Loading...
HomeMy WebLinkAboutVA199100034 Plan - Approved 1991-09-10e7-e7- 'e1571;r'1C_ A1,111�2Z577- TYPE x, MP'tF' ,®rW ,524*2e,125?eE X PROF TEMP- CONS TR UC TION'\ S A4 T e 0 4'py'ell 5 0/ A 1:11Z- 45M0,; -Fzl- - INV. COUNTY OF ALBEMARLE DEPARTMENT OF ENGINEERING GENERAL CONSTRUCTION NOTES FOR SITE PLANS Revised: February 14, 1989 1. The abbreviation V.D.O.T. made hereafter refers to the 6. All drainage inlets shall have a 2-inch local depression. Virginia Department of Transportation. The term County refers to the County of Albemarle, Virginia. 7. Paved or rip -rap lined ditch may be required when in the 2`01t", ILV-/P 61 1"Z17 opinion of the Director of Engineering, or his designee, 743 N' 2. Prior to commencement of any construction within any existing it is deemed necessary in order to stabilize a drainage b public right-of-way, including connection to any existing channel. road, a permit for said construction shall be obtained from a V.D.O.T. 8. All traffic control signs shall conform with the Virginia U Flannel for Uniform Traffic Cnntinl Devices latest edition. T rt f, elds, 3. All paving and drainage related materials and construction 7-, e- 7 methods shall conform to current specifications and standards 9. Unless otherwise noted all conci-otc pipe shall be reinforced \\F. of V.D.O.T. unless otherwise noted. concrete pipe - Class III. Lit, -\• ,w - 4. Erosion and siltation control measures shall be provided in 10. All excavation for underground pipe installation must comply accordance with the approved erosion control plan and shall with OSHA - Standards for the Construction Industry (29 CFR I 42E be installed prior to any clearing, grading or other Part 1926). construction. Vo 5. All slopes and disturbed areas are to be fertilized, seeded > 0 and mulched. Maximum allowable fill or cut slope is 2:1. Where reasonably obtainable lesser slopes of 4:1 or better 7X are to be achieved. sell -z4 WT, Radi ld We the undersigned daveloper(s) understand that approval of OF I •-I�ewage' ON" this plan by the County of Albemarle does not necessarily indicate Virginia Department of Transportation I cyl (VDOT) /ex ­4z�' approval of the plan. Approval of the plan by the County ower c does not in any way relieve me of my responsibility in obtaining final VDOT approval prior to the issuance of '_0 'f - building permits and/or ccrtificatesof occupancy. SM' 0, Y-1 er hGe DEVELOPER DATE /A,11 N X 7 ... ... DESCRIPTION BUILDING WALLS + :•` \ STORM SEWER 5 —Z SANITARY SEWER WATER LINE X CONTOUR LINES e7d SPOT ELEVATIONS o �-I TREES WATER VALVE tt ---too` .0_. 7' T 4—\WATER METER L Lv.=, K .4. 14 "N (0 IN V 1-01 It U i? _7 4- <.=> 7' ee7-9p 4 �/', 17 0 J CIO Jo 41 QIQ X\ y 1V Paton Harris Rti.,t Enginet-rs, Surveyors, Fairfax, VA 100 South Main `Il rt-el, P0 11, Ix P I Bridgewater, VA Brido.(%-tcr. \ irgin6 22812 Le,,,burg, VA Metro 3' 85-3( 83S 7o3 82;i-2olo Ro&vffle' NID Vir&,inia Bt:aeh, VA CLIENT WiNFRIED ADLER 13.0';. BOX 7423 CHARLOTTESVILLE, VA 22906 ti JOB 717 F 2 5-2 5: .0,'00-010 Odoc_ J V Ir -"Ov Q-1 41'' 4 APPROVED: 'of 4 e �"O—/xoo'im �ENGINEERENGY L E G E /?f,00- IN' D 1W (ZONING) EXIST[I'll G P R 0 0 S E D —OF-1 RE 0 FICIALY 10* (ALBEMARLE CO. SERVICE AUTHORITY)" 1911 5F7-1 Q5 27 ToV,:: i NOT APPLICABLE, ,VIRGINIA DEPT. OF HEALTHI. NOT APPLICABLE IVIRGINIA DEFT.� OF TRANSPORTATION), ROL LEGEND EROSION C 0 N"T �� / f ';_251 E TITL11KEY11SYMBOL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE1 ___7 1.0 STRAW BALE BARRIERqB) AIIII, SILT FENCE S F 1.3 6 OUTLET PROTECTION GENERAL NOTES 1. All construction shall conform to County of Albemarle and Virginia Department of Transportation Standards and Specifications. 2. All finished grading, seeding, sodding or paving shall be, done in such /Z0I manner to preclude the ponding of water on the site, particularly adjacent jn to buildings and back of curbs. 3. Contractor to verify field conditions prior to and during construction a -ad notify Patton, Harris, -Rust and Associates at (703) 828-2618 immediately of any discrepancies between actual field conditions and approved.plan. 4. Existing underground utility information taken from available records. The contractor is responsible for verifying the exact location of all utilities prior to construction and for any damages that may occur due tt' his failure to locate and protect these underground facilities. 5. Compact subgrade to 95% of theoretical maxiii-_im density per ASTM D-698 (AASHTO T-99) at the optimum moisture content, within plus or minus 3% points of optimum. p/// 419e T?82525 /�F,:5S-6:W7Z/ C09A7_65V _41117,111V -:571<5;A7 -.!5 AS --5170WAI 4W 7 _:516hT out A 'Fyl_�F622 110"Zv X, //y 06v Z?4_-21v- 11g 7, P.9GE '�Dl - 1111F STRUCTURE NO. DESCRIPTION jLENGTH' INV. IN INV. OUT SLOPE LREMARKS 1 11 1 15 CMP 44 1 102.50 102.00 1.136% PROVIDE 2 !EA., ES-1 SITE DEVELOPMENT PLAN AND LANDSCAPE PLAN PRoFESSIoNA1,�UL SNLT11 0 Ar Ar -W C.r-ORGE E. FOARD 9 ,f No. 759B 00.--D SURVS it n 0I -11-A N­ 1 -- 4:1nr II If NO. DESCRIPTION DATE. HVSDBY RFN'BN' APPROk ED DATE 17 177. 4 _045-t5110 .44t5"Z--3- REVISION APPROk'ED BY 7 le S.A ADD. GRACING LIM175 51-00-91 Dvv G K 5 SLR VE1 BY P K R & A DESIGN J. D. H. DRAWN CHKD G.K.S. FILE N" 5967—IC DA'11, APRIL 27, 1989 SCALE 11 —20, 1 1 SHEET lir