HomeMy WebLinkAboutSDP201800089 Correspondence Final Site Plan and Comps. 2019-12-08PROJECT MANAGEMENT CIVIL ENGINEERING bH11V1V LAND PLANNING ENGINEERINGa December 9, 2019 Mr. David James County Engineering Albemarle County Community Development Regarding: Pantops Corner Final Site Plan — Final Site Plan Comment Response Engineering Dear David, Thank you for your review of the Final Site Plan for Pantops Corner. We have revised the design of the Final Site Plan per your Comments received October 11, 2019. See below for our comment response. 1. Noted, VSMP amendment covers offsite stockpile areas and does not revise any items for the FSP. 2. Addresse, 3.-Irnnz(znr 4. Noted, 2 additional copies are attached. 5. Noted, 2 additional copies are attached. 6. uuiu55e� 7. ,addressed. 8. Addressed. 9. Addressed. 10. Addressed. 11. Addressed. 12. Addressed. 13. Addressed. 14. Addressed. 15. Addressed. 16. Addressed. 17. Addressed. 18. Addressed. 19. Addressed. 20. Addressed. 21. Addressed. 22. Addressed. 23. Addressed. 24. Addressed. 25. Addressed. 26. Addressed. 27. Addressed. 28. Addressed. Page 1 of 2 29. Future connection locations are noted on the plans. Future connections shall be designed and constructed with site plans for any outparcel lot that needs to make a connection (in other words, Parcel 5A, 5B, and 5E) All easements needed to make a future connection at these locations have already been provided in the easement plat. As such, there is no other info to show. To avoid confusion, plan and profiles references to A9Z have been removed. If you have any questions or concerns about these revisions please feel free to email me at keane .shimp- engineering.com and copy Justin Shimp at justin(a�shimp-engineering.com or call at (434) 299-9843 and we can discuss any questions that you may have in further detail. Best Regards, Keane Rucker, EIT Shimp Engineering, P.C. Page 2 of 2