TO: Christopher P. Perez I Senior Planner
FROM: Dan Mahon, Greenways Supervisor
Department of Parks and Recreation
SUBJECT: SDP201800031 Rivanna Village Phase 2 — (Block F, G, H, I, and J) - Final Site Plan
DATE: 11/18/2019
The Department of Parks and Recreation have the following comments:
1. [COD Sec 8] Open Space/Greenspace Preservation. Prior to final site plan approval the Director of Parks and Recreation is required
to approve a park plan, which shall ensure amenities provided meet the needs of the County and satisfy the rezoning. Final:
Comment still relevant. Dan Mahon provided the applicant comments on the park plan. Pending revisions of the final site plan to
address these review comments. Rev 1. Comment still relevant. Please work with Parks and Recreation to receive an approved
park plan and ensure the site plan matches. Rev 2. Comment still relevant. Please work with Parks and Recreation to finalize an
approved park plan and ensure the site plan matches. See Parks and Recreation comments #2 through #5 provided below. Rev 3.
Comment still relevant. Please work with Parks and Recreation to finalize an approved park plan and ensure the site plan
matches.
2. [COD Sec 8 Open Space/Greenspace Preservation] Park Master Planning. The two playground areas shall be combined into a
single large playground. Ensure this playground area is ADA accessible with ramps. Also, revise the age groups served by the entire
playground to be ages 2-12. Rev 3. Please work with Parks and Recreation to finalize an approved park plan and revise the site
Dian to ensure it matches.
3. [COD Sec 8 Open Space/Greenspace Preservation] Park Master Planning. Revise the multipurpose lawn, the lawn, the
playgrounds, the pavilion areas, and the playing field to be ADA accessible. Rev 3. work with Parks and Recreation to finalize an
approved park plan and revise the site plan to ensure it matches.
4. [COD Sec 8 Open Space/Greenspace Preservation] Park Master Planning. Discontinue the playground's shredded rubbed surface
and replace with ADA approved double shredded mulch. Rev 3. Playground equipment area to be surfaced with a Pour -in -Place,
Rubber Mats/Tiles. Please work with Parks and Recreation to finalize an aoaroved Dark Dian and revise the site Dian to ensure it
matches.
S. [COD Sec 8 Open Space/Greenspace Preservation] Park Master Planning. Label all fence types throughout the park. Rev 3.
Modify the type of fencing to Black vinyl coated, omit the option for the fence to be green. Additionally, provide the gauge of
fencing. This item shall be fully addressed on the Final Park Plan and the final site plan.
5. [COD Sec 8 Open Space/Greenspace Preservation] Park Master Planning. The playground layout on Sheet 69, is a carryover and
needs to be revised to match what is proposed in the playground.
6. [COD Sec 7.1, 4.12] The proposed phasing is not approvable because all of the required parking spaces for the park use are not
provided in the first phase (Phase 2A). Additionally, half of a guest space is located in Phase 2A, which is truly required for phase 26.
Revise the phasing to include all required parking for the use.
7. [COD Sec 8 Open Space/Greenspace Preservation] Park Master Planning. Dog Park Rev 3. Provide drinking fountain at the dog
park site for park users and pets. Please work with Parks and Recreation to finalize an approved park plan and revise the site plan
to ensure it matches.