r Ir ll I I1 ` t-----:*/ ' " ,, ,// /I I I /qrI , , �' I , I ' I I 1 I jl i 1 I/ n I I I I I , , + \ \ \ 1 a I , a 1 N I, 1 i i + , \ , ` \ I 1 I ILL I 1 \ ��' \ • rex \ • \\ • • , s�1, \ , , +\ I\ \ `' \ ,1 `\ `, \ \\\\ ,\ \\\ \\\ \ \\ 1 y$k m 1 , 1 \ \ `, \\ \ \\ ` \ \ \\ \ \ \ \ \ \\ \ ) Z • \ \ e \ O\ • THIS DRAWING PREPARED AT THE �•N�J��COM�H� r I M M O N S C R O V P CMARLO,TESVILLE OFFICE 1 r �G • • YOUR VISION ACHIEVED THROUGH OURS. :� y N�j 608 Pres[pn Avenue,Suite 200 I Charlottesville,VA 22903 =`e� r Ey y • • • TE1434.296.6624 FAX 434.295.8317 www.timmons.wm =s5 _ t• (y: \2 Z it _ :r �..•r-I =: PROPERTY OF BELLA SIGNATURE HOMES LLC WPO PLAN n Il m DATE REVISION DESCRIPTION :� In In vi ri N 05/30/19 REVISIONS PER COUNTY COMMENTS •i• .* n H a J ,j 4 E. n f ° 08/15/19 REVISIONS PER COUNTY COMMENTS Z.�1 �?��4 V N m COUNTY OF ALBEMARLE,VA o V i M 11/05/19 REVISIONS PER COUNTY COMMENTS '. R vN0U', ' O o H o aaNNHa4 1rI STORMWATER SUMMARY PLAN m - m a w These plans and associated documents are the exclusive properly of TIMMONS GROUP end may not be reproduced In whole or in pad and shall not be used for any purpose whatsoever,inclusive.but not limited to conslmcgon,biddIng,and/or consWctwn staking without Ile express wnttan consent of TIMMONS GROUP. • t / \ / / \ \\ \ , 1 , NNrrrary \ \\ I 1, \\\ i / / // / r \ '\ / // \ .\ \� •\�I \ \ \ , \, Ii \ LEGEND CnvgrytTo bemPde �aLTH p�j;• / ' / / I I 1 \\ I I Cnvserratbo PlsP CheekllR-To be Placed on LaodaraP<lgam } \ N / / i • / • I 1 1 , , 1 I Ii ,1:1 FOREST AND OPEN SPACE (Handbook,pp 111-IRY111-39T for completespedflnsbns) * �' \ 1 , \ -(, / /' / / \ 1 I , , l I I CLINT W- 2Z ``\ \\ 1 \I \ \-� �'/ �' // / _ ` I I I t 1 I I I ' ' 1' J PAVEMENT 1. The fallow Ina hem shall be shown no the Om: O \ • \ 1 ) / / N /// I I 1 1 1 I I I 1 ❑T,rambcroMa: 2c� S FFLET >Z 1 \ / / ' \ �' 1 I I I I I i [::•:I HOUSES AND DRIVEWAYS ❑Limn of clearing drir .ofatm m be e,.:al: : �• rz • \ \` 1 I . Lic N 4380 �: \ I I / / /// / / I I I t I I I , I I ❑ Lamont and OPe ofP«medve fencing; :,f ,,rru.r \ \ { 1 1 \`� 1 \ /�/ / - __-, \ / / 1 I , I I 1 I I MANAGED TURF ❑erad.M.S.requmng u«w:nil«»a11,: y04, I�S�IG �W;� - \ \ I /' I i /// ' \\� / 1 1 1 1 1 I ❑Pngosduc«LinR«aeeneling bolmd We hoist of clearing. %�,`c{` G.1.` \ I I I \ \1 \ •,- / ' - ` \ / / / r 1 I I 1 I I 4.rj ION Ab�':r ` \ I \ ��-_-- ! I / �' ______� `� \ \ /'/ / I I I I I , 2 nark_ ~Nra HN \ 1 % 1 / / / i �] I,' / I I I I I ❑AOUr.rat\r saved shall xnwkedmtbp"m«nnmaatanc,gnlaeanstisibkmwn@mentoperato„ \ `\ \ \ \\ \\ 1 1 / / / / _ \\ \ \ / /r _I // , / ' I 1 1 , I I I I \ \ . ❑No gmdeeg shall begin wdl the aec mnrkmg bean been inspcted adappro,W b,,a County Inspect«. \ \\ \\ \ \\ J l I/ // / / \ \\ \ / / /// �^ -/_ 1 ! I I 1 \ \ \\ \ \ � \ \\ / ' / l / /'/ / / __ \\\ • \ / / / / / ) / I/ / l i I I i I t 1 \ a. o mmnctmneanaw tect.maam«alwl be nnivacawith me wntmc,er on site. r 8 '/ • prts«,aiov Pm \, `` \\ I, I \ /� - l /Y- --c/,�/ '' /l `\\`\\ \\`\\\ \\ \ /' /' /'/ /// ' 1 I , r l `\\ 1 4. E.wloran,Operation and smr.em >E \ I 1 1 -_T'-Il_r--= /- -L `\ `� \ \ \ \ \ / / / / //// •- - '/ I , / \`I ` 1 ❑ Havyeguipmen4.d«dar traffic and(IOW{ofoansmsnoo mvc,fnis including sail shall Pat between.,union the daphno afnom w a;E \I \ I1 I 1 I \ / I /i / T ;,- /___/_,_-_ a-- \_ \\ \ //- \ / / / ! / Y l _ ' / ' I /' / , to he saved. w Z 3 ` / - - - \ ` u i ! 1 / // ; // \ -\-\--'- \ - / 1 / - // / / // 5. Roil F.roabn and Gnrmwater 11wenNwn IkNm' ¢w e / / ' i I N / / / / / / ,�\---t-\_ \- �-- \ C- ` / ' ' /r , I ` - ' / / / / ❑su.ndc.,,a.nml,ml adversely trees to h.awed w o`.^, / / / ' \\ \ \ / I / / / / / Q Fly. / / / /'' _\ ` ` \ \ \ \ - �L / r I l / /` - / / / ❑ Fires are o«tenniod»;,hiP lop i«,vrdm,ripunc ora..Mm x,a,d. / I I / //4 / / --___ \ , \ \ \ \ , / I / i I / / / / -_________. / , /' / / T, Tonle MareNab: zkve u / ' / I I j / /- Q / • / - \ •, \ \ \ / / I /• / / / / / ' /' ❑Tnxctmumulyddlvoth rtonu F p lODfxnfthe dsrldioe ofpcesmbe smelt 3 p w ~ / / 1 / /• J. // ' \\` \ , \ \ \ �\ --_/ / I , / / / 1 : I 1 -- '' / /// R. ►mferdn Yrnrieg O<�N W W 1 / ' / j / lyt? / / / -` • \ \ '\ \ \ / ! / , 1 I /r / / / / , ❑Trtamberemmd wiNmJo far atnpmposdbuild'mR«Bmdmd xii,%yshall W protected by fencing. '"u v o£££ / / / .,t // V r / , / \\ , \ ' \ /' 1 / / 1 ' I / - \ ❑ Fc.ing shall be in lase and Mall be in and zd Courtly h dm ¢'e^. £££ / / T.A.d 45 FAR,5PE;Al'Y.a I I , / P inspected tPws by ty Inspector pri«mga Ror wnsvornw N QOO r / / CENTER OF RT s�.'J,I • j d?yN / / , / ' \ , \ 1 ��` / / / 1 / 1 , I r` '' / / // ,'� / - j U V U ! C,,'yQ / , / \ \\ \ \ / / / 1 I _---- - - / // \ 9. Tree Well v >>> / / REF DE 2C lE••'2V'S f2g //1 '✓:.,n / / \ , / / I 1 1 I I- ❑When P / ,'' {, eC`/,, y / // / ` ' \ \\ \ , \ \ - - -- / , / 1 I - __ ✓,J / '� ground val. the raised uiWm Nc d,iplirc of sated, dun Ire Po,ubd and detail P 1 /PLAT I n .i / I' / \ - / __ __ / ''� / sum,anm r r approval. >j 8 / i / / ,/ •/ / 1-;",`q•- // // / \ \ \ \ \ 1 \ / 1 / , l I I I ___---- ''�/. / _ 10.Tree wan: z z z l % I�// /' .( ,- // / / /" \ \ '\ \\ '\ \\ \\\ 1 �k/ I 1 , I 1 1 II 1 \ ' 1 _l '/ i O mined gonad nnm be toward ailhm Me&glten rtem be roved.a tee wall shall be provided:and a mamma=detail TI.F la/, I / / / 1\ / / / / / / \ ` 1 \�__ __ I / / I , I I - \ \ \ \\ \ , --__ `l' • ` II.Trtnderm and TunoNine: o 0 \ , / 1 ,• \ \ / ❑Waco matching is required within the brain ofclaring,n shall be done as fee away from the awl of tree as possible.Tmmcimg "� /' , i `. under al mpatea,hat nettsawy mine I W W ! I l � ." / / EXISTING \ 1 1 _ I t I , \ �\ \ \ \\ \ ` -- �/'' large dmlR»;nmaayreeaer,aoa./ I{ TGtc JU," / .,.../ CH 2"'9 p__ ?/7a°A0E;Sa \ ! • \I 1 I •/ r / E''�•-'NG `-�` S / 1 ,.'jog T'-t- : ` \ , 1 • \ \ \ \ \ \ U 1 zrenang,nanxmrm»ium,reean,-dandngmnrnaldranap 1 I I /'. I a,, _.,--/-ANCEYG -'1 -�_ r a:CC:Q= �.__-- -r-- -- sett JiIN i' _ f 1 \\\ \` - Le I om_ '--- g _ ' �, - " - i • ' 1 1 I3.Damned TenI ! i r / /■ _ • _i-�-_ �-•_ _ - __-' - - / /� ' "--- ❑Danvgduasdwlbel.atedwoadumlyhyPnming,r hrs,anaraa,.rro<tmd.,Kaln,mwmMamr.M�,altu �i 1 I I 1 I I((l - - ' _F - - -i---�= ` T- - ' / , / 'f / 1 I ,I I \OTF.:IT IR TIIF.DF.YF.LOPF.R'R NFSPO\RiBLL.1Tt'TOCONfER\4'ITNTHE CO\TMC"IOR O\IREF.COVSERYATIO\ ¢ n I I 1 I ! ♦L'I p,. ���� - _ -5 _ _- - _� _,�- 1 •, / e / i I '_ t.- -7 /I REQUIREMENTS. O / I Is �pt�. - _ / ` _--'----- � � ',_�-_�--`: /( rn DATE a ` / OWNER SIGNATURE CC(DATE) 02/19/19 ( I :$" tJF_{-/di r j I• t /'_,"-�✓' ��� \ • \ -, `r ? /.'J , 1 DRAWN BY 1 1 cuuFRT I b`-`°II ���� o ���aa� ���������-�r- 1 S.rT,d n' I ! �, , \ - - - - CONTRACT PURCHASER SIGNATURE (DATE) C.GAYNER 1 urW, 'I `�� �.1� ,v2 a ��� ;f I(' s/v0s pa9elml 1 I`'0P L I.` o' '/• le''; \-~ 4/1• ° ti D _ �._Natr��� ® �� ' 1 , JD DESIGNED BY i ( a i I / ( ^I -.. : ' �� ' �� I 'I C.SHIFFLETT ,i I % I / ;e 4/` ! PARCEL AREA:18.28 AC. 6`36 AC`DISTURBED - ' ,-„�- _ _ r • .,a - • ( ) _�� ,r / \ _- ��� h i isi 1�*�• ' CHECKED BY 1 1 / / -W+ 1 ".:,/ IMPERVIOUS= 0.99 AC. \' 1'e' ! r - i, t T --__ ---' � C.SHIFFLETT , \ / / / ++ I I, 'r .I I MANAGED TURF=10.57 AC. "� ! \ Yls'+r 'I l! 1 1 •, \ `` `� --- • `\ \\ / �,,�1 r ! ,. PRESERVED FOREST=6.72 AC. Try'-� ; - '- - " - f , _as r\ ' , I 1 , , \ ` `\\` ` \ / /, SCALE • /// / r' �i r l �"_-'_ - _ '7j , y' \ ____" ; o .1 1 , :1`���A�1��: "� `.- -530 ' •• z Z rilitY • 1 al, 7 1 t , I , I • o _--_----- PEACH / �' II II I " '• l i I i ,A�, 4*S5 .1, 4(�74i._e. 550,c✓g _ �- _ I'/ rl 1 r1 i I •`\\ \S�, CIE 0 Q r f ♦I AAAArG Y .O!!A!!!!A!!� r,\ f,�" - _ ris - __ -- l l ve7 -1 / 0- > , , , , _- -. ` / I I IllAAA!!A!lCCll:.....Ar O!O!!iAA!!!!lAAIAIAAIATir - ] ''f'''4 _Sill' i�cIAAO!!G!!!llOc� _ / / 1"� �.:+F�► •, 31 !a OAl4!•"rY';::♦AlAAl�AAlAlAA° :l�iAAGAAAA!!A / '' W 1 \ I i i ! AAIAAI.�AAA�.4l`%iAAAAAAAIAIAAAAAAAAAIAOA.IAAAIGA( sa. J��SA9�A`AAA�CAAOA�AA��A J / / / I , I m _ \ - �I / N ' -- ' AAA!!!!♦♦A.�OlAAAAAAAAAAAO••cvrr._' . 540 ♦lO1♦AAA�9ri!lO.Al�iA!. - / / w , 1 I 1 I OAAAAIAII�►Ash!lIAAAOIAAAAAAAIAIAAAOAO►AiAAA!►OA!*IAAA:r ���� .� ' �9'clGcAA(A?CAIAAAAAIAIAIAIcIAIAGIA�IAilIOAAAAIGI�fi�li'' / I t \ S2v (/ �I a s - 1 \ `\ I I '\ .0��►AA���A���AAAAOAAA�AAAA�AAAG,•AAAAA�AIA@OAAeAAy:AAAAAHAACOAAOACAAOA�AAIOAtGAAAA�'AAIDi - , 1 / re / 1 J W 3 1 , i , \ E1 R �AI►A►4.►A0AAOAAAOAAlclAAA9A!lIOA�AO•►A•AQ�IAOAI�IAAA/AAAAA!!!!!y!1!'AA(A�A4A��AA�AAICAAAAlG�IAiAIcIASAs��IAS�IG� I���♦ sAM/F RESf AN 1, r f ,.•)' k K OA�CAI ►�AA4►IOAAIAIAIAIAAAOAAIAOAAAIAAAIAGA(�A►A�IIAIIIA�iAAAAlAIILAA®!Av►AAf•►AOIIi►OIACIGOIAAAAA9AiAlAAAAAlIGOGAriAI;IAAOA►A!!!!�!A!!`A. ° W " I I I , I , 1 , , 1 ♦!\!!!!! ! !!!!!! !AA♦A!1♦!►GAl♦!!♦♦♦�AtAlAG ' ! !!lCAIAGAAAlIAGi•A!!7�► ♦ ' -OPEN AM I I l/ / I - { O 1- -- -, _ 'I I ry ' ` PARf�EL AREA\ \` \ ` �,\\• ,/,Ov`'DIAOIO�AAAAA'►!AlAIAAAIAOIOIAAAOO�lAlA1�9A��AAAGAIAAOIIOAAAAA !��ICAAOA 4c►AAIAAA'A'!l�i.Cce4GAAAIIGIAAAVAIA�1A�AGAA!AAAAOO!A•i- -- ..1,./, / -' / ' 'r! ` \` \ - r - ----- "- LJ,J !\ I, 18.28TACRES \Swll FOREST A51D. •,4. • st,,,,*AAAAAA@AlAIAAAIAIA!@AAlg9AlAlCAA`�AIAAAGAIAAC`IAAAIAAGIOaQA!?�lgACA�' 1,AGAIAGAAAICAA.SOA7A0lAGAA,IOIAOAriIAAA-4>AIA�AA!lAIOAA.AIAIAIAAOAAAAAAeA ,�-1�O•,,,'FI-YRI I / I r \\ \\\\ , 51[ _-' dS �. `\ \ OPEN sRA .0°AAAlAOAAAAl,OAAlAlAA, A `±�71A ,�4��A'AOAAAAACAIOGA?`A4►CAIi►AiA�jA6s�GAGOlAIAOAAIAAI��!►!!•►l1,A �AIIAAIIA A�OAIIIIA SREE PRESF/rtVATiON Arl:r• _____ a ' 1 1' I ` ` \\\ ` \ \‘ `, °►�!@AA@OAAACA�A!l�IA �Ir ..-►.44•, IIA/AIAQIAIAG�IAIAAIGE!lA-d`Ao$i>��Gv..A•t�Al�CIA.@.AAIGIAAAA�AIA�A�►AA��A,���ASAAAAA!±��Ali!l�AIAAA\__s it ACRES'/ / / ' / \ `. ` -5'I: � _, I:Id Q _ - `\ A-, A:. v•A A ,. '�\\. . AlAAIAAAlAAAIAAAIAAOICAAAAAci�Y G i�:A!�I�A±AA±�'►?�.�A�� ��G �L"v .i��!,A±IIAAA�� �/AIAA�AAAAAAiA�1AAAcIAA CA!AAAIAAIAAOA!`.i?- / / / 1 -----__- O I IAA•#•;, •A•►•ll!'TIAA!!A! A!A@�AC►I�A!/►•. 00�AAAIAIIAIAIAAAIAlAAAAAAAAAAAc�v�.A.AcAAAIAAAAAIAIAr�Al,r Ai► :v�CO!�4±O�O�AAAAOc�•COAIAI��A��OCIAAIAIA!IAIAAAIAIAIAAIAlIOA�l4AAA ♦`♦ / ' `i2' _ > ---- I I 1 I r f4444:•• AIIlOAIIAIAA►AAOAAAAAAG0l�!!A!+EA`aAO`AlAAAAOAA`1AAAAAO ►AAI�►AIIIAOfIIOAO!!A!!►:2�!l�►IAGAIA!.�hA'av:!ql),.. jj, ....1 ,...... lAAIAIAAi�ACAOIOAIAAA:ASOAAAAAAP i' - - - - - u t _ A!A AAAAAAAAAAA AAlAAAAAAAAAlAA plAAe}OAA9,A�c•a CC A,AlAAAAA!AAAAA!!!!AAAAIAAA►AAIAIAA��IIOAAAIAIAAAOAIAAAAA�AOA!l�t��A►e"C r��:eGA±CIAAAAlIAOA��►�►w!�''4 "►�QCeA CjCAA0A4AAjOAAA'►IpC�jjAAAA�AAAAA0A014►���_ -510 LLI J / / ►!d!G!!!A!A!!lIAAAIAIAAIAAAOASAAf10AClACt►IAAC�ICIAIAJAAICll01•Al►AOIA!!!lAIAAlA.1AC`+-s!!!�!►y4�►JGO�v.S .A�A�IA!!•G!O!AlAIQA►Ae��A!!!iG!!A!lI�AAA!!!�lAlAa �;,, � ' 0Q Q ♦AAA♦♦AAAAAAA♦AAl♦♦A ♦OAOAI!!!!lIAAA�IAIO!!A!OC'O!A!!lIAOOAIAAIAOvO�....�Gb@�?OYVOIA.c�. �N��hAI►!A!►AAh�A!!AAlIiAOI�-AIAAAIAGA✓IAAAGO�\NA�tv�lAl��� •!.._ . . 'A �►AA!' I , iAAAAAOAAAA♦AAA♦♦♦AO' 440 .IAAAAAAA.AAAAAAA♦OAAAAAAAAAA♦AA011AA9A. FAO,OO�v._A.&.., O!!0" .c��'.AAAAlAOAAAAI±D►AIAAAOAOA9�l�lAAAAAIAIAAGAIAAAAA..►�Af•►A�Ai000?1-l-l-AlA/A!!!A W AOOAAAA►AAAAOAAAAAAAIAAAAAAi�AAO�►A A`lAIAAAAA!!lAIOJA:�OOAAAIAIAAAAAIAIAAAIAAAl�AAIAIOIACA!AAAAASOIAA(E !�i CAAi�►OACIOA :C'C c�:�!CS±A t�l9!A!@ f�@ A A! .11.!! A A A A.00 7 A A A A!!G!A!Y� !CA! �..A i!@ C!i♦ p s '/,, ° ♦!!GA♦���CAI!lACIAAIAV (>AOA! ► !lIA.�SAIA!!A@ 1�` 'O!A!lAIAAIAIAi•AlAccC;.,�iA�IO �AIS�CIv..!sA��,�A.AI. !.:IAIA•aSl. �A!!!!�llAiA!ll��A�IA.�AAAIA!!A!!lAAIA�I��►!! m 1 ►!!CA♦♦�..►l.��OA-`AIA.AN A•Cl4v,0 ♦l/AAA!!A!!(►!CA!►AIAAAAAA!lilA, !?!llO.c�.!�-:,, ,, -• n,�. _ /►..A�A�A!\�tIA�� '' '' '.- ,!!A!Al ��AIAO,�IAiAC00AA4A- A . A♦ ♦♦AAAAAAAAAAAOAl..AA...AAb AA.A!_ !!.!.C.CI ,A !lI�AC.�lll0��9 A!lAlA:l1{�AtiGdOC�..c..A��.�110A�AAw.-.���lpv4,llAA•A�!lIAAAAA!!-lAAIAAA�; •�iC4/!!A!!A!llA�i�.s'AAA-4 1- `s'. I AA!!!!l'4' *- -AAA♦♦01 .4 , 0 ♦AAAOA.A...AAA.'!.:JAI AA.._!!_ 9G.4, lA00' ' 4l��4'47-` •���AAe..__*-,.A�I�AI,. �los.". _.AAAO* .A�!llAA.IAAIAI ►�d. ._Aloe! eA !.!@AaA00 LL w i♦AAAAAAAAAAAAAAAAAAOAAAAA•>AAIAAAI♦A♦A♦AAA♦AAAA.., "' . - 44 .0- �AAA .._=--_.� _ . - .41•Ar�.__.4-!JAl40l.<A_.121.' �►�V. A�`AAAIA_�iA9!$OGri!!A!AlAl7iA@�<stlrdlD.�l��IAIAA AC4•Gz1f.AA ♦!!t Q s I 1 ►♦A!♦A♦♦A♦♦AAA♦AA!!lAAIAAA@AOAAAl�AAA♦A♦O♦OAA♦AA..AO♦♦♦OAA�AAAl0 '.>ili �.002.v�,• 411,•o.. 1,.�w,. . ,4,4,4 _ -•!!. .IAA._���A�4G,4A.rIAAlm& ,lCAEO.N..�•?•....- .A�A!! A.A+A.A±�..., u_ h = I II N��AAA�A.iit4.AAAAAAAAAAAAAAA��!!!♦AA♦AAAAOIA♦AAAAAAIV -'-" .IA•- 4-wA-A_?ogre-. .A�..Des..v---4- �A • `1 .. .�e.e. ••. �..IG......-a,"�- - _ -GM., ,v- vl i!_oft.�C-.- 4,7�c,4�.. �. A..�.�. AGA�.!A��O�l�l�•�IAI.A toA lAIA!!�A @A!@!!!!�A A!O r► A A. A!-.�!A! Aid�.....-A��i.. A�OCAOIAA.. • �:!!'�9.►AlAA00001�1cS'�A'� :OIAIAAAOOAIAIAAAAiAAC�!cAOAiA4*cAf°AAD� CAO! .i��:�!i�A A.� .-.-! - Z QS o I I I/ c A �l..�2.���1�.1 ��.Q.�A±�A1s±O�•-4.4,- Ir�044447-►.--",l�� --I±A•�CA`�A-IA,AA!`!?t1" A v..cAA. AEI►N.,.OOOOODAAAAOOA�iAOAAiA.A0000AA•O•CA±AAAG"4.' -_A-�.��s tyKAAhA�iA..AO� Z 2i "e u• ' \ d ! ..O�AA.. •. .���.��:����•O�^�u ��lA!lI�AAA!lAIAA!!!!A A>..•��`� . A-A��A'(�iA.�l�� / I \. -� -- ------- - . .....L,..�w���.A�7! %.�: .-A•.T.��...CA�L? C♦ lrvv.- 1-1 p I gat, ,\ \ t ' �/'� / • ' 'l OVERHEAD \ \ \ • `\\\ \p0)ci;�\„�,S \ ` \\ `.\ _--_ -_--__-_ - - _ \`` \\\�\\ \ , ' \♦ �- 1 _ - _ V/U Z 9i m _ `\ 'l 1 ' \ \ ,\' • ` _ 1 �8v-�86 48 _ - .4gG- a // / UPI.POLES N \`\`\ \\ Jet€JUNCY\�?E\aSA �--- - - _ \\\ \,\ \ ',\\, \'11 \ - _ ````I�--- - ,_--- �� 8-- -------- Z °- io • a \\ _ - .--1 z as\\ ' 0 e vc oI \ m Q s 1 i L 2b'FROM THE CENTER OF O z f a E ROUTE 743 DED;c,a see-e 12, SiI THE COU,VTY FCR FOBLIC i.3 O USE TM 2,20PX n ee o W REF O8 F7&2.a0 PtA;' Ce Y W WATER QUALITY ANALYSIS \1/. W TAT E �- S= o PARCEL AREA 18.28 ACRES(6.36 ACRES DISTURBED) O c$ IMPERVIOUS=0.99 ACRES �/ O o AMANAGED TURF=5.37 ACRES cc SWM FOREST AND OPEN SPACE=6.72 ACRES ♦�. 7 a REMAINING LOAD REDUCTION REQUIRED(LB/YR)=-0.08 LBNR JOB NO. $ o SCALE 1'=6D' c it 1 41219 0 60' 120' A 8 s SHEET NO. - y C7.1 E I / / / / r r' % / / Vu- - % ' I \ \ \ \ .\. '\ . \ \\ \' \ \ \\ ' . ,,I 111• \ IL 1 ' / /..../ ' /' r / / / / I( _-- -��- ri// I \�// I \\ \` �N``\.\'`- t I \ t\��N y.\ t\\ `\ \\\ \` I III I 1 I \`` N\ �NjTN�op,hry� I / ' ' I ` . \ \ l_ i III ' I 1 l - I‘,„."- 1 ? /rlr /// 1 I / / / 1--\ 'M �1 I 1 \ 1 1l l I I I I /.>. \`- �\ \ )\ \ \ i I 1 \ \ \ I I / ' \ V \ / \\\ ��`�- \1 \ ` \, `\ `\ , 1 I r . \\v\I 1 / I 111II i i _ �wJ C� \ '. \\ \ \ \ ` \ 1 1 1 / ' \ \ , \� \ ``I ' 1 1 \ 1 I ' ' )\\ I / 1 I 1 I --- \�`� C /• r' I 1 I /r 1 , I 1 , - WATER QUANTITY ANALYSIS �e CLINT W. r� \ \ \\ ` \\ \ \ 1 ` /-// / \ ' I I I 1 1 , I I / ,„,„,,/,,,, , , , ,,_________.,„„:„,...„___, � r - p \ \\ ♦ \ \\\`\ `\ `\ \\\ 1 \\ \ \\ ♦ `_ II I I 11 I 1 1 I I I Y'X/ CpS F LET 7= \` \\ \ ` \�\ \ \\\ • \ , I \ / • / /V / - \\ -�/ / / ' 1 I I I I I II // I I \_-____-_ A-�LiaN.{I\;0,0:tr.":�� \ ` ♦ • `♦ \ \\ , 1 1 1 1 / ' / / / --��`\ \ \ S / ' / / I I I I I I I I I ' l I ' ____-- - '- DRAINAGE AREA ANALYSIS(PE-DEVELOPED) i•F �\ ` \ \` ` \ \ \`, \ I \ \ \--' / '/- FLOW PA \ / / / /i { I I r rI ' II ONSITE AREA I-ON ��i`SS! f1.42 ♦ \ �� \�` `� \ \ \ \ \ ` \ \1 \ \\ / ' / / '' \ ♦ \ \ \ / \ / IIr II I ♦ \ \ \ AREA RES ACRESrh N \ \ \ ` ` `.� \ `.\ • '\ \ \ \ 1 / l lJ // , / - --_\ ♦ \ ♦ \ \ / \ / / ' / / -- l I r/ I I I \ \ .` . \ 0.02 ACRES(IMPERVIOUS) _ ----:::.,-'2,,," \\ :�\\ \\ ` ♦ \` ,I 1 \ �_'_-�'� ,/�-_�',/ / \ \\ \ \ \ \/ \ / / / /'/T_ ', , / , r / ` \ I ``\ ` 1.71 ACRES(MANAGED TURF) \ \ \ '\ \\ I \�L. ll-- 1 7- - \ \ \ t� / , l/ - ' I \ ` I `` ` Tc=13.3 MIN \ `\ ��\`\\\`;♦♦`\\\\\ 1 , ' I I j �Y /J J/'1 / /// , // -� \�\��;-r=-Vic.�C y�1//�r r r"i �-� / I I /'/ r \ `\ \\ ` O(CFS) V(AC-FT) rvE \ \ t 1 I / / , PRE-DEVELOPED DRAINAGE AREA 1-0 / \ \ \ _ I '' r /' -`\ 1 \ 1 YEAR 0.72 0.053 E \` ` \ \\ \ , / I - \ \ \ \\ \ I / ' r // '''/''----------'-'''/ ' ' / / , 2 YEAR 4.12 `.I`.i\ 1 \`\/ i \ I \ \\\III i,,/// / % I , TO ANALY(OFFSITETIS POINT'' `-,, \\\\\\\\\\ -_\ ' /1 . r / I l/' I -_ / //, ''/ //'__ 1 1\ \ `1 10 YEAR 4.12 = °'3 / 1 \\ I'I I ' ' AREA=8.19ACRES - \ \ \ / 1 , / 1 1 I 1 1 I / ,�/ /%/ _ . \ I I I III. i a r ''/ / - ,'/ ' / Ii1111I' ,''/'/ / / IMPERVIOUS=0.84 ACRES/' ♦ \\ \\ \\ ' \ \ I,. ' / / / / 1 I I I r , //// / ` ' ♦ / I I OFFSITE AREA I-O ¢❑LL c1 - / / , ,,1 I , \ \ \ I r r r I I _ _ / / // \ ` \ AREA ACRES -�/ // .' / / , /r l r,/ I , / • / MANAGED TURF=7.25 ACRES / N \ ' I ` \ , 1 / // ' 1 /I I I I I 1 I - l/ / N`\\ \ .. / .. / , / r/' ' / / WOODED=0.10 ACRE \ \ \ \ \ -I- ' / / / 1 I ( _ /' \ ` -/ 0.84(IMPERVIOUS) lg.,-m z / / / I ' / \ \ \ \ I I 1 I _- .\ 7.25(MANAGED TURF O .:2-___-- i / /// / / / \ \ , I \, \ \ • 1-)' r 1 I , \ \ I ,\ / J �' \\\ 0.10(WOODED) i�o°rv' // // ! I / / ' ' / 1 \ \ T /„' I ' `� ♦\\ \��// • ` \ Tc=15.9 MIN 2I"1` -_ ''/ /. ' / ' // I ' I' \ - / / _ 1 ` \ ` \ `--- / I I' \\♦` \ \\ ' 1'- `/ I1 1� l�� \ \ \ % II \� ♦\�).�♦•♦\ \\ \\ -' ,/ ♦♦`\ O(CFS) -LLr / '`-7I-1 '' L- --,'-- - / / . I/ \ \`\ \ 1 r//-' .\ `\ 1YEAR8.13 1NtE, II 1 I I / 41L. ,• 1 ` - - �i'L '//'''/ '/'///// /'/'! , , \♦\ \ R270Qvei Ff_ IiR z7.0o : $u0I \ - ' ' ' I I / /' ' \ I I I \ ` - \-r / / " OFFSITE AND ONSITE AREAS COMBINED I I / /� / ' ' 1 I ' i'1 I' ♦\ 40,}' ---- Ti - / <<,� S/ //'/"r\ \\♦ J 000 I / ` - ' / I \` / O CFS $r I 1 / I /r � , , I I I I I 1�' �/_ `\ _-- .'_ - ,' '/ ' 1/ / / \ ` `` ` ' 2YEAR 13.91 1 1 1 / I ; 1/ I 1 11 ' I 1 1 11 1 1 I % / // LII `\ '�_`♦��� -�_ _� .'/�. ' ./' ' II I /i // j ),\\♦�� \ ` --_ 10 YEAR 31.02 F a 1 1 I \ I 1 1 1 , \ I 1 I / ``IF '♦ // _ _ '. / / I ` • ' ui mVl pl 1 1 1 l `, I\ • `\ \, I I 1 I,�/ I ` \ ` ��O\NPIFFI V \\ `.\` \- / _ `\ / /�✓ `✓ ' /, l//l\\\'•\\\�_� //// / , 0 000 ' I \ \ , 1 i 1 \ / i , 1 r!r r I ' r -- `\♦ / / - I. I'I / ,\ -___--- ' / DRAINAGE AREA ANALYSIS(POST-DEVELOPMENT) s E h \ \ ' I I' T --- '/II -- ---- ' ` \/ �` / / `� \ \ `` / / ONSITE AREA ION-D OSWM1 arc\ / /' _ `_-� _ _-�/' - \ 1I 1I it `�\`\. - - =/� 0.3AREA ACRES(IMPERVIOUS) S❑ m ' I ` _ - � , .__ ' ____ . w 1 / , / . ' _J , I \` Tc=89MIN F-\ r / `\ -- 11 II r _ / 1J- i _ ' It�11 \ - ' VW \ ` ` `\PRE-DEVELOPED DRAINAGE AREA 1-ON - III 1 I , /71\.