Loading...
HomeMy WebLinkAboutSDP201900058 Review Comments Initial Site Plan 2019-12-12 (2)GIRGINIP` COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 December 12, 2019 Scott Collins 200 Garrett Street, Suite K Charlottesville VA 22902 SDP201900058 2415 Ivy Road Commercial Redevelopment Plan — Initial Site Plan Mr. Collins: The Site Review Committee has reviewed the development proposal referenced above. Initial comments for the following divisions of the Department of Community Development and other agencies, as applicable, are attached: Albemarle County Planning Services Albemarle County Engineering Services Albemarle County Information Services (E911) Albemarle County Building Inspections Albemarle County Department of Fire Rescue Architectural Review Board (ARB) [Comments pending, to be forwarded once received] Virginia Department of Transportation (VDOT) Albemarle County Service Authority (ACSA) Rivanna Water Sewer Authority (RWSA) Comments reflect information available at the time the development proposal was reviewed, and should not be considered final. However, the Site Review Committee has attempted to identify all issues that will be required to be resolved prior to Final Site Plan approval. Attached are the review comments for the above referenced site plan. This item is scheduled to be discussed at the January 91h SRC meeting. Pursuant to conversations with ARB staff the ARB meeting for this project has been postponed at the request of the applicant. Because of this please defer the project to allow the ARB review to be incorporated into the action letter. Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, A� -- Senior Planner AL��9�r t'IRGINZ�' COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Memorandum To: Scott Collins From: Christopher Perez Division: Community Development — Planning Date: December 12, 2019 Subject: SDP201900058 2415 Ivy Road Commercial Redevelopment Plan — Initial Site Plan The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Zoning Ordinances unless otherwise specified.] 1. [4.12.15(g)] Curb and gutter in parking areas and along travelways. Provide curb and gutter throughout the parking areas and along the travelways. 2. [4.12.15(a)] Surface Material. Pave all parking and access aisles. 3. [32.7.2.31 Sidewalk. Provide sidewalks from the rear parking areas to the building. 4. [32.7.2.3] Sidewalk. Replace the proposed 5' wide asphalt path at the front of the property with a standard 5' wide concrete sidewalk that meets VDOT standards. 5. [4.12] Parking. The proposed and existing office space onsite was found to be 32,620 SF, which requires 131 parking spaces. Sheet 1 of the plan incorrectly lists 31,805 SF of office space and only provides 128 spaces for this use. Ensure the SF listed on sheet 1 matches the SF proposed and existing throughout the rest of the plan. Revise parking calculation appropriately. 6. [4.12] Parking. In the parking calculation discontinue the use of "manufacturing and warehouse", as there is no warehousing; rather, merely list it as manufacturing/processing/assembly & fabrication. 7. [4.12] Parking. There is a typographical error associated with the parking calculation for manufacturing, which lists 5,000 SF open to the public; however, the proposal is for 3,280 SF of manufacturing/processing/assembly & fabrication. Is the square footage open to the public truly 500 SF? Ensure the correct square footage which is open to the public is listed. Additionally, at a minimum 2 customer parking spaces are required when using this calculation. 8. [4.12] Parking. Revise the line lengths for the 3 proposed parking spaces at the end of the 25-space parking area at the rear of the site. 9. [4.12.13, 4.12.181 Load areas. Clearly dimension the loading space. Loading spaces shall be designed so as not to impede any required parking spaces, or any pedestrian or vehicular circulation. Loading spaces shall be a minimum of 12 feet in width, 14'/z feet in clearance height and a length sufficient to accommodate the largest delivery trucks serving the establishment, but in no case will such length be less than 25 feet. 10. [4.12.18] Dumpster pad. Dimension the dumpster pad. 11. [32.5.1(c)] Boundary lines. Depict the new property line associated with the boundary line adjustment. 12. [32.5.2(a)] The adjacent parcel, TMP 60-25, is zoned Highway Commercial (HC). Revise. 