HomeMy WebLinkAboutSDP201900073 Review Comments Initial Site Plan 2019-12-16COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
Site Plan Review
Project title: Overlook Hotel — Initial Site Plan
Project file number: SDP2019-00073
Plan preparer: Shimp Engineering, 912 E. High St. Charlottesville, VA 22902
Justin M. Shimp; justinAshimp-en in�g com
Owner or rep.: DJCM Investments, LLC, 1389 Richmond Road, Charlottesville, VA 22911
Plan received date: 2 Dec 2019
Date of comments: 16 Dec 2019
Plan Coordinator: Christopher Perez
Reviewer: John Anderson
SDP2019-00073
For Initial Site Plan Approval
1. Provide retaining wall (RW) preliminary height (ht.) on south side of hotel.
2. Certificate of plat, bk.-pg. 2905-346, aligns with SPD2019-00073, C2. Ref. plat, bk.-pg. 2905-351, and
revise C2 to show: 30' landscape, tree conservation, 15Tgas, 20' drainage and 20' sewer easements across
TMP 78-73A7.
3. Ref. plat at bk.-pg. 3045-566, and revise C2 with labels that identify `1,884 S.F. Overlap Area' along N
boundary of TMP 78-73A7; provide bk.-pg. ref. to this overlap strip.
4. Additional comments are possible once existing (recorded) sewer, drainage, landscape, gas, and tree
conservaiton easements are shown.
5. C2: Show nearest Ex. storm inlet on US Rte. 250.
6. Provide additional existing on -site contour labels.
7. Label commercial entrace radius.
8. Label VDOT right-of-way.
9. Provide conceptual stormwater quality narrative (purchase nutrient credits, on -site SWM, etc.).
10. Provide conceptual stormwater quantity narrative to supplement C4 UG system graphic linework.
11. Provide preliminary new development VaRRM.xls (post -developed) TP reduction (lb./yr); support item 9.
For Final Site Plan Approval
1. VSMP /WP02019-xxxxx approval is required prior to FSP approval. VSMP /WPO Plan may be submitted.
If not, please submit VSMP /WPO Application at earliest convenience.
2. SWM facility and any public drainage easements must be recorded prior to VSMP /WPO plan approval.
C3
3. Revise to include sidewalk width near US Rt. 250.
4. Label steep slopes (dashed) linework.
5. Label HC-parking space dimensions.
6. Label trails, if any.
7. Name /label walls.
8. Label CG-12.
9. Provide stop sign at site entrance.
Engineering Review Comments
Page 2 of 4
10. Dimension internal parking area/s: aisle, space width /length. Label 10'-1 V space in front of 22 internal
parking spaces, N side of hotel. If this is pedestrian space provide bumper blocks for these 22 spaces.
11. Recommend label internal parking area 'I -story parking.'
12. Label important site features: stairs (pedestrian connection to Abbey Road); loading area, etc.
13. Obtain, record, show and label off -site easement pedestrian connection to Abbey Road.
14. Provide /show distance to Hansen Rd. intersection. Distance appears to be approx. 280-ft. Ensure design
meets Min. VDOT entrance separation for Rt. 250 roadway classification, and speed.
15. Provide VDOT guardrail for parking spaces on N side of hotel (VDOT GR-1).
16. If sidewalk along N face of hotel is flush with asphalt pavement, provide wall (or other barrier) to separate
pedestrians and vehicle traffic. Else revise to show CG-2 /CG-6 with 5' sidewalk.
17. Dimension loading area. Ensure Min. vertical clearance is unobstructed by structures, or tree canopy.
18. Label parking aisle width at narrowest point (near curb R12.0' label).
19. Provide and label HC parking space signs.
C4
20. Provide spot elevations at site entrance to indicate whether US Rt. 250 street runoff enters the site.
21. Provide spot elevations to guide commercial entrance construction, given existing grade at US Rt. 250.
22. Proposed retaining wall, N side of building, approaches 30' ht. in places. Provide GR-1 for all parking,
north of hotel, and for the five parking spaces proposed along the west edge of the parking lot.
23. Provide and label CG-6. Ref. recent meeting /discussion (Ecovillage Charlottesville; see 18-4.12.15.p.)
24. Label proposed terrain contours.
25. Show existing sanitary sewer.
26. Show proposed gas line service.
27. Show proposed /existing waterlines.
28. Show roof leader line connections to SWM.
29. Provide LD-204, LD-229, and storm line profiles.
30. Ensure positive drainage away from patio, and port cochere.
31. Ensure underground SWM system can be installed or replaced without encroaching on nearest retaining
wall. See easement diagram, ACDSM, pg. 15.
32. Show and label railings for retaining walls, N and S sides of hotel, including highest elev. of 3-tier walls.
33. Show proposed grading required for retaining walls; for example: walls near Rt. 250 do not tie to existing
grade. Tie proposed grading for retaining walls to existing grade.
