Loading...
HomeMy WebLinkAboutSDP201900073 Review Comments Initial Site Plan 2019-12-16COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Site Plan Review Project title: Overlook Hotel — Initial Site Plan Project file number: SDP2019-00073 Plan preparer: Shimp Engineering, 912 E. High St. Charlottesville, VA 22902 Justin M. Shimp; justinAshimp-en in�g com Owner or rep.: DJCM Investments, LLC, 1389 Richmond Road, Charlottesville, VA 22911 Plan received date: 2 Dec 2019 Date of comments: 16 Dec 2019 Plan Coordinator: Christopher Perez Reviewer: John Anderson SDP2019-00073 For Initial Site Plan Approval 1. Provide retaining wall (RW) preliminary height (ht.) on south side of hotel. 2. Certificate of plat, bk.-pg. 2905-346, aligns with SPD2019-00073, C2. Ref. plat, bk.-pg. 2905-351, and revise C2 to show: 30' landscape, tree conservation, 15Tgas, 20' drainage and 20' sewer easements across TMP 78-73A7. 3. Ref. plat at bk.-pg. 3045-566, and revise C2 with labels that identify `1,884 S.F. Overlap Area' along N boundary of TMP 78-73A7; provide bk.-pg. ref. to this overlap strip. 4. Additional comments are possible once existing (recorded) sewer, drainage, landscape, gas, and tree conservaiton easements are shown. 5. C2: Show nearest Ex. storm inlet on US Rte. 250. 6. Provide additional existing on -site contour labels. 7. Label commercial entrace radius. 8. Label VDOT right-of-way. 9. Provide conceptual stormwater quality narrative (purchase nutrient credits, on -site SWM, etc.). 10. Provide conceptual stormwater quantity narrative to supplement C4 UG system graphic linework. 11. Provide preliminary new development VaRRM.xls (post -developed) TP reduction (lb./yr); support item 9. For Final Site Plan Approval 1. VSMP /WP02019-xxxxx approval is required prior to FSP approval. VSMP /WPO Plan may be submitted. If not, please submit VSMP /WPO Application at earliest convenience. 2. SWM facility and any public drainage easements must be recorded prior to VSMP /WPO plan approval. C3 3. Revise to include sidewalk width near US Rt. 250. 4. Label steep slopes (dashed) linework. 5. Label HC-parking space dimensions. 6. Label trails, if any. 7. Name /label walls. 8. Label CG-12. 9. Provide stop sign at site entrance. Engineering Review Comments Page 2 of 4 10. Dimension internal parking area/s: aisle, space width /length. Label 10'-1 V space in front of 22 internal parking spaces, N side of hotel. If this is pedestrian space provide bumper blocks for these 22 spaces. 11. Recommend label internal parking area 'I -story parking.' 12. Label important site features: stairs (pedestrian connection to Abbey Road); loading area, etc. 13. Obtain, record, show and label off -site easement pedestrian connection to Abbey Road. 14. Provide /show distance to Hansen Rd. intersection. Distance appears to be approx. 280-ft. Ensure design meets Min. VDOT entrance separation for Rt. 250 roadway classification, and speed. 15. Provide VDOT guardrail for parking spaces on N side of hotel (VDOT GR-1). 16. If sidewalk along N face of hotel is flush with asphalt pavement, provide wall (or other barrier) to separate pedestrians and vehicle traffic. Else revise to show CG-2 /CG-6 with 5' sidewalk. 17. Dimension loading area. Ensure Min. vertical clearance is unobstructed by structures, or tree canopy. 18. Label parking aisle width at narrowest point (near curb R12.0' label). 19. Provide and label HC parking space signs. C4 20. Provide spot elevations at site entrance to indicate whether US Rt. 250 street runoff enters the site. 21. Provide spot elevations to guide commercial entrance construction, given existing grade at US Rt. 250. 22. Proposed retaining wall, N side of building, approaches 30' ht. in places. Provide GR-1 for all parking, north of hotel, and for the five parking spaces proposed along the west edge of the parking lot. 23. Provide and label CG-6. Ref. recent meeting /discussion (Ecovillage Charlottesville; see 18-4.12.15.p.) 24. Label proposed terrain contours. 25. Show existing sanitary sewer. 26. Show proposed gas line service. 27. Show proposed /existing waterlines. 28. Show roof leader line connections to SWM. 29. Provide LD-204, LD-229, and storm line profiles. 30. Ensure positive drainage away from patio, and port cochere. 31. Ensure underground SWM system can be installed or replaced without encroaching on nearest retaining wall. See easement diagram, ACDSM, pg. 15. 32. Show and label railings for retaining walls, N and S sides of hotel, including highest elev. of 3-tier walls. 