13. [32.7.9.61 Landscaping within parking area. Provide parking lot landscaping and calculations. An area of at least five percent of the paved parking and vehicular circulation area shall be landscaped with trees or shrubs. Neither the areas of street trees and shrubs required by sections 32.7.9.5(d) and (e) nor shrubs planted between a parking area and a building on the site shall be counted toward the minimum area landscaped area for a parking area. 14. [32.5.2(1)] Existing and Proposed Utilities. Currently the plan depicts trees and shrubs on and around the gas lines. Relocate all proposed plantings out of the gas easement. When no easement exists, ensure the plantings are setback from the gas lines as specified by Charlottesville Gas. If no gas line easements exist, prior to final site plan approval please provide written verification from Charlottesville Gas that the plantings are appropriately setback from their gas lines. 15. [32.5.2(p), 32.7.2.11 The proposed entrances shall be designed and constructed as required by the standards of the Virginia Department of Transportation. VDOT approval of the proposed entrances to the site shall be required prior to final site plan approval. 16. [32.5.2(n)] Any proposed outdoor lighting must be shown on the site plan. A photometric plan and lighting cut sheets must be provided with the final site plan. Proposed lighting must comply with requirements of Sec. 32.7.8 & Sec 4.17 of the Zoning Ordinance. In addition to meeting all lighting requirements a standard lighting note will be required. 17. [32.5.2(n)] If there is to be a sign for the proposed use, on the final site plan depict and label the sign location. (Depicting the sign on the final site plan is not approval of the sign location or type). 18. [Comment] Pursuant to conversations with ARB staff the ARB meeting for this project has been postponed at the request of the applicant. Comments will not be provided by the ARB till the meeting is held. Because of this please defer the project to allow the ARB review to be incorporated into the action letter. SRC REVIEWERS Albemarle County Engineering Services (Engineer) John Anderson, j anderson2 ckalbemarle.org — review comments attached. Albemarle County Information Services (E911) Andrew Slack, Aslack(kalbemarle.org — No objection, review comments attached. Albemarle County Building Inspections Michael Dellinger, mdellingergalbemarle.org — review comments attached. Albemarle County Department of Fire Rescue Shawn Maddox, smaddox(kalbemarle.org — review comments attached. Architectural Review Board (ARB) Paty Saternye, psaternye(cr�,albemarle.org — review comments pending. Virginia Department of Transportation (VDOT) Adam Moore, adam.moore(kvdot.vir ig nia.gov — review comments attached. Albemarle County Service Authority (ACSA) Richard Nelson, rnelson(cr�,serviceauthority.org — review comments attached. Rivanna Water Sewer Authority (RWSA) Dyon Vega, DVega(krivanna.org — review comments attached. Please contact Christopher Perez in the Planning Division by using cperez(kalbemarle.org or 434-296-5832 ext. 3443 for further information. COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Site Plan Review Project title: E 2415 Ivy Road Commercial Redevelopment Project file number: SDP2019-00058 Plan preparer: Scott Collins; Collins Engineering [200 Garrett St., Suite K, Charlottesville, VA 22902, scott(&collins-en in�g com] Owner or rep.: Currell Corporation 35 Old Farm Road, Charlottesville, VA 22903 Plan received date: 5 Nov 2019 Date of comments: 9 Dec 2019; Rev 12/12/19 Plan Coordinator: Christopher Perez Reviewer: John Anderson SDP2019-00058 For Initial Site Plan Approval 1. Report Limits of Disturbance, acreage. Note, sheet 1 (20% reduction), appears to indicate LOD may exceed 1 Ac. 2. Provide Site Summary Site tab information, VaRRM re -development .xls, that shows pre- and post - redevelopment land cover (best estimate) and TP load reduction required for redevelopment. Engineering understands values may change with VSMP /WPO Plan submittal, but at conceptual level, given age and uncertainty of storm network to which this development will discharge, this information is needed for initial site plan approval. 