Loading...
HomeMy WebLinkAboutARB201900128 Staff Report 2019-12-09ARCHITECTURAL REVIEW BOARD STAFF REPORT Project #/Name ARB-2019-128: Stonefield DI Preliminary Review Type Preliminary Review of a Site Plan and Architectural Design Parcel Identification 061 WO0300019AO Location East of Hydraulic Road, between Inglewood Drive and District Avenue, currently a parking lot fronting Hydraulic Zoned Neighborhood Model District (NMD), Entrance Corridor (EC) Owner/Applicant OCT Stonefield Property Owner LLC/W W Associates (Herb White) Magisterial District Jack Jouett Proposal To construct a 6-8-story apartment building with 234 units and associated site improvements. A Special Exception is required for the proposed height. Context/History The site is located within the Stonefield development, for which the ARB has reviewed and approved numerous applications. Nearby buildings have been approved with heights above 5 stories. These include the Hyatt Place Hotel to the north at 6 stories, the Hyatt House hotel to the northeast at 6 stories (not yet constructed), and a mixed -use building at Bond and Inglewood to the northwest at 6 stories (not yet constructed). The Regal movie theater is to the southeast. Townhouses are to the west. Visibility The apartment building will be readily visible from the Hydraulic Road Entrance Corridor and the upper stories of the building will be visible from a distance on the Rt. 29 Entrance Corridor. ARB Meeting Date December 16, 2019 Staff Contact Margaret Maliszewski and Khris Taggart REF GUIDELINE ISSUE RECOMMENDATION GENERAL GUIDELINES Purpose, Compatibility with significant historic sites, Structure design 1 The goal of the regulation of the design of The primary building material is Hardie siding Provide for review samples of development within the designated Entrance (lap, shiplap, reveal panel system, and panels the proposed materials and Corridors is to insure that new development within with trim). Brick is used as a secondary colors. the corridors reflects the traditional architecture of material in one bay of the Hydraulic elevation, the area. Therefore, it is the purpose of ARB review and along a portion of the base on the side Revise the Hydraulic Road and of these Guidelines, that proposed development streets. A color print of the materials has been elevation to present more of a within the designated Entrance Corridors reflect submitted (samples have not). The brick is red "primary facade" appearance in elements of design characteristic of the significant with dark brown/black accents, siding is off- line with the materials, balance historical landmarks, buildings, and structures of the white, gray and bronze. Trim is sand/tan. These and use of hierarchy displayed Charlottesville and Albemarle area, and to promote colors and materials appear to be compatible in the Bond Street elevation. orderly and attractive development within these with those approved in the Stonefield shopping corridors. Applicants should note that replication of center, the Regal Cinema and the Block D2 To better determine historic structures is neither required nor desired. Phase 2 building, as well as the materials proposed for the Hyatt House Hotel, but appropriateness of the 6-story building height along Hydraulic 2 Visitors to the significant historical sites in the Charlottesville and Albemarle area experience these samples are needed for confirmation. Each of Road, provide the following for sites as ensembles of buildings, land, and vegetation. the line drawing elevations includes a portion review: In order to accomplish the integration of buildings, rendered in color with material/color call -outs. land, and vegetation characteristic of these sites, the For clarity, call -outs are needed for the full A Hydraulic Road street Guidelines require attention to four primary factors: elevations; full colored elevations would be elevation showing the compatibility with significant historic sites in the helpful. apartment building, the area; the character of the Entrance Corridor; site townhouses and the cinema. development and layout; and landscaping. Although individual elements of the design are traceable to historic buildings in the area • A "perspective" image 3 New structures and substantial additions to existing structures should respect the traditions of the (masonry base, grouped windows, showing the Hydraulic architecture of historically significant buildings in the stringcourses and secondary cornices, elevation head-on. Charlottesville and Albemarle area. Photographs of emphasized roofline), the overall building is historic buildings in the area, as well as drawings of not a strong reflection the historic architecture • Perspectives from the architectural features, which provide important of the area. Hydraulic/Inglewood and examples of this tradition are contained in Appendix Hydraulic/District A. The Hydraulic