Loading...
HomeMy WebLinkAboutWPO201900050 Bond Estimates 2019-12-11Project Name: Berkmar Overlook VSMP Plan (WP0201900050) WPO file number: WP02019-00050 TMP(s): 45-112F1, 45-112F2, 45-84A & 45-85 Date Estimate Completed: 12/08/2019;chkbyJA/Albemarle,i2/:L1/:L9 Stormwater Management Bond Estimate Item Item No. Unit Unit Cost Cost Number installed permanent diversion or ditch 0 ft $13.00 $0.00 standard manhole frame top (not inlet) 1 ea $500.00 $500.00 drop inlet or grate 1 ea $3,500.00 $3,500.00 manhole structure (per ft. rise) 10 ft $450.00 $4,500.00 pipe (112 If of 18" included in the E&S plan) pipe, rcp, cmp (15 to 48") in d 0 ES-1,2 1 EC-1 25.0 ft $40.00 $1,500.00 aggregate base or drainage stone in d 0.0 ft L ' 0.0 ft W 0.0 ton $35.00 $0.00 (outfall rio rap included with E&S plan) earthwork for trap/basin: (Included with the Erosion Control Plan) height of dam at toe cut at high side 0 ftheight of fill at faceoft ft cut at face 0 ftlength of damft length of cut 0 fttop widthft width of cut ft ove transitic 0 transitic 0 sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transit 0 ft (depth below transit 0 ft (area below transitio 0 sf (area above transitic 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway �ft JOAL CY estimate 0 cy $13.00 $0.00 width of spillway ft (spillway stone tons 0 tons $50.00 $0.00 structures for basin: (Included with the Erosion Control Plan) riser height ft riser diameter =in (riser unit price) $0.00 $0.00 barrel length 0 ft base plate or fdn $200.00 $0 barrel diameter 0 in ce) $0.00 $0.00 barrel collars $200.00 $0 baffle length Mft $50.00 $0 trees 0 ea $275.00 $0.00 shrubs 0 ea $50.00 $0.00 seedlings 0 ea $5.00 $0.00 underdrain (LF) 0 ft $5.00 $0.00 biofilter soil mix (CY) 0 cy $45.00 $0.00 trash rack/ anti vortex devices 1 ft $1,500.00 $1,500.00 maintenance access road (LF) 320 ft $50.00 $16,000.00 12/11/2019 Project Name: Berkmar Overlook VSMP Plan (WP0201900050) WPO file number: WP02019-00050 TMP(s): 45-112F1, 45-112F2, 45-84A & 45-85 Date Estimate Completed: 12/08/2019; chk by JA /Albemarle, 12/11/19 Stormwater Management Bond Estimate Item Item Number rip -rap, placed depth 2 ft length width 6.0 (tons) survey and layout (price per 0.1 mi.) acres 9.7 basins mobilization as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractor's price as a base) WP0201900050 SWM_bond -Berkmar Overlook-CE120819 chk jal21119 No. Unit Unit Cost Cost installed 20.0 ft 18 $60.00 $1,080.00 1 $5,350.00 $2,500.00 1 ea $2,000.00 $2,000.00 1 ea $2,000.00 $2,000.00 1 ea $3,000.00 $3,000.00 $0.00 cost sum $43,430.00 contingency $4,343.00 Total $47,780 12/11/2019