Loading...
HomeMy WebLinkAboutWPO201900021 Correspondence 2019-11-13TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. November 5, 2019 John Anderson County of Albemarle 401 McIntire Rd Rm, 227 Charlottesville, VA 22902 608 Preston Avenue P 434.295.5624 Suite 200 F 434.295.8317 Charlottesville, VA 22903 www.timmons.com RE: UVA Research Park Loop Road — VSMP Permit Plan Review — WP02019-00021- Comment Response Letter Dear Mr. Anderson: We have reviewed all of your comments from (Rev.2), October 17, 2019 and made the necessary revisions. Please find our responses to the comments below in bold lettering. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code Section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. a. Sec. 1 (Registration Statement): Revise to include: I. An email address for Todd Marshall, UVA Foundation. An email address for Todd Marshall had been added. Rev.1 Addressed. II. Registration Statement signature. Acknowledged, A signature will be provided once a contractor has been selected. Rev.1 Acknowledged. Acceptable to Engineering. b. Sec.9 (Signed Certification): Please sign. Acknowledged, A signature will be provided once a contractor has been selected. Rev.1 Acknowledged. Acceptable to Engineering. c. Sec.11 (General Permit Copy) Please include 2014 VAR10. The above is now included in the SWPPP Rev.1 Partially addressed. As follow-up; please replace 23-pg. 2014 General VPDES Permit with 2019 General VPDES Permit. The SWPPP has been updated with the updated 2019 General VPDES Permit. CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIs I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES Rev.1 Addressed. d. List WP02019-00021 on cover of SWPPP. The WPO number is now included on the cover of the SWPPP Rev.1 Addressed. e. New: Sec. 7, Enhanced inspection frequency change with 2019 General VPDES Permit. Please ref. II G.2.a (pg.13/PDF-ref.link, above). Revise Sec.7, SWPPP. Section 7 has been revised to reflect the changes in the updated General VPDES Permit. [Rev.2 Addressed. The PPP content requirements can be found in County Code section 17-404. Rev.2 Although comment response letter, August 27, 2019, indicates items 1, 2, 3, below, were addressed, Exhibit included in SWPPP d. 27 Aug 2019 (sent w email 10/16/2019 8:25 AM) does not address these items; suspect prior version of Exhibit sent inadvertently. Please send revised PPP Exhibit. 1. If Sec. 6 PPP Exhibit is revised, please provide an updated Exhibit. The PPP has been updated with the revised layout. Rev.1 Partially addressed. As follow-up; Include rectangle labeled concrete washout for dedicated concrete truck washout (differs from mortar mixing station). An area dedicated for concrete truck washout has been included. Rev.2 Comment persists. Pollution Prevention Plan has been revised and a concrete washout dedicated for concrete truck has been provided. 2. New: Indicate rain gauge location ('x' or rectangle or similar). Label rain gauge. A rain gauge location has been called out. Rev.2 Comment persists. A rain gauge has been added and called out on the pollution prevention plan. 3. New: Recommend revise construction entrance label/legend to ref. paved construction entrance (PCE). The construction entrance label has been revised accordingly. Rev.2 Comment persists. The construction entrance will be gravel and the label callout has been revised accordingly. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved for reasons listed, below. The stormwater management plan content requirements can be found in County Code Section 17-403. 1. Revise plan title to include ref. to VSMP / WP020190021. The plan title has been revised to call out the WPO Number Rev.1 Addressed. 