elevation has multiple parts, which helps break up the mass of the building intersections, clearly showing the building 4 The examples contained in Appendix A should be used as a guide for building design: the standard of and establish a rhythm, but the elevation lacks elevations along Hydraulic compatibility with the area's historic structures is not a sense of organization, focus and hierarchy intended to impose a rigid design solution for new that is appropriate for an EC -facing elevation. and the side streets. development. Replication of the design of the The Bond Street elevation, which is not visible important historic sites in the area is neither intended from the Hydraulic, exhibits that level of Provide for review the full line nor desired. The Guideline's standard of organization and hierarchy with prominent drawing elevations in color compatibility can be met through building scale, brick towers balanced with a regular with material/color call -outs. materials, and forms which may be embodied in distribution of window bays, rooftop detail and architecture which is contemporary as well as secondary cornices. Incorporating these traditional. The Guidelines allow individuality in characteristics into the Hydraulic elevation design to accommodate varying tastes as well as would be appropriate. special functional requirements. The District and Inglewood elevations are quite 9 Building forms and features, including roofs, windows, doors, materials, colors and textures should long. They are broken into bays with be compatible with the forms and features of the treatments similar to those used on the significant historic buildings in the area, exemplified Hydraulic elevation, and they have the same by (but not limited to) the buildings described in lack of hierarchy. Perspectives with a broader Appendix A [of the design guidelines]. The standard view taken from the Hydraulic/Inglewood and of compatibility can be met through scale, materials, Hydraulic/District intersections, showing the and forms which may be embodied in architecture elevations along the side streets, would be which is contemporary as well as traditional. The useful in determining if the forms, scale and replication of important historic sites in Albemarle detailing are appropriate. County is not the objective of these guidelines. The six -story building height is expected to 12 Architecture proposed within the Entrance Corridor should use forms, shapes, scale, and materials to appear compatible with other taller buildings create a cohesive whole. internal to the shopping center. The submitted images don't clearly show that the building will be compatible with the neighboring buildings on Hydraulic. The angle of the perspective images provided along Hydraulic Road does not allow a clear comparison of the apartment building height and form to the height and form of the adjacent townhouses and cinema. Perspectives with a broader view, in addition to a street elevation including the townhouses, apartment building, and cinema, would be useful in determining compatibility and appropriateness of the request for the special exception. 5 It is also an important objective of the Guidelines to The proposed building height is similar to that 10 11 establish a pattern of compatible architectural characteristics throughout the Entrance Corridor in order to achieve unity and coherence. Building designs should demonstrate sensitivity to other nearby structures within the Entrance Corridor. Where a designated corridor is substantially developed, these Guidelines require striking a careful balance between harmonizing new development with the existing character of the corridor and achieving compatibility with the significant historic sites in the area. Buildings should relate to their site and the surrounding context of buildings. The overall design of buildings should have human scale. Scale should be integral to the building and site design. of the Hyatt Place hotel, the Hyatt House hotel (not yet approved), and the Block D2 Phase 2 building (all 6 stories). Those buildings are all set back further from the Hydraulic Road corridor. Along Hydraulic, the proposed apartment building is 5 and 6 stories tall at approximately 57' and 65' high. The townhouse block to the west has 2 stories plus a full roof, with an approximate height of 36' above street level. The cinema to the east is a blocky form at about 40' high. The form, height, and general character and treatment of each of these buildings is very different. The submitted images don't clearly show that the building will be compatible with the neighboring buildings on Hydraulic. Streetscape views showing more of the proposed building and more of the townhouse block and cinema would be helpful in determining compatibility along the corridor. The apartment design includes horizontal roof elements with a deep projection that