Loading...
HomeMy WebLinkAboutSUB201700187 Bond Estimates 2019-11-08Subdivision Name: Road Plans for Crozet Court Road Plan number: SUB201700187 T M P(s): 05600-00-00-04500 Date Estimate Completed: 11/8/19 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Item # Item No. Unit Unit Cost Cost installed % compete cost remaining Road Name -Stations Agatha Ridge Lane: STA. 10+11.45 to 16+68.39, to end cul-de-sac road length 656.9 ft 1 aggregate base, VDOT 21-B [ sheet C9 ] 6.0 in d 656.9 fit L 29.0 ft W 666.8 ton $35.00 $23,337.79 0% $23,337.79 2 asphalt base (13M-25.0D) 2.5 in d 656.9 ft L 24.0 ft W 241.4 tons $100.00 $24,142.55 0% $24,142.55 3 asphalt intermediate (IM-19.OD) 0.0 656.9 0.0 0.0 tons $110.00 $0.00 0% $0.00 4 asphalt surface course, SM-12.5D) 1.5 in d 656.9 ft L 24.0 ft W 144.9 tons $120.00 $17,382.63 0% $17,382.63 5 Jamestown Road: STA. 10+00 to 13+61, end cul-de-sac (±) road length 361.0 ft 6 aggregate base, VDOT 21-B [ sheet C9 ] 6.0 in d 361.0 ft L 29.0 ft W 366.4 ton $35.00 $12,824.53 0% $12,824.53 7 asphalt base (15M-25.0) 2.5 in d 361.0 ft L 24.0 ft W <= Ave. W 132.7 tons $100.00 $13,266.75 0% $13,266.75 8 asphalt intermediate (IM-19.OD) 0.0 361.0 0.0 0.0 tons $110.00 $0.00 0% $0.00 9 asphalt surface course, SM-12.51D) 1.5 in d 361.0 ft L 24.0 ft W 79.6 tons $120.00 $9,552.06 0% $9,552.06 Fire Apparatus concrete grid pavers [Ref. K. Rucker email: 11/8/2019 ao6 PM ] 250.0 ft L 12.0 ft W 3000.0 SF $10.00 $30,000.00 0% $30,000.00 Road, - 210' L aggregate base, VDOT 21-B [ sheet C9 ] 8.0 in d 250.0 ft L 12.0 ft W 140.0 ton $35.00 $4,900.00 0% $4,900.00 bedding sand [ sheet C9 ] 1.0 in d 250.0 ft L 12.0 ft W 17.5 ton $10.00 $175.00 0% $175.00 10 curb CG-6 recommend Fairfax UP 2055.0 ft $15.00 $30,825.00 0% $30,825.00 11 sidewalk, concrete (6) 2308.0 ft $17.00 $39,236.00 0% $39,236.00 12 ramp CG-12 2 each $350.00 $700.00 0% $700.00 13 street name sign 2 each $200.00 $400.00 0% $400.00 14 traffic control sign-2 stop; 2 speed limit; 4 No Parking 8each $200.00 $1,600.00 0% $1,600.00 15 cemetery access sign 1 each $200.00 $200.00 0% $200.00 16 Street Landscape; trees -Sheet C8.0 40 each $150.00 $6,000.00 0% $6,000.00 17 drop inlet or grate 10 each $3,500.00 $35,000.00 0% $35,000.00 18 standard manhole frame top (not inlet) 4 each $500.00 $2,000.00 0% $2,000.00 19 manhole structure (per ft. rise) -3'/inlet-NH 80 ft $450.00 $36,000.00 0% $36,000.00 20 matting, EC-2 or 3 - incl w / WPO201700075 bond 0.0 ft L 0.0 ft W 0.0 sy $2.00 $0.00 0% $0.00 21 pipe, rcp, crop (15 to 48") 15.0 in d 2 ES-1,2 0 ECA 1070.0 ft $35.00 $38,450.00 0% $38,450.00 22 pipe, rcp, cmp (15 to 48") 18.0 in d 1 ES-1,2 0 EC-1 158.0 ft $40.00 $6,820.00 0% $6,820.00 23 clear and grub (100'±x 1200') 1200.0 ft L 75.0 ft W 2.1 acre $24,000.00 $49,586.78 0% $49,586.78 24 cut grading; details below 2033.0 cy $4.00 $8,132.00 0% $8,132.00 25 fill grading; details below 667.0 cy $9.00 $6,003.00 0% $6,003.00 26 cut talc /James: (36' x 2.5' x 150') + 27 ft'/yd. - STA. 10+50 to 12+00 (±) 500.0 cy $4.00 27 cut calc /Agatha: (36' x 2' x 350') + 27 ft'/yd. - STA. 10+50 to 14+00 (±) 933.0 cy $4.00 28 cut talc /Agatha (36' x 3' x 15(Y) + 27 ft'/yd. - STA. 15+00 to 16+50 (±) 600.0 cy $4.00 29 fill talc /James: (36' x 2' x 150') + 27 ft'/yd. - STA. 12+00 to 13+50 (±) 400.0 cy $9.00 30 fill talc /Agatha: (36' x 2' x 100') + 27 ft'/yd. - STA. 14+00 to 15+00 (±) 267.0 cy $9.00 31 as -built drawings (1k+ price per 0.1 mi.) 1017.9 ft L 0.19279 mi. 2 Isum $2,000.00 $5,000.00 0% $5,000.00 32 survey and layout (price per 0.1 mi.) 1017.9 ft L 0.19279 mi. 2 Isum $2,000.00 $5,000.00 0% $5,000.00 33 mobilization 1 Isum $2,000.00 $2,000.00 0% $2,000.00 34 materials testing 1017.9 ft L 2.03588 ins of 500' 3 each $200.00 $620.00 0% $620.00 35 compaction testing 1017.9 ft L 2.03588 ins of 500' 3 each $200.00 $620.00 0% $620.00 36 CBR tests (1 every 0.1 mi. per road) 1017.9 ft L 2.03588 ins of 500' 3 each $200.00 $620.00 0% $620.00 37 stone depth inspections 1017.9 ft L 2.03588 ins of 500' 3 each $200.00 $620.00 0% $620.00 38 pavement inspections 1017.9 ft L 2.03588 ins of 500' 3 each $200.00 $620.00 0% $620.00 39 pipe and drainage video inspections 1228 ft $2.00 $2,456.00 0% $2,456.00 40 VDOT surety (1 lane) 1017.9 ft L 0.19279 mi. 2 Lanes $2,000.00 $7,711.67 0% $7,711.67 41 VDOT maintenance fee (1 In rd, 1 yr) 1017.9 ft L 0.19279 mi. 2 Lanes $150.00 $578.38 0% $578.38 42 VDOT admin. Cost recovery fee(1 lane) 1017.9 ft L 0.19279 mi. 2 Lanes $100.00 $635.58 0% $635.58 cost sum $423,015.71 $423,015.71 gre}mom1 $0.00 $0.00 Contingency $42,301.57 $42,301.57 JEA-110819 RP -bond _est_5NOMU-Crozet Court_SUB201700187_RP_110819 Total $465,320 $465,320 0-drive offload 102519 -TO DO to cloud\anderson\040918 bonds\estimates\RP bond est 5Nov2014-Crozet CourtSUB201700187 RP 110819.xlsx 11/8/2019