33. Show proposed grading required for retaining walls; for example: walls near Rt. 250 do not tie to existing grade. Tie proposed grading for retaining walls to existing grade. 34. Provide design to capture weep hole drainage at base of tiered walls. 35. Label radius of dashed -circle at lower parking elevation, an area for fire -rescue apparatus turnaround. 36. Engineering anticipates ACF&R request for on -site fire hydrant, given 230' and 270' distance to Ex. FHs, east and west of site. Engineering defers to ACF&R. 37. Ensure UG SWM Facility cover is adequate for fire -rescue apparatus (-66 ton apparatus). 38. C2 existing contours indicate a natural stormwater conveyance exists along N property boundary. Design shows -30-ft. wall near this (off -site /US Rt. 250) natural storm (conveyance) channel. Accommodate Ex. drainage easement /gully /culvert, bk.-pg. 3045-558 (see, below_). Walls may not encroach Ex. easement/s. 7MP 4784PO4-40-013A4 DRAINAGE EASEMENT V DRAINAGE EASEMENT D B. 407. .� D.B. 1132, PG. 118 r----- PG. 86JPLAT)OUL1 -T-� SEE SEE DETAIL/I! ---------_N69�.iC-ems --r'�� r�1; Lt �DETAIL#2 ! "A" S83"5T42" W 4521T F-" L=----_j BOUNDARYLINE"A Ir _ _ IN -- -J OVERLAP AREA HURT INVESTMENT COMPANY A 988 D.B. . M. 128 39. Provide spot elevations to ensure positive drainage and no nuisance ponding in parking areas. 40. Obtain /record and show temporary construction and/or permanent grading easements required to construct retaining walls (RW) on S side of hotel. Note: segmental block RW design would require one or both, and would also require a Maintenance Easement on TMP 78-73B 1 (installation /repair /replacement of geogrid). Engineering Review Comments Page 3 of 4 41. Provide sealed geotechnical retaining wall design to Engineering prior to FSP approval. 42. Wall ht. >3-ft. requires a building permit; ht. >4-ft. requires sealed geotechnical retaining wall (RW,) design. 43. Show grading and paved storm runoff channel along top of retaining wall on N side of hotel (paved since fill section); provide grading and paved runoff channels along top of retaining walls on S side of hotel (paved given steepness /length of slopes above walls). Also, item 55, below. 44. Show waterline connection to proposed 15' fountain. 45. Provide one or more grate -style drains for 15' fountain, for incidental water that may create hazard. 46. Ensure proposed grading on managed steep slopes at west end of site conforms with any applicable construction standard listed at 18-30.7.5 (benched grading may be required). 47. Provide armored design for channel created by proposed /existing grade, west end of site. Also, item 43. C5 48. Engineering recommends additional landscape screening on N side of hotel, above the retaining wall to discourage trespass. A fall from 30' height presents risk of injury or death. 49. Note: Additional landscape plantings should discourage trespass, but not compromise wall design. 50. Note (WPO plan -related): For slopes steeper than 3:1, propose vegetative cover hardier than grass that does not require mowing, and that requires minimal (if any) maintenance. 51. Provide plant schedule. 52. Ensure plant types proposed near base of 3-tier wall along S boundary near US Rt. 250 do not compromise integrity of wall; recommend consider whether proposed plant types will thrive in this narrow space. 53. Ensure Min. 2' clearance between FC and'h mature tree trunk DIA for 15 parking spaces, S side of site. C6: 54. Provide typical details, including VDOT IS-1, SL-I. 55. Provide paved storm runoff (RW) channel detail. 56. Provide water /sanitary sewer details. 57. Provide roof leader line detail. 58. Provide VDOT GR-1 detail. 59. Provide stairway detail/s. 60. Provide standard handrail detail (VDOT HR-1) for retaining wall on N side of hotel; decorative railing is insufficient, given wall height. 61. Revise pavement and dumpster pad details, eliminate `T symbol. • • • .. raaaDPacorAc�re 000000000a00000a 9 WOI q1A en�sTohE CO/�iAC1rD SLRGAADE NK CBIMO 1 TYPICAL. SIDEWALK SECTION SRot is sm. 7' Of 51YM1 SVKWAW 060 G�C�ndn�e�C�GnG� A'i VDOT 021A8ASf510FF - C PA D511R(.RADE 10%F3flD VERFIFD sQTYPICAL PAVEMENT SECTION FOR PARKING LOT ci Not To 5-de LClIM .fAY5 7- 6 Ai A, A A7COO 57RCNMLE =FIWCRCW.DRM BARS ATt70C ` A" CWAC ACTED SuEC+ADE "Mcow" 3 Dum sler Wad Deta1 TOIEmDy� T. des. 62. Min CBR =10.0 is typical. Please clarify design intent of Min. CBR =6.0. Request for clarification, only. Engineering Review Comments Page 4 of 4 Please feel free to call if any questions. Thank you J. Anderson 434.296-5832 -0069 SDP20190007J VVG11U W( FIVLLA 1Jr 161U