are similar in appearance elements on the Hyatt House and Block D2 buildings. The proposed building is situated approximately 1200' from the Rt. 29 Entrance Corridor. The upper stories of the building will be visible from the Rt. 29 EC and, at that distance, is expected to have an appropriate The apartment building is a large one. The design attempts to break the large size down in multiple ways — with material and color changes, projections, changes in depth, and varying heights. This provides some variety and rhythm and human -scaled elements for Revise the EC frontage landscaping to promote human scale. drivers and pedestrians to relate to, but the overall large size will be the primary impression. Alternate landscaping could enhance the human scale. 13 Any appearance of "blankness" resulting from Blankness is not a characteristic of the None. building design should be relieved using design proposed design. detail or vegetation, or both. 14 Arcades, colonnades, or other architectural Connecting devices are not proposed and have None. connecting devices should be used to unify groups of not been used in the development to date. buildings within a development. 15 Trademark buildings and related features should be The proposal does not have the appearance of a None. modified to meet the requirements of the Guidelines. trademark design. 16 Window glass in the Entrance Corridors should not be Window glass is not addressed in the proposal. Provide specs and a sample for highly tinted or highly reflective. Window glass in the the proposed window glass. Entrance Corridors should meet the following Include the standard window criteria: Visible light transmittance (VLT) shall not glass note on the architectural drop below 4091o. Visible light reflectance (VLR) drawings. shall not exceed 30%. Specifications on the proposed window glass should be submitted with the applicationfiorfinal review. Accessory structures and equipment 17 Accessory structures and equipment should be There is some existing equipment along and Clarify the "roof appurtenance integrated into the overall plan of development and near the EC street. No additional equipment is stepback" and confirm that shall, to the extent possible, be compatible with the shown on the plan. With the proposed 6-story rooftop equipment will not be building designs used on the site. height, rooftop equipment is not expected to be an issue, even though Hydraulic has an visible from the ECs. 18 The following should be located to eliminate visibility from the Entrance Corridor street. If, after appropriate increased elevation in the vicinity of siting, these features will still have a negative visual Commonwealth, but the purpose of the "roof impact on the Entrance Corridor street, screening appurtenance stepback" shown in the diagrams should be provided to eliminate visibility. a. Loading is unclear. areas, b. Service areas, c. Refuse areas, d. Storage areas, e. Mechanical equipment, f. Above -ground utilities, and g. Chain link fence, barbed wire, razor wire, and similar security fencing devices. 19 Screening devices should be compatible with the design of the buildings and surrounding natural vegetation and may consist of: a. Walls, b. Plantings, and c. Fencing. 21 The following note should be added to the site plan and The note appears on the cover sheet. None. the architectural plan: "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." 20 Surface runoff structures and detention ponds should Stormwater will tie into the existing None. be designed to fit into the natural topography to avoid underground system. the need for screening. When visible from the Entrance Corridor street, these features must be fully integrated into the landscape. They should not have the appearance of engineered features. 22-31 Lighting No lighting is proposed. However, note that Provide for review a lighting building -mounted lights are subject to review. plan that includes all proposed pole lights, and ground- and building -mounted light fixtures. Landscaping 7 The requirements of the Guidelines regarding The plan shows that the existing landscaping Provide at least one additional landscaping are intended to reflect the landscaping along the Hydraulic Road frontage does not 31/2" caliper large shade tree characteristic of many of the area's significant meet the EC Guidelines. At least one large near the center of the Hydraulic historic sites which is characterized by large shade shade tree is missing from a location near the Road frontage. trees and lawns. Landscaping should promote visual center of the frontage, and it appears that order within the Entrance Corridor and help to smaller trees were provided at the west end of See recommendations under integrate buildings into the existing environment of the frontage (possibly due to the existence of #11. the corridor. overhead utility lines). It appears that the trees were also originally provided at 2%2" caliper at 8 Continuity within the Entrance Corridor should be obtained by planting different types of plant planting (rather than 31/2"). materials that share similar characteristics. Such common elements allow for more flexibility in the Most of the existing trees are labeled as design of structures because common landscape deciduous and their caliper size is noted on the features will help to harmonize the appearance of plan. Species are not noted. A continuous row development as seen from the street upon which the of shrubs is shown along the frontage. Corridor is centered. A power easement runs along the frontage. 