Loading...
HomeMy WebLinkAboutSDP201900033 Review Comments Final Site Plan and Comps. 2019-11-22County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 Phone 434-296-5832 Fax 434-972-4126 Memorandum To: Justin Shimp (Justin@shimp-engineering.com) From: Paty Saternye, Senior Planner Division: Planning Date: June 21, 2019 Rev. 1: August 9, 2019 Rev. 2: November 22, 2019 Subject: SDP201900033 Northside Material Recovery Facility - final site plan The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] Most of the remainine items to be addressed are minor. technical "clean un" items. such as corrections to notes on addine missin information required on the plan. Staff is willing to meet to discuss these changes if that would be helpful. The specifics of these items are outlined in the comments section below. We wanted to call also your attention to the items most of note. They are: • WPONMMP approval. • Instrument that will assure continuation of the off -site parking. Instrument has been submitted (11/21/2019) and will be reviewed. • The vacation of the drainage easement across the property. Easement plat submitted and last associated document submitted (11/21/2019) for County signatures. • The creation of a stormwater facility maintenance easement (see WPONSMP comments this and other required items). Easement plat reviewed and SWM Facility Deed of Easement has been submitted (11/21/2019) for County signatures. COMMENTS: Comments from Initial Site Plan review that were to be addressed with the Final Site Plan submission: [4.18.04, 5.1.51, 5.1.52, & 26.5(C)] The Special Exceptions (SEs) that were requested were approved with conditions by the BOS on May 1, 2019. Address the following in reference to the conditions of approval for the SEs. a) [SE Condition #3(f) & 4(b)] Add a note to the site plan that specifies how conditions 3(f) & 4(b) will be met and the method of measurement that will be utilized. If any permanent physical object(s) will be utilized for these measurements, then show them on the site plan and label them accordingly. Rev. 1: Comment not yet fully addressed. A note has been added. However, it does not specify the full requirements of conditions 3(f) and 4(b) and it also integrates a timing from 3(d) that does not apply to 3(f) or 4(b). Therefore, must be revised. Address the following: ii. Include in the note WHAT visible markers are proposed that will "... be utilized to measure and limit the height of the stockpiles." iv. If the form of visible markers is permanent in nature, then shown them on the site plan and label them accordingly. Rev. 2: Comment not fully addressed. Address the following: i. See and address the comments from zoning. ii. In addressing zonings comments ensure that the following are also revised: a. Note #1 on Sheet C4, b. The Visible Marker Detail on Sheet C6, including its title, c. The section labels on Sheet C4, d. The visible marker symbol (shown on both sheets C4 & C5), and provide additional markers, and e. Ensure all stock piles are provided with their permanent markers and section labels. Stockpile Area #4 did not have any labels for visible markers in this last submission. [32.5.2(i), 32.5.2(n), 32.5.2(m)] Streets, easements, and travel ways. c& Ingress and Egress. Address the following: e) A note on the coversheet of the site plan states "Parking shall be provided on the adjacent TMP 32-67." Address the following: i. Provide revised parking calculations for the existing use(s) on TMP 32-67 and demonstrate that there is sufficient parking available to meet the parking requirements for the proposed use on this site plan. Rev. 1: Comment not yet fully addressed. Revise the portion of the parking calculation for SDP2004-26 on the cover sheet to show: Rev. 2: Comment not vet fully addressed. In the parking calculation, where the four spaces are subtracted for this use, change the word "Requested" to be "Reserved for SDP2019-33 Parking" ii. Provide the instrument that will assure continuation of the off -site parking for this use (4.12.8(e)). Rev. 1: Comment not yet addressed. The comment response stated, "The owner, who is also the owner of the off - site parking, will provide, prior to final approval of this site plan, an instrument that will assure continuation." Please note that the instrument must be approved by the County and recorded prior to the final site plan being approved since the parking is required for this site plan. Rev. 2: Comment not vet fully addressed. An instrument to address off -site parking was submitted on 11/21/2019 and will be reviewed. This instrument must be approved by the County and recorded prior to the final site plan being approved since the parking is required for this site plan. 12. [32.5.2 j & 32.5.2(k)] Existing sewer and drainage facilities; Proposed sewer and drainage facilities. Address the following: a) Address the following: i. Submit for review a plat that vacates the existing drainage easement that runs parallel to northside drive for most of its length. This plat must be approved and recorded prior to the final site plan being approved since the existing easement conflicts with trees that are to be preserved for screening. Rev. 1: Comment not yet fully addressed. The comment response stated, "The vacation plat is being prepared for submittal." This plat must be submitted, reviewed, approved and recorded prior to the final site plan being approved since the existing easement conflicts with trees that are to be preserved for screening. Rev. 2: Comment not vet fully addressed. The submitted easement plat must be approved and recorded prior to the final site plan being approved since the existing easement conflicts with trees that are to be preserved for screening. 