Loading...
HomeMy WebLinkAboutSDP201900067 Review Comments Final Site Plan and Comps. 2019-12-06COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Site Plan Review Project title: Ecovillage Charlottesville — Final Project file number: SDP2019-00067 Plan preparer: Shimp Engineering Justin M. Shimp; Keane Rucker Owner or rep.: Ecovillage Holdings Inc. Plan received date: 6 Nov 2019 Date of comments: 6 Dec 2019 Plan Coordinator: Tim Padalino Reviewer: John Anderson SDP2019-00067 1. Address WPO Plan review comments sent 12/4/19 (WP0201900053). WPO Plan approval is required prior to Final Site Plan (FSP) Approval. 2. If project is to be subdivided, SWM Facility, SWM Facility Access, and public /private drainage easements may be recorded with the subdivision plat, meaning, once WPO Plan is approved, SWM Facility Maintenance Agreement is recorded, VAR10 (DEQ) VPDES permit issued, and WPO Plan bonded, the project is eligible to receive a Grading Permit (eligible for pre -construction). Also: see items 28 and 45. 3. Submit Road Plan and Private Street Authorization request at earliest convenience. Engineering defers to Planning Division on Private Street request, yet is involved and reminds Applicant of code requirements at 14-234 if making private street authorization request. Engineering will support request, given density and comprehensive plan goals, and prior Ecovillage special use permit and initial site plan approvals (SP2018- 00016, SDP2018-00056, respectively), which reflect design consistent with planning goals. Nevertheless, private streets are subject to VDOT design standards /specifications, Albemarle County Design Standards Manual guidance, and Drainage and Road Plan Checklists for plan reviewers. Please submit Road Plan with Application, with minimum number of print copies (or digital road plan) as soon as possible. Roads must be built or bonded prior to Final Plat approval. Road plan must be approved prior to FSP approval. 4. FSP is subject to SP201800016 and SDP201800056 conditions /conditional approval requirements. Engineering defers to Planning concerning interpretation or effect of these approval documents. Cl 5. Slopes Note: Provide LS name /date that 9,866 SF of preserved slopes overlay was surveyed less than 15%. 6. Provide related plan references: SP201800016, SDP201800056, WP0201900053, SUB2019-XXXXX (Road Plan). 7. Provide description of any steep slopes waiver granted, with reference to legislative action. Provide details of waiver or exemption to disturb steep slopes. 8. Provide copies of detailed PE -sealed geotechnical retaining wall designs for wall ht. > 4' max. associated with parking or any road /travelway prior to FSP approval. See Final Site Plan checklist for plan reviewers, p. 1. Also Retaining Wall Plan checklist; Attached. C2 9. Show /label preserved steep slopes on TMP #61-21013. Applies to additional sheets; C17, for example. 10. Label stream buffer (TMP #61-210B). C3 11. Label typ. parking stall depth and width, all parking areas. For perpendicular radial (curvilinear) parking, label stall width `at narrowest point along the length of the space.' (18-4.12.16.c.4.) 12. Label HC-parking space width (2 separate locations). 13. Revise Road A 32 ' Private to clarify that paved surface is 20', not 32'. Engineering Review Comments Page 2 of 4 14. Similarly, revise Road B, C, D, 30' Private to clarify width of geocell pavers (vs. 30' easement width). 15. At relevant points along Road D, label radii. (See Roads B, C.) 16. Provide VDOT GR-2 guardrail on south side of lower parking lot for any parking space fronting retaining wall, or space facing a grade of -3:1, or steeper. 17. Label 10' Multi -use pedestrian trail. 18. Label 14' Emergency Fire Access. 19. Provide CG-6 (curb with gutter) to match VDOT Road Design Manual typ. CG section in urban setting, not CG-2. Provide CG-6 for Road A between Rio Rd. E entrance and the 4 perpendicular parking spaces just north of the 2 HC- parking spaces on west side of Road A, thru R5' radius return. CG-2 does not meet VDOT standard for urban design; please revise to VDOT standard. Also, 18-4.12.15.g. 20. Provide CG-6, continuous from point identified in item 19., through last curvilinear parking space (End of Road A). 21. Provide CG-6, not CG-2, in all parking areas. Ref. 18-4.12.15 a. No exception appears to exist under Resolution adopted May 1, 2019 (SP201800016), or special permit condition 3., which reads (in part): `Improvements related to stormwater, drainage, and grading shown on the final site plan and water protection ordinance plan for Ecovillage Charlottesville shall be in general accord with the same improvements and grading shown on the "Stormwater Improvements" exhibit and "Proposed Entrance Layout" exhibit prepared for SP201800016 by Shimp Engineering, P.C. and dated 2/4/2019 and subsequently revised 2/27/2019, inclusive of additional modifications as noted in a. — c. below, and to the satisfaction of the County Engineer.' CG-6 is required to meet ordinance design requirements for parking, and VDOT typ. section for subdivision roads. 22. Recommend Site Summary include Ref. to WP0201900053 1.26 Ac. Forest /Open Space Easement. 23. Label 12' and 14' turnaround W (narrowest) and L dimensions, to clarify, and avoid misunderstanding. 24. Ensue SU design vehicle has adequate room to maneuver at proposed 12' and 14' turnarounds, including without striking screening enclosure at trash tote storage adjacent to 12' turnaround. [Ref. VDOT Road Design Manual, Appendix B 1, Fig. 2-2] 1. A single -unit (SLI) truck design vehicle, as defined by AASHTO, should be used for the design of all local subdivision streets. Dimensions for this vehicle are depicted in Figure 2-2 of the AASHTO Geometric Design of Highways and Streets 2011, shown as Figure 1. 0j �!A t0A p1M 'F6m • cor FIGURE 1 - "FIGURE 2-2" SCANNED FROM "A POLICY ON GEOMETRIC DESIGN OF HIGHWAYS AND STREETS," AASHTO, 2011 25. Provide sight distance line to ensure 100' min., unobstructed stopping sight distance through curvilinear section with perpendicular parking, Road A. 26. Label all easement linework. 27. Label all drainage easements downstream of any SWM facility (incl 38 raingardens) as public drainage easements. Also, reference /address WP0201900053 12/4/19 Engineering review comments. 28. Provide deed bk.-pg. reference to recorded (off -site) sight -distance easement (right), 390' for 35 MPH, across TMP# 61-190. Ref. Ecovillage Proposed Entrance Layout, SE Engineering, 02-27-2019. This easement is required prior to Final Site Plan approval. There is no safe safe no from development unless this sight -distance easement is obtained /recorded. Show /label sight distance easement on C3. Engineering Review Comments Page 3 of 4 ECOVILLAGE: PROPOSED ENTRANCE LAYOUT oa-aiaoie 29. C3/C4: Identify multi -use pedestrian trail material, either in legend, on plan, or both. Provide typ. detail. 30. C3/C4: Show northern -most extent of 14' Emergency Fire Access (Secondary Exit) point of connection with: Rio Road, Ex. paths /sidewalks, etc. Any work within VDOT R/W Rio Road E, requires land use permit, and VDOT approval. 31. Note: Road Plan should provide profile of 14' Emergency Fire Access for comparison with fire apparatus ground clearance requirements. C5 32. With CG-6, ensure no nuisance ponding. Provide spot elevations as needed to ensure positive drainage. 33. Revise 8% grade < 5% where Road A serves perpendicular parking spaces. (18-4.12.15.c.) 34. Revise 6% grade < 5% where Road A serves perpendicular HC-parking spaces. (18-4.12.15.c.) 35. Road Plan approval requires 70' CL radius (20 MPH design speed) 4% super -elevation, but proposed grade reverses required super -elevation, causing inadequate side friction through the 70' R curve. Revise per Exhibit 5, AASHTO Guidelines for Geometric Design of Very Low -Volume Local Roads (ADT < 400). AASHTO�Guidelines for Geometric Design of Eery Low -Volume Local Roads (ADT 5400) Metric Reduced Maximum Minimum radius (m), R,„,,, Design design design side speed speed friction Max. superelevation rate (%), a,,, (kmth) (km/h) factor, fa: 4 6 8 10 12 20 20 0.180 15 15 10 10 10 30 25 0.170 25 20 20 20 20 40 30 0.170 35 30 30 25 25 50 35 0,170 45 40 40 35 35 60 45 0.165 80 70 65 60 55 70 50 0.160 100 90 80 75 70 80 60 0.150 150 135 125 115 105 90 70 0.140 215 195 175 160 150 100 80 0-140 280 250 230 210 195 US Customary Reduced Maximum Minimum radius (ft), R_ Design design design side speed speed friction Max. superelevation rate %, era, (mph) (mph) factor, fax 4 6 8 10 12 15 15 0.175 70 65 60 55 50 20 15 0.175 70 65 60 55 50 25 20 0,110 125 115 105 100 90 30 20 0.170 125 115 105 100 90 35 25 0.165 205 185 170 155 145 40 30 0A 60 300 275 250 230 215 45 35 0.155 420 380 350 320 295 50 40 0.150 560 510 465 425 395 55 45 0.140 750 675 615 565 515 60 50 0.140 925 835 760 695 640 Exhibit 5. Guidelines for Maximum Side Friction Factor and Minimum Radius (New Construction, ADT <250 veh/day, Limited Heavy Vehicle Traffic) 36. Provide inlet capture along inside of Road A revised 70' R curve (w CG-6). C6 Engineering Review Comments Page 4 of 4 37. Relocate SWM Facility access (MH) from parking space to parking lot access aisle, to permit access. 38. With CG-6, revise depiction of VDOT-typ. inlets. Integrate inlets with CG-6 as opposed to cut /fill section. 39. Label StormTech Bayfilter SWM Facility Easement width. Compare with ACDSM diagram /equation, p. 15; image, below (Ensure Min. width for proposed SWM Facility — provide calc. /show equation): Albemarle County Design Standards Manual — Engineering 0 EA5E51E,NTnNT1T. I1LOU ER- Miff-S;•WiNMES,i EASEIM Tq' 1I.- Enl]P�IE:T c. Drainage easements are to be labeled on plans and plats; "Drainage Easement" and "dedicated to public use". d. Drainage easement plats must be accompanied by a deed. Standard deeds are provided by the Count Attorney, along with administrative guidelines. These are also available in the documents forms center of the county website; btV-//www.albemarle.orp,/detforms.M?department--cdengyMo. 40. C6/C7: Revise storm inlet /pipe design consistent with WPO201900053 Engineering review comments. 41. C8: Relocate plantings to resolve conflicts with proposed SWM Facility or public drainage easements, including 38 individual raingardens (easements not currently shown). As a general rule, do not locate plant center -points within 2' of an easement for storm pipe, or SWM facility, since plants are not points, but develop central stems /trunks, and extensive root systems. Tree protection typically requires canopy to be located outside limits of disturbance. In this case, a better design is to ensure mid- to large -caliper species canopies lie outside public drainage easements. Once SWM facility easements are shown, Engineering anticipates revision to plant locations. At least 3 large shade trees are shown inside raingardens; at least 3 large shade trees touch raingardens. All six, and perhaps others, must be relocated for raingardens to function, or be maintained, or for FSP /WPO plan approval. 42. CI51C16: Revise storm sewer profiles consistent with WP0201900053 12/4/19 Engineering review comments. C16 43. Revise easement across TMP #61-210B to New 20' Public Drainage Esmt. An easement downstream of a SWM facility is public. Albemarle requires access for future inspection /possible maintenance. 44. Please check (TMP #61-21013) Parcel A-1-A label; this appears inconsistent with GIS /Real Estate records. 45. C 17: Provide copy of recorded on -site sight -distance easement, left. Sight -distance easements (left /right) are prerequisite to FSP approval. 46. Sign /date C 1 of FSP. There is instance of recorded Shimp Engineering Site Plan with unsigned /undated C1 PE -seal, marked review only. Albemarle will (try to) avoid this in the future. (Ref SDP2018-00039) 47. Revise per 18-Sep 2018 Engineering ISP review comment 10, image, below: 10. Slopes steeper than 3:1 must specify a plant type or grass on the landscape plan that can withstand the steep slope. 48. Provide geocell paver detail. Please feel free to call if any questions. Thank you J. Anderson 434.296-5832 -x3069 SDP201900067 Ecovilla-c FSP 120619