3. Sheet 2: Provide existing contour labels. Very few, perhaps just one, label makes it difficult to review this site plan. If vertical variation is flat, please use 1-ft. interval for existing and proposed contours. Additional contour detail required. Sheet 4: 4. Show conceptual UG detention using dark line type (if overlooked, please notify reviewer). 5. Show proposed grading and storm utilities using dark line -type. 6. Tie proposed grading to existing terrain contours. 7. Outline proposed LOD using readily readable dark line -type. 8. Provide proposed grade for 22-space parking (recommend flow lines); may change with FSP, yet relevant to ISP approval. 9. Engineering recommends Notes clarify limits of disturbance, new impervious area, net new impervious, existing /proposed storm conveyance, existing /proposed new building (building space appears unchanged). For Final Site Plan Approval 1. Ensure commercial entrance on Ivy Road/US Rt. 250 meets VDOT commercial entrance standard. 2. As ISP sheet 1 Note states, VSMP /WPO plan approval is required prior to final site plan approval. 3. SWM Facility /Facility Access Easement plat with deed must be recorded prior to VSMP /WPO Plan approval; this may occur with boundary line adjustment plat, or independent of BLA plat. 4. Sheet 4: It is uncertain whether DI -pipe shown traversing proposed 22-space parking lot in front of the site may discharge directly to Ex. storm system. With FSP, submit thorough analysis of Ex. storm system along Ivy Road for each discharge point, to limits of analysis. 5. Label parking space typ. length. Ref. ACDSM p. 17 for graphic guidance on design options. 6. Label east and west -most parking space length, N side of parking lot. 7. 8. 9. 10 11 12 13 Engineering Review Comments Page 2 of 3 Avoid placing detention access (MH lid) in any parking space/s. Provide public drainage easement downstream of any proposed SWM facility, to the property line. Provide proposed water quality swale easement. Provide SWM Facility access, between Ivy Road RW and SWM facility easements. Ensure radii at commercial entrance meet VDOT CG-11 Min. R. (Also, FSP, item 1., above) Relocate /evaluate Ex. DI, W side of commercial entrance. Provide drainage plan, including LD-204, LD-229. 14. (Rev. 12/12): Engineering supports any Planning Div. request for sidewalk leading west then north from entrances facing Ivy Road (facing south) to parking west and north of existing structure; it is a basic required design feature, from Engineering perspective (blue arrow, below, probable location). I9, - QPROPOSED xirEoo SF DUMPSTER PAD TYp p g END DFCG., OFFICE (INCLUDING I3W 5F OF CURS MANUFACTURING! PROCESSING1 EDGE OF ASSEMBLY]& FABRICATION PAVEMENT PROPOSED CG-,CURB PROPOSED LOADING AREA (3o RSn PROPOSED HEAVY 1 570RY DITTY ASPHALT TRAVELWAY PRICK __.l60 SF) EXIST] PROPOSED ,3,B6D SF ASPHI OFFICE PAVFh 9' TYF PROPOSED ,r RaR SF PROPOSED ,,Sop SF COMMERCIAL RETAIL RESTAURANT PROPOSED CG-i FROPOSED G' HAND,RAMP CONCRETE SIDEWALK PROPOSED -R-IED16— PROPOSED EXTERIOR POTENTIAL FUTURE CG-, CURB HAND RAM BRICK PATIO($,$ 59 THAVELWAY r CONNECTION TO -� y ADIACENT PARCELS '-------' � '-------' TO THE WEST I - FNEWG-SAN. 3 SWR LAT. PROP05EOBRICK EB>YR - /E%IST. FIRE PERVIOUS.. £ LINE - PARKING SPACES S-y ]_R-.3o:lPcsE_e0.cr.� PROPOSED EAVY J 4 OTRAVELWAH ALT 15. Albemarle strongly encourages Applicant and Contractor to coordinate with City of Charlottesville Gas Engineering Review Comments Page 3 of 3 Utility Department prior to constructing improvements above existing gas service line to existing structure. 16. (Rev 12/12) Engineering response to 10/21/19, Collins Engineering Waiver request: Request for waiver of parking lot curb and gutter, and parking lot surface requirements for 2415 Ivy Road Commercial Redevelopment by letter dated October 21, 2019, is denied. Request does not provide one (or more) compelling reason for Albemarle to waive requirements listed at 18-4.12.15(a),(g). Whether patrons are customers or employees has no effect on decision concerning whether a surface is paved, or not. Ordinance sets a paved surface threshold of 4 or more parking spaces since stone is problematic. Gravel is a loose uneven medium that poses risk to pedestrians. Design should provide a smooth walking and riding surface, with sidewalks (see item 14., above). A paved surface with positive drainage provides a reliable surface for pedestrians, whereas stone poses challenge (if not risk) to the elderly or very young who may have balance issues, and