2. VSMP Plan and Road Plan Design Calculations & Narrative, 3/25/19: a. SWM Quantity Narrative — Include information highlighting (via prior -approved graphic, narrative, zoning, site, or WPO data) how eastern side of project drains to a large wet pond that was designed to handle stormwater quantity for the full build out of the research park. Recommend information identical to Timmons Group Lewis and Clark Drive Road Extension VSMP Plan and Road Plan Design Calculations & Narrative booklet, d. 3/25/2019, pg. 18-19. Drainage exhibits have been added to calc book. Rev.1 Addressed. b. LD-229: Provide computational data requested at D.ESC Plan, items 7 and 8. LD-299 has been updated. See revised calc book Rev.1 Addressed. c. Revise SWM routings — see items 14, 15 below. SWM routings have been revised to match current drainage areas and CN values. Rev.1 Addressed. Also, items 14,15, below. 3. Ensure dry pond design details on VSMP/WPO match details on SUB201900049, or preferably limit design detail provided for dry pond on the Road Plan to conceptual outline, saving details for the VSMP / WPO Plan. Acknowledged plan is developed as one set with select sheets included in the road or VSMP plan as necessary. Rev.1 Partially addressed. As follow-up; See item 18.d., below. See response for comment 18. Rev.2 Addressed. 4. Show proposed SWM Facility / Access / Drainage Easements. Easements have been added to plan See sheet C4.0. Rev.1 Partially addressed. As follow-up; Revise '10' wide grass access road' label to 'SWM Facility Access.' Outline SWM Facility easement/s. (Please show/label SWM Facility Access on SUB201900106 — UVA Research Park Loop Road Final Plat.) Easements have been revised as requested. Rev.2 Addressed. 5. Provide curb break / mountable curb to provide SWM Facility Access (ACDSM, pg.12). Provide access label or note on plan and linework with proposed grading that meets ACDSM standard, text image, below, for dry pond Access: Best Management Practices for Stormwater Management: All practices must have adequate vehicle access; 10' width graded at less than 20%. Anything over 20% must be surfaced with gravel or pavement. Access must be to all structures and forebay cleanout areas. Easements must be provided over all access and facilities, to accompany deeds and agreements as available on the county website; 20' wide segment of CG-7 mountable curb, 10' wide vehicle access road with 20% maximum slope, and easement lines have been added. Rev.1 Addressed. 6. Provide typ. Detail, transition from CG-6 to mountable (rolltop) curb at point of SWIM facility access. Detail has been added to sheet C1.1 Rev.1 Not addressed. Sheet C1.1 is not included in the plan, and C1.1 is not listed in C0.0 sheet list table. Please restore typ. Detail from C1.1 to plans. Sheet CM has now been included in the VSMP Plan submission. Rev.2 Addressed. 7. Recommended ref. SUB201900049, UVA Research Park Loop Road (Road Plan), on C0.0. Reference has been added to sheet C0.0 Rev.1 Addressed. 8. Sheet C1.1 is not strictly necessary. Recommend remove this sheet from the VSMP / WPO Plan. Acknowledged. Sheet has been removed. Rev.1 Addressed. Also, see item 6., above. (Typ. Detail). 9. C1.2: Provide VDOT IS-1 detail (inlet shaping). Detail has been added to sheet C1.1 Rev.1 Not addressed. Ref. items 6./8.; restore detail to plans. Detail Sheet CM has been included with the VSMP Plans. Rev.2 Addressed. 10. C4.2, C4.3 are not strictly necessary. Recommend remove these sheets from the VSMP / WPO Plan. Acknowledged. Sheets have been removed. Rev.1 Addressed. 11. C5.3 is not strictly necessary. Recommend remove this sheet from the VSMP/WPO Plan. Acknowledged Rev.1 Addressed. 12. C6.1/Stormwater Quality: VSMP Plan and Road Plan Design Calculations and Narrative (booklet) 3/25/19 submitted with SUB201900049 does not appear to include runoff reduction spreadsheet (VaRRm.xls); apparently no booklet submitted with WPO201900021. Provide VARRm.xls. (Only booklet re. to Water Quality in booklet, image below pg.3). VRRM pages have been added to the calc book and digital version of VRRM has been provided. Rev.1 Partially addressed. The only VaRRM.xIs data included with Calc. booklet is Drainage Area 'A', which appears three times: twice with DA total acreage of 2.10 Ac., once with DA total acreage of 2.80 Ac. Please review / revise calculation booklet to include VaRRM.xIs site, water quality compliance, runoff volume and CN, and summary tab information, and as many discrete drainage area tabs as there are DAs routing to a BMP practice. It may be DA 'A' appears multiple times to reflect routing to practices 16 and 17, but all three DA 'A' tab data appear to relate to the filtering device. The VaRRM Spreadsheet has been revised, and areas have been revised to match accordingly. Site Tab has been included to show 2.1 Acres the total post developed disturbed area that does not flow to Preexisting SWM Pond 1. Tab A has been included to show the treatment achieved by the Barracuda and Isolator Row in Series. Rev.2 Addressed. Water Quality: The current site is undeveloped. 