- //Y- -- Tir ,- - ----_ 'l-/- -i --_ - ' - - /r / I I ` =-_ - __ I ' // 1 YEAR 3.77 0.124 p / \ \\\\ \ \ , I 1 I 1\, I I I ANALYSIS _ - /, _�-_ = J / ' I1 �•�� (' ' 2 YEAR 3.77VI DATE r -\ \ TO ANALYSIS POINT- / I I III ( POINT %`�� /' - - �� -_ / / - '- \ ` \\ \ 1 _ _/ ( , \ 10 YEAR 7.73 /'' ^\\\ \\\\\ \ •. AREA=1.73 AC ES `\ I/ I III` \ 1 I\ \ ��\ (I('� / -r_ _ r I I I ,' � `� / \ ` •• IMPERVIOUS=0.02 ACRES I 1 \ -I'"-- // - /''r/,'r _-(_ f ) 0 02/19/19 \ \ I \ \ - - - /,'IJ-�, _ I / „ -}_ O OFFSITE AREA I0.D(TO SWM 1 DRAWN / ` \ \ \ \ WOODED=1.71 ACRES' I \ \ \\ \\\ `\\♦1..„.......„, / -'1 / _ - I , `� `- -II 6 AREA=8.19 ACRES SHJFFLr / \ ♦` -- \ I , ♦ \ \"\♦ ♦\,\ \J♦ .'' --- '-' ---- - _ -- // ///lI' - 2 7.25 ACRES(IMPERVIOUS) C.SHIFFLETT \'\ \ \ `-` - -__- I I ♦I\` ` `` ^-'- - - r- /"/ - 7.25 ACRES(MANAGED TURF) /' / //`\ \ 1 \ \ \ - - - _ 1 I I ``�I ♦` \`, ♦\",•` \\ ♦ \ ♦\ • _'_' -/ O.tO ACRE(WOODED) • DESIGNED BY / \ \ \ \\ \ \`_-- - - `I I --� I _-_- ~ii ' \♦N - Tc=15.9 MIN /','//' \ \ ` _ - _ I • \ ♦ \`` \\ \ : ♦ _� - - _ - _ --- I \ • C.SHIFFLETT \ •\`\♦♦♦ ---__-___- 1 I 1/�/ I' I --I ♦��i�.� ` \.,,\;\\\\ .' \•1` � ``,__ _`� I�►`\"^ _ - _ _�//'r 1�w. _ ____ _ tYEAR 8.13(CFS) • CHECKED BY ' ' IlerOk / \ ` `.: ��\ cipil _ •V��I- - SCALE I'=100' 2VEAR 12.50 ---_-_-- I I 1/ -)�\\`\� \ " ` ice\` � ` ` ♦.- --�_ `-`_' / .1� -� _ - I 10 YEAR 27.00 • • `___`-_; \ / '' •• • PRE-DEVELOPED DRAINAGE AREAS ��s _ SWM i(DRY POND) . SCALE AS SHOWN ' ' / / / / / / \ \ ■ ' ` \ \ '\ • `\`� `� \ \ , \ \ • ` \ \ \ \\ , I I, I \ \ 1 YEAR 8.32(CFS) 1 I / ; ,, /r I / / / / �,�( �------ - r// I ` \- / \\ `\ �� •.\`� '\ I \ram `\\ `� `\\ \, III11 I i \\` `�. 2YEAR 13.61 I ,'/ / I r / / r ^ I \�/ \\ _ \ \ I 1 \lt' / 1 ( ! I , I , I 10 YEAR 28.69 • \ \ 1 I\ ♦ ' / I I I / l l I r 1 \ \ N\ \` .\-, \ \ 1 I , T.,`♦\ V\I I I I 1 r, , I I , l = \ \ \\ \ \ 1 1 I\ \♦ \\ I 11 , ' / / / \ 1\ \• /,' \\ = `.\.I 1 I I I \ \ `I 1 I \ `\\\\ /Il 1 1 I 1 I I -___,, - CHANNEL PROTECTION(ENERGY BALANCE): CL \' \ \ \ \ \ 1 _` \ _,/' % J 1 1 1 1 , i I I i ''// ' I __-_- = 5 0.80• •RVPR \rDEVELOP ` \\\` \ '\ '/ /- / \ 1 ,',/// I I - _ _ - DDEVELOPED (OFRE-DEVELOPED E-0EVELOPED IR ED _ '\\N• ♦\\ , \ \` ` \ \ 1 \ \ / __ _ \ \ ` _, %/� ' I/� III , 1 , II / //r / 1 , I \ ___-�. '-- OD d@ 1 \I 1 -- - a Q ,_ , \ \ \ `\\♦ \`\\ \\� \\`♦\ ' I 1 \\ I -/ /� /'/'/•' _ _ �.\ \\ , i/ i/l' II I i i I ' I' i ; i j� - \ ``\ OMAX(1-Yr)s0.8010.72 CFS•0.053)AC\FT)/(0.124)AC1FT=0.246 CFS \\\' \ \\\\ \\� \�\ . \\\\I I` I\ \ \\ �\ / // // /' ��___ -F40W PATH\ \\ \, / / /'//i �'/, ; I r I I I I , I , ( �\ �\ \ 0.246 CFS+8.13 CFS(OFFSITE)=8.38 CFS \\`_ \\\\.\\. .\ .` \` `\\ \ \ \ \_ / //// - . \ `\ \ \ \ i \ / / / T - I r ,l I , I I \ - \\ • \ / / / , . ` O(1-Yr)POST-DEV=8.32 CFS OK U \ ♦ \ I / / / ' / ' /,'- \.'`\.\. \ \ \--- ___ , I / / / /// /,- -- r' •,'`\ 1 I \ FLOOD PROTECTION N\ \� \ ` \ \ \ \I I r'/ /// / , j l/ / / ' 'POST-DEVELOPED AREA IO-D / , I I / ' l////I _____' /'/ / /'/ /. /// 1 1 1, ` 0I� ce• \\I `` ` \I / I \ I II / / 4- / ,' 1 I / /l I __ /.-- 1 Im • I \` ' ` I I / ' TO SWM 1 r / , r / POST-DEVELOPED O sPRE-DEVELOPED 0 ce y LLJ „-',,,,...,/'- , /// % \III i ilr I //'/' / i'� :11/I ,'/ / - (OFFSITE:DETAINED) .`I '/ /1 , / f I: I 1 I; I I r' ',/ //, _-♦`�\ I I 1 F- / / / •'/ / , 11 I I / , ' / - / /I- /, AREA=8.19 ACRES / , ;1 , I r r____� \ \ \ I / ,/ //) ,/r I / J , / / I I 1 I I ___\ /' \ \ - / 2-YEAR 13.61 CFS(POST-DEVELOPED Oz)513.91 CFS(PRE-DEVELOPED Oz) OK. O Q -- / - _ / / , /// //1,// r/ ' / ! /`! //7 N IMPERVIOUS=0.84 ACRES' -I'- / // 1 1 I I i I I (i- J/ /,/ \ \ -- _/ 10-YEAR 28.69 CFS POST-DEVELOPED Oto)5 31.02 CFS(PRE-DEVELOPED OID) OK. =j -'.'-/ i ///'�', ' / ' , MANAGED TURF=7.25 ACRES /' r _ \ \ ( Ill w ��- / '// ', //// /I' ' / , / s/ I--- s'7 �/ . � WOODED=0.10 ACRES Nw'< /\ ' I I I I i I I I I I 1 l I \ /--_--,,'/' , -- 9 '---'''/� .jj/i'i i'/ I ' I I 1 -- DA=o.3<ACRE/ ,!/ -• ` `DDCHB _ I - / .' III /I \ . ♦ \ \\\\\ \ \\ _,,.,/;.\ 1 `- ` 0 _,,Ia 5. _ //. ///i ,/ I I I I / ,' ` : ; i.. � -.T; ;., o=o.w ,.'. DITCH // 'D'IrcH• o \` ` ) - \.`.\ . m d a _---- '- //� '/ I I 1 •1 I ; I , ) --•�� •=--�._. OA=O.EA ACRE ,DA=0 19 ACRE / ' i __ \ m `"s. II I / % /•,/'- '' / i I • ; t �• e���� o� ����., -_- .�.�. �<S�``, •� ;1 I��.1J�E Z '�r1 - 1 1 / r / I 1 1 LOW PATH ;G1e`, Y -) ' i - /�� ��� • __ - /' (/J n \ 1 1 I , \ I\ \, ` i ` '' I �I4 I I ' I �\ \`�. � , \`-� T`--rl ' '// z - ��r 1 + '� 'rl _mi I f/ „ : / 1 \\`;\ / Q E- a I \ \ \ \\ I POST-DEVELOPED AREA 10N-D / I1! I r , 1 - / ,- !� '� \ _-_-_ / • S. / / \\ I / I TOSWM1\.. '► .it„.11� E- ,. . ''J J \ `` ,`\ :: \ ` w w m£ g / ' / / (ONSITE;DETAINED)_ I_' _ � _ , • I I I I 1 ` ♦\ \ ` '/' O .. / ' ' AREA=1.73 ACRES ,f. '' Il I�• .� 1'/ 'J, !'' a '_- I I '1 \A." `\ - `- / ~ om 1 --- / , /' IMPERVIOUS=0.33 ACRES__ y - _ _ _ q I , / MANAGED TURF=1.40 ACRES II a r I' I r , _ 1 ''.,% �,. �, i i rl `\ \\\\. �,'- ,'/ cQ L _- -•‘ 1\ / r I • I 'I+I( ' 1 / /I/`�- �\ -.',I,/ '/, - r - j, --IT-- _ --; En ",'I//III 11, \ ' O L .- a _ \ \ \ ` ... - / I • I , 1 /' / 1 - _ `� \ 1/�. /' - , - i -i - i=_ _ - / ' I I tr�1j\ 1 / Ce mp.P 3 ' /\\ \\\\\\ \\ \, \\ _� �'�i- /I, �' I `\ 1 �I /// - ANALYSIS ,�,�s - _� /�,�F/__-�\ J 1111' 1 I q•� 1'-/// _� \ \ ` _ I I ,' ,As:I\Ic.':: POINT i' 'II(_"- // _ _ ! I 1 1 , �- _ Ce (n 1 gi 0 _- (>44, E (C:13 L'I'' (^ �' ^\`\ \ \ ' ----' _ _ `1 I lVND OPN ' i -----:',1IJF � _ I1}1'� ---- ------- I I' . . .\ .' IEr ►. --- ' - - SCALE,==100' a • ------- `' ,I / I r Irina `\ ~�__��- er�:` a '�!641\`a`a ice=_' -- --- - o 100' 200' =3_______--;--_-_\ , / ,-' \ \ / _ _--_ _ SHEET NO. c= `\`,`� `\\ ,POST-DEVELOPED DRAINAGE AREAS " :\\,\\``\;`' `';�'1_= I --_- C7.2 ��xll!h LTf14a�/i¢s VA DEO STORMWATER DESIGN SPECIFICATION NO.15 r O,' u„�'''-'4 _ m7 ,�+,a ow.1 TOP OF DAM=557.00 ='�+' S: 9.3.Maintenance Inspections s"• F CUNT w- �: " `e <) / 5' 3D'GRASS SPILLWAY 1-YR ELEV=553.98 S FFLET Y,1 Maintenance of ED ponds is driven by annual inspections that evaluate the condition and performance of the pond, - _\• !� r.^ /t.• ELEV.555.33 2-YR ELEV=554.17 including the following: •'ernes^Rae ( 10-YR ELEV=555.57 NJ80 a� - � fw.7 1.02'FREEBOARD %- = Ls°L ;_ �7 100-YR ELEV.555.98 f 100-YR ELEV=555.98 �fp I I/5/I G �. • Measure sediment accumulation levels in forebay. • Monitor the growth of wetlands,trees and shrubs planted.Record the species and their approximate coverage, roe•ea•RVH Crete n,e^HA 04}pR ;f/ arm Frr _ - - _ - IMPERVIOUS CORE ,�w,fSS/ `� and note the presence of any invasive plant species. GRA s a AND CUTOFF TRENCH WI, ��4�eaaaa, • Inspect the condition of stormwater Inlets to the pond for material damage,erosion or undercutting. too r0•wnmc15 CREST ELEV.553.83 L • Inspect the banks of upstream and downstream channels for evidence of sloughing,animal burrows,boggy +o ,,s ••v areas,woody growth.or gully erosion that may undermine embankment Integrity. 4 r • Inspect pond out(all channel for erosion,undercutting,np-rap displacement.woody growth,etc. -- 7•I'', p� 2 E • Inspect condition of principal spillway and riser far evidence of spading,joint failure,leakage,corrosion,etc. 48'RCP RISER H 3 • Inspect condition of all trash racks,reverse sloped pipes or Dashboard risers for evidence of clogging,leakage, W/ANTI-VORTEX DEVICE debris accumulation,etc. i�u^f INS OUT 550.89(18 HDPE) i of • Inspect maintenance access to ensure it is free of woody vegetation,and check to see whether valves, s Z E manholes and locks can be opened and operated. ..�,..• •••• ' 'a"') hbt • Inspect internal and external side slopes of the pond for evidence of sparse vegetative cover,erosion,or t .O.V. ,/;-,1,p•.,/,- 18'ORIFICE W/TRASHRACK 552.75 Q•-• 0 slumping,and make needed repairs immediately. i �• •- "NO'c IF"'I POND BOTTOM 552.75 -ES-1 w 0 A.. �s J .,s "T,torn - 138.50'-18'HOPE @4mim .501, INV 544.66 i J`um z Based on inspection results,specific maintenance tasks will be triggered.Example maintenance inspection 3+b� a^�As "' 8'DIA.X 1.5' i checklists for Extended Detention Ponds can be accessed in Appendix C of Chapter 9 of the Virginia Slormwaler GENERAL NOTES FOR TRASH RACK CONC.BASE "lit'', Management Handbook(2010).For a more detailed maintenance inspection checklist,see Appendix Bin CWP ,.STEEL m COVED.To AS,A-cs. z m d v re Stonmwafer Pond and Wetland Maintenance Guidebook(2004). ----_-_-:.._: OS0 cca w u701 a Al SURFACES OF TRASH RAC.NS)RUST BE NOT DIPPED GALVAN3ED AFTER FABRICATION EMBED 6'IN CONCRETE z a ai° o 3 TRASH RAIX(S)TO BE FASTENED TO WAIL WITH t/c-DASONRY ANCHORS TRASH RIP-RAP OUTLET RACx(S7 TO aE REu0VARIL PIPE TO CONSIST OF PROTECTION ^r i,Ri ASH 0001(s)TO BE CENTERED HORIZONTALLY own ME G°ENNG WATERTIGHT JOINTS r a vN'. 5 FABRICATOR VAT um,Co.PONENTS OF IRASh RACK FRAYS TO INPRU c NOTES: m u v 0 U U U CONSTRucr0000 r OF TRASH RAO..YOencanons RUST BEAPPROVED BY 1.TRASH RACK TO BE INSTALLED ON 14.4'ORIFICE AS SHOWN ON Ifi 4 z COPS PRIOR To FABRICATION. DETAIL ON THIS SHEET OR APPROVED EQUAL 2. 0D ORIFICE TRASH RACK DETAIL ATION CORE AND CUTOFFNL.TRENCH SHOWN FOR U U O INFORMATIONAL PURPOSES ONLY.FINAL DESIGN TO BE PROVIDED DETAIL TAKEN FROM MONTGOMERY COUNTY,MD BY GEOTECHNICAL ENGINEER. i S a WATER RESOURCES SPECIFICATIONS ' z 2 2 2 0F4. 0 S . h N >KC j O 0> F OY457h V C'h ti AC Doti SWM-1-DRY POND O in DATE No Scale 5 O •LEVEL SPREADER TIMBER LENGTH(L)CALCULATIONS 5 on 02/19/19 DRAWN BY DRAINAGE AREAS FROM C7.0 C.SHIFFLETT DITCH C(0.66 AC C:0.61)+DITCH D1202(0.18 AC C:0.64) DRAINAGE AREA=0.84 AC C=0.62 • DESIGNED BY Tc=6 MIN 6' 3' 1(10)=4.60 INMR C.SHIFFLETT O(10)=0.62(4.60)(0.84).2.40 CFS • CHECKED BY L=13 LF x 1 CFS INFLOW(10-YR STORM EVENT USED) : • C.KOTARSKI L=13 LF X 2.40 CFS=31.2'=>32.0' �-11 \_- -•e SCALE GRASS CHANNEL/PIPE OUTFALL 6' .r�i_/.r_�1104. • I'=40' MAINTENANCE NOTE:INSPECTIONS SHALL TAKE PLACE ANNUALLY, �.�.�,tip*ikp�.p-..:. • z IDEALLY DURING THE NON-GROWING SEASON.SEDIMENTS SHOULD )�.�.�....�y. =�•� �•e 1 • BE CLEANED OUT OF THE LEVEL SPREADER FOREBAYS AND FLOW . . u o. SPLITTERS. .A� a ~� /l.` ) CL VDOT STD.CLASS At (2)6'X6'WOOD TIMBER / (n RIPRAP VDOT STD.CLASS Al 0 Z 16'LONG#4 EPDXY RIPRAP Q_ 0 2 COATED REBAR D - LEVEL SPREADER DETAIL U = I _1U s No Scale 0 0 s COUNTY OF ALBEhfARLE w er �$ Dapan,HNvt of Conunuvip Ikveloyvrin CC _ L J Construction Record Drawings(As-built)for VSMP Cie 0 '-I The following is a list of infartnafioo required on construction record drawings for = > W E stornlwater faciti des(reference Water Protection Ordinance 17-422).It is preferable that the wLL ui 0 1 construction record drawing be prepared by someone other than the designer.Please do riot provide design drawings as construction record drawings.i° 0 r,/ < t Z S A.A signed and dated prefasional seal of the preparing engineer or surveyor. D T .g B.The name and address of the firm and individual preparing the drawings on the title sheet Q a m C.The constructed location of all hems associated with each facility.and the inspection records to verify Q u i i proper dimensions,materials and installation.The items include,but are not limited to the following: 0 I- _ . I. Inspection Records and photographs for pipe trenches and bedding.including undcrdmins. z Z 5 0 2. Video Pipe Inspection for any pipes which am not accessible or viewable. z W 3. Updated Location with geocoordinates of all facilities. 7 z ay a4. Verified Drainage Ares snaps for the drainage area mated,and for drainage l0 the facilities. �/'Y e o T 5. Current physical and topegrnphle surrey for all earthen structures.Ponds should include a survey V/OU f':r `o of the pond bottom Surveys should verify pond volumes are per design.Corrections may be required Q e • for alterations from the design. Z 6. Plants,d profn and type. Z 7, Plans nod peofd for a8 adverts Pipes,Risers,Weirs and Drainage Structures-Display the _J Q 21 8 installed type t drainage setio.structures.when/pipe sire,ions c materials,desigoend uramrent(s). O W ry m inlet and outlet protection,alignment and driven elevations compared to design. N n8. Computations:For significant deviations from design,provide sealed computations verifying that u, m the as-built condition is equivalem or better than design LU o E 9. Ditch Lines-Display the combatted location of all ditch lines and channels,including typical V,•, Q s m ii sections and listings 0 _r 2 10.Easements-Show all platted as easements with dead book references labeled.Facilities and drainage elmust be within planed easement.Provide copies of recorded documents. E 48 3 I I.CnardmE,fences or other safety provisions-Displaytoy the constructed location of all safety pmvisiuns;fences,guardrail.including the type,length and applied end treatments,compered to O g 9 jj design. ce 12.Material layers-biofsller media,stone layer;.sand layers.keyways and cares must be verified as to I- 3 s` 0 certifications Bioftlter media must be an approved state mix. material types and depths.Include inspection rayons.boring or tat pit reports W N and materials < 13.Arms rinds-show locution of access toads,surface treatment deoilugo,etc,av applicable O .8 14.Campactian reports are requited to verify fill compaction in dams. _ requited - IS.Manufacturers certifications for proprietary BhtP's citifying Proper installation and functioning. cc1_ - 's - JOB NO. 'L ig 41219 '2 IT SHEET NO. B y C7.3 i1 Section 6. Pollution Prevention Plan. __: (reference County Code 17-404 and State Regulation 9VAC25-880-70 part II section A.4) A. Plan showing pollution activities and prevention practices (Provide a reduced 1 1 x 17 copy of a site plan on which all of the following activity locations are clearly marked. Keep this plan up-to-date with ongoing site changes and inspections.) i- Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County SIGHT EA GE.DEDICATED TO // tt - I , / / I / I / / �•2----=''."‘ 1 ' \\ ` \ �, ``.,________________J,'',- /' �/ I I I , ' , , .T•1• LTN N��ry / / // / THE COUNTY FOR Pykic USE / // ` \ I , I 1 1 I \ Op). / /' CONSTRUCTION / , • i , I \ • ` t 0. / 1 1 \ 9� / �'� TRAILER f- / / EST/N - \ \ 11 \ \- •O `\ �\-- 1< CLi NT W. %: TELE.✓UNC1. - / 3J'PV CONSTRUCTION �� / __ _/ D2G33P � ROAEASE, \ \ `_____________ —i TYPE.' }\ t _am/1 5 FFLET ENTRANCE l r •E. Cpl.ch ----__ St�B-�23PkT , , _____ ___, " // / SOIL \ `� \ l..• t TEMPORARY, / :-'E•F n;- n�1 • I -______ \ 1 \ \ OIL TYPE 94 \ \ A Lia'.N.I<I}BOTOILETS _ / ABOVE GROUND FUEL CONTAINER 11 1 1 ` \ ' ' G,�'.,� / 'TINGF/ r T -WITH IMPERMEABLE HEAVY-MIL ` 94B _ / •.•••••• ` NTRANGE 6 360.3 Gpd LINER.VOLUME SUFFICIENT 70 _ _ ` ` ` %, / '���)0\'AL E •• / ,41 �- r• E CONTAIN STORED FUELED � — — _��'1P _` `� \ \ ' I• 1 \ — TECE.JUNCT.\I/ / �� / .--__!. _ / VOLUME+10%(GAS/DEISEL I — -1= — \--_ \ .-' ''/ / DUI -',• ♦.... .. r I - / - —_ i 1 1 -�\ _ • 0 _ 1 li / /'/ //',/ ' ' ■■� �~ �� 1/DUMPSTER / I/ (/ /' �— T \r J —r�`-r- — — i LIMITS OF / / /// '/ 2 o 4q \ a a . - _ _ 'DISTURBANCE- _ \ - -'YID _ - I B ■I�h� �.L♦ ♦ \ , \\ 1 , 1 -1�- �_ 6.3=ACR=S "__ T / — v o 61111161 �Ilr. 1'111\I/�iA�� ~�^ '/7.4411111111111DAM- 0�i / 1' , 1 I 1 ♦ '1-- ♦ .1, ♦ �_. / /''l / �' EN il d r'ii n h I '� � �WR �� llinv , \ ,\ I \ I\ \OLIVIA COURT -B ~� ♦ �._♦ ♦ �'•, /' ' zw•°' I ,L'r, li; / 7 /, ,�� \ \ \ '�'PUBLIC b1a,,,,y �� I A ♦ ~_� ♦/ fl ._ __ v o 2'` 1O - \ COUN7FOR PU ' / iii—�� u v 0¢'�^ F • ' �1 1 S DILATED./ - i-T \ O /' - h� B m ' I I ,1 I T��� FOR / /SWM FACILITY - \ _. _ / \` -trio q6 /' �� e N . 2 2 2 lil PU'- / / ® r " DRAINAGE. I �i _ _ °j'- h i d ,888 I I , / EA'�EMENT �� \\ \ • \ •\®\ \� ��"`' i ru ,� / ,> I \ 1 CONCRETE 1gip 1 I / /..�i. EASEMENT ®\ ��/��� h-' d y. fir_' ' WWW 1 WASHOUT O / �••�%'' a _ Q I I; \�I S', 7 / ..::;J \ SOIL TYPE, � `s��j� j, '`jay\`II ittr �j;i � : �'; sF ® . . . Imising _ W z Z Z I Cxh 1 ' \ } I 1 / / I \ . I, �'�' �fIF/� / MU r . o' zzz I\ 1 1 /J/ • 1 '' - / W W �n i �I `\ \ \ I , 1 II 1 r / /� ` 'I \ �� ''� �� ''�/ '// _. � Imo'-- �. MU TS o o rnm W II \ , 1 1 1 / / I I \ \\` A ,.ti' TS \ ------) / /'''/'// ' �'� I- tr jL*\\I 1 I \\ \, I I I - ' I 1 �� / I\ \/\ ' I<'// / �` PS \ / J1i .12'CMP CULVERT' � LI I / /1 / / I _ 0 - \ / W w o h h O I i • r ` INV.IN//559.0 � ' LL 4 <,., o G) I I I ! I \ ` I INVAUT=558 75 / W a o o PS I I / If / - I • -- �./ , .� - _ ,/, DATE r l ) I l , I INSTALL-EOM-1 ONLY \ _ , / '!' CI 02/19/19 i I I I / I ��-- r I I /55 •556 AFTER CON'TRIBU7ING \ ______-,I / ►� �• • /'/ ----, - ' ' • / _ -! DRAWN BY I I * I I I II l I II II / /� , DRAINAGE AREAIS, • - iF - \ - - / .i I I I 1 // 1\ --- --/___ STABILIZED ` \ •') / r/ • PS --I 4 / ' C.GAYNER I I r I I I /l l l ®. : 10 4 556 554� I N \ ----_-_I / // i /'/ \ �' ) / __ • DESIGNED BY I I1 // I I I I i r I / I 1 .y .i .`'\ / \ \ ` / •% // \ \ MUTS �/' 'I • C.SHIFFLETT I I i I I I r 'I I / I' l / I r I \ I SF \1-- ,��----- _ kk•_ // / I 4, 1 1 I l II / l I , I' .jP 1' -►��` - SF PS . , / - /' / ' • ___ _---- 1 -' / ' • CHECKED BY III i I I I I I l l r I r,\I ,1:i�1� _�`� \ • \ • �� -TS �� \ f I / 1 • C.SHIFFLETT {/ I 1 i I r i / I ;`�-. �'�/.i' log ' ' r - - -1� \// / \ \ ` / / '�/' ' ' • • SCALE I /nY Ul1,,, I ' ' ' II I I / l ` 1 1 i~ r�1 1 � _ __ , `` *,t MU --- � ' / ,„. / ` � �� .'-�-�T.S r. - 1 • 1'=30' II 1 ' 1 1 I I I ' h if ,,‘ II I ' I, I , I �, I�/ /// / 1 \ I_ ___ \ \ -I I /�hy1', / / 1 __- " I / / , • 1 /1 I , - � fIll I 1 / /'•1 1 TYPE:_ \ ; I / ''. _ 1" _,/ `�.- a .SOIL t pi I 1 ` ', II ® I ` ` , 1 I' // / I / �1 \\1 94C \ \ \ � -- I ,c / / �ti ----=-- !'_I__"__j- , , '• 0.., - r AZ I I LIMITS OFI 1 / / / \,1 I-__ � \ y y' / // - �.\•. _ /�` _ r I 1 I 1 DI$TURBAjJCE=I / ____ TP /-\ J�S .yt0'' ," _ _ I /`' ' 1 ' VI I I 1 , I a 6.36 ACRES I V. �_ \ 2 O� I�/� 1 'r.S�'' "_""_ 1 j \ • ' I I /' 1/..