32 Landscaping along the frontage of Entrance Corridor streets should include the following: a. Large shade trees should be planted parallel to the Entrance Corridor Street. Such trees should be at least 3'/2 inches caliper (measured 6 inches above the ground) and should be of a plant species common to the area. Such trees should be located at least every 35 feet on center. b. Flowering ornamental trees of a species common to the area should be interspersed among the trees required by the preceding paragraph. The ornamental trees need not alternate one for one with the large shade trees. They may be planted among the large shade trees in a less regular spacing pattern. c. In situations where appropriate, a three or four board fence or low stone wall, typical of the area, should align the frontage of the Entrance Corridor street. d. An area of sufficient width to accommodate the foregoing plantings and fencing should be reserved parallel to the Entrance Corridor street, and exclusive of road right-of-way and utility easements. 33 Landscaping along interior roads: Existing trees are shown to remain along Add large shade trees, 2'/2" a. Large trees should be planted parallel to all interior District Ave. and Inglewood Drive, with some caliper at planting, on roads. Such trees should be at least 2'/2 inches caliper gaps in the required 40' spacing. Four Willow Inglewood to establish a (measured six inches above the ground) and should Oaks are proposed to be added along District continuous row spaced 40' on be of a plant species common to the area. Such trees Ave. to fill the gap there. No trees are added center. should be located at least every 40 feet on center. along Inglewood; only the southern third of the Inglewood frontage has trees on the D1 side of the street. Mechanical equipment, parking garage entrance, and on -street parking spaces occupy the frontage with no trees. If the on - street parking spaces are not required, planting area and trees should be added. 34 Landscaping along interior pedestrian ways: Sidewalks are provided along District, See #32. a. Medium trees should be planted parallel to all Hydraulic and Inglewood. Trees are provided interior pedestrian ways. Such trees should be at least as described in #32 and #33. 2'/2 inches caliper (measured six inches above the ground) and should be of a species common to the area. Such trees should be located at least every 25 feet on center. 35 Landscaping of parking areas: The existing surface parking lot would be None. a. Large trees should align the perimeter of parking removed with this proposal and a parking areas, located 40 feet on center. Trees should be garage interior to the building would be planted in the interior of parking areas at the rate of constructed. The garage would not be visible one tree for every 10 parking spaces provided and from the streets. should be evenly distributed throughout the interior of the parking area. b. Trees required by the preceding paragraph should measure 2'/z inches caliper (measured six inches above the ground); should be evenly spaced; and should be of a species common to the area. Such trees should be planted in planters or medians sufficiently large to maintain the health of the tree and shall be protected by curbing. c. Shrubs should be provided as necessary to minimize the parking area's impact on Entrance Corridor streets. Shrubs should measure 24 inches in height. 36 Landscaping of buildings and other structures: The plan shows existing landscaping along the Revise the landscape plan to a. Trees or other vegetation should be planted along EC frontage that doesn't meet the EC satisfy the EC minimums and the front of long buildings as necessary to soften the requirements and that appears to differ from add trees to complement the appearance of exterior walls. The spacing, size, and the approved plan. Trees are missing and architectural design and balance type of such trees or vegetation should be determined planting sizes are smaller. The landscape plan the building height. by the length, height, and blankness of such walls. should be revised to satisfy the EC minimums b. Shrubs should be used to integrate the site, and to add trees to complement the buildings, and other structures; dumpsters, accessory architectural design and balance the building buildings and structures; "drive thru" windows; height. service areas; and signs. Shrubs should measure at least 24 inches in height. 