4.66 acres of disturbed area was analyzed for water quality. There will be 1.08 Ibs/year to be treated via manufactured treatment device. The remaining 0.22 Ibs./yr of required nutrient credits area to be purchased from a DEQ-Approved Nutrient Credit Bank in Accordance with CA code 62.1-44.15:35. Acknowledged. 13. Note: Applicant must coordinate nutrient credit purchase with Ana Kilmer, Albemarle County, once plan review comments are addressed prior to purchasing credits. Purchase of nutrient credits is required for VSMP plan approval. Design has been revised so that offsite credit purchase is no longer necessary. Rev.1 Partially addressed. This is not immediately apparent. See item 12, above. Include VaRRM.xIs data with calculation booklet, or VaRRM.xls data clearly presented on plans so that site and summary data depict phosphorus load reduction required, and practices which reduce phosphorus to the point that offsite credit purchase is not required. Please do not send VaRRM.xIs to reviewer to address this comment, since email or e-attachments are not approved with a VSMP/WPO plan. Engineering, however, appreciates digital VaRRM.xls submittals. Please confirm if .xIs sent via email, and if so, date sent. Offsite credits will be purchased. Credit availability letter has been included with submission. Digital version of VaRRM spread sheet was emailed to John Anderson 8/27/2019. Rev.2 Addressed. Note: Plan proposes purchase of 0.27 Ibs/yr phosphorus nutrient credits. 14. C6.1: A fair portion of the 3.10 Ac. Off -site post -development area cannot reach the dry pond without inlet west of N-S leg of loop road similar to inlet south of E-W section of the loop road. See images, below (blue outlined area). Please provide inlet / pipe connection to route this off -site runoff to the dry pond, to qualify for quantity compliance as well as to collect flow at an otherwise low -point that lacks drainage outfall, unless runoff is to sheet over the curb onto the paved surface. The area indicated sheet flows over the curb or across the edge of pavement and flows to the gutter and inlet. Rev.1 Withdrawn. Review of development plans for areas west will likely accommodate drainage needs at this location. Applicant responses (acceptable in interim). (inlet 114) C5.1: offsite routed low point without collection — blue circle/highlight (contour 576'+-) Offsite runoff will sheet flow over curb into inlet 114 15. Ensure plan CN/Acreage match routing report values. Sub -catchment 3S, 9S report values do not match plan data. Revise routings, consistent with plan sheet C6.1/ref. images: The CN values and acreage have been updated on sheet C6.1 to match the routing report. Rev.1 Addressed. 16. L1.0: VDOT Std Class Al riprap dimensions need not appear on this sheet. The dimensions no longer appear on this sheet. Rev.1 Addressed. Sheet L1.0 removed from WPO plan set. 17. L1.0: Recommend shift leader line of label reading 'Tie to nearest inlet (Typ.)'to more clearly indicate UD-4 (Typ) is to tie to nearest inlet. This leader line has been removed from this sheet. Rev.1 Addressed. L1.0 removed from WPO Plan set. 18. Choose BMP practice from approved list, or an approved proprietary measure. a. Use plan labels that identify/match a best management practice listed at 2011 Design Specifications for Practices 1-15. Labels added to sheet C5.0 calling out Stormtech Isolator Row (Practice 17, filtering device) and Baysaver Barracuda (Practice 16, hydrodynamic device). Rev.1 Partially addressed. As follow-up: Please provide design plan / profile for Str. 102 (flow-splitter) — see