� • • I' 1 / 11 I 1I '/ • ri • I I ' 1 1 1 , I , 1 I I / t},�M'W�a' t �� , Ivy ....._ M1 I I -' ~, \ ` \ } I I i I , I i •1�• \\\ _ 1 _ -1 /'' // �-Y' \ x jl II I ' 'tl 1\ \` \`\ } 1 II 1 1\ \ �� -`___'-- �`� -_{3 / I , ' - "/_,_---' P 1 . - __ SO TYPO z\ I I`` \I ''"I -- I'"� ' / --- ' ��' '' � a II I 1 1 \ , �- I $OIL TYP 1 1 \\ I -- I, 7i_ g s i i I - I \ ` ` BUILDING - - i ---_ O Q Z • 36B I I \\ \ 1,00'VYPJ BUr DER `\ `� SETBACK\ - ' ' ' _ > Q 8 • s; 30'PRESU{RlPTI IVEII \ I \ �(TYP.) — — — --i r- - 5 �,- , / /I ;�, , , - w g I- i I ;11 EASEMENT \ \ \�/y` \ sr ; _ _ - w w I� 75'SETBAOK \\ `� •\\ SWIM FOREST AND / 'I'\ ,s se / L 5 " / W 1L \ \ \ \\ \\ \\ \ •`\DP N,SPACE JJJ \ I\\ \�\\\ \ Rs / / '� ,1 ' � '-I' � / ,� "_' HQ I it I `\ \ `\ \`\ \ \\ `` \ `� \\\\ \\\ \ r/ / / - "�_ .5=°� �' /''� _ - --' _ Q p per, • 1I II \— —' - - — - - —\ • \ STRE�h� � U ➢f n 1I 15-OAIP CULVERT \ ` \ ` \ ` `T\ I J 111 I S?2i1N •- \ \ Jj� \ \ \\ \.9 t3' \ • \ \ ` \ \\I\\ 7..< 1 , - O E- U 5710OUT I - \ \ `.04 9 , \'ss- S ,, , \ \ \ I m ` \6 CO 6'\ `, c\ \ \ - - - EROSION CONTROL LEGEND J d o s • i I BUILDING \ 'C `` N • • r ,- -- \ \` -` - --- LIMITS OF CLEARING AND GRADING w '� 1 I SETBACK /\ \`\ ` 25'SIDE` \ - _- -- --- ®®©m©m an En© DRAINAGE DIVIDE - O c e I \ CRlilc. \ \SETBACK(1-1'd.j • \ ` -- SOIL AREA DIVIDE St fi I (TVP.) S\ SOIL TYPE`�5B I'` \ \I\' • • \ \ _ , - 0 -_ E a'1 I \`\\ \ \ N\\\ JJ \�`` \ ' \ `` \ ` \\ - __ CE � := CONSTRUCTION ENTRANCE 3.02 p� ` I \\_ _L` \ L\ N \ ` \ `�\ \�\ - - --- SF X X SILT FENCE 3.051_ • h 1 I `��9 • • • \ \ \ .�\` \ `'``<� \ `\ \ IP j/ INLET PROTECTION 3.07 m• O 1 1 1 • \ ` `\ • \ • \ 1 O\\ `\�_ 35'REATr' - - ST e _ o I I I ,�% • \ \ \�. \\ LIPi O SEDIMENT TRAP il 8 �' I } ♦ \ \` \ ` • \ • • \• __SETBACK(TVE}-f _ _______ _ 3.13 ME /� ;� BI,\ 1 - \ N •• \ ~ \ , `• `` \ • \ \ _ _ OUTLET PROTECTION 3.18 LL a=_ ' q� I /11 Qi \ - \\• • `\ •\ `\` \\ \\ \ • •� ,` \\` II CDAIL CHECK DAM 3.20 ISB N0. q .- I I' LzPCO \ \ \ \\ •\ ``� \\`� - ___SCAE I'=30- 41219 m mR. 1 / UTIL..OL ES \ \\ ``` \ PS PERMANENT SEEDING 3.32 \\ POSE l4:'7RyNSF 3 I _ N \ \ \\\TELE JU.NC7 \ -- _ SHEET NO. e // / \ \ `\ `\\ \\ `\ (?/iJE ` ` \ --` ___ T`i i' 0 3D'- 60' .NIRGINTA EROSION AND SEDIMENT CONTROL HANDBOOK'SPECIFICATION NUMBER PPP-1 „B S 1103141219.Eadysvllle_Subd1swn\OWG/Sheel/Extub5PPP.dwg I Plotted on 11/5/2019 256 PM I by Anna Fontaine REFER TO SHEET PPP-1 , - tea •a ii T , \ a t i !me � 1• l• r la, � � ^ � � T a rl �•a min Now nm T m•-a MI .. II , lI ' 11 \` II I I w \ ' \I , / / �.J/ / / ' l I 11 r\ \\ 1 II i I I 1 / / / \ '\I u, N I I, 1 /, I; 0' / r,.` ` r 11 ' i I� 11 i 11 ` I I 1 ( / / / \ m \ I „i 1 \ 1 1 / / / ® ' 1'1 1 \I 1 1 I 1 / / / \ '1 \ 1 1 / / ' r1l 1 / ' 1 I- I 1 1\ 1' \ 1 \ I` I \ ` I /�// / '/ // / //` I Sec ® r 1 1 1 11 `` 1 I' t 1 I I I uy\ `�', , \ 1 ' \ \ \ 1 � 1 /, I ' ', ' 1 ` / 1 I . ® 1 1 \ �V .III/ I, V \ I ii 1 ` \ \ \ I\ 1 1 ' i I g I i ► I i 1, e ► `\ `_-In, ' I I 1 I I I I I ' \ `\ `\ \ • \�'` `• \ \ � I' I I I , 1 1 I 1 ( '` 1\ /. \ 1 `\ / I_ 1 1 ' I I +— I 1 1 1 I \ 'N \ ` `\ \ \ �� I I 1 I I ` 1 \ \ \ ` \ 1 \ /'' / / / I' 1 1 I 1 I il 1 1 \\ \ -- \ \ \\ \` \\ `\ 1 \1� '\ ' '\ \ �1 L \ 1 \ ` \ Sep ` 1 \\ I I I 1 I I I 5\ \ \ \ \ -- \ \ 1 y` \ \ \ , , \ • , / I /' I I I ' �- \ \ \ \\ \ \ ` \\ \ \ 11 11 �aa��- �►�` ` \ \ \\\� ‘\ 1 , 111 ` \ \\ i I , q, , 1 . Cil ‘,,I r\ \ - \\ — is\ . s ,, ; , , -, , ; i , , ,\ ‘ \ \ \ \ ‘ 0 —< \ \, ,k \ \ \ , \\ ---,-,_ \ , ) / , , ,,\, 1 , fo , , , i ; ,,,, , \ \\ \ \ pi \ , \ , III I I „ ' \ \ \\ • \ 1 ` \ cn0 \`\ • \ { \I 1 ' / / / , rr1 ' I I I I I I I I `\ \ , \ \ \\ ` I , \ 1 \ Qh \`\� •\ \ `\ `\ ss� / ,I ,, , .. I , \ 1 ,, • / / //I /' ' /l I ' I , '\ 1 , `I 1 1 \ \ i \ .` _ \ •\ \ 1 I /_Iy 1 \ , , 1 1 tv' - r �///\ ' /// / ' / / / /''''' / / // , ' \ •1 1 \ \ 1 11 \ \\• \ \` , \\ 1 I ! 1 \ O \ ?It/ e► 1 ` -_ / / ,/ // ' /' / ,' / /'' ` \ \ I ` \ �\ \ \, e \ i 1 1 �\ .I ' 1 1 \\ / • I /, / , '/' , / // I \I \ , \\ \ \\ \ \ ' �m r� ` f �. /'/ / T' / \ ‘i ' \ ill A-I _.r•• \� �;\\\\- \\ ►1\ \ z sus\ ' /' 2 , /'' / / _ ,1 � _ T \-///(1\ \ ,\ \\` \ `\\ `\A,\\ \\ \ tee— _1-+ � ,` 1 /y \ • • `,,Z \ `, ; dr; ‘‘-----\ s ‘s 4.; . , .., ____, , 12,8 �', / ,RI , ' 1 ' 1 1 1 �_ Tom' \ `\ \ \\ , \ \ �. \ \ —\ \`\ \ V \ I sq '®j,/I I^ __. -- ' .,,, , ,, \ v ,g, ,( \\ 7--\‘‘ \ • • ' 7.----"— P.:1111i,,.._ ' ' -�-' / // l I 1 i I '', l ' ' I 1 ' \1 \I \` \ 1� r n — e/ /``1 1 r1 • r F I 1 / ' , / i 1 / In I l I - r� ; 1 I O 1 I L fwll C -' 1 ► \ —_ / /l 1'' / ,///, , / I I i r r / l I / 1 / / r ; % 1 -mow" -si7�C� e \\ \ 1/,I / /'/'/ , / i I i i / 1 1,' 17 e:+-F-.� .t. / I / / I l 1 ' 1n ' 1 1 I I I l - I 1 / ; / , y'N_ T1 - � I'=�1 --- ` ` I l ` ' I / I I I ' ' ' / l I r I �1 f ' ' ' ' ' ' I I , I I 1 1 I / I ' ' / / / / , I ►' i i \...•l`_ n:}f:..:. Q 1 ' I I ' I 1 ` ' , , I ' /lII / , , m0"Ow — r `� 1 I' ) /, I i' I / I lr l I �z�1I��/ 1, I I /-,/ '-- \\III , I , I it / / I I I ' 1 my _ --_- ---- ``I\` `t I 1 I nL z -- 1 I 'i i--'/ ```\ 1\1 11a 11 I 1 j iI I I I/ / .T\ \-¢- ^• \`\` - -- ___- - / — \\ _ I-�- `----:. 11• 1\\ _ I __ _ _ I I I I II 1 \1 \1 I 1 '1 I 71 I I I'\ A _ _ _ _ — — — / 11 t 1 11 ' /' ,' I I '1 1 \ 1 '\ \\` \�\ I ' \ \\`'� ------- ,' -// 015 '. ./III-?r1I- / / '•••L'''?' / / / —e,,,,-- . -,-- '' /101 / / / / , ... Uc ' 1 A ' / / / /-. t 1 I 1 I 1 - ' ' ' /' ' 1 ' ' , 1 , I 1 / ' / ' , ' ' / ,n � ', , ' C , / ' ,�A. --' 't It '1 O ' , I// r/ / I t/ r- /� .►:l1 }'1 ► ` ' l 4- -8- ` '/ I r -n` 7.aF ' l/ 1 - I I I I / / /� , V —t0 I I , / , 1 I 1 i _ 1 II I I , � N 4 / , 1 fll �� , ' ' ' It I II I N,m OT N 1 V r I ' I ' / ' i I ' I ' I)( 1 1 I I I Ir I 1 I 141 u r I I/ m ► l I I 11 w O OO 0®® I I I I ' 'm / 1 II ' In, ► I r I ' \ • .11 ' I ' 1 / / 1 I I 1 I 1 m I ; I ' 1 .1 l r 1 I I P. , I I \ \'`,& )C ,44 - ' I I , i j I I I I ' �� o W ITI \ ', I I I I ' / ® II 1 I II I \\ • x 11 I t T I I ' I IWI o 3 v 2 O 0, on w0 O 3 Z ' I 1I I 11 , `I t1 \ _O I 1\I ` \` N 1 ' ` I .` x 1. g .i m A n pl I I I N I I. I , 1 I lf.) r ` 'rj tQ \ 3 r. pO '' o m T. m o Z 11 I ,N 1 I f I 1 \ 1\ \\ ► 1\ I n\ \ o z o o O am 1 y 1 \\ \ , , 1 \ JI \\ \ g o z 5 a r II I ()col 1 I 1 \ \ \ \ \� \ o m P 1 n T.O I 1 1 \ \ \ \ rI-.1�'.� 1 ` \ Z LZt 1m I I GI I I 1 1 \ \ \ ►—.l ` ` ` o 'n II 9 1 I 1 \ \� \ \ • cy o IF \ --ice 4 1 \ \ \ :I. \ \ , • • z ti o m w .I w ti \ \ \ \ \ \ \ \\, \ \`\ \ \ AI T I M M O N S C R O V P N'.����.,..,, __ • �• THIS DRAWING PREPARED AT THE `���a C0,1/M • YOUR VISION ACHIEVED THROUGH OURS. CMARLOTTESVILLE OFFICE r" � (/ • • 608 Preston Avenue,Suite 200 1 Charlottesville,VA 22903 r, r ,4 +. TEL 434.295.5624 FAX 434.295.8317 www.Ummons,com Sa n r s 2y u. 'I2 rl. • 1, . PROPERTY OF BELLA SIGNATURE HOMES LLC WPO PLAN x i . n p . rc r DATE REVISION DESCRIPTION .. M 0. .p to w ^ c 05/30/19 REVISIONS PER COUNTY COMMENTS 7'9 e f _ li S r i n z 08/15/19 REVISIONS PER COUNTY COMMENTS S, � -,N z iI.av z COUNTY OF ALBEMARLE,VA c S, r 0 2 ti m 11/05/19 REVISIONS PER COUNTY COMMENTS ".:h; Vlls1'� N `D POLLUTION PREVENTION PLAN m in a a N____ These plans end associated documents are the exclusive properly of TIMMONS GROUP and may nor be reproduced in whole or In pad end shall not be used for any purpose whatsoever,Inclusive,but not limited to construction,lidding,and/or consbucbon staking without the express written consent of TIMMONS GROUP. B. Sources of Pollutants, locations, and prevention practices Pollutant,or Pollutant Prevention Practices, Generating Activity Location on site Control Measures C. Sources of Pollutants continued. Common activities and minimum control and prevention practices Pollutant,or Pollutant Prevention Practices, Generating Activity Location on site Control Measures Follow Erosion and Sediment Control Clearing,grading,excavating,and un- Land disturbance area Plan. Dispose of clearing debris at stabilized areas acceptable disposal sites.Seed and mulch, or sod within 7 days of land clearing Cover storm drain inlets and use drip pans Paving operations Roads and driveways and absorbent/oil dry for all paving machines to limit leaks and spills Concrete washout shall occur in area Direct concrete wash water into a leak- Concrete washout and adjacent to the construction entrance as proof container or leak-proof settling basin cement waste designated on the Pollution Prevention that is designed so that no overflows can Plan. occur Enclose or cover material storage areas. Mix paint indoors in a containment area or Structure construction,stucco, Structures in a flat unpaved area.Prevent the painting, and cleaning discharge of soaps,solvents,detergents and wash water,paint,form release oils and curing compounds. Dewatering operations Dewatering as necessary when Water shall be filtered,settled or similarly converting SB-1 to SWM-1 treated prior to discharge. Designated areas for material delivery and Material delivery and storage Adjacent to construction entrance. storage. Placed near construction entrances,away from waterways and drainage paths Material use during building process Building areas Follow manufacturer's instructions. MSDS's attached. Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Pollutant,or Pollutant Location on site Prevention Practices, Generating Activity Control Measures Waste collection area will not receive a substantial amount of runoff from upland areas and does not drain directly to a waterway. Containers have lids covered • before periods of rain,or are in a covered area. Scheduled collection to prevent As provided by contractor overfilling.MATERIALS NOT TO BE Solid waste disposal BURIED ON-SITE Convenient and well-maintained portable sanitary facilities will be provided,and Sanitary waste Current locations shown on plan located away from waterways or inlets. Such facilities shall be regularly maintained. Apply fertilizers in accordance with Landscaping operations N/A Tree Protection Only manufacturer's recommendations and not during rainfall events To be treated in a sediment basin or better Wash Waters Wash area is located at the construction control as specified on plan.Minimize entrance. the discharge of pollutants from equipment and vehicle washing Vehicle and equipment washing Designated areas and details shown on Provide containment and filtering for all plan wash waters per the plan Minimization of exposure to precipitation and stormwater.Minimize the exposure of building materials,building products, construction wastes,trash,landscape materials,fertilizers,pesticides,herbicides,detergents, sanitary waste,and other materials present on the site to precipitation and to stormwater. (Identify all non-stormwater discharges to occur on your site. Keep this plan up-to-date with ongoing site changes and inspections. See CGP, 9VAC25-880-70 section E for examples of non-stormwater discharges.) D. Non-stormwater discharges Discharge Pollutants or Pollutant Location on Site Constituents Dust control water Sediment As shown on plan Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Discharge Pollutants or Pollutant . Location on Site Constituents E. Persons responsible for pollution prevention practices (Provide the names and contact information for all persons responsible for prevention practices as listed above.) TBD F. Response and reporting practices Minimize discharges from spills and leaks.Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures as follows. Respond to all spills,leaks and discharges as follows; Materials and equipment necessary for oil or chemical spill cleanup will be kept in the temporary material storage trailer onsite. Equipment will include,but not be limited to,brooms,dust pans,mops,rags,gloves,goggles,kitty litter, sand,saw dust,and plastic and metal trash containers. All oil or other chemical spills will be cleaned up immediately upon discovery. Identify and stop source of discharge. Use absorptive materials to soak up as much chemical as possible. Place all contaminated material in trash containers for disposal. Report all spills,leaks and discharges as follows; (Provide detailed response and reporting practices according to 9VAC25-880-70, Part if, section A.4.e.) Reports will be made to the following: Virginia Department of Emergency Management Emergency Operations Center(EOC) Phone: (800)468-8892 Spills large enough to reach the storm sewers will be reported to the National Response Center at 1-800-424-8802. G. Pollution Prevention Awareness (Describe training and procedures to provide awareness and compliance for all measures in this document; waste management, wash waters, prevention measures, etc.) The registered land disturber shall oversee all construction activities to implement and maintain pollution prevention measures. As such training and procedures shall be provided by contractor for each worker on site before they begin land disturbing activities. Training on implementation of erosion and sediment control devices/procedures must be provided by registered land disturber each time a new E&SC procedure is constructed. Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload allocation, and exceptional waters. This site discharges to impaired waters as detailed on the following sheets. Enhanced inspection frequency is required as outlined below: (1) Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day; and (2) Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls discharging to surface waters identified as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit. Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Bacteria TMDL Development for the Rivanna River Mainstem, North Fork Rivanna River, Preddy Creek and Tributaries, Meadow Creek, Mechums River, and Beaver Creek Watersheds Submitted by Virginia Department of Environmental Quality Prepared by ' ifi'► THE Louis Berger Group, INC. 6`t 2445 M Street, NW Washington, DC 20037 Final Report March 2008 Bacteria TMDLs for Rivanna River Mainstem, North Fork Rivanna River, Preddy Creek and Tributaries, Meadow Creek, Mechums River, and Beaver Creek Watersheds Executive Summary This report presents the development of bacteria TMDLs for the Rivanna River mainstem, North Fork Rivanna River, Preddy Creek and tributaries, Meadow Creek, Mechums River, and Beaver Creek watersheds. These water bodies were listed as impaired on Virginia's 303(d) Total Maximum Daily Load Priority List and Reports (DEQ, 1998, 2002, 2004, 2006) because of violations of the state's water quality standards for E. coli and for fecal coliform bacteria. Description of the Study Area The bacteria impaired Rivanna River watershed is located within the borders of Albemarle, Greene, Nelson, and Orange counties. The city of Charlottesville is also within the watershed's boundaries. All impaired streams are located in the Rivanna River watershed (USGS Cataloging Unit 02080204). The entire Rivanna River bacteria impaired watershed is approximately 321,877 acres. Impairment Description Segments of the Rivanna River mainstem, North Fork Rivanna River, Preddy Creek and tributaries, Meadow Creek, Mechums River, and Beaver Creek were listed as bacteria impaired on Virginia's 2002, 2004, and/or 2006 303(d) Total Maximum Daily Load Priority List and Reports due to violations of the state's water quality standard for fecal coliform bacteria and/or E. coli. The impaired segments are located in the Rivanna River Basin in central Virginia. The watershed is located in the hydrologic unit (HUC) 02080204. The impaired watersheds include the City of Charlottesville and portions of Albemarle, Greene, Orange, and Nelson counties. The impaired segment of the Rivanna River (VAV-H28R-RVN01A00) extends 5.28 miles along the mainstem from the confluence of the North Fork Rivanna River to Moores Creek. This segment of the Rivanna River was first listed on the 2006 305(b)/303(d) Water Quality Assessment Integrated Report for exceedances of the E. coli standard. During the 2006 assessment period (January 200 through December 2004), 2 Executive Summary E-1 Bacteria TMDLs for Rivanna River Mainstem, North Fork Rivanna River, Preddy Creek and Tributaries, Meadow Creek, Mechums River, and Beaver Creek Watersheds out of 9 samples (22%) collected at listing station 2-RVN037.54 exceeded the E. coli criterion of 235 cfu/100 ml. The impaired segment of Beaver Creek (VAV-H23R-BVRO2A04) extends 4.8 miles from its headwaters to Beaver Creek Reservoir. This segment of Beaver Creek was first listed on the 2004 305(b)/303(d) Water Quality Assessment Integrated Report for exceedances of the fecal coliform standard. During the 2004 assessment period (January 1998 through December 2002), 2 out of 16 fecal coliform samples (13%) collected at listing station 2-BVR005.70 exceeded the fecal coliform standard instantaneous of 400 cfu/100 ml. This segment remained on the 303(d) list in the 2006 Water Quality Assessment Report. The impaired segment of Meadow Creek (VAV-H28R-MWCO1A00) extends 4.01 miles from its headwaters to the confluence of the Rivanna River. This segment of Meadow Creek was first listed on the 2002 303(d)Water Quality Assessment Integrated Report for exceedances of the fecal coliform standard. During the 2002 assessment period (January 1996 through December 2000), 4 out of 23 fecal coliform samples (17%) collected at ) listing station 2-MWC000.60 exceeded the fecal coliform instantaneous standard of 400 cfu/100 ml. The impaired segment of the Mechums River (VAV-H23R-MCM01A00) extends 10.44 miles from the confluence of the Lickinghole Creek to the Moormans River. This segment of the Mechums River was first listed on the 2006 305(b)/303(d) Water Quality Assessment Integrated Report for exceedances of the E. coli standard. During the 2006 assessment period (January 2000 through December 2004), 2 out of 18 samples (11%) collected at listing station 2-MCM005.12 exceeded the E. coli criterion of 235 cfu/100 ml. The impaired segment of the North Fork Rivanna River (VAV-H27R-RRN01A00) extends 10.38 miles from the public water intake to the confluence of the Rivanna River. This segment of the North Fork Rivanna River was first listed on the 2006 305(b)/303(d) Water Quality Assessment Integrated Report for exceedances of the E. coli standard. -- During the 2006 assessment period (January 2000 through December 2004), 3 out of 9 Executive Summary E-2 Bacteria TMDLs for Rivanna River Mainstem, North Fork Rivanna River, Preddy Creek and Tributaries, Meadow Creek, Mechums River, and Beaver Creek Watersheds samples (33%) collected at listing station 2-RRN002.19 exceeded the E. coli criterion of 235 cfu/100 m1. The impaired segment of Preddy Creek and its tributaries (VAV-H27R-PRD01A00) extends 25.96 miles from its headwaters to the confluence of the Rivanna River. This segment of Preddy Creek was first listed on the 2006 305(b)/303(d) Water Quality Assessment Integrated Report for exceedances of the E. coli standard. During the 2006 assessment period (January 2000 through December 2004), 3 out of the 9 samples (33%) collected at listing station 2-PRD000.21 exceeded the E. coli criterion of 235 cfu/100 ml. During this same period, only 1 out of the 9 samples (11%) collected at listing station 2- PRD004.42 exceeded the E. coli criterion of 235 cfu/100 ml. Applicable Water Quality Standards At the time of the initial listing of Rivanna River mainstem, North Fork Rivanna River, Preddy Creek and tributaries, Meadow Creek, Mechums River, and Beaver Creek segments, the Virginia Bacteria Water Quality Standard was expressed in fecal coliform bacteria; however, the bacteria water quality standard has recently been changed, and is now expressed in E. coli. Virginia's bacteria water quality standard currently states that E. coli bacteria shall not exceed a geometric mean of 126 E. coli counts per 100 mL of water for two or more samples within a calendar month, or an E. coli concentration of 235 counts per 100 mL of water at any time. However, the loading rates for watershed- based modeling are available only in terms of the previous standard, fecal coliform bacteria. Therefore, the TMDL was expressed in E. coli by converting modeled daily fecal coliform concentrations to daily E. coli concentrations using an in-stream translator. This TMDL was required to meet both the geometric mean and instantaneous E. coli water quality standard. Watershed Characterization The land use characterization for the Rivanna River watershed was based on a combination of land cover data from the National Land Use Land cover data set (NLCD) using 2001 reference data and the Virginia Depth tiuent of Forestry 2005 land use data. Executive Summary E-3 Bacteria TMDLs for Rivanna River Mainstem, North Fork Rivanna River, Preddy Creek and Tributaries, Meadow Creek, Mechums River, and Beaver Creek Watersheds Dominant land uses in the watershed are forest (64%) and agriculture (21%). These account for a combined 85% of the total land area in the watershed. The potential sources of fecal coliform include run-off from livestock grazing, manure applications, industrial processes, residential, and domestic pets waste. Some of these sources are driven by dry weather and others are driven by wet weather. The potential sources of fecal coliform in the watershed were identified and characterized. These sources include permitted point sources, failed septic systems and straight pipes, livestock, wildlife, and pets. TMDL Technical Approach The Hydrologic Simulation Program-Fortran (HSPF) model was selected and used as a tool to predict the in-stream water quality conditions of the delineated watershed under varying scenarios of rainfall and fecal coliform loading. HSPF is a hydrologic, watershed-based water quality model. The results from the model were used to develop the TMDL allocations based on the existing fecal coliform load. Basically, this means that HSPF can explicitly account for the specific watershed conditions, the seasonal variations in rainfall and climate conditions, and activities and uses related to fecal coliform loading. The modeling process in HSPF starts with the following steps: • delineating the watershed into smaller subwatersheds • entering the physical data that describe each subwatershed and stream segment • entering values for the rates and constants that describe the sources and the activities related to the fecal coliform loading in the watershed The Rivanna River watershed was delineated into 41 smaller subwatersheds to represent the watershed characteristics and to improve the accuracy of the HSPF model. Of these 41 representing the entire Rivanna River watershed, 28 were within the bacteria impaired watershed. This delineation was based on topographic characteristics, and was created using a Digital Elevation Model (DEM), stream reaches obtained from the National Hydrography Dataset(NHD), and stream flow and in-stream water quality data. Executive Summary E-4 Bacteria TMDLs for Rivanna River Mainstem, North Fork Rivanna River, Preddy Creek and Tributaries, Meadow Creek, Mechums River, and Beaver Creek Watersheds Stream flow data were available from the U.S. Geological Survey (USGS). Weather data were obtained from the National Climatic Data Center (NCDC). The data used in the model include meteorological data (hourly precipitation) and surface airways data (including wind speed/direction, ceiling height, dry bulb temperature, dew point temperature, and solar radiation). The period of January 1998 to December 2006 was used for HSPF hydraulic calibration and validation. The hydrologic calibration parameters were adjusted until there was a good agreement between the observed and simulated stream flow, thereby indicating that the model parameterization is representative of the hydrologic characteristics of the study areas. The model results closely matched the observed flows during low flow conditions, base flow recession and storm peaks. Instream water quality data for the calibration was retrieved from DEQ, and was evaluated for potential use in the set-up, calibration, and validation of the water quality model. The existing fecal coliform loading was calculated based on current watershed conditions. Since Virginia has recently changed its bacteria standard from fecal coliform to E. coli the modeled fecal coliform concentrations were changed to E. coli concentrations using a translator. TMDL Calculations The TMDL represents the maximum amount of a pollutant that the stream can receive without exceeding the water quality standard. The load allocation for the selected scenarios was calculated using the following equation: TMDL=E WLA+E LA+MOS Where, WLA=wasteload allocation (point source contributions); LA= load allocation (non-point source allocation); and MOS =margin of safety. Executive Summary E-5 Bacteria TMDLs for Rivanna River Mainstem, North Fork Rivanna River, Preddy Creek and Tributaries, Meadow Creek, Mechums River, and Beaver Creek Watersheds The margin of safety (MOS) is a required component of the TMDL to account for any lack of knowledge concerning the relationship between effluent limitations and water quality. The MOS was implicitly incorporated in this TMDL. Implicitly incorporating the MOS required that allocation scenarios be designed to meet a 30-day geometric mean E. coli standard of 126 cfu/100 mL and the instantaneous E. coli standard of 235 cfu/100 mL with 0% exceedance. Typically, there are several potential allocation strategies that would achieve the TMDL endpoint and water quality standards. A number of load allocation scenarios were developed to determine the final TMDL load allocation scenario. For the hydrologic period of January 2000 to December 2006, fecal coliform loading and instream fecal coliform concentrations were estimated for the various scenarios using the developed HSPF model of the Rivanna River mainstem, North Fork Rivanna River, Preddy Creek and tributaries, Meadow Creek, Mechums River, and Beaver Creek. After using the instream translator, the TMDL allocation plan was developed to meet geometric mean and instantaneous E. coli standards. Based on the load-allocation scenario analyses, the daily TMDL allocation plans that will meet the 30-day E. coli geometric mean water quality standard of 126 cfu/100 mL and the instantaneous E. coli water quality standard of 235 cfu/100 mL are presented in Table E-1. Executive Summary E-6 Bacteria TMDLs for Rivanna River Mainstem, North Fork Rivanna River, Preddy Creek and Tributaries, Meadow Creek, Mechums River, and Beaver Creek Watersheds Table E-1; Allocation Plan Loads for E. cot/(%reduction)for the Rivanna River mainstem, North Fork Rivanna River,Preddy Creek and tributaries,Meadow Creek,Mechums River, and Beaver Creek Watershed Human Sources Livestock Agricultural Wildlife (failed septic (Direct and urban (Direct systems and Instream non point Instream straight pipes) Loading) sources Loading) Rivanna River 100% 100% 95% 76% VAV-H28R-RVNO 1A00 North Fork Rivanna River 100% 100% 95% 92% VAV-H27R-RRNO 1 A00 Preddy Creeks and Tributaries 100% 100% 95/°o 72/o° VAV-H27R-PRDO1A00 Meadow Creek 100% 100% 95% 48% VAV-H28R-MWCO 1A00 Mechums River 100% 100% 95% 76% VAV-H23R-MCM01 A00 Beaver Creek 100% 100% 95% 66% VAV-H23R-BVR02AO4 The summaries of the daily bacteria TMDL allocation plan loads for the Rivanna River mainstem, North Fork Rivanna River, Preddy Creek and tributaries, Meadow Creek, Mechums River, and Beaver Creek are presented in Table E-2. Table E-3 summarizes the yearly bacteria TMDL allocation plan loads. Table,E-2: Rivanna River mainstem,North Fork Rivanna River,Preddy Creek and' I tributaries,Meadow Creek,Mechums River, and Beaver Creek TMDL Allocation Plan Loads for E. coil(cfu/day) WLA (Point LA MOS Watershed Sources) (Nonpoint (Margin of TMDL sources) safety) Rivanna River 3.72E+10 4.11E+11 Implicit 4.48E+11 VAV-H28R-RVN01 A00 North Fork Rivanna River 9.88E+09 1.62E+11 Implicit 1.72E+11 VAV-H27R-RRNO 1 A00 Preddy Creeks and Tributaries 6.67E+08 5.91E+10 Implicit 5.97E+10 VAV-H27R-PRDO l A00 Meadow Creek 4.08E+10 2.36E+10 Implicit 6.44E+10 VAV-H28R-MWCO 1 A00 Mechums River 9.06E+07 3.50E+10 Implicit 3.51E+10 VAV-H23R-MCM01A00 Beaver Creek 2.60E+08 1.12E+10 Implicit 1.14E+10 VAV-H23R-BVR02A04 Executive Summary E-7 Bacteria TMDLs for Rivanna River Mainstem, North Fork Rivanna River, Preddy Creek and Tributaries, Meadow Creek, Mechums River, and Beaver Creek Watersheds Table E-3: Rivanna River mainstem,North Fork Rivanna River,Preddy Creek and tributaries,Meadow Creek,Mechums River,and Beaver Creek TMDL Allocation.Plan Loads for E. colt (cfulyear). WLA(Point LA MOS Watershed Sources) (Nonpoint (Margin of TMDL sources) safety) Rivanna River 4.93E+12 4.11E+13 Implicit 4.60E+13 VAV-H28R-RVNO 1 A00 North Fork Rivanna River 2.15E+12 1.54E+13 Implicit 1.75E+13 VAV-H27R-RRNO 1 A00 Preddy Creeks and Tributaries 2.43E+11 5.58E+12 Implicit 5.83E+12 VAV-H27R-PRDO 1 A00 Meadow Creek 3.89E+12 2.23E+12 Implicit 6.12E+12 VAV-H28R-MWC01 A00 Mechums River 3.31E+10 3.31E+12 Implicit 3.34E+12 VAV-H23R-MCM01A00 Beaver Creek VAV-H23R-BVR02A04 3.29E+10 1.07E+12 Implicit 1.10E+12 TMDL Implementation The Commonwealth intends for this TMDL to be implemented through best management practices (BMPs) in the watershed. Implementation will occur in stages. The benefits of staged implementation are: 1) as stream monitoring continues to occur, it allows for water quality improvements to be recorded as they are being achieved; 2) it provides a measure of quality control, given the uncertainties than exist in any model; 3) it provides a mechanism for developing public support; 4) it helps to ensure the most cost effective practices are implemented initially, and 5) it allows for the evaluation of the TMDL's adequacy in achieving the water quality standard. Table E-4 provides load reduction targets for staged implementation achieving a 10% instantaneous standard violation reduction for each TMDL watershed. While section 303(d) of the Clean Water Act and current EPA regulations do not require the development of TMDL implementation plans as part of the TMDL process, they do require reasonable assurance that the load and wasteload allocations can and will be implemented. Additionally, Virginia's 1997 Water Quality Monitoring Information and Restoration Act (the "Act") directs the State Water Control Board to "develop and implement a plan to achieve fully supporting status for impaired waters" (Section 62.1- Executive Summary E-8 Bacteria TMDLs for Rivanna River Mainstem, North Fork Rivanna River, Preddy Creek and Tributaries, Meadow Creek, Mechums River, and Beaver Creek Watersheds 44.19.7). The Act also establishes that the implementation plan shall include the date of expected achievement of water quality objectives, measurable goals, corrective actions necessary and the associated costs, benefits and environmental impacts of addressing the impairments. EPA outlines the minimum elements of an approvable implementation plan in its 1999 "Guidance for Water Quality-Based Decisions: The TMDL Process." The listed elements include implementation actions/management measures, timelines, legal or regulatory controls, time required to attain water quality standards, monitoring plans, and milestones for attaining water quality standards. Once developed, DEQ intends to incorporate the TMDL implementation plan into the appropriate Water Quality Management Plan (WQMP), in accordance with the Clean Water Act's Section 303(e). In response to a Memorandum of Understanding (MOU) between EPA and DEQ, DEQ also submitted a draft Continuous Planning Process to EPA in which DEQ commits to regularly updating the WQMPs. Thus, the WQMPs will be, among other things, the repository for all TMDLs and TMDL implementation plans developed within a river basin. Executive Summary E-9 Bacteria TMDLs for Rivanna River Mainstem, North Fork Rivanna River, Preddy Creek and Tributaries, Meadow Creek, Mechums River, and Beaver Creek Watersheds Table E-4: Rvarrna.River mainstem,North Fork Rivanna River,Preddy Creek and tributaries,Meadow Creek,Mechums River, and Beaver Creek TMDL Stage..I Allocation Scenario 1 (10% Instantaneous Standard Violation) violation of violation of Failed Direct NPS NPS Direct GM Inst. Watershed Septics& Livestock (Agricultural) (Urban) Wildlife standard standard Pipes 126 235 #/100m1 #/100m1 Rivanna River VAV-H28R- 100% 92% 0% 0% 0% 14.7% 10% RVNO1A00 North Fork Rivanna River 100% 100% 50% 0% 0 VAV-H27R- 58% 21% 10% RRNO1 A00 Preddy Creeks and Tributaries 100% 100% 50% 48% 0% 36.8% 10% VAV-H27R- PRDO 1A00 Meadow Creek VAV-H28R- 100% 100% 0% 23% 0% 27% 10% MWCO1A00 Mechums River VAV-H23R- 100% 100% 55% 0% 0% 33% 10% MCM01A00 Beaver Creek VAV-H23R- 100% 95% 0% 0% 0% 31.4% 10% BVRO2A04 Executive Summary E-10 Section 8. Qualified personnel The following personnel are responsible for inspections; (Provide the name, telephone number, and qualifications of the qualified personnel conducting inspections.) TBD • Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 9. Signed Certification (Provide certification according to 9VAC25-870-370. For purposes of plan review and approvals, this certification should be the owner of the property, the same signature as appears on the bonds and applications. Another operator can be designated on the delegation of authority form to follow.) CERTIFICATION • "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather ' and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Owner/Operator Name: Luke Kitelinger Company: Bella Homes LLC Title: C) IA, e/- Signature: �✓ `'��G,/r/4. Date: /i AV/q Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County Section 10. Delegation of authority. (Provide the persons or positions with authority to sign inspection reports or to modify the stormwater pollution prevention plan. A formal, signed delegation of authority is needed.) Delegation of Authority (name), hereby designate the person or specifically described position below to be a duly authorized representative for the purpose of overseeing compliance with environmental requirements, including the Construction General Permit, at the construction site. The designee is authorized to sign any reports, stormwater pollution prevention plans and all other documents required by the permit. (name of person or position) (company) (address) (city, state,zip) (phone) By signing this authorization, I confirm that I meet the requirements to make such a designation as set forth in the Construction General Permit (CGP), and that the designee above meets the definition of a "duly authorized representative". Operator Name: Luke Kitelinger Company: Bella Homes LLC Title: Signature: Date: Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 11. General permit copy (Provide a copy of the construction general permit, 9VAC25-880) Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County eld i4 COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY General Permit No.: VAR10 Effective Date: July 1, 2019 Expiration Date: June 30, 2024 GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES AUTHORIZATION TO DISCHARGE UNDER THE VIRGINIA STORMWATER MANAGEMENT PROGRAM AND THE VIRGINIA STORMWATER MANAGEMENT ACT In compliance with the provisions of the Clean Water Act, as amended, and pursuant to the Virginia Stormwater Management Act and regulations adopted pursuant thereto, operators of construction activities are authorized to discharge to surface waters within the boundaries of the Commonwealth of Virginia, except those specifically named in State Water Control Board regulations that prohibit such discharges. The authorized discharge shall be in accordance with the registration statement filed with the Department of Environmental Quality, this cover page, Part I - Discharge Authorization and Special Conditions, Part II - Stormwater Pollution Prevention Plan, and Part III - Conditions Applicable to All VPDES Permits as set forth in this general permit. Construction General Permit Effective July 1, 2019 Page 2 of 26 PART DISCHARGE AUTHORIZATION AND SPECIAL CONDITIONS A. Coverage under this general permit. 