to strollers, the disabled, and deliveries. Gravel is not equivalent to a paved surface for this commercial re -development with regard to strength, durability, sustainability and long-term maintenance. Design must meet requirements listed at 18-4.12.15(a). Similarly, this redeveloped commercial site requires design that directs storm runoff to detention or treatment facilities prior to release to existing conveyance, which may be inadequate (analysis to determine). A water quality swale may be designed using a curb cut, without abandoning curb/gutter, which serves a purpose. Rather than waiving curb /gutter requirements, it is essential to control and direct runoff from paved surfaces to existing /proposed stormwater management facilities. Please design to standards listed at 18-4.12.15(g). To approve a waiver request providing relief from requirements that prevent erosion, excessive or uncontrolled runoff, and may minimize risk to patrons using parking areas, contradicts the purpose and intent of ordinance. Note: Engineering is amenable to curb -only design, but does not waive requirement for curb (CG-2). No requirement of drainage, or VSMP /WPO plans is waived. If design proposes limited drop inlets, opting instead for curb cut leading to water quality swale west of existing structure, Engineering will evaluate this design against VDOT drainage manual, Drainage Plan checklist for plan reviewers, and ACDSM. CG-6 (curb /gutter) appears more nearly a necessity for new parking in front of the grocery /restaurant, though here, as well, curb cut leading to a SWM treatment or detention is an option. Please feel free to call if any questions. Thank you J. Anderson 434.296-5832 -x3069 SDP201900058 2415 Ivy Road Commercial Redev ISP rev121219 plus waiver Review Comments for SDP201900058 11nitial Site Plan Project Name: 2416 Ivy Rd Commercial Redevelopment Plan - Initial - Electronic Submittal Date Completed: Friday, November 08, 2019 DepartmentlaivisionlAgency: Review sus: Reviewer: Andrew Slack CDD E911 I No Objection Nd No objection_ Page: County of Albemarle Printed On: '12)1 T2 119 Review Comments for SDP201900058 11nitial Site Plan Project Name: 2416 Ivy Rd Commercial Redevelopment Plan - Initial - Electronic Submittal Date Completed: Thursday, November 21, 201 DepartmentlaivisionlAgency: Review Sys: Reviewer: Michael Dellinger -E CDD Inspections Requested Changes Nd 212 parking spaces requires 8 accessible spaces, please identify_ n Proposed restaurant will require a grease trap, please itentify how this will be accomplished_ Please provide a detail for accessible parking signage_ Add the follo}r5,ing to the general notes page: All roof drains shall discharge in a manner not to cause a pLiblic nLiisance and not over sidewalks_ Page: County of Albemarle Printed On: '12WV20'19 Review Comments for SDP201900058 11nitial Site Plan Project Name: 2415 Ivy Rd Commercial Redevelopment Plan - Initial - Electronic Submittal Date Completed: Wednesday, December 04, 01 DepartmentlaivisionlAgency: Review Sys: Reviewer: Shawn Maddox Fire Rescue Requested Changes 1 _ For any building with a height of 30' or higher the travel way shall be 6' of unobstructed clear width for one contiguous side of the building_ These areas shall be marked NO PARKING FIRE LANE_ 2. The turning radiLis for the "fire access aroUnnd the building" portion of the plan appears to be such an angle that apparatus cannot make that turn based on current configuration- 3- Hydrants will need to be added on the site_ Hydrants shall be provided with a 500' spacing, such that YOU are not more than 50' of travel distance from a hydrant_ A hydrant shall also be provided within 100' of any FDD required on this site 4_ FDD's shall be shown on the site plan for each structure and must have a hydrant within 100 of each FDD 5_ Provide the ISO needed fire flow calculation for each structure and a recent fire flow test showing the available fire flow on the site- 6- Knox Boxes are required for each structure_ Please add a note indicating this requirement and that the location can be coordinated with the fire marshal's office_ Page: County of Albemarle Printed On: 12 10120'19 Charles A. Kilpatrick, F.E. Commissioner COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road - Culpeper, Virginia 22701 December 06, 2019 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Christopher Perez Re: 2415 Ivy Road Commercial Redevelopment Plan — ISP SDP-2019-00058 Review #1 Dear Mr. Perez: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Collins Engineering, dated October 21, 2019, revised November 04, 2019, and offer the following comments. 