HomeMy WebLinkAboutWPO201900045 VSMP - SWPPP 2019-08-22 COUNTY OF ALBEMARLE
ck P �f 1111 Department of Community Development
r ®-` 401 McIntire Road,North Wing
Charlottesville,Virginia 22902-4596
� Tel.(434)296-5832•Fax(434)972-4126
1'iRGrrP
Stormwater Pollution Prevention Plan (SWPPP)
For Single Family Residential Construction within a larger plan of development
For Construction Activities At:
Project Name: Liberty Hall
Address: 2698 Liberty Hall Lane
Charlottesville,VA 22901
Prepared by:
Name: B.Clark Gathright, P.E.
SWPPP Preparation Date: Aug. 22, 2019
(This document is to be made publicly available according to 9VAC25-880-70,Part II,section D. With the
building permit, it is to be posted in a prominent place at the jobsite entrance and available to the public and the
county inspector.)
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Single Family Residential Albemarle County
•
Erosion and Sediment Control Plan.
An erosion and sediment control plan is in place for the overall development,under the operation of the
developer. An erosion and sediment control agreement is in place for this lot,and is attached.
(Provide a signed copy of the agreement here.)
Stormwater Management Plan
A stormwater management plan is in place for the overall development,under the operation of the developer.
Details and plans for required stormwater management measures on this lot are attached.
❑ There are no required stormwater management measures on this lot. A stormwater management
agreement is in place for this lot.
(Provide plans and details for any stormwater management facilities or best management practices to be used on
this lot, or provide a signed copy of the agreement here.)
Pollution Prevention Plan.
(reference County Code 17-404 and State Regulation 9VAC25-880-70 part 11 section A.4)
A. Sources of Pollutants. Common activities and minimum control and prevention practices
Pollutant, or Pollutant Prevention Practices,
Generating Activity Location on site Control Measures
Follow Erosion and Sediment Control
Clearing,grading,excavating,and un- Plan. Dispose of clearing debris at
stabilized areas Land disturbance area acceptable disposal sites.Seed and mulch,
or sod within 7 days of land clearing
Cover storm drain inlets and use drip pans
Paving operations Roads and driveways and absorbent/oil dry for all paving
machines to limit leaks and spills
Direct concrete wash water into a leak-
Concrete washout and Current location and detail shown on proof container or leak-proof settling basin
cement waste plan that is designed so that no overflows can
occur
Enclose or cover material storage areas.
Mix paint indoors in a containment area or
Structure construction,tion,stucco, in a flat unpaved area.Prevent the
painting, and cleaning Structures discharge of soaps,solvents,detergents
and wash water,paint,form release oils
and curing compounds.
Water shall be filtered,settled or similarly
Dewatering operations Dewatering sites shown on plan treated prior to discharge as shown on
plan
Designated areas for material delivery and
Material delivery and storage Designated area shown on plan storage. Placed near construction
entrances,away from waterways and
drainage paths
Material use during building process Building areas Follow manufacturer's instructions.
MSDS's attached
Waste collection area will not receive a
substantial amount of runoff from upland
areas and does not drain directly to a
Current designated container areas on waterway. Containers have lids covered
Solid waste disposal plan before periods of rain,or are in a covered
area Scheduled collection to prevent
overfilling.MATERIALS NOT TO BE
BURIED ON-SITE
Convenient and well-maintained portable
Sanitary waste Current locations shown on plan sanitary facilities will be provided,and
located away from waterways or inlets.
Such facilities shall be regularly
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Single Family Residential Albemarle County
•
Pollutant, or Pollutant Location on site Prevention Practices,
Generating Activity Control Measures
maintained.
