Loading...
HomeMy WebLinkAboutWPO201900064 Bond Estimates 2019-11-06 Project Name: Marshall WPO file number:WP0201900064 TMP(s):06300-00-00-01900 Date Estimate Completed:11-8-2019 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number (installed) stablization(PS,TS) acres $5,000.00 $5,000.00 silt fence(SF) ft $5.00 $0.00 safety fence(SAF) ft $5.00 $0.00 diversion(DD,FD,RWD) ft $13.00 $0.00 temporary slope drain(TSD) pipe length -ft pipe diameter in $0.00 $0.00 earthwork for trap/basin height of dam at toe ft cut at high side ft height of fill at face ft cut at face ft length of dam ft length of cut ft top width ft width of cut ft (area above transition 0 sf (area below transitic 0 sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transitio 0 ft (depth below transit 0 ft (area below transition; 0 sf (area above transiti, 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway _ft (TOAL CY estimate 0 cy $13.00 $0.00 width of spillway ft (spillway stone tons 0 tons $50.00 $0.00 structures for basin riser height ft riser diameter in (riser unit price) $0.00 $0.00 barrel length ft base plate or fdn $200.00 $0 barrel diameter in (barrel unit price) $0.00 $0.00 barrel collars $200.00 $0 baffle length ft $50.00 $0 silt fence inlet protection(IP) $100.00 $0.00 stone inlet protection(IP) $200.00 $0.00 outlet protection(OP) length -ft width ■ft $0.00 $0.00 chaannell(SC(SCC,matted) length ft width ft $0.00 check dam depth in channel ft channel width ft $0.00 $0.00 construction entrance(CE) $2,500.00 $0.00 wash rack $2,000.00 $0.00 paved construction entrance $3:500.00 $0.00 rip-rap,placed depth -ft length -ft width 'oils 0 tons $60.00 $0.00 survey and layout(price per 0.1 mi.) acres traps and basins $0.00 mobilization $0.00 $0.00 cost sum $5,000.00 contingency $500.00 Total $5,500 11/8/2019