1. During the period beginning with the date of coverage under this general permit and lasting until the general permit's expiration date, the operator is authorized to discharge stormwater from construction activities. 2. This general permit also authorizes stormwater discharges from support activities (e.g., concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, borrow areas) located on-site or off-site provided that: a. The support activity is directly related to the construction activity that is required to have general permit coverage for discharges of stormwater from construction activities; b. The support activity is not a commercial operation, nor does it serve multiple unrelated construction activities by different operators; c. The support activity does not operate beyond the completion of the last construction activity it supports; d. The support activity is identified in the registration statement at the time of general permit coverage; e. Appropriate control measures are identified in a stormwater pollution prevention plan and implemented to address the discharges from the support activity areas; and f. All applicable state, federal, and local approvals are obtained for the support activity. B. Limitations on coverage. 1. Post-construction discharges. This general permit does not authorize stormwater discharges that originate from the site after construction activities have been completed and the site, including any support activity sites covered under the general permit registration, has undergone final stabilization. Post-construction industrial stormwater discharges may need to be covered by a separate VPDES permit. 2. Discharges mixed with nonstormwater.This general permit does not authorize discharges that are mixed with sources of nonstormwater, other than those discharges that are identified in Part I E (Authorized nonstormwater discharges) and are in compliance with this general permit. 3. Discharges covered by another state permit. This general permit does not authorize discharges of stormwater from construction activities that have been covered under an individual permit or required to obtain coverage under an alternative general permit. Page 3 of 26 4. Impaired waters and total maximum daily load (TMDL) limitation. a. Nutrient and sediment impaired waters. Discharges of stormwater from construction P 9 activities to surface waters identified as impaired in the 2016 § 305(b)/303(d) Water Quality Assessment Integrated Report or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit for(i) sediment or a sediment-related parameter (i.e., total suspended solids or turbidity) or (ii) nutrients (i.e., nitrogen or phosphorus) are not eligible for coverage under this general permit unless the operator develops, implements, and maintains a stormwater pollution prevention plan (SWPPP) in accordance with Part II B 5 of this permit that minimizes the pollutants of concern and, when applicable, is consistent with the assumptions and requirements of the approved TMDL wasteload allocations and implements an inspection frequency consistent with Part II G 2 a. b. Polychlorinated biphenyl (PCB) impaired waters. Discharges of stormwater from construction activities that include the demolition of any structure with at least 10,000 square feet of floor space built or renovated before January 1, 1980, to surface waters identified as impaired in the 2016 § 305(b)/303(d) Water Quality Assessment Integrated Report or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit for PCB are not eligible for coverage under this general permit unless the operator develops, implements, and maintains a SWPPP in accordance with Part II B 6 of this permit that minimizes the pollutants of concern and, when applicable, is consistent with the assumptions and requirements of the approved TMDL wasteload allocations, and implements an inspection frequency consistent with Part II G 2 a. 5. Exceptional waters limitation. Discharges of stormwater from construction activities not previously covered under the general permit effective on July 1, 2014, to exceptional waters identified in 9VAC25-260-30 A 3 c are not eligible for coverage under this general permit unless the operator develops, implements, and maintains a SWPPP in accordance with Part II B 7 of this permit and implements an inspection frequency consistent with Part II G 2 a. 6. There shall be no discharge of floating solids or visible foam in other than trace amounts. C. Commingled discharges. Discharges authorized by this general permit may be commingled with other sources of stormwater that are not required to be covered under a state permit, so long as the commingled discharge is in compliance with this general permit. Discharges authorized by a separate state or VPDES permit may be commingled with discharges authorized by this general permit so long as all such discharges comply with all applicable state and VPDES permit requirements. D. Prohibition of nonstormwater discharges. Except as provided in Parts I A 2, I C, and I E, all discharges covered by this general permit shall be composed entirely of stormwater associated with construction activities. All other discharges including the following are prohibited: 1. Wastewater from washout of concrete; 2. Wastewater from the washout and cleanout of stucco, paint, form release oils, curing compounds, and other construction materials; Page 4 of 26 3. Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; 4. Oils, toxic substances, or hazardous substances from spills or other releases; and 5. Soaps, solvents, or detergents used in equipment and vehicle washing. E. Authorized nonstormwater discharges. The following nonstormwater discharges from construction activities are authorized by this general permit when discharged in compliance with this general permit: 1. Discharges from firefighting activities; 2. Fire hydrant flushings; 3. Waters used to wash vehicles or equipment where soaps, solvents, or detergents have not been used and the wash water has been filtered, settled, or similarly treated prior to discharge; 4. Water used to control dust that has been filtered, settled, or similarly treated prior to discharge; 5. Potable water sources, including uncontaminated waterline flushings, managed in a manner to avoid an instream impact; 6. Routine external building wash down where soaps, solvents or detergents have not been used and the wash water has been filtered, settled, or similarly treated prior to discharge; 7. Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred (or where all spilled or leaked material has been removed prior to washing); where soaps, solvents, or detergents have not been used; and where the wash water has been filtered, settled, or similarly treated prior to discharge; 8. Uncontaminated air conditioning or compressor condensate; 9. Uncontaminated ground water or spring water; 10. Foundation or footing drains where flows are not contaminated with process materials such as solvents; 11. Uncontaminated excavation dewatering, including dewatering of trenches and excavations that have been filtered, settled, or similarly treated prior to discharge; and 12. Landscape irrigation. F. Termination of general permit coverage. 1. The operator of the construction activity shall submit a notice of termination in accordance with 9VAC25-880-60, unless a registration statement was not required to be submitted in accordance with 9VAC25-880-50 A 1 c or A 2 b for single-family detached residential structures, to the VSMP authority after one or more of the following conditions have been met: Page 5 of 26 a. Necessary permanent control measures included in the SWPPP for the site are in place and functioning effectively and final stabilization has been achieved on all portions of the site for which the operator has operational control. When applicable, long term responsibility and maintenance requirements for permanent control measures shall be recorded in the local land records prior to the submission of a complete and accurate notice of termination and the construction record drawing prepared; b. Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for the ongoing discharge; c. Coverage under an alternative VPDES or state permit has been obtained; or d. For individual lots in residential construction only, final stabilization as defined in 9VAC25- 880-1 has been completed, including providing written notification to the homeowner and incorporating a copy of the notification and signed certification statement into the SWPPP, and the residence has been transferred to the homeowner. 2. The notice of termination shall be submitted no later than 30 days after one of the above conditions in subdivision 1 of this subsection is met. 3. Termination of authorization to discharge for the conditions set forth in subdivision 1 a of this subsection shall be effective upon notification from the department that the provisions of subdivision 1 a of this subsection have been met or 60 days after submittal of a complete and accurate notice of termination in accordance with 9VAC25-880-60 C, whichever occurs first. 4. Authorization to discharge terminates at midnight on the date that the notice of termination is submitted for the conditions set forth in subdivisions 1 b through 1 d of this subsection unless otherwise notified by the VSMP authority or department. 5. The notice of termination shall be signed in accordance with Part III K of this general permit. G. Water quality protection. 1. The operator shall select, install, implement, and maintain control measures as identified in the SWPPP at the construction site that minimize pollutants in the discharge as necessary to ensure that the operator's discharge does not cause or contribute to an excursion above any applicable water quality standard. 2. If it is determined by the department that the operator's discharges are causing, have reasonable potential to cause, or are contributing to an excursion above any applicable water quality standard, the department, in consultation with the VSMP authority, may take appropriate enforcement action and require the operator to: a. Modify or implement additional control measures in accordance with Part II C to adequately address the identified water quality concerns; b. Submit valid and verifiable data and information that are representative of ambient i conditions and indicate that the receiving water is attaining water quality standards; or Page 6 of 26 c. Submit an individual permit application in accordance with 9VAC25-870-410 B 3. All written responses required under this chapter shall include a signed certification consistent with Part III K. PART II STORMWATER POLLUTION PREVENTION PLAN A. Stormwater pollution prevent plan. 1. A stormwater pollution prevention plan (SWPPP) shall be developed prior to the submission of a registration statement and implemented for the construction activity, including any support activity, covered by this general permit. SWPPPs shall be prepared in accordance with good engineering practices. Construction activities that are part of a larger common plan of development or sale and disturb less than one acre may utilize a SWPPP template provided by the department and need not provide a separate stormwater management plan if one has been prepared and implemented for the larger common plan of development or sale. 2. The SWPPP requirements of this general permit may be fulfilled by incorporating by reference other plans such as a spill prevention control and countermeasure (SPCC) plan developed for the site under § 311 of the federal Clean Water Act or best management practices (BMP) programs otherwise required for the facility provided that the incorporated plan meets or exceeds the SWPPP requirements of Part II B. All plans incorporated by reference into the SWPPP become enforceable under this general permit. If a plan incorporated by reference does not contain all of the required elements of the SWPPP, the operator shall develop the missing elements and include them in the SWPPP. 3. Any operator that was authorized to discharge under the general permit effective July 1, 2014, and that intends to continue coverage under this general permit, shall update its stormwater pollution prevention plan to comply with the requirements of this general permit no later than 60 days after the date of coverage under this general permit. B. Contents. The SWPPP shall include the following items: 1. General information. a. A signed copy of the registration statement, if required, for coverage under the general VPDES permit for discharges of stormwater from construction activities; b. Upon receipt, a copy of the notice of coverage under the general VPDES permit for discharges of stormwater from construction activities (i.e., notice of coverage letter); c. Upon receipt, a copy of the general VPDES permit for discharges of stormwater from construction activities; d. A narrative description of the nature of the construction activity, including the function of the project (e.g., low density residential, shopping mall, highway, etc.); e. A legible site plan identifying: �� Page 7 of 26 (1) Directions of stormwater flow and approximate slopes anticipated after major grading activities; (2) Limits of land disturbance including steep slopes and natural buffers around surface waters that will not be disturbed; (3) Locations of major structural and nonstructural control measures, including sediment basins and traps, perimeter dikes, sediment barriers, and other measures intended to filter, settle, or similarly treat sediment, that will be installed between disturbed areas and the undisturbed vegetated areas in order to increase sediment removal and maximize stormwater infiltration; (4) Locations of surface waters; (5) Locations where concentrated stormwater is discharged; (6) Locations of any support activities, including (i) areas where equipment and vehicle washing, wheel wash water, and other wash water is to occur; (ii) storage areas for chemicals such as acids,fuels,fertilizers, and other lawn care chemicals; (iii) concrete wash out areas; (iv) vehicle fueling and maintenance areas; (v) sanitary waste facilities, including those temporarily placed on the construction site; and (vi) construction waste storage; and (7) When applicable,the location of the on-site rain gauge or the methodology established in consultation with the VSMP authority used to identify measurable storm events for inspection as allowed by Part II G 2 a (1) (ii) or Part II G 2 b (2). 2. Erosion and sediment control plan. a. An erosion and sediment control plan designed and approved in accordance with the Virginia Erosion and Sediment Control Regulations (9VAC25-840), an "agreement in lieu of a plan" as defined in 9VAC25-840-10 from the VESCP authority, or an erosion and sediment control plan prepared in accordance with annual standards and specifications approved by the department. b. All erosion and sediment control plans shall include a statement describing the maintenance responsibilities required for the erosion and sediment controls used. c. An approved erosion and sediment control plan, "agreement in lieu of a plan," or erosion and sediment control plan prepared in accordance with department-approved annual standards and specifications, implemented to: (1) Control the volume and velocity of stormwater runoff within the site to minimize soil erosion; (2) Control stormwater discharges, including peak flow rates and total stormwater volume, to minimize erosion at outlets and to minimize downstream channel and stream bank erosion; Page 8 of 26 (3) Minimize the amount of soil exposed during the construction activity; (4) Minimize the disturbance of steep slopes; (5) Minimize sediment discharges from the site in a manner that addresses(i)the amount, frequency, intensity, and duration of precipitation; (ii)the nature of resulting stormwater runoff; and (iii) soil characteristics, including the range of soil particle sizes present on the site; (6) Provide and maintain natural buffers around surface waters, direct stormwater to vegetated areas to increase sediment removal, and maximize stormwater infiltration, unless infeasible; (7) Minimize soil compaction and, unless infeasible, preserve topsoil; (8) Ensure initiation of stabilization activities, as defined in 9VAC25-880-1, of disturbed areas immediately whenever any, clearing, grading, excavating, or other land- disturbing activities have permanently ceased on any portion of the site, or temporarily ceased on any portion of the site and will not resume for a period exceeding 14 days; and (9) Utilize outlet structures that withdraw stormwater from the surface (i.e., above the permanent pool or wet storage water surface elevation), unless infeasible, when discharging from sediment basins or sediment traps. 