37 Plant species: a. Plant species required should be as The plant species are found in the None. approved by the Staff based upon but not limited to recommended lists. the Generic Landscape Plan Recommended Species List and Native Plants for Virginia Landscapes (Appendix D . 38 Plant health: The following note should be added to the The note is on sheet C-11. None. landscape plan: "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of theplant." Site Development and layout, Development paftern 6 Site development should be sensitive to the existing The proposed building occupies the entire None. natural landscape and should contribute to the block as viewed from the Hydraulic corridor. creation of an organized development plan. This may The pattern of roads, lanes, paths and walks are be accomplished, to the extent practical, by those that already exist at the perimeter of the preserving the trees and rolling terrain typical of the block, and they connect to adjacent organized area; planting new trees along streets and pedestrian circulation systems. ways and choosing species that reflect native forest elements; insuring that any grading will blend into The proposed building is oriented parallel to the surrounding topography thereby creating a the Hydraulic EC, although the primary continuous landscape; preserving, to the extent entrance is at the opposite end of the building. practical, existing significant river and stream valleys which may be located on the site and integrating The site has already been developed as a these features into the design of surrounding parking lot; no significant natural features development; and limiting the building mass and remain. height to a scale that does not overpower the natural settings of the site, or the Entrance Corridor. For drivers and pedestrians traveling east on Hydraulic, the view across the Stonefield 39 The relationship of buildings and other structures to the Entrance Corridor street and to other development to the northeast will be reduced development within the corridor should be as by the proposed 6-8 story building. follows: a. An organized pattern of roads, service lanes, bike paths, and pedestrian walks should guide the layout of the site. b. In general, buildings fronting the Entrance Corridor street should be parallel to the street. Building groupings should be arranged to parallel the Entrance Corridor street. c. Provisions should be made for connections to adjacent pedestrian and vehicular circulation systems. d. Open spaces should be tied into surrounding areas to provide continuity within the Entrance Corridor. e. If significant natural features exist on the site (including creek valleys, steep slopes, significant trees or rock outcroppings), to the extent practical, then such natural features should be reflected in the site layout. If the provisions of Section 32.5.2.n of the Albemarle County Zoning Ordinance apply, then improvements required by that section should be located so as to maximize the use of existing features in screening such improvements from Entrance Corridor streets. f. The placement of structures on the site should respect existing views and vistas on and around the site. Site Grading 40 Site grading should maintain the basic relationship of The site has already been graded. The proposal None. the site to surrounding conditions by limiting the use of takes advantage of the change in grade across retaining walls and by shaping the terrain through the the site, placing 6 stories along Hydraulic and use of smooth, rounded land forms that blend with the 8 stories at the middle of the building along existing terrain. Steep cut or fill sections are generally District Ave. unacceptable. Proposed contours on the grading plan shall be rounded with a ten foot minimum radius where No retaining walls are proposed. they meet the adjacent condition. Final grading should achieve a natural, rather than engineered, appearance. Retaining walls 6 feet in height and taller, when necessary, shall be terraced and planted to blend with the landscape. 41 No grading, trenching, or tunneling should occur No grading is shown within the illustrated drip Show how existing trees to within the drip line of any trees or other existing line of existing trees to remain, though the remain will be maintained in a features designated for preservation in the final building is shown less than 1' away from some healthy condition during Certificate of Appropriateness. Adequate tree of those trees. construction. protection fencing should be shown on, and coordinated throughout, the grading, landscaping and erosion and sediment control plans. 