example; photos, below. Include elevations. A detail of the flow splitting manhole has been provided. Additional details are also included for the Baysaver and Barracuda device. Rev.2 Addressed. (photo removed with Rev.2 comments.) b. If design proposes an Extended Detention (ED) Pond, use link to visit the Clearinghouse and carefully consider design criteria listed at VA DEQ Stormwater Design Specification No. 15, Section 6, including: i. 6.1- Overall sizing ii. 6.2 —Treatment Volume Drawdown and Detention Design iii. 6.3 — Required Geotechnical Testing iv. 6.4 — Forebay Design v. 6.5 — Conveyance and Overflow vi. 6.6 —Internal Design Features vii. 6.7 — Landscaping and Planting Plan viii. 6.8- Maintenance Reduction Features ix. 6.9 — ED Pond Material Specifications Extended Detention is not proposed as part of this project. A dry pond will be used to control stormwater quantity, but it will not be considered a BMP for stormwater quality c. Provide detailed plan and profile for a listed practice that meets design criteria. Details have been added to sheets C6.2 and C6.3 d. Provide Landscaping and Planting Plan. Example of partially approved Ex. Det. Pond profile / recent VSMP / WPO Plan submittal ): Landscape plan was included in previous submission; however Extended Detention is not proposed as part of this project. The pond is a dry pond for quantity only. Rev.1 Partially addressed. As follow-up: A SWM quantity measure requires design plan / profile detail and calculations comparable to a SWM quality facility. Provide plan /profile, design and calculations that demonstrate design intent, consistent with HydroCAD routings. Profile information, in particular, is essential for construction, inspection, bond estimates, and As -Built comparison with design. C6.0 / C7.0 plan and riser details are insufficient. Label pond floor dimensions. Dry pond profile has been added on C7.0. Pond floor dimension have been added to sheet C5.0. Rev.2 Partially addressed. Note: Dry pond is a SW quantity measure. Design detains the 100-yr event volume, with 1-ft. freeboard with no emergency spillway. Ref. plan sheet 7.0. As follow-up: Dry Pond DI-1 Riser Structure 302 Detail and Str. 302 profile remain confusing. Provide sufficient detail to clarify design; plan view design data is essential: • Structures: o DI-1 wall ■ Show location of DI-1 wall relative to what appears to be a weir structure (see detail). o Weir: If weir plate proposed, show location relative to DI-1, and riser. o Riser: ■ Diameter if cylindrical; dimensions if rectangular. ■ Location/design relative to outfall, DI-1 structure, weir. • Clarify whether there are 3, or 2, or 1 structure/s (Riser, DI-1, weir). • Include profile, detail, and especially plan views that make clear how these structures function, relate, and will be installed. Clarify meaning of 12" thick DI- 1 wall beyond, and since Dis are typically closed at the top (with horizontal not vertical openings), clarify how riser is to be built. It appears almost as if a DI-1 is proposed behind a weir wall, but if this is the case, how will a trash rack work or be affixed. Please study final submittal for clarity with respect to dry pond structure outfall. Riser Structure 302 has been modified further to clarify structure details. See sheet C7.0 for updated detail. There will be one riser structure (302) that will be a VDOT rectangular standard DI-1 Box. The box will have two (2) 4.75" orifice at the front side bottom and a 15" x24" notch cut out or formed in the top of the wall on same side of the box. The structure will also include a trash rack and a skimmer per details on sheets C1.2 and C1.3. There will be one 24" discharge pipe (301) from the rear of the structure. The top of the structure will be open with no grate or top slab. A trash rack will be attached to the top. 19. Additional SWM Plan (VSMP / WPO) review comments possible, once plan re- submitted. Rev.1 Acknowledged 20. New: Provide additional legible terrain contour labels west of Loop Road. Additional terrain contours have been included. Rev.2 Addressed. 