34. Provide design to capture weep hole drainage at base of tiered walls.
35. Label radius of dashed -circle at lower parking elevation, an area for fire -rescue apparatus turnaround.
36. Engineering anticipates ACF&R request for on -site fire hydrant, given 230' and 270' distance to Ex. FHs,
east and west of site. Engineering defers to ACF&R.
37. Ensure UG SWM Facility cover is adequate for fire -rescue apparatus (-66 ton apparatus).
38. C2 existing contours indicate a natural stormwater conveyance exists along N property boundary. Design
shows -30-ft. wall near this (off -site /US Rt. 250) natural storm (conveyance) channel. Accommodate Ex.
drainage easement /gully /culvert, bk.-pg. 3045-558 (see, below_). Walls may not encroach Ex. easement/s.
7MP 4784PO4-40-013A4
DRAINAGE EASEMENT
V DRAINAGE EASEMENT D B. 407. .� D.B. 1132, PG. 118
r----- PG. 86JPLAT)OUL1 -T-�
SEE
SEE DETAIL/I! ---------_N69�.iC-ems --r'�� r�1; Lt �DETAIL#2
! "A" S83"5T42" W 4521T F-"
L=----_j BOUNDARYLINE"A Ir _ _ IN -- -J
OVERLAP AREA
HURT INVESTMENT COMPANY
A 988
D.B. . M. 128
39. Provide spot elevations to ensure positive drainage and no nuisance ponding in parking areas.
40. Obtain /record and show temporary construction and/or permanent grading easements required to construct
retaining walls (RW) on S side of hotel. Note: segmental block RW design would require one or both, and
would also require a Maintenance Easement on TMP 78-73B 1 (installation /repair /replacement of geogrid).
Engineering Review Comments
Page 3 of 4
41. Provide sealed geotechnical retaining wall design to Engineering prior to FSP approval.
42. Wall ht. >3-ft. requires a building permit; ht. >4-ft. requires sealed geotechnical retaining wall (RW,) design.
43. Show grading and paved storm runoff channel along top of retaining wall on N side of hotel (paved since
fill section); provide grading and paved runoff channels along top of retaining walls on S side of hotel
(paved given steepness /length of slopes above walls). Also, item 55, below.
44. Show waterline connection to proposed 15' fountain.
45. Provide one or more grate -style drains for 15' fountain, for incidental water that may create hazard.
46. Ensure proposed grading on managed steep slopes at west end of site conforms with any applicable
construction standard listed at 18-30.7.5 (benched grading may be required).
47. Provide armored design for channel created by proposed /existing grade, west end of site. Also, item 43.
C5
48. Engineering recommends additional landscape screening on N side of hotel, above the retaining wall to
discourage trespass. A fall from 30' height presents risk of injury or death.
49. Note: Additional landscape plantings should discourage trespass, but not compromise wall design.
50. Note (WPO plan -related): For slopes steeper than 3:1, propose vegetative cover hardier than grass that does
not require mowing, and that requires minimal (if any) maintenance.
51. Provide plant schedule.
52. Ensure plant types proposed near base of 3-tier wall along S boundary near US Rt. 250 do not compromise
integrity of wall; recommend consider whether proposed plant types will thrive in this narrow space.
53. Ensure Min. 2' clearance between FC and'h mature tree trunk DIA for 15 parking spaces, S side of site.
C6:
54. Provide typical details, including VDOT IS-1, SL-I.
55. Provide paved storm runoff (RW) channel detail.
56. Provide water /sanitary sewer details.
57. Provide roof leader line detail.
58. Provide VDOT GR-1 detail.
59. Provide stairway detail/s.
60. Provide standard handrail detail (VDOT HR-1) for retaining wall on N side of hotel; decorative railing is
insufficient, given wall height.
61. Revise pavement and dumpster pad details, eliminate `T symbol.
• • • .. raaaDPacorAc�re
000000000a00000a 9 WOI q1A en�sTohE
CO/�iAC1rD SLRGAADE
NK CBIMO
1 TYPICAL. SIDEWALK SECTION
SRot is sm.
7' Of 51YM1 SVKWAW
060
G�C�ndn�e�C�GnG� A'i VDOT 021A8ASf510FF
- C PA D511R(.RADE
10%F3flD VERFIFD
sQTYPICAL PAVEMENT SECTION FOR PARKING LOT
ci Not To 5-de
LClIM
.fAY5
7- 6
Ai A,
A A7COO 57RCNMLE
=FIWCRCW.DRM
BARS ATt70C
`
A" CWAC
ACTED SuEC+ADE
"Mcow"
3 Dum sler Wad Deta1
TOIEmDy�
T. des.
62. Min CBR =10.0 is typical. Please clarify design intent of Min. CBR =6.0. Request for clarification, only.
Engineering Review Comments
Page 4 of 4
Please feel free to call if any questions. Thank you
J. Anderson 434.296-5832 -0069