42 Areas designated for preservation in the final Certificate of Appropriateness should be clearly delineated and protected on the site prior to any grading activity on the site. This protection should remain in place until completion of the development of the site. 43 Preservation areas should be protected from storage or movement of heavy equipment within this area. 44 Natural drainage patterns (or to the extent required, Drainage will tie into the existing system. None. new drainage patterns) should be incorporated into the finished site to the extent possible. 10 Staff recommends the following as the primary points of discussion: 1. The compatibility and appropriateness of the 6-story building height along the Hydraulic Road corridor 2. The character and appearance of the Hydraulic Road elevation 3. The general character and appearance of the apartment building design 4. EC frontage landscaping appropriate for a 6-story building height Staff offers the following comments on the Special Exception: It is not clear from the submittal that the 6-story building height will have an appropriate appearance along the Entrance Corridor. The following additional information is requested to determine the appropriateness of the requested building height: 1. A Hydraulic Road street elevation showing the apartment building, the townhouses and the cinema. 2. A "perspective" image showing the Hydraulic elevation head-on. 3. Perspectives from the Hydraulic/Inglewood and Hydraulic/District intersections, clearly showing the building elevations along Hydraulic and the side streets. Staff offers the following comments on the Initial Site Plan: • Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c(2), (3) and (5) and recommended conditions of initial plan approval: ■ Staff recommends approval of the initial site plan once the Special Exception issues are resolved. • Regarding recommendations on the plan as it relates to the guidelines: None. • Regarding conditions to be satisfied prior to issuance of a grading permit: None. • Regarding the final site plan submittal: A Certificate of Appropriateness is required prior to final site plan approval. 1. Provide for review samples of the proposed materials and colors. 2. Revise the Hydraulic Road elevation to present more of a "primary fagade" appearance in line with the materials, balance and use of hierarchy displayed in the Bond Street elevation. 3. To better determine appropriateness of the propose building along Hydraulic Road, provide the following for review: a. A Hydraulic Road street elevation showing the apartment building, the townhouses and the cinema. b. A "perspective" image showing the Hydraulic elevation head-on. 11 c. Perspectives from the Hydraulic/Inglewood and Hydraulic/District intersections, clearly showing the building elevations along Hydraulic and the side streets. 4. Provide for review the full line drawing elevations in color with material/color call -outs. 5. Revise the EC frontage landscaping to promote human scale. 6. Provide specs and a sample for the proposed window glass. Include the standard window glass note on the architectural drawings. 7. Clarify the "roof appurtenance stepback" and confirm that rooftop equipment will not be visible from the ECs. 8. Provide for review a lighting plan that includes all proposed pole lights, and ground- and building -mounted light fixtures. 9. Provide at least one additional 3%" caliper large shade tree near the center of the Hydraulic Road frontage. 10. Add large shade trees, 2%2" caliper at planting, on Inglewood to establish a continuous row spaced 40' on center. 11. Revise the landscape plan to satisfy the EC minimums and add trees to complement the architectural design and balance the building height. 12. Show how existing trees to remain will be maintained in a healthy condition during construction. 12 TABLE A This report is based on the following submittal items: Sheet # Drawing Name Drawing Date/Revision Date C1 SITE PLAN Cover Sheet 10/17/19 C2 Abbreviations and legend 10/17/19 C3 General Notes 10/17/19 C4 Earthwork Requirements 10/17/19 C5 Proffers 10/17/19 C6 Existing Conditions 10/17/19 C7 Demolition Plan 10/17/19 C8 Site Layout Plan 10/17/19 C9 Details 10/17/19 C10-11 Landscaping Plan Details and Notes 10/17/19 1-2 ARB PRELIMINARY REVIEW 11/4/19 3 Description 11/4/19 4 Vicinity 11/4/19 5 Site Photos 11/4/19 6-7 Site Plans 11/4/19 8-10 Landscape Plans 11/4/19 11 Context 11/4/19 12-15 Perspective Illustrations 11/4/19 16-19 Elevations 11/4/19 20 Exterior Palette 11/4/19 1 SPECIAL EXCEPTION APPLICATION 11/4/19 2 Vicinity 11/4/19 3 Existing Development Site D1 Plan 11/4/19 4-5 Site Plan Existing, Proposed 11/4/19 6 Contextual Building Story Diagram 11/4/19 7 Building Stories Stud 11/4/19 8 Building Stories at District Avenue 11/4/19 9 Bond St. & District Ave. Proposed rendering 11/4/19 10 Hydraulic Rd. & District Ave. Proposed rendering 11/4/19 13