I have prepared the following summary in response to your comments and concerns:
A. General
1. Comment: Please submit a final site plan(FSP) amendment for approval. The WPO plan must
be approved prior to FSP approval. If this was the site plan sorry it was submitted with the
WPO application form.Please submit site plans & application separately for review.
Response: A separate site plan has been submitted to the county for review.
2. Comment: Sheet 1: Remove `Amendment to SDP 2014-0065". Add WPO number under title
—WP0201900033. Remove approval's block(not needed for WPO plan).
Response: The WPO number has been added to the title block and the approval block has
been removed.
B. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must
contain(1) a PPP, (2) an ESCP, (3) a SWMP, and(4) any TMDL measures necessary.
1. Comment: Registration Statement — Provide existing General Permit number if still active;
Otherwise, submit new registration form (attached). The MS-4 operator is the County of
Albemarle(please correct).
Response: A signed registration statement was provided.with the previous submittal. A
copy of the statement is provided with this revision.
2. Comment: Please submit the SWPPP—template found here:
http://www.albemarle.org/uploadlimages/forms_center/departments/Community_Development/f
orms/Engineering_and_WPO—Forms/Stormwater—Pollution—Prevention—Plan—SWPPP—
template.
PDF
Response: A SWPPP will be provided by the contractor under separate cover.
3040 Avemore Square Place •Charlottesville,VA 22911
Telephone(434) 984-2700 •Fax(434) 978-1444
Charlottesville'Lynchburg
C. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
1. Comment: Show any proposed clearing/grading activities, paving operations, landscaping
operations,E&S controls, staging, stockpile,borrow, fueling,waste disposal, vehicle/equipment
washing, concrete washout locations on the PPP.Also, show locations where concentrated
stormwater discharges.
Response: The PPP will be provided with SWPPP.
D. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP.
This plan is disapproved, and the reasons are provided in the comments below. The stormwater
management plan content requirements can be found in County Code section 17-403.
1. Comment: Sheet 10: It appears that under 9VAC25-870-96. Water quality. B. 4. Situation 4
applies. Determine pollutant load entering BMP(s), pollutant load removed by BMP(s), and
verify compliance is met.
Input the values for the impervious cover computation. The existing site is a parking lot
with imperious cover>20%. Please use the RR value of 19.45 lbs determined from the
water quality worksheet to make comparison. It appears that an additional (19.45-
18.96=0.49) 0.49 lbs of phosphorus nutrient credit is required.
Response: As discussed water quality for the proposed improvements is provided with the
existing Stormfilter, Vortechs, and Filterras. Please refer to the pollutant removal
calculations on the plans for details.
2. Comment: The stormwater narrative incorrectly lists `WPO# 2014-00065' (Our Ladies of the
Angels Monastery project). I believe the earlier approved plan was WP0201400102.
Response: The stormwater narrative has been revised to show the correct WPO number.
3. Comment: Submit an amendment to WPO201400065 showing the reduction of remaining
BMP phosphorus nutrient credits available for the site will be used by this project
WPO201900033.
Response: As discussed water quality for the proposed improvements is provided with the
existing Stormfilter, Vortechs, and Filterras. The excess phosphorous removal from
WP0201400065 is being utilized to satisfy the requirements for this development.
4. Comment: Show building's roof drain(s) and where its outfalls or connects to.
Response: The roof drain leased has been added to the plans as requested.
3040 Avemore Square Place • Charlottesville,VA 22911
Telephone(434)984-2700 •Fax(434)978-1444
Charlottesville•Lynchburg
Page 2 of 3
E. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is disapproved, and the reasons are provided in the comments below. The erosion
control plan content requirements can be found in County Code section 17-402.
1. Sheet 4:
a. Comment: Show location of all existing and proposed utilities and easements with deed
book references.
Response: The existing utilities and associated deed book references are provided on the
plans.
b. Comment: Show existing streets deed book/page references.
Response: . The deed book/page references for the private streets have been added to the
plans.
2. Comment: Sheet 8: Show Construction Entrance(s) & detail. Paved construction entrance
required(DSM,pg. 8).
Response: A construction entrance and detail are provided on the plans.
We trust that the above responses and revised plans properly address the outstanding items. If
you have any questions,please contact me.
Sincerely,
WW Associates, Inc.
John D. Beirne, Jr., P.E.
Senior Project Engineer
3040 Avemore Square Place •Charlottesville,VA 22911
Telephone(434) 984-2700 •Fax(434)978-1444
Charlottesville•Lynchburg
Page 3 of 3