1. The existing sidewalk along SR 250 is a narrow asphalt path without existing CG-12 or crossing delineations for bicycles and pedestrians. Will the County require standard sidewalk? 2. Please replace old curb cuts with continuous curb or acceptable edge of pavement. 3. Entrance geometry (including curb radii) must meet standards found in the Road Design Manual, Appendix F. 4. Interconnectivity should be considered with the gas station to help alleviate the existing congestion and points of conflict. 5. Please provide sight distance lines and profile for entrance onto Ivy Road (SR 250. 6. Entrance location does not meet required spacing from a signalized intersection and other entrances as detailed in Appendix F of the VDOT Road Design Manual. 7. Is the proposed entrance intended to be a partial access? If so, it must be physically restricted. 8. Please show mill and overlay on plans in accordance with WP-2. Show limits of mill and overlay to adjacent travel lane. Also, please add the WP-2 detail to the plans. 9. Please provide an MOT plan in accordance with the Virginia Work Area Protection Manual. MOT plan should be on a separate sheet and designed for this project, include the proposed mill and overlay. 10. Landscaping plants and trees adjacent to the sight distance triangle will need to be maintained in area between 2 and 7 feet above ground as a clear zone to preserve sight Iines and accommodate pedestrians. 11. Please provide sufficient information on the plans to evaluate the grading and drainage aspects of the entrances and public roadway. Please note that the final site plan must show conformance with the VDOT Road Design Manual Appendices B (1) and F, as well as any other applicable standards, regulations, or other requirements. Please provide two copies of the revised plan along with a comment response letter. If further information is desired, please contact Max Greene at 434-422-9894. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the VDOT Charlottesville Residency Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, & C L' Grd7.(./' Adam J. Moo , P.E. Area Land Use Engineer Culpeper District VirginiaDOT.org WE KEEP VIRGINIA MOVING WE KEEP VIRGINIA MOVING Christopher Perez From: Richard Nelson <rnelson@serviceauthority.org> Sent: Tuesday, December 3, 2019 2:44 PM To: Christopher Perez Subject: SDP201900058 - 2415 Ivy Road Commercial Redevelopment Plan - Initial CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Chris, I recommend SDP201900058 - 2415 Ivy Road Commercial Redevelopment Plan — Initial for approval with the following conditions: RWSA will need to approve the proposed sewer connection. The water meter called out to be replaced is listed as serving 2405 Ivy Road in our records. The water line called out as existing fire line is most likely the 1.5 inch meter serving 2415 Ivy Road. Provide fixture counts to determine water meter size. If water meter upgrades are needed, the appropriate connection fee will be charged. Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434) 977-4511 Christopher Perez From: Dyon Vega <DVega@rivanna.org> Sent: Wednesday, November 27, 2019 10:27 AM To: Christopher Perez Cc: vfort@rivanna.org; Richard Nelson Subject: 2415 Ivy Road Commercial Redevelopment comments Attachments: 2- Currell Corporation Plat 050819.pdf, RWSA General Notes.doc CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Chris, RWSA has reviewed the Initial Site Plan for 2415 Ivy Road Commercial Redevelopment Plans dated 12/21/19 by Collins engineering and has the following comments. General Comments: 1. RWSA is seeking easements for a future raw water main along the western boundary line of this parcel. A plat showing the proposed easements (attached) was previously provided to the property owner for consideration. The proposed water line route would have no apparent impact on the proposed site plan. We request that the easements be reviewed in conjunction with the site review process, and if acceptable to property owner, that these easements be shown on the final site plan. 2. RWSA would like more information on the proposed use of the manufacturing space and estimated sewer flows to determine if a sewer flow capacity request will be required for final site plan approval. 