27. [32.5.2 (e), (n) 32.6.2(j) & 32.7.9.4 (b)&(c)] Address the following: b) Provide the labels for the existing trees to be preserved in the northeast portion of TMP 32-73, which is adjacent to TMP32-22C4 Rev. 2: Comment not vet fully addressed. See ARB and Zoning comments in reference to the areas of preserved trees that were removed from preservation in the 11/12/19 resubmission 31. [Comment] See the attached comments from most reviewers. VDOT and ARB comments will be provided once they are available. Rev. 1: Comment not yet fully addressed. See the attached comments from most reviewers. ACSA comments will be provided once they are available. Rev. 2: Comment not vet fully addressed. See the attached comments from all remaining reviewers. 34. Rev. 1: [NEW COMMENT] Revise the elevation labels on the proposed topography to be correct. The elevation labels appear to have typographical errors, sometimes even having two different elevations on the same topo line. The area around the proposed berm appears to have the most errors. Rev. 2: Comment not vet fullv addressed. There are approximately six topographical lines. in the area of the proposed screening berm, that show two different elevations on the same line. An example is that the topographical line for 532 is labeled as "32" on one end and then labeled "02" on the other end. Revised the elevations so that thev are correct and consistent. 36. Rev. 1: [NEW COMMENT] Revise the section labels for the "Entrance Paving Detail" on sheets C4 & C6 to be correct. Address the following: a) On C4 it should be shown, in the circle, 7/C6 and not as 6/C6. b) On C6 it should be shown, in the circle, 7/C6 and not as 7/C7. Rev. 2: Comment not vet fully addressed. Address the following: a) On Sheet C5 the label (8/C6) for the section through the berm no longer matches the revised section (9/C6) number specified on Sheet C6. No section number is shown for the berm on sheet C4, even though labels for the other sections are provided there. b) On Sheet C5 there appear to be multiple section labels for 4/C6 & 5/C6 floating around in areas that the section details would not apply. Revise the site plan to ensure all section labels are shown in the correct areas. 38. Rev. 2: [NEW COMMENT]: Prior to approval of the site plan the deed book and page number for the recorded easement plat must be added to the site plan in the blanks provided. Please contact Paty Saternye in the Planning Division by using psaternye@albemarle.org or 434-296-5832 ext. 3250 for further information. Review Comments for SDP201900033 Project Name: Northside Material Recovery Facility - Final Date Completed: Wednesday, November 20, 01 DepartmentIDivisionfAgency: Review Sys: Reviewer: Margaret Maliszewski 71 CBBARB Requested Changes Show all existing wooded area on 3-73 to be preserved, to be consistent with ARB approvals_ n Page: County of Albemarle Printed On: 1-V22)20'19 Review Comments for SDP201900033 Project Name: Northside Material Recovery Facility - Final Date Completed: Friday, November 22, 201 DepartmentlDivisionfAgency: Review sus: Reviewer: Rebecca Ragsdale 71 DID Zoning Requested Changes11 -Section 4.1 _18(e) requires an instrument be recorded that ensures the continuation of required parking on TMP 3 -67_ All properties for the proposed use and the parcel using the required parking must be subject tolsign the instrument assuring the parking- -The tree preservation areas shall match the special exception condition #3 and the ARB approval letter dated August 9, 2019 and plans dated August 1, 2019_ -The piles are limited to 24' and 28' so each marker must have those measurements delineated and certified by a surveyor to comply with special exception conditions_ Permanent markers must be installed at the upper and lower elevations of each stockpile_ Marker locations shall be identified on the site plan_ As part of verifying conditions, the county will confirm the marker height and location for each stockpile by requiring surveyor certification- - Zoning clearance must be issued prior to commencement of the use_ Page: County of Albemarle Printed On: 1-V22120'19 County of Albemarle Department of Community Development Memorandum To: Patricia Saternye From: Emily Cox Date: 12 June 2019 Rev. 1 Date: 07 Aug 2019 Rev. 2 Date: 13 Nov 20109 Subject: Northside Material Recovery Facility— Final Site Plan (SDP201900033) The final site plan for Northside Material Recovery Facility has been reviewed by Engineering. The following comments will need to be addressed before approval: 1. VSMP Plan (WPO201500001) must be amended and approved before final site plan can be approved. Rev. 1: Comment not addressed. Rev. 2: Comment not addressed. WPO plan approval is pending SWM agreement recordation and nutrient credit purchase. 2. Plans should be signed, sealed and dated by professional. [18-32.6.1 ] Rev. 1: Comment acknowledged. 3. Specify the type of stone for the stone access aisle cross-section. [Sheet C6] Rev. 1: Comment Addressed. 4. Provide a cross-section of the proposed berm. Rev. 1: Comment Addressed. 5. Rev. 1: Please provide a copy of the exhibit that shows adequate sight distance at the entrance. Rev. 2: Comment addressed. 6. Rev. 2: SUB201900175 plat and deeds must be recorded before final site plan can be approved. COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper, Virginia 22701 Stephen C. Brich, P.E. Commissioner November 19, 2019 Ms. Paty Saternye County of Albemarle Department of Community Development 401 McIntire Roy Charlottesville, VA 22902 Re: SDP-2019-00033- Northside Drive Material Recovery Facility -Final Site Plan Dear Ms. Saternye: We have reviewed the Northside Drive Material Recovery Facility Final Site Plan, submitted by Shimp Engineering, dated May 13, 2019, revised December 08, 2019, and find it to be generally acceptable. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. If further information is desired, please contact Willis Bedsaul at 434-422-9866. Sincerely, 14w-�.M'kjL( Adam J. Mo re, P.E. Area Land Use Engineer Charlottesville Residency WE KEEP VIRGINIA MOVING Review Comments for SDP201900033 Project Name: Northside Material Recovery Facility - Final Date Completed: Wednesday, November 13, 01 DepartmentIDivisionfAgency: Review Sys: Reviewer: Richard Nelson ACSA I No Objection Nd 019-11-13: There are no comments on this site plan_ Page: County of Albemarle Printed On: 1-V22)20'19