Loading...
HomeMy WebLinkAboutSDP201900064 Review Comments Initial Site Plan 2019-12-17r� 'AL � IRGS?at� County of Albemarle Department of Community Development Memorandum To: Kelsey Schlein- Shimp Engineering From: Megan Nedostup- Principal Planner Division: Planning Services Date: December 17, 2019 Subject: SDP-2019-064 Proffit Road Townhomes South- Initial Site Plan The Planner for the Planning Services Division of the Albemarle County Department Community Development will recommend approve the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] Requirements: 1. [32.5.2a] The front maximum setback is listed incorrectly on the cover sheet. The maximum front setback for R15 is 25 feet. Revise. 2. [32.5.2a] List the building separation requirement of 10 feet. 3. [32.5.2b] The Land Use schedule needs a number of revisions: a. The open space listed on one location states 51,717sf, then is listed as 7,OOOsf below. Open space has a definition and it's unclear if there are elements being counted as open space that are permitted as open space under the definition. b. The percentages and square feet calculations don't seem to be correct. Double check the math. The amounts provided do not seem to add up. 4. [32.5.2b] The number of parking spaces listed does not meet the requirements of the ordinance. 2.25 spaces are required for each unit, which equals 90 total required spaces. Revise to meet the requirements. 5. [32.5.2n] Label the area between the emergency access and the main entrance. Will this be open space? 6. [32.5.2n] Sidewalk connections are needed from the public sidewalks to the front of the units for pedestrian access. 7. [32.5.2n] A sidewalk connection is needed to connect the sidewalks from Private Road A to the sidewalks on Private Road C. There is only a landscape strip and pedestrian access is needed. 8. [32.5.2n] Will ramps be provided for the corners of the blocks on the sidewalks for ADA access? Show ramps. 9. [32.5.2n] Label the materials for the sidewalks and paths. 10. Will lighting be provided? If so, a lighting plan that meets the requirements of the ordinance needs to be provided with the final site plan. 11. [32.5.2n] If the tot lot will contain the equipment required in the ordinance provide a note on the plan that states that tot lot equipment will be provided in accordance with 4.16. 12. Easements will be required for sidewalk and planting strips that are contained in the lots and not within the right of way. Please contact Megan Nedostup at the Department of Community Development 296-5832 ext. 3004 for further information.