3. Please include the RWSA General Water and Sewer Notes (attached) on the final site plan. Sheet 3: 1. Label RWSA 12" VCP Sanitary Sewer Line with ownership, material, and diameter. Label RWSA Sanitary Sewer Easement with ownership. 2. Include a profile in the final site plan showing the proposed 6" tie-in to the RWSA sanitary sewer manhole. 3. Include the following sewer connection notes on the final site plan: o All connections to RWSA manholes shall be watertight and made with a flexible rubber boot. o All coring methods, the coring contractor and all materials for construction shall be approved by RWSA in writing prior to construction. o RWSA Engineering Staff shall be present for all cores into the manholes. Contact RWSA Engineering a minimum of 3 business days in advance to schedule a core of a manhole. o Bypass pumping may be required at the sole discretion of RWSA staff. o Grouting of the manhole bench or interior may be required, at the sole discretion of RWSA staff, for a smooth transition of flow. o Existing manholes shall be backfilled to original grade to the satisfaction of RWSA. Sheet 4: 1. Label RWSA 12" VCP Sanitary Sewer Line with ownership, material, and diameter. Label RWSA Sanitary Sewer Easement with ownership. 2. There is significant grading over the RWSA 12" clay sewer main for the future travelway connection to adjacent parcels. Care should be taken to ensure the RWSA sewer line is protected during grading activities and that minimum cover requirements are met. Depending on the depth of the sewer main at this crossing, additional permanent protective measures may be needed, such as replacement with ductile iron pipe or concrete encasement. Sheet 6: There is an existing storm drain that crosses over the RWSA sanitary sewer main in the vicinity of the proposed sanitary sewer lateral and travelway connection which may be in conflict with the utility connection, grading, and planting. This storm drain should be shown on all sheets. Ownership of the storm sewer is currently unknown. Label RWSA 12" VCP Sanitary Sewer Line with ownership, material, and diameter. Label RWSA Sanitary Sewer Easement with ownership. No trees are allowed in the existing RWSA sewer easement. Let me know if you have any questions. Dyon Vega Civil Engineer RIVA IN TNI WATERII SEWERAUTHQRITY Rivanna Water & Sewer Authority (434) 977-2970, Ext. 170 695 Moores Creek Lane Charlottesville, VA 22902 www.rivanna.org NOTES 1. THE PARCEL IDENTIFICATION NUMBER FOR THE PROPERTY SHOWN HEREON /S 06000-00-00-025AO 2. NO TITLE REPORT FURN/SHED. THIS PLAT /S SUBJECT TO ANY EASEMENTS AND RESTRICTIONS OF RECORD. 3. BOUNDARY /NFORMAT/ON SHOWN HEREON /S BASED ON DEEDS AND PLATS OF RECORD. 4. LOT A /S RECORDED IN DEED BOOK 1490 AT PAGE 461, SURIWEYOR S' CERTIFICATE /, RYAN J. DREELIN, A DULY LICENSED LAND SURVEYOR 11V THE COMMONWEAL TH OF VIRGIN/A, DO HEREBY CERTIFY THAT THE PROPERTY SHOWN HEREON /S NOW 11V THE NAME OF CURRELL CORPORATION AS RECORDED /N CHARTER BOOK 17 AT PAGE 59 AMONG THE LAND RECORDS OF ALBEMARLE COUNTY, V/RG/NIA. RYAN / DREELIN LAND SURVEYOR NLTH l� �v A RYAN J. DREELIN y Lic. No. 003186 `�O SUR�01 AREA TABUMT/ON RWSA PERMANENT WATERL/NE EASEMENT .........4,500 SO. FT ....................... 0.1033 ACRE TEMPORARY CONSTRUCT/ON EASEMENT ................ 6, 069 SQ, FT....................... 0.1393 ACRE OLD GARTH ROAD ROPE BERWICK TE ROAD WELLINGTON DRIVE Q GOLF COURSE OR/VE B/RDWOOD DRIVE V VICINITY MAP SCALE 1 '=4, 000' PLAT SHOWING A RWSA PERMANENT WATERLINE EASEMENT AND TEMPORARY CONSTRUCT/ON EASEMENT TO BE ACQUIRED BY RIVANNA WATER AND SEWER AUTHOR/TY ON THE LAND OF CURRELL CORPORATION SAMUEL MILLER MAGISTERIAL DISTRICT ALBEMARLE COUNTY, VIRGINIA SCALE 1 "--100' MAY 7, 2019 SHEET 1 OF 2 100 0 50 100 1 inr±h = 1(10 feet. a Z o Q� z W � o E--lQa- 0 Qoo �0 a � z z w> Q (U) vV) Q' 0 � y�I J m wr w LLJ Of z� w 0 00 00 I 17-094 r.-l��xy ff�Sl#lfr � - 118.66' TEMPORARY CONSTRUCTION ESMT. (HEREBY GRANTED) N06'15'02'W 677.07' EX. 90' RWSA SANITARY SEWER ESMT. (D. B. 593, PG. 334)co V \O z =42.74 0� A=10.00' RWSA PERMANENT o ♦ U1 z WATERLINE ESMT. /�0(P�l �O z (HEREBY GRANTED G� P � g LOT A �� C-, , N CURRELL CORPOR4T/ON #2415 NY ROAD VCS >g83 NORTH (SOUTH ZONEc LINE TABLE LINE BEARING DISTANCE L 1 N76°14'17'1W 797.70' Z2 544 32 38'W 20. 