Apply fertilizers in accordance with
Landscaping operations Landscape areas shown on plan manufacturer's recommendations and not
during rainfall events
To be treated in a sediment basin or better
Wash Waters Wash areas shown on plan control as specified on plan.Minimize
the discharge of pollutants from
equipment and vehicle washing
Vehicle and equipment washing Designated areas and details shown on Provide containment and filtering for all
plan wash waters per the plan
Provide double walled tanks,a lined
Fueling Fueling station containment area,drip pans,and spill
prevention and cleanup materials.
(Provide any site specific
activities here.)
Minimization of exposure to precipitation and stormwater.Minimize the exposure of building materials,building products,
construction wastes,trash,landscape materials,fertilizers,pesticides,herbicides,detergents,sanitary waste,and other materials
present on the site to precipitation and to stormwater.
(Identify all non-stormwater discharges to occur on your site. Keep this plan up-to-date with ongoing site
changes and inspections. See CGP, 9VAC25-880-70 section E for examples of non-stormwater discharges.)
B. Non-stormwater discharges
Discharge Pollutants or Pollutant Location on Site
Constituents
C. Persons responsible for pollution prevention practices
(Provide the names and contact information for all persons responsible for prevention practices as listed above.)
Clark Gathright, P.E. 434-987-0294 cathright@dgarchs.com
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Single Family Residential Albemarle County
D. Response and reporting practices
Minimize discharges from spills and leaks. Minimize the discharge of pollutants from spills and leaks and implement chemical spill
and leak prevention and response procedures as follows.
Most spills can be cleaned up following manufacturer specifications.Absorbent/oil dry,sealable containers,plastic bags,and
shovels/brooms are suggested minimum spill response items that should be available at this location.
1st Priority: Protect all people
2nd Priority: Protect equipment and property
3rd Priority: Protect the environment
1. Check for hazards(flammable material,noxious fumes,cause of spill)—if flammable liquid,turn off engines and nearby
electrical equipment. If serious hazards are present leave the area and call 911.LARGE SPILLS ARE LIKELY TO
PRESENT A HAZARD.
2. Make Sure the spill area is safe to enter and that it does not pose an immediate threat to health or safety of any person.
3. Stop the spill source.
4. Call co-workers and supervisor for assistance and to make them aware of the spill and potential dangers.
5. If possible,stop spill from entering drains(use absorbent or other material as necessary).
6. Stop spill from spreading(use absorbent or other material)
7. If spilled material has entered a storm sewer,contact locality's storm water department.
8. Clean up spilled material according to manufacturer specifications,for liquid spills use absorbent materials and do not flush
area with water.
9. Properly dispose of cleaning materials and used absorbent material according to manufacturer specifications.
Emergency Contacts:
Normal Working Hours DEQ Valley Regional Office 540-574-7800
Nights,Holidays&Weekends VA Dept.of Emergency Management 804-674-2400
Pollution Prevention Awareness
All site personnel and workers will be made aware of the prevention practices and measures contained in this
document.
Qualified personnel
The following personnel are responsible for inspections;
(Provide the name, telephone number, and qualifications of the qualified personnel conducting inspections.)
Clark Gathright, P.E.434-971-8848
General permit copy
A copy of the construction general permit, 9VAC25-880,will be attached to this document on the construction
site. The general permit can be found at
http://www.deq.virginia.gov/Programs/Water/StormwaterManagement/VSMPPermits/ConstructionGeneral Permit.aspx
Inspection logs
Inspections will be conducted on-site,and recorded here,as required by the 9VAC25-880-70, Part II, section B
and F of the Construction General Permit.
Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Single Family Residential Albemarle County
Signed Certification
(Provide certification according to 9VAC25-870-370. For purposes of plan review and approvals, this
certification should be the owner of the property, the same signature as appears on the bonds and
applications.)
CERTIFICATION
"I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and
evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my
knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for
submitting false information, including the possibility of fine and imprisonment for knowing violations."
Owner/Operator Name: 71' L C
Company: !-4,�'.( A . � LLL
Title: C /4I7 G,
Signature: f7
Date:
Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Single Family Residential Albemarle County