HomeMy WebLinkAboutSUB201900147 Review Comments Road Plan and Comps. 2019-11-08 (2)COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Road and Drainage plan review Project title: St. Francis Avenue - Road Plans Project file number: SUB201900147 Plan preparer: Shimp Engineering [keane@shimp-engineering.com] Owner or rep.: Barry Wood [barrywwood7l @gmail.com] Date Received: 18 September 2019 Date of comments: 8 November 2019 Keane, We have reviewed the plans and have the following comments: Engineering 1. The minimum K value for sag vertical curves is 15 in the Design Standards Manual. Please revise the VC at Sta. 12+63.20. 2. Show and label the road name sign. 3. Show and label the stop sign. 4. Provide speed limit signs on the proposed road. 5. Include on the plans the Private Road Acceptance Procedure and the As -built Road Plan Policy (included in email). Planning See document attached to email. Fire Rescue 1. The cul-de-sac needs to be a minimum of 96' diameter for emergency apparatus turn around. 2. The private street must be 20' of clear unobstructed travel width. VDOT See document attached to email VDOT and Planning comments are attached to this email. GIS has no objection. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate Engineering Review Comments Page 2 of 2 request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; httD://www.albemarle.orLy/deDtforms.asD?deDartment=cdenL,wDo If you have any questions or concerns, please contact me either by email (mwentland@albemarle.org) or by phone at 434-296-5832 ext. 3458. Sincerely, Matt Wentland, P.E. Civil Engineer H File: SUB201900147 St Francis Av Road Plans review comments 11-08-19.doc