21. New: Compare C3.3 pipe layout, which appears to route runoff north, then east, off -site, bypassing dry detention pond, with C6.1 post -developed routed area/s. If area shown in top image below bypasses dry detention pond, please revise relevant plan sheets, revise routings, design, etc. The bypass pipe is an ESC Phase 1 measure to allow offsite clean water to bypass the sediment trap temporarily. Pipe has been removed from ESC phase II plan. Rev.2 Addressed. (Images incl. With Rev.1 comments removed with Rev.2 review comments.) 22. New: Revise typo at 8/26 Calculations report, p.3, Water Quality: 'The remaining 0.28 Ibs/yr of required nutrient credits area to be....' To read "The remaining 0.27 Ibs/yr of required nutrient credits are to be...". The above typo has been corrected. D. Erosion and Sediment Control Plan (ESCP) Virginia Code 62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved for reasons listed, below. The erosion control plan content requirements can be found in County Code Section 17-402. 1. C3.1: Provide Paved Wash Rack detail (ACDSM, pg. 8). A Paved wash rack details has been added to the plan sheet. See sheet C3.1. Rev.1 Addressed. C3.2: 2. Show break in SSF at stone weir outfall, ST2. Break in SSF has been added Rev.1 Addressed. 3. Label ST1, ST2 stone weir dimensions (L x W) in plan view. Weir dimensions have been added to weir labels Rev.1 Addressed. 4. C3.3: Provide Str. # consistent with C3.0 Phase II Sequence. Numbers have been added to pipe 401 and structure 402, as called out in Phase II Sequence Rev.1 Partially addressed. As follow-up; Please see / address New SWM Plan comment 21, above. Comment has been addressed bypass pipe has been removed from phase II. Rev.2 Addressed. Note: bypass pipe has been removed from Phase II. 5. Cannot locate temporary 15" HDPE pipe. Edit/revise C3.0 Phase I sequence, as needed. Temporary 15" HDPE is located near Construction Entrance. Labels have been modified to clarify temporary nature of pipe Rev.1 Addressed. 6. C3.3: Check C3.0 Phase II sequence Note 2.1 against C5.0. Revise if pipe / str. Ref. should be Str. 300, 301. Structure 402 and pipe 401 are correct. Note 2.1 on C3.0 has been revised to clarify that storm system associated with dry pond must be operation prior to removal of temporary HDPE pipe, which allows offsite runoff to bypass project site during construction Rev.1 Addressed. 2.1.: Once the contributing drainage area to sediment trap #1 has been permanently stabilized and approved by the ESC Inspector, remove sediment trap #1. Contractor to ensure silt fence along the toe of slope is installed and in good condition at all times to ensure existing wetlands are protected. Once the storm system associated with dry detention basin is operational, remove the temporary 15" HDPE pipe and end section. Install structure 402 and pipe 401 accordingly. (Image Incl. with Rev.1 comments removed with Rev.2 review comments.). 7. LD-229 submitted with SUB201900049 does not appear to include design computations for pipe 301. Evaluate design flow and discharge velocity against pipe capacity and riprap outfall dimensions. Pipe 301 is routed as part of the Hydrocad analysis for the dry pond. Rev.1 Not addressed. Please indicate, using Hydrocad analysis or other means, that pipe 301 capacity and riprap at pipe 301 outfall are sufficient to meet Q2-VeL/10-capacity (dry pond) routed flows. Also, see dry pond riser structure detail (image, below). Routings include relevant parameters, but do not explicitly address this comment. Outlet Protection Sizing calculation has been included in calculations book. Rev.2 Addressed. Note: Calc booklet, p. 8 riprap Min. sizing (w1=45, w2=5.1', L=9') is consistent with plan sheet C5.0: (wl=6', w2=6', L=9'). (Images incl. with Rev. 1 comments removed with Rev.2 review comments). 8. Evaluate discharge velocity against riprap outfall, Str. 200 / VDOT ES (capacity appears sufficient). Riprap calculations have been added to calc book Rev.1 Addressed. We have included PDF copies of the plans for your review. If you have any questions or comments, please feel free to give me a call at 434.295.5624. Sincerely, Jonathan Showalter, PE Project Manager