3. Stormwater management plan. a. Except for those projects identified in Part II B 3 b, a stormwater management plan approved by the VSMP authority as authorized under the Virginia Stormwater Management Program (VSMP) Regulation (9VAC25-870), or an "agreement in lieu of a stormwater management plan" as defined in 9VAC25-870-10 from the VSMP authority, or a stormwater management plan prepared in accordance with annual standards and specifications approved by the department. b. For any operator meeting the conditions of 9VAC25-870-47 B of the VSMP regulation, an approved stormwater management plan is not required.,In lieu of an approved stormwater management plan, the SWPPP shall include a description of, and all necessary calculations supporting, all post-construction stormwater management measures that will be installed prior to the completion of the construction process to control pollutants in stormwater discharges after construction operations have been completed. Structural measures should be placed on upland soils to the degree possible. Such measures must be designed and installed in accordance with applicable VESCP authority, VSMP authority, state, and federal requirements, and any necessary permits must be obtained. 4. Pollution prevention plan. A pollution prevention plan that addresses potential pollutant- generating activities that may reasonably be expected to affect the quality of stormwater discharges from the construction activity, including any support activity. The pollution prevention plan shall: a. Identify the potential pollutant-generating activities and the pollutant that is expected to be exposed to stormwater; Page 9 of 26 b. Describe the location where the potential pollutant-generating activities will occur, or if identified on the site plan, reference the site plan; c. Identify all nonstormwater discharges, as authorized in Part I E of this general permit, that are or will be commingled with stormwater discharges from the construction activity, including any applicable support activity; d. Identify the person responsible for implementing the pollution prevention practice or practices for each pollutant-generating activity (if other than the person listed as the qualified personnel); e. Describe the pollution prevention practices and procedures that will be implemented to: (1) Prevent and respond to leaks, spills, and other releases including (i) procedures for expeditiously stopping, containing, and cleaning up spills, leaks, and other releases; and (ii) procedures for reporting leaks, spills, and other releases in accordance with Part III G; (2) Prevent the discharge of spilled and leaked fuels and chemicals from vehicle fueling and maintenance activities (e.g., providing secondary containment such as spill berms, decks, spill containment pallets, providing cover where appropriate, and having spill kits readily available); _ ' (3) Prevent the discharge of soaps, solvents, detergents, and wash water from construction materials, including the clean-up of stucco, paint, form release oils, and curing compounds (e.g., providing (i) cover (e.g., plastic sheeting or temporary roofs) to prevent contact with stormwater; (ii) collection and proper disposal in a manner to prevent contact with stormwater; and (iii) a similarly effective means designed to prevent discharge of these pollutants); (4) Minimize the discharge of pollutants from vehicle and equipment washing,wheel wash water, and other types of washing (e.g., locating activities away from surface waters and stormwater inlets or conveyance and directing wash waters to sediment basins or traps, using filtration devices such as filter bags or sand filters, or using similarly effective controls); (5) Direct concrete wash water into a leak-proof container or leak-proof settling basin. The container or basin shall be designed so that no overflows can occur due to inadequate sizing or precipitation. Hardened concrete wastes shall be removed and disposed of in a manner consistent with the handling of other construction wastes. Liquid concrete wastes shall be removed and disposed of in a manner consistent with the handling of other construction wash waters and shall not be discharged to surface waters; (6) Minimize the discharge of pollutants from storage, handling, and disposal of construction products, materials, and wastes including (i) building products such as asphalt sealants, copper flashing, roofing materials, adhesives, and concrete admixtures; (ii) pesticides, herbicides, insecticides, fertilizers, and landscape Page 10 of 26 materials; and (iii) construction and domestic wastes such as packaging materials, scrap construction materials, masonry products, timber, pipe and electrical cuttings, plastics, Styrofoam, concrete, and other trash or building materials; (7) Prevent the discharge of fuels, oils, and other petroleum products, hazardous or toxic wastes, waste concrete, and sanitary wastes; (8) Address any other discharge from the potential pollutant-generating activities not addressed above; (9) Minimize the exposure of waste materials to precipitation by closing or covering waste containers during precipitation events and at the end of the business day, or implementing other similarly effective practices. Minimization of exposure is not required in cases where the exposure to precipitation will not result in a discharge of pollutants; and f. Describe procedures for providing pollution prevention awareness of all applicable wastes, including any wash water, disposal practices, and applicable disposal locations of such wastes, to personnel in order to comply with the conditions of this general permit. The operator shall implement the procedures described in the SWPPP. 5. SWPPP requirements for discharges to nutrient and sediment impaired waters. For discharges to surface waters (i) identified as impaired in the 2016 § 305(b)/303(d) Water Quality Assessment Integrated Report or (ii) with an applicable TMDL wasteload allocation established and approved prior to the term of this general permit for sediment for a sediment- related parameter (i.e., total suspended solids or turbidity) or nutrients (i.e., nitrogen or phosphorus), the operator shall: a. Identify the impaired waters, approved TMDLs, and pollutants of concern in the SWPPP; and b. Provide clear direction in the SWPPP that: (1) Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; (2) Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and (3) A modified inspection schedule shall be implemented in accordance with Part II G 2 a. 6. SWPPP requirements for discharges to polychlorinated biphenyl (PCB) impaired waters. For discharges from construction activities that include the demolition of any structure with at least 10,000 square feet of floor space built or renovated before January 1, 1980, to surface waters (i) identified as impaired in the 2016 § 305(b)/303(d) Water Quality Assessment Integrated Report or(ii)with an applicable TMDL wasteload allocation established and approved prior to the term of this general permit for PCB, the operator shall: Page 11 of 26 a. Identify the impaired waters, approved TMDLs, and pollutant of concern in the SWPPP; b. Implement the approved erosion and sediment control plan in accordance with Part II B 2; c. Dispose of waste materials in compliance with applicable state, federal, and local requirements; and d. Implement a modified inspection schedule in accordance with Part II G 2 a. 7. SWPPP requirements for discharges to exceptional waters. For discharges to surface waters identified in 9VAC25-260-30 A 3 c as an exceptional water, the operator shall: a. Identify the exceptional surface waters in the SWPPP; and b. Provide clear direction in the SWPPP that: (1) Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; (2) Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and (3) A modified inspection schedule shall be implemented in accordance with Part II G 2 a. 8. Identification of qualified personnel. The name, phone number, and qualifications of the qualified personnel conducting inspections required by this general permit. 9. Delegation of authority. The individuals or positions with delegated authority, in accordance with Part III K, to sign inspection reports or modify the SWPPP. 10. SWPPP signature. The SWPPP shall be signed and dated in accordance with Part III K. C. SWPPP amendments, modification, and updates. 1. The operator shall amend the SWPPP whenever there is a change in the design, construction, operation, or maintenance that has a significant effect on the discharge of pollutants to surface waters and that has not been previously addressed in the SWPPP. 2. The SWPPP shall be amended if, during inspections or investigations by the operator's qualified personnel, or by local, state, or federal officials, it is determined that the existing control measures are ineffective in minimizing pollutants in discharges from the construction activity. Revisions to the SWPPP shall include additional or modified control measures designed and implemented to correct problems identified. If approval by the VESCP authority, VSMP authority, or department is necessary for the control measure, revisions to the SWPPP shall be completed no later than seven calendar days following approval. Implementation of these additional or modified control measures shall be accomplished as described in Part II H. Page 12 of 26 3. The SWPPP shall clearly identify the contractors that will implement and maintain each control measure identified in the SWPPP. The SWPPP shall be amended to identify any new contractor that will implement and maintain a control measure. _. 4. The operator shall update the SWPPP as soon as possible but no later than seven days following any modification to its implementation. All modifications or updates to the SWPPP shall be noted and shall include the following items: a. A record of dates when: (1) Major grading activities occur; (2) Construction activities temporarily or permanently cease on a portion of the site; and (3) Stabilization measures are initiated; b. Documentation of replaced or modified controls where periodic inspections or other information have indicated that the controls have been used inappropriately or incorrectly and were modified; c. Areas that have reached final stabilization and where no further SWPPP or inspection requirements apply; d. All properties that are no longer under the legal control of the operator and the dates on which the operator no longer had legal control over each property; e. The date of any prohibited discharges, the discharge volume released, and what actions were taken to minimize the impact of the release; f. Measures taken to prevent the reoccurrence of any prohibited discharge; and g. Measures taken to address any evidence identified as a result of an inspection required under Part II G. 5. Amendments, modifications, or updates to the SWPPP shall be signed in accordance with Part III K. D. Public notification. Upon commencement of land disturbance, the operator shall post conspicuously a copy of the notice of coverage letter near the main entrance of the construction activity. For linear projects, the operator shall post the notice of coverage letter at a publicly accessible location near an active part of the construction project (e.g., where a pipeline crosses a public road). The operator shall maintain the posted information until termination of general permit coverage as specified in Part I F. E. SWPPP availability. 1. Operators with day-to-day operational control over SWPPP implementation shall have a copy of the SWPPP available at a central location on-site for use by those identified as having responsibilities under the SWPPP whenever they are on the construction site. - ' Page 13 of 26 2. The operator shall make the SWPPP and all amendments, modifications, and updates available upon request to the department, the VSMP authority, the EPA,the VESCP authority, local government officials, or the operator of a municipal separate storm sewer system receiving discharges from,the construction activity. If an on-site location is unavailable to store the SWPPP when no personnel are present, notice of the SWPPP's location shall be posted near the main entrance of the construction site. 3. The operator shall make the SWPPP available for public review in an electronic format or in hard copy. Information for public access to the SWPPP shall be posted and maintained in accordance with Part II D. If not provided electronically, public access to the SWPPP may be arranged upon request at a time and at a publicly accessible location convenient to the operator or his designee but shall be no less than once per month and shall be during normal business hours. Information not required to be contained within the SWPPP by this general permit is not required to be released. F. SWPPP implementation. The operator shall implement the SWPPP and subsequent amendments, modifications, and updates from commencement of land disturbance until termination of general permit coverage as specified in Part I F. 1. All control measures shall be properly maintained in effective operating condition in accordance with good engineering practices and, where applicable, manufacturer specifications. If a site inspection required by Part II G identifies a control measure that is not operating effectively, corrective actions shall be completed as soon as practicable, but no later than seven days after discovery or a longer period as established by the VSMP authority, to maintain the continued effectiveness of the control measures. 2. If site inspections required byPart II G identifyan existingcontrol measure that needs to be P q modified or if an additional or alternative control measure is necessary for any reason, implementation shall be completed prior to the next anticipated measurable storm event. If implementation prior to the next anticipated measurable storm event is impracticable, then additional or alternative control measures shall be implemented as soon as practicable, but no later than seven days after discovery or a longer period as established by the VSMP authority. G. SWPPP Inspections. 1. Personnel responsible for on-site and off-site inspections. Inspections required by this general permit shall be conducted by the qualified personnel identified by the operator in the SWPPP. The operator is responsible for ensuring that the qualified personnel conduct the inspection. 2. Inspection schedule. a. For construction activities that discharge to a surface water identified in Part II B 5 and B 6 as impaired or having an approved TMDL or Part I B 7 as exceptional, the following inspection schedule requirements apply: (1) Inspections shall be conducted at a frequency of (i) at least once every four business days or(ii) at least once every five business days and no later than 24 hours following a measurable storm event. In the event that a measurable storm event occurs when Page 14 of 26 there are more than 24 hours between business days, the inspection shall be conducted on the next business day; and ) (2) Representative inspections as authorized in Part II G 2 d shall not be allowed. b. Except as specified in Part II G 2 a, inspections shall be conducted at a frequency of: (1) At least once every five business days; or (2) At least once every 10 business days and no later than 24 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 24 hours between business days, the inspection shall be conducted on the next business day. c. Where areas have been temporarily stabilized or land-disturbing activities will be suspended due to continuous frozen ground conditions and stormwater discharges are unlikely, the inspection frequency described in Part II G 2 a and 2 b may be reduced to once per month. If weather conditions (such as above freezing temperatures or rain or snow events) make discharges likely, the operator shall immediately resume the regular inspection frequency. d. Except as prohibited in Part II G 2 a (2), representative inspections may be utilized for utility line installation, pipeline construction, or other similar linear construction activities provided that: (1) Temporary or permanent soil stabilization has been installed and vehicle access may compromise the temporary or permanent soil stabilization and potentially cause additional land disturbance increasing the potential for erosion; (2) Inspections occur on the same frequency as other construction activities; (3) Control measures are inspected along the construction site 0.25 miles above and below each access point (i.e., where a roadway, undisturbed right-of-way, or other similar feature intersects the construction activity and access does not compromise temporary or permanent soil stabilization); and (4) Inspection locations are provided in the inspection report required by Part II G. e. If adverse weather causes the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection.Any time inspections are delayed due to adverse weather conditions, evidence of the adverse weather conditions shall be included in the SWPPP with the dates of occurrence. 3. Inspection requirements. a. As part of the inspection, the qualified personnel shall: (1) Record the date and time of the inspection and, when applicable, the date and rainfall amount of the last measurable storm event; Page 15 of 26 (2) Record the information and a description of any discharges occurring at the time of the inspection or evidence of discharges occurring prior to the inspection; (3) Record any land-disturbing activities that have occurred outside of the approved erosion and sediment control plan; (4) Inspect the following for installation in accordance with the approved erosion and sediment control plan, identification of any maintenance needs, and evaluation of effectiveness in minimizing sediment discharge, including whether the control has been inappropriately or incorrectly used: (a) All perimeter erosion and sediment controls, such as silt fence; (b) Soil stockpiles, when applicable, and borrow areas for stabilization or sediment trapping measures; (c) Completed earthen structures, such as dams, dikes, ditches, and diversions for stabilization and effective impoundment or flow control; (d) Cut and fill slopes; (e) Sediment basins and traps, sediment barriers, and other measures installed to control sediment discharge from stormwater; (f) Temporary or permanent channels, flumes, or other slope drain structures installed to convey concentrated runoff down cut and fill slopes; (g) Storm inlets that have been made operational to ensure that sediment laden stormwater does not enter without first being filtered or similarly treated; and (h) Construction vehicle access routes that intersect or access paved or public roads for minimizing sediment tracking; (5) Inspect areas that have reached final grade or that will remain dormant for more than 14 days to ensure: (a) Initiation of stabilization activities have occurred immediately, as defined in 9VAC25-880-1; and (b) Stabilization activities have been completed within seven days of reaching grade or stopping work; (6) Inspect for evidence that the approved erosion and sediment control plan, "agreement in lieu of a plan," or erosion and sediment control plan prepared in accordance with department-approved annual standards and specifications has not been properly implemented. This includes: Page 16 of 26 (a) Concentrated flows of stormwater in conveyances such as rills, rivulets, or channels that have not been filtered, settled, or similarly treated prior to discharge, or evidence thereof; (b) Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; (c) Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. Inlets and catch basins with failing sediment controls due to improper installation, lack of maintenance, or inadequate design are considered unprotected; (d) Sediment deposition on any property(including public and private streets)outside of the construction activity covered by this general permit; (e) Required stabilization has not been initiated or completed or is not effective on portions of the site; (f) Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage portion of the basin; (g) Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater from below the surface of the wet storage portion of the trap; and (h) Land disturbance or sediment deposition outside of the approved area to be \� disturbed; (7) Inspect pollutant generating activities identified in the pollution prevention plan for the proper implementation, maintenance, and effectiveness of the procedures and practices; (8) Identify any pollutant generating activities not identified in the pollution prevention plan; and (9) Identify and document the presence of any evidence of the discharge of pollutants prohibited by this general permit. 4. Inspection report. Each inspection report shall include the following items: a. The date and time of the inspection and, when applicable, the date and rainfall amount of the last measurable storm event; b. Summarized findings of the inspection; c. The locations of prohibited discharges; d. The locations of control measures that require maintenance; Page 17 of 26 e. The locations of control measures that failed to operate as designed or proved inadequate or inappropriate for a particular location; f. The locations where any evidence identified under Part II G 3 a (6) exists; g. The locations where any additional control measure is needed; h. A list of corrective actions required (including any changes to the SWPPP that are necessary) as a result of the inspection or to maintain permit compliance; i. Documentation of any corrective actions required from a previous inspection that have not been implemented; and j. The date and signature of the qualified personnel and the operator or its duly authorized representative. 5. The inspection report shall be included into the SWPPP no later than four business days after the inspection is complete. 6. The inspection report and any actions taken in accordance with Part II shall be retained by the operator as part of the SWPPP for at least three years from the date that general permit coverage expires or is terminated. The inspection report shall identify any incidents of noncompliance.Where an inspection report does not identify any incidents of noncompliance, the report shall contain a certification that the construction activity is in compliance with the e SWPPP and this general permit. The report shall be signed in accordance with Part III K of this general permit. H. Corrective actions. 1. The operator shall implement the corrective actions identified as a result of an inspection as soon as practicable but no later than seven days after discovery or a longer period as approved by the VSMP authority. If approval of a corrective action by a regulatory authority (e.g., VSMP authority, VESCP authority, or the department) is necessary, additional control measures shall be implemented to minimize pollutants in stormwater discharges until such approvals can be obtained. 2. The operator may be required to remove accumulated sediment deposits located outside of the construction activity covered by this general permit as soon as practicable in order to minimize environmental impacts. The operator shall notify the VSMP authority and the department as well as obtain all applicable federal, state, and local authorizations, approvals, and permits prior to the removal of sediments accumulated in surface waters including wetlands. Page 18 of 26 PART III CONDITIONS APPLICABLE TO ALL VPDES PERMITS NOTE: Discharge monitoring is not required for this general permit. If the operator chooses to monitor stormwater discharges or control measures, the operator shall comply with the requirements of subsections A, B, and C, as appropriate. A. Monitoring. 1. Samples and measurements taken for the purpose of monitoring shall be representative of the monitoring activity. 2. Monitoring shall be conducted according to procedures approved under 40 CFR Part 136 or alternative methods approved by the U.S. Environmental Protection Agency, unless other procedures have been specified in this general permit. Analyses performed according to test procedures approved under 40 CFR Part 136 shall be performed by an environmental laboratory certified under regulations adopted by the Department of General Services (1 VAC30-45 or 1 VAC30-46). 3. The operator shall periodically calibrate and perform maintenance procedures on all monitoring and analytical instrumentation at intervals that will ensure accuracy of measurements. B. Records. 1. Monitoring records and reports shall include: a. The date, exact place, and time of sampling or measurements; b. The individuals who performed the sampling or measurements; c. The dates and times analyses were performed; d. The individuals who performed the analyses; e. The analytical techniques or methods used; and f. The results of such analyses. 2. The operator shall retain records of all monitoring information, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation, copies of all reports required by this general permit, and records of all data used to complete the registration statement for this general permit, for a period of at least three years from the date of the sample, measurement, report or request for coverage. This period of retention shall be extended automatically during the course of any unresolved litigation regarding the regulated activity or regarding control standards applicable to the operator, or as requested by the board. C. Reporting monitoring results. Page 19 of 26 1. The operator shall update the SWPPP to include the results of the monitoring as may be performed in accordance with this general permit, unless another reporting schedule is specified elsewhere in this general permit. 2. Monitoring results shall be reported on a discharge monitoring report (DMR); on forms provided, approved or specified by the department; or in any format provided that the date, location, parameter, method, and result of the monitoring activity are included. 3. If the operator monitors any pollutant specifically addressed by this general permit more frequently than required by this general permit using test procedures approved under 40 CFR Part 136 or using other test procedures approved by the U.S. Environmental Protection Agency or using procedures specified in this general permit,the results of this monitoring shall be included in the calculation and reporting of the data submitted in the DMR or reporting form specified by the department. 4. Calculations for all limitations which require averaging of measurements shall utilize an arithmetic mean unless otherwise specified in this general permit. D. Duty to provide information. The operator shall furnish, within a reasonable time, any information which the board may request to determine whether cause exists for terminating this general permit coverage or to determine compliance with this general permit. The board, department, EPA, or VSMP authority may require the operator to furnish, upon request, such plans, specifications, and other pertinent information as may be necessary to determine the effect of the wastes from his discharge on the quality of surface waters, or such other information as may be necessary to accomplish the purposes of the CWA and the Virginia Stormwater Management Act. The operator shall also furnish to the board, department, EPA, or VSMP authority, upon request, copies of records required to be kept by this general permit. E. Compliance schedule reports. Reports of compliance or noncompliance with, or any progress reports on, interim and final requirements contained in any compliance schedule of this general permit shall be submitted no later than 14 days following each schedule date. F. Unauthorized stormwater discharges. Pursuant to § 62.1-44.5 of the Code of Virginia, except in compliance with a state permit issued by the department, it shall be unlawful to cause a stormwater discharge from a construction activity. G. Reports of unauthorized discharges. Any operator who discharges or causes or allows a discharge of sewage, industrial waste, other wastes or any noxious or deleterious substance or a hazardous substance or oil in an amount equal to or in excess of a reportable quantity established under either 40 CFR Part 110, 40 CFR Part 117,40 CFR Part 302, or§62.1-44.34:19 of the Code of Virginia that occurs during a 24-hour period into or upon surface waters or who discharges or causes or allows a discharge that may reasonably be expected to enter surface waters, shall notify the Department of Environmental Quality of the discharge immediately upon discovery of the discharge, but in no case later than within 24 hours after said discovery. A written report of the unauthorized discharge shall be submitted to the department and the VSMP authority within five days of discovery of the discharge. The written report shall contain: 1. A description of the nature and location of the discharge; 2. The cause of the discharge; Page 20 of 26 3. The date on which the discharge occurred; 4. The length of time that the discharge continued; 5. The volume of the discharge; 6. If the discharge is continuing, how long it is expected to continue; 7. If the discharge is continuing, what the expected total volume of the discharge will be; and 8. Any steps planned or taken to reduce, eliminate and prevent a recurrence of the present discharge or any future discharges not authorized by this general permit. Discharges reportable to the department and the VSMP authority under the immediate reporting requirements of other regulations are exempted from this requirement. H. Reports of unusual or extraordinary discharges. If any unusual or extraordinary discharge including a "bypass" or"upset," as defined in this general permit, should occur from a facility and the discharge enters or could be expected to enter surface waters, the operator shall promptly notify, in no case later than within 24 hours, the department and the VSMP authority by telephone after the discovery of the discharge. This notification shall provide all available details of the incident, including any adverse effects on aquatic life and the known number of fish killed. The operator shall reduce the report to writing and shall submit it to the department and the VSMP authority within five days of discovery of the discharge in accordance with Part III 12. Unusual and extraordinary discharges include any discharge resulting from: 1. Unusual spillage of materials resulting directly or indirectly from processing operations; 2. Breakdown of processing or accessory equipment; 3. Failure or taking out of service of some or all of the facilities; and 4. Flooding or other acts of nature. I. Reports of noncompliance. The operator shall report any noncompliance which may adversely affect surface waters or may endanger public health. 1. An oral report to the department and the VSMP authority shall be provided within 24 hours from the time the operator becomes aware of the circumstances. The following shall be included as information that shall be reported within 24 hours under this subdivision: a. Any unanticipated bypass; and b. Any upset that causes a discharge to surface waters. 2. A written report shall be submitted within five days and shall contain: a. A description of the noncompliance and its cause; Page 21 of 26 b. The period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time it is expected to continue; and c. Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The department may waive the written report on a case-by-case basis for reports of noncompliance under Part Ill I if the oral report has been received within 24 hours and no adverse impact on surface waters has been reported. 3. The operator shall report all instances of noncompliance not reported under Part Ill 11 or 2 in writing as part of the SWPPP. The reports shall contain the information listed in Part Ill 12. NOTE: The reports required in Part Ill G, H and I shall be made to the department and the VSMP authority. Reports may be made by telephone, email, or by fax. For reports outside normal working hours, leaving a recorded message shall fulfill the immediate reporting requirement. For emergencies,the Virginia Department of Emergency Management maintains a 24-hour telephone service at 1-800-468-8892. 4. Where the operator becomes aware of a failure to submit any relevant facts, or submittal of incorrect information in any report, including a registration statement, to the department or the VSMP authority, the operator shall promptly submit such facts or correct information. J. Notice of planned changes. 1. The operator shall give notice to the department and the VSMP authority as soon as possible of any planned physical alterations or additions to the permitted facility or activity. Notice is required only when: a. The operator plans an alteration or addition to any building, structure,facility, or installation that may meet one of the criteria for determining whether a facility is a new source in 9VAC25-870-420; b. The operator plans an alteration or addition that would significantly change the nature or increase the quantity of pollutants discharged. This notification applies to pollutants that are not subject to effluent limitations in this general permit; or 2. The operator shall give,advance notice to the department and VSMP authority of any planned changes in the permitted facility or activity, which may result in noncompliance with state permit requirements. K. Signatory requirements. 1. Registration statement. All registration statements shall be signed as follows: a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer means: (i)a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy-making or decision-making functions for the corporation; or(ii)the manager of one or more manufacturing, production, or operating facilities, provided the Page 22 of 26 manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for state permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures; b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this chapter, a principal executive officer of a public agency includes (i) the chief executive officer of the agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency. 2. Reports and other information. All reports required by this general permit, including SWPPPs, and other information requested by the board or the department shall be signed by a person described in Part Ill K 1 or by a duly authorized representative of that person. A person is a duly authorized representative only if: a. The authorization is made in writing by a person described in Part Ill K 1; b. The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the operator. (A duly authorized representative may thus be either a named individual or any individual occupying a named position); and c. The signed and dated written authorization is included in the SWPPP. A copy shall be provided to the department and VSMP authority, if requested. 3. Changes to authorization. If an authorization under Part Ill K 2 is no longer accurate because a different individual or position has responsibility for the overall operation of the construction activity, a new authorization satisfying the requirements of Part Ill K 2 shall be submitted to the VSMP authority as the administering entity for the board prior to or together with any reports or information to be signed by an authorized representative. 