Loading...
HomeMy WebLinkAboutSDP201900060 Review Comments Initial Site Plan 2019-12-18COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 December 18, 2019 Jim Taggart Roudabush, Gale & Associates 914 Monticello Road Charlottesville, VA 22902 itiLggart@xoudabush.com RE: SDP201900060 Belvedere Phase 5 — Initial Site Plan Dear Mr. Taggart: The Site Review Committee has reviewed the development proposal referenced above. Initial comments from the following divisions of the Department of Community Development and other agencies, as applicable, are attached: Albemarle County Planning Services (Planner) Albemarle County Engineering Services (Engineer) (attached) Albemarle County Information Services (E911) (attached) Albemarle County Building Inspections (attached) Albemarle County Department of Fire Rescue (attached) Albemarle County Service Authority (attached) Rivanna Water and Sewer Authority (pending) Virginia Department of Transportation (attached) Thomas Jefferson Health District (attached) Comments reflect information available at the time the development proposal was reviewed and should not be considered final. However, the Site Review Committee has attempted to identify all issues that will be required to be resolved prior to Final Site Plan approval. Please request a six month deferral of the Initial Site Plan by Mon4.@L December 23 2019 to allow staff time needed to review resubmitted plans addressiniz these comments. W do not receive a deferral request by then I will move forward with a denial of the site plan. Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, � ,4 Brent W. Nelson Senior Planner Albemarle County Planning Services (Senior Planner) — Brent Nelson, bnelson albemarle.or — Required changes: Prior to initial site plan approval, at a minimum, comments 1-5 shall be addressed in a resubmittal. Comments to be addressed prior to the Initial Site Plan approval: I . Pay the required notices fee of $435.00. 2. [32.7.2.21 Provide a street connection to TMP 62-16A. TMP 62-16A is designated for development in the Comprehensive Plan and is within the Development Area. Revised drawings submitted must show required inter -parcel street connections to the property line, not to a phase line within the parcel. Any additional street connections provided will be considered voluntary unless required by one of the other Site Review Committee reviewers. However, even voluntary connections should be shown in the initial site plan since the addition of such connections significantly impact the layout of the development. Section 32.7.2.2 of the County Code specifies that all streets within a development shall be: a) Coordinated as to location, width, grades and drainage with other streets. This includes, but is not limited to, existing or future subdivisions or developments and by continuing the existing or planned streets into adjoining areas by dedication or reservation of right-of-way adequate to accommodate continuation of the streets. b) Be extended and constructed to the abutting property lines to provide vehicular and pedestrian interconnections to future development on adjoining lands, terminating within the development with a temporary turnaround. The arrangement of the streets shall provide adequate access to adjoining lands within the development where necessary to provide for the orderly development of the county including, but not limited to, reserving temporary construction easements of sufficient area to accommodate the future completion of the street when the adjoin lands are developed. 3. [32.5.2 (b)] Phase 1, on its own, must meet all Cluster Development requirements. Revise Site Data on Sheet 1 Cover Sheet to include total square footage of Phase 1 area. Include a table showing how the Phase 1 development meets density and open space requirements for R-4 Residential Standard Level Cluster Development. The cluster development must meet density requirements listed in SECTION 2.2.1 , minimum area requirements listed in SECTION 2.2.3 and open space requirements listed in SEC. 4.7. Label square footage of each individual open space area shown on Sheet 3 Layout Plan. 4. [32.5.2(a), 32.5.2Q)] Existing or platted streets. Road plans submitted for this development (SUB 2019-70) show a right-of-way width of 58' for the section of Fowler Street adjoining this proposal. Previously approved road plans for this section of Fowler Street (SUB 2016-213) show the right-of-way at 57' wide. Revise the Initial Site Plan drawings to clarify where the additional 1 foot of right-of-way width is located and whether it goes into the required Conservation Area. The approved/recorded plat for this Conservation Area (DB 5169/566) shows a 0.066 acre Conservation Area. If the size of the Conservation Area open space is reduced below the size approved in previous variations, a new variation will be required. Provide drawings showing the entire length of the proposed temporary fire road. The drawings should show all: • Utilities • Steep slopes • Conservation areas • Cluster development open space • Layout and proposed grading for previously approved Belvedere Phase 4A-1 (SDP 2018-59) • Layout and proposed grading for Belvedere Phase 4A-2 (SDP 2019-66) currently under review. • The relocated driveway (Belvedere Blvd Ext.) with fire road merging correctly at that same point. This information is needed to evaluate whether or not the temporary fire road is permitted in a conservation area. The term "conservation area" means an area identified on a plan submitted for approval which contains cultural assets or natural features such as non -tidal wetlands, floodplain, slopes identified in the open space element of the comprehensive plan, or streams and stream buffers, within which only limited disturbance or development is allowed. Uses allowed in conservation areas include, but are not limited to, utilities, greenways, pedestrian paths, streets, and stormwater management facilities, where, in the opinion of the County Engineer, no other location is reasonably available and when these improvements have the least impact possible on the environmental ental features of the area. Ensure that cluster development minimum open space requirements for Phase 4A-1 and Phase 4A-2 are met despite adding the temporary fire road. Both site plans would have to be amended to show the temporary fire road. Entrance to the proposed temporary fire road is blocked by proposed on -street parking spaces on Fowler Street. Correct this and update the parking schedule accordingly. 5. [32.5.2 n] "Proposed Use" on Sheet 1 Cover Sheet lists 18 single family detached units as part of Belvedere Phase 5, Part 2 but does not show them in the drawings provided. Remove this reference as this review is for Phase 1 only. Comments to be addressed with the Final Site Plan submission: 6. A site plan meeting all the requirements of section 32.6 of Chapter 18 of the Code. 7. [32.5.2(b)] Dedication of open space. Provide the following note: "Open Space is hereby dedicated to the HOA. " Provide information on the HOA that will be maintaining the open space. Ensure that the open space will be owned and maintained by an HOA. 8. [32.5.1, 32.5.2(a), 4.19] Yards. Revise Site Data on Sheet 1 Cover Sheet to give the full description for the setbacks. Ensure that all setbacks shown on the plan are accurately labeled. Non-Infill Setbacks Front Minimum - 5 feet from the right-of-way or the exterior edge of the sