Loading...
HomeMy WebLinkAboutSDP198000027 Action Letter 1980-05-27�,�.� OF A L.e��� c� a x Department of Planning RoaERT W. TUCKER. JR. 604/206•5823 DIRECTOR OF PLANNING A14 EAST MARKET STREET CHARLOTTESVILLE, VIRGINIA 22901 May 28, 1980 Reverend Charles King Monticello Wesleyan Church 701 Monticello Avenue Charlottesville, Virginia 22901 RONALD S. KEELER A8818TANT DIRECTOR OF PLANNING DOUGLAS W. ECKEL SENIOR PLANNER NANCY MASON CAPERTON PLANNER IDETTE CHARLIE KIMS6Y Re: Monticello Wesleyan Church Site Plan Dear Rev. King: The Albemarle County Planning Commission, at its meeting on May 27, 1980, approved the above noted site plan, subject to the following: .1. A building permit will be issued when the following conditions have been met: a, Provide additional landscaping around the building and note that it will be maintained in a healthy condition, to be replaced if it should die; b. Virginia Department of Highways & Transportation approval of the commercial entrance; c, Septic permit; d, Compliance with the Soil Erosion Ordinance; e. Compliance with the Runoff Control Ordinance; f. Fire Official approval of two mans of egress from the basement, including walkways; and approval of relocation of handicap parking spaces to the rear of the site for first phase; g. Move any parking spaces outside of the floodplain; h. Place a security chain at the entrance except during church events; 2. A Certificate of Occupancy will be issued when the following conditions have been met: a. Fire Official approval of dry hydrant. Please note that the Zoning Ordinance requires that construction be commenced within 18 months of the Planning Commission action or the approval will be void. If you should have any questions, please do not hesitate to call. Sincerely, N. Mason Caperton Planner NMC/js , Cc: Planning Staff Jack Collins J. Harvey Bailey Byron Coburn (Rt.743) Robert Vaughn Jesse Hurt Ira Cortez F.`Anthony Iachetta Wm.Morris Foster