4. Certification. Any person signing a document under Part Ill K 1 or 2 shall make the following certification: 5. "I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant ) Page 23 of 26 penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." L. Duty to comply. The operator shall comply with all conditions of this general permit. Any state permit noncompliance constitutes a violation of the Virginia Stormwater Management Act and the Clean Water Act, except that noncompliance with certain provisions of this general permit may constitute a violation of the Virginia Stormwater Management Act but not the Clean Water Act. Permit noncompliance is grounds for enforcement action; for state permit coverage, termination, revocation and reissuance, or modification; or denial of a state permit renewal application. The operator shall comply with effluent standards or prohibitions established under § 307(a) of the Clean Water Act for toxic pollutants within the time provided in the regulations that establish these standards or prohibitions or standards for sewage sludge use or disposal, even if this general permit has not yet been modified to incorporate the requirement. M. Duty to reapply. If the operator wishes to continue an activity regulated by this general permit after the expiration date of this general permit, the operator shall submit a new registration statement at least 60 days before the expiration date of the existing general permit, unless permission for a later date has been granted by the board. The board shall not grant permission for registration statements to be submitted later than the expiration date of the existing general permit. N. Effect of a state permit. This general permit does not convey any property rights in either real or personal property or any exclusive privileges, nor does it authorize any injury to private property or invasion of personal rights, or any infringement of federal, state or local law or regulations. O. State law. Nothing in this general permit shall be construed to preclude the institution of any legal action under, or relieve the operator from any responsibilities, liabilities, or penalties established pursuant to any other state law or regulation or under authority preserved by§ 510 of the Clean Water Act. Except as provided in general permit conditions on "bypassing" (Part III U) and "upset" (Part III V), nothing in this general permit shall be construed to relieve the operator from civil and criminal penalties for noncompliance. P. Oil and hazardous substance liability. Nothing in this general permit shall be construed to preclude the institution of any legal action or relieve the operator from any responsibilities, liabilities, or penalties to which the operator is or may be subject under§§ 62.1-44.34:14 through 62.1-44.34:23 of the State Water Control Law or§ 311 of the Clean Water Act. Q. Proper operation and maintenance. The operator shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances), which are installed or used by the operator to achieve compliance with the conditions of this general permit. Proper operation and maintenance also includes effective plant performance, adequate funding, adequate staffing, and adequate laboratory and process controls, including appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems, which are installed by the operator only when the operation is necessary to achieve compliance with the conditions of this general permit. R. Disposal of solids or sludges. Solids, sludges or other pollutants removed in the course of treatment or management of pollutants shall be disposed of in a manner so as to prevent any pollutant from such materials from entering surface waters and in compliance with all applicable state and federal laws and regulations. Page 24 of 26 S. Duty to mitigate. The operator shall take all steps to minimize or prevent any discharge in violation of this general permit that has a reasonable likelihood of adversely affecting human health or the environment. T. Need to halt or reduce activity not a defense. It shall not be a defense for an operator in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this general permit. U. Bypass. 1. "Bypass," as defined in 9VAC25-870-10, means the intentional diversion of waste streams from any portion of a treatment facility. The operator may allow any bypass to occur that does not cause effluent limitations to be exceeded, but only if it also is for essential maintenance to ensure efficient operation.These bypasses are not subject to the provisions of Part Ill U 2 and 3. 2. Notice. a. Anticipated bypass. If the operator knows in advance of the need for a bypass, the operator shall submit prior notice to the department, if possible at least 10 days before the date of the bypass. b. Unanticipated bypass. The' operator shall submit notice of an unanticipated bypass as required in Part Ill I. 3. Prohibition of bypass. a. Except as provided in Part III U 1, bypass is prohibited, and the board or department may take enforcement action against an operator for bypass unless: (1) Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage. Severe property damage means substantial physical damage to property, damage to the treatment facilities that causes them to become inoperable, or substantial and permanent loss of natural resources that can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production; (2) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass that occurred during normal periods of equipment downtime or preventive maintenance; and (3) The operator submitted notices as required under Part III U 2. b. The department may approve an anticipated bypass, after considering its adverse effects, if the department determines that it will meet the three conditions listed in Part Ill U 3 a. Page 25 of 26 V. Upset. 1. An "upset," as defined in 9VAC25-870-10, means an exceptional incident in which there is unintentional and temporary noncompliance with technology-based state permit effluent limitations because of factors beyond the reasonable control of the operator. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation. 2. An upset constitutes an affirmative defense to an action brought for noncompliance with technology-based state permit effluent limitations if the requirements of Part III V 4 are met. A determination made during administrative review of claims that noncompliance was caused by upset, and before an action for noncompliance, is not a final administrative action subject to judicial review. 3. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventative maintenance, or careless or improper operation. 4. An operator who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs or other relevant evidence that: a. An upset occurred and that the operator can identify the cause of the upset; b. The permitted facility was at the time being properly operated; c. The operator submitted notice of the upset as required in Part III I; and d. The operator complied with any remedial measures required under Part III S. 5. In any enforcement proceeding, the operator seeking to establish the occurrence of an upset has the burden of proof. W. Inspection and entry. The operator shall allow the department as the board's designee, the VSMP authority, EPA, or an authorized representative of either entity (including an authorized contractor), upon presentation of credentials and other documents as may be required by law to: 1. Enter upon the operator's premises where a regulated facility or activity is located or conducted, or where records shall be kept under the conditions of this general permit; 2. Have access to and copy, at reasonable times, any records that shall be kept under the conditions of this general permit; 3. Inspect and photograph at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this general permit; and 4. Sample or monitor at reasonable times, for the purposes of ensuring state permit compliance or as otherwise authorized by the Clean Water Act or the Virginia Stormwater Management Act, any substances or parameters at any location. Page 26 of 26 For purposes of this section, the time for inspection shall be deemed reasonable during regular business hours, and whenever the facility is discharging. Nothing contained herein shall make an inspection unreasonable during an emergency. X. State permit actions. State permit coverage may be modified, revoked and reissued, or terminated for cause. The filing of a request by the operator for a state permit modification, revocation and reissuance, or termination, or a notification of planned changes or anticipated noncompliance does not stay any state permit condition. Y. Transfer of state permit coverage. 1. State permits are not transferable to any person except after notice to the department. Except as provided in Part III Y 2, a state permit may be transferred by the operator to a new operator only if the state permit has been modified or revoked and reissued, or a minor modification made, to identify the new operator and incorporate such other requirements as may be necessary under the Virginia Stormwater Management Act and the Clean Water Act. 2. As an'alternative to transfers under Part III Y 1, this state permit may be automatically transferred to a new operator if: a. The current operator notifies the department at least 30 days in advance of the proposed transfer of the title to the facility or property; b. The notice includes a written agreement between the existing and new operators containing a specific date for transfer of state permit responsibility, coverage, and liability between them; and c. The department does not notify the existing operator and the proposed new operator of its intent to modify or revoke and reissue the state permit. If this notice is not received, the transfer is effective on the date specified in the agreement mentioned in Part III Y 2 b. 3. For ongoing construction activity involving a change of operator,the new operator shall accept and maintain the existing SWPPP, or prepare and implement a new SWPPP prior to taking over operations at the site. Z. Severability. The provisions of this general permit are severable, and if any provision of this general permit or the application of any provision of this state permit to any circumstance, is held invalid, the application of such provision to other circumstances and the remainder of this general permit shall not be affected thereby. Section 12. Inspection logs INSPECTION FREQUENCY: (1) Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day; and (2) Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls discharging to surface waters identified as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit. Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County STORM WATER INSPECTIONS FOR VSMP GENERAL PERMIT LAND DISTRIBUTING ACTIVITIES Page 1 By this signature,I certify that this report is By this signature,I certify that this report is PROJECT: accurate and complete to the best of my accurate and complete to the best of my MONITORING FOR THE WEEK BEGINNING: knowledge: knowledge: DATE AND TIME OF INSPECTION: RAINFALL: Date of Rain Amount(Inches) Initials Qualified Personnel Operator/Duly Authorized Representative By this signature,I certify that the contruction By this signature,I certify that the contruction activity is in compliance with the SWPP and activity is in compliance with the SWPP and general permit. general permit. EROSION AND SEDIMENT CONTROL FACILITIES INSPECTED: (Inspections shall be conducted according to Part IIF2 of the Permit.However,if the discharges of stormwater from construction activities are to surface waters identified as Qualified Personnel Operator/Duly Authorized Representative imparied,inspections shall be conducted according to Part Note: If insepction report does not identify any incidents of non-compliance IB4d.) ceritication statement on page 3 shall be signed. Facility Identification Date and Time of Operating Properly Description of Inspection (Y/N) inspection observations OBSERVATION OF RUNOFF AT STORM WATER DISHCARGE OUTFALLS: (Inspections shall be conducted according to Part IIF2 of the Permit.However,if the discharges of stormwater from construction activities are to surface waters identified as imparied,inspections shall be conducted according to Part IB4d.) Stormwater Discharge Date Clarity Floating Solids Suspended Oil Sheen Other obvious Visible If yes,describe actions Describe measures taken to Outfall Identification Solids indicators of sediment taken to prevent future clean up sediment outside stormwater leaving the releases(may need to of disturbed limits(may pollution(list site?(Y/N) attach additional need to attach additional and describe) information) information) Clarity:Choose the number which best describes the clarity of the discharge where 1 is clear and 10 is very cloudy Floating Solids:Choose the number which best describes the amount of floating solids in the discharge where 1 is no solids and 10 the surface us covered in floating solids Suspended Solids:Choose the number which best describes the amount of suspended solids in the discharge where 1 is no solids and 10 is extremely muddy. Oil Sheen:Is there an oil sheen in the stormwater discharge(Y or N)? STORM WATER INSPECTIONS FOR VSMP GENERAL PERMIT LAND DISTRIBUTING ACTIVITIES Page 1 By this signature,I certify that this report is By this signature,I certify that this report is PROJECT: accurate and complete to the best of my accurate and complete to the best of my MONITORING FOR THE WEEK BEGINNING: knowledge: knowledge: DATE AND TIME OF INSPECTION: RAINFALL: Date of Rain Amount(Inches) Initials Qualified Personnel Operator/Duly Authorized Representative By this signature,I certify that the contruction By this signature,I certify that the contruction activity is in compliance with the SWPP and activity is in compliance with the SWPP and general permit. general permit. EROSION AND SEDIMENT CONTROL FACILITIES INSPECTED: (Inspections shall be conducted according to Part IIF2 of the Permit.However,if the discharges of stormwater from construction activities are to surface waters identified as Qualified Personnel Operator/Duly Authorized Representative imparied,inspections shall be conducted according to Part Note: If insepction report does not identify any incicents of non-compliance IB4d.) ceritication statement on page 3 shall be signed. Facility Identification Date and Time of Operating Properly Description of Inspection (Y/N) inspection observations OBSERVATION OF RUNOFF AT STORMWATER DISHCARGE OUTFALLS: (Inspections shall be conducted according to Part IIF2 of the Permit.However,if the discharges of stormwater from construction activities are to surface waters identified as imparied,inspections shall be conducted according to Part IB4d.) Stormwater Discharge Date Clarity Floating Solids Suspended Oil Sheen Other obvious Visible If yes,describe actions Describe measures taken to Outfall Identification Solids indicators of sediment taken to prevent future clean up sediment outside stormwater leaving the releases(may need to of disturbed limits(may pollution(list site?(Y/N) attach additional need to attach additional and describe) information) information) Clarity:Choose the number which best describes the clarity of the discharge where 1 is clear and 10 is very cloudy Floating Solids:Choose the number which best describes the amount of floating solids in the discharge where 1 is no solids and 10 the surface us covered in floating solids Suspended Solids:Choose the number which best describes the amount of suspended solids in the discharge where 1 is no solids and 10 is extremely muddy. Oil Sheen:Is there an oil sheen in the stormwater discharge(Y or N)? STORM WATER INSPECTIONS FOR VSMP GENERAL PERMIT LAND DISTRIBUTING ACTIVITIES Page 1 • By this signature,I certify that this report is By this signature,I certify that this report is PROJECT: accurate and complete to the best of my accurate and complete to the best of my MONITORING FOR THE WEEK BEGINNING: knowledge: knowledge: DATE AND TIME OF INSPECTION: RAINFALL: Date of Rain Amount(Inches) Initials Qualified Personnel Operator/Duly Authorized Representative By this signature,I certify that the contruction By this signature,I certify that the contruction activity is in compliance with the SWPP and activity is in compliance with the SWPP and general permit. general permit. EROSION AND SEDIMENT CONTROL FACILITIES INSPECTED: (Inspections shall be conducted according to Part IIF2 of the Permit.However,if the discharges of stormwater from construction activities are to surface waters identified as Qualified Personnel Operator/Duly Authorized Representative imparied,inspections shall be conducted according to Part Note: If insepction report does not identify any incidents of non-compliance 184d.) ceritication statement on page 3 shall be signed. Facility Identification Date and Time of Operating Properly Description of Inspection (Y/N) inspection observations OBSERVATION OF RUNOFF AT STORMWATER DISHCARGE OUTFALLS: (Inspections shall be conducted according to Part IIF2 of the Permit.However,if the discharges of stormwater from construction activities are to surface waters identified as imparied,inspections shall be conducted according to Part IB4d.) Stormwater Discharge Date Clarity Floating Solids Suspended Oil Sheen Other obvious Visible If yes,describe actions Describe measures taken to Outfall Identification Solids indicators of sediment taken to prevent future clean up sediment outside stormwater leaving the releases(may need to of disturbed limits(may pollution(list site?(Y/N) attach additional need to attach additional and describe) information) information) Clarity:Choose the number which best describes the clarity of the discharge where 1 is clear and 10 is very cloudy Floating Solids:Choose the number which best describes the amount of floating solids in the discharge where 1 is no solids and 10 the surface us covered in floating solids Suspended Solids:Choose the number which best describes the amount of suspended solids in the discharge where 1 is no solids and 10 is extremely muddy. Oil Sheen:Is there an oil sheen in the stormwater discharge(Y or N)?