62' L3 50533'42E 406, 67' L4 50257'17'E 705.93, L5 544 32 38'W 15.85' L6 50533'42E 402..22' L7 50257'17'E 225.57' CURVE TABLE CURVE RADIUS LENGTH TANGENT CHORD BEARING DEL TA Cl 2962.75' 206.84' 103.46' 206.80' S43°50'17'E 4 00'00" PQ OSC �bCD G w> z>Q Q �Q Q®o PLAT SHOWING A RWSA PERMANENT WATERLINE EASEMENT x w El AND w TEMPORARY CONSTRUCT/ON �4 z EASEMENT w TO BE ACOUIRED BY co • ,p,LTH °F�r R1VANNA WATER AND SEWER AUTHOR/TY ON THE LAND OF 21, RYAN J. DREELIN CURRELL CORPORATION Lic. No. 003186 SAMUEL MILLER MAGISTERIAL DISTRICT ALBEMARLE COUNTY, VIRGINIA ' 2019 `44� SUR�1���� SCALE.• 1'SHEET 2 OM2 7, 100 0 50 100 17094 Rivanna Water & Sewer Authority (RWSA) General Water & Sanitary Sewer Notes Last Revised: April 2016 1. All materials and methods of construction shall comply with the latest version of the General Water and Sewer Design and Construction Standards — Version 1.0, adopted in December 2015, except as modified below or modified in special notes. 2. RWSA shall approve all construction materials and methods of construction. A preconstruction conference shall be held with RWSA prior to the start of any work. 3. The contractor shall be responsible for notifying Miss Utility (1-800-552-7001). 4. RWSA Engineer (Victoria Fort at (434) 977-2970 ext. 205) shall be notified three business days prior to the start of construction. 5. All work is subject to inspection by RWSA staff. No tie-ins to the existing system shall be made without coordination with and the presence of RWSA staff. No work shall be conducted on RWSA facilities on weekends or holidays without special written permission from RWSA. 6. For sanitary sewer line construction: RWSA may require bypass pumping for tie-ins to the existing system. All doghouse manholes must be pressure -tested before a connection is made to the system. 7. The location of existing utilities as shown on the plans is from data available at the time of design and is not necessarily complete or accurate. The Contractor shall be responsible for the verification of the location, size and depth of all existing utilities, both surface and subsurface. The Contractor shall immediately notify the Engineer of any discrepancies between the plans and field conditions. The Contractor shall use due diligence to protect all utilities and structures from damage at all times, whether shown on the plans or not. Damage to any existing utilities shall be repaired by the Contractor to the original condition at no additional cost to the Owner. 8. Erosion and sediment control facilities shall not be permitted in the RWSA easement without special written permission from RWSA. No grading shall be permitted in the RWSA easement unless permitted otherwise by RWSA in writing. 9. No blasting shall be permitted within 100 feet of RWSA facilities without written permission and RWSA approval of the blasting plan. Ground monitoring during blasting and a pre -blast survey may be required. For blasting within 100 feet of any operative RWSA sewerlines, bypass pumping and/or pre- and post -CCTV may be required. RWSA may also require certification from a licensed professional engineer stating that the proposed blasting will not damage any RWSA facilities. Damage to any utilities due to blasting shall be repaired by the Contractor to the original condition at no additional cost to the Owner. 10. The contractor shall observe minimum separation requirements for utility crossings. When a crossing is made under an existing facility, adequate structural support shall be provided for the existing pipe. The area of the crossing shall be backfilled with compacted 57 stone to the springline of the existing pipe. 11. New water main installations shall be pressure tested, chlorinated, flushed and have water samples approved prior to making any permanent connection to the public water system. Approved methods of filling and flushing new water mains will be required to prevent any contamination of the public water system. 12. All easements for new RWSA facilities shall be recorded prior to placing the new facilities into service. 13. No permanent structural facilities will be permitted in the RWSA easement. This includes building overhangs, retaining walls, footers for any structure, drainage structures, etc. 14. Trees are not permitted in the RWSA easement.