HomeMy WebLinkAboutSDP201900058 Review Comments Initial Site Plan 2019-12-09COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
Site Plan Review
Project title:
E 2415 Ivy Road Commercial Redevelopment
Project file number:
SDP2019-00058
Plan preparer:
Scott Collins; Collins Engineering [200 Garrett St., Suite K, Charlottesville, VA
22902, scott(&collins-en in�g com]
Owner or rep.:
Currell Corporation 35 Old Farm Road, Charlottesville, VA 22903
Plan received date:
5 Nov 2019
Date of comments:
9 Dec 2019
Plan Coordinator:
Christopher Perez
Reviewer:
John Anderson
SDP2019-00058
For Initial Site Plan Approval
1. Report Limits of Disturbance, acreage. Note, sheet 1 (20% reduction), appears to indicate LOD may
exceed 1 Ac.
2. Provide Site Summary Site tab information, VaRRM re -development .xls, that shows pre- and post -
redevelopment land cover (best estimate) and TP load reduction required for redevelopment. Engineering
understands values may change with VSMP /WPO Plan submittal, but at conceptual level, given age and
uncertainty of storm network to which this development will discharge, this information is needed for initial
site plan approval.
3. Sheet 2: Provide existing contour labels. Very few, perhaps just one, label makes it difficult to review this
site plan. If vertical variation is flat, please use 1-ft. interval for existing and proposed contours. Additional
contour detail required.
Sheet 4:
4. Show conceptual UG detention using dark line type (if overlooked, please notify reviewer).
5. Show proposed grading and storm utilities using dark line -type.
6. Tie proposed grading to existing terrain contours.
7. Outline proposed LOD using readily readable dark line -type.
8. Provide proposed grade for 22-space parking (recommend flow lines); may change with FSP, yet relevant to
ISP approval.
9. Engineering recommends Notes clarify limits of disturbance, new impervious area, net new impervious,
existing /proposed storm conveyance, existing /proposed new building (building space appears unchanged).
For Final Site Plan Approval
1. Ensure commercial entrance on Ivy Road/US Rt. 250 meets VDOT commercial entrance standard.
2. As ISP sheet 1 Note states, VSMP /WPO plan approval is required prior to final site plan approval.
3. SWM Facility /Facility Access Easement plat with deed must be recorded prior to VSMP /WPO Plan
approval; this may occur with boundary line adjustment plat, or independent of BLA plat.
4. Sheet 4: It is uncertain whether DI -pipe shown traversing proposed 22-space parking lot in front of the site
may discharge directly to Ex. storm system. With FSP, submit thorough analysis of Ex. storm system along
Ivy Road for each discharge point, to limits of analysis.
5. Label parking space typ. length. Ref. ACDSM p. 17 for graphic guidance on design options.
6. Label east and west -most parking space length, N side of parking lot.
Engineering Review Comments
Page 2 of 2
7. Avoid placing detention access (MH lid) in any parking space/s.
8. Provide public drainage easement downstream of any proposed SWM facility, to the property line.
9. Provide proposed water quality swale easement.
10. Provide SWM Facility access, between Ivy Road RW and SWM facility easements.
11. Ensure radii at commercial entrance meet VDOT CG-11 Min. R. (Also, FSP, item L, above)
12. Relocate /evaluate Ex. DI, W side of commercial entrance.
13. Provide drainage plan, including LD-204, LD-229.
Please feel free to call if any questions. Thank you
J. Anderson 434.296-5832 -x3069
SDP201900058 2415 Ivy Road Commercial Redev ISP 120919