Loading...
HomeMy WebLinkAboutSUB200800092 Checklist (2) /CoC Sv b - f a ALBEMARLE COUNTY ENGINEERING REVIEW CHECKLIST: Subdivision Plat Preliminary: < 1. preliminary site review committee checklist items according to 14-302A. .„2/critical slopes waiver request[14-304] a. access,utilities, stormwater; no alternative location outside of critical slopes [18-4.2.6c] ..--s trmwater Management comps and concept,with mitigation if appl. [14-305, 14-417] a. exemptions [17-312F,G, 17-314C] b. captures as much area as possible [17-312C, 17-315A] c. removal rate met for each project drainage area [17-315B,C,DSM503.3A] d. stream buffer disturbance minimized,approved for mitigation [17-320-322,DSM504] e. sufficient room on plan to accommodate all facility areas and required elements 4. te street justification, earthwork comparison[14-306] 5._prsposed slopes flatter than 2:1 [DSM903A5(2)] _-prelim check of road standards; cds, intersection angles,CL radii,widths, design speed, etc. 7—interconnections [14-409] 8. access free of flooding(25yr), or alternative access provided [14-410F] (identify,to be on road plans) each lot shall front on a private or public street[14-403] Mach lot shall have reasonable access to the building site from the street [14-404] 1-1.-easements or letter of permission for off-site work[DSM1102] 1-2-right-of-way dedications for future roads with an adopted plan [14-429] Final: 1. site review committee checklist items per 14-303. 2. conformance to infrastructure plans(road plans, stormwater plans,etc.) [14-311,DSM903B4] 3.temporary cul-de-sacs, length>300' serving 4 lots [14-410C] Drainage easements for public or through drainage,and streams [14-431,DSM903C,DSM1101B] a. drainage easement widths 12'+2(depth-5') b. dedicated to public use(discharge from right-of-way) c. easement centerline bearings, or sufficient dimensions 5. stream buffers [17-317] 6. completion of improvements,or surety/bond posted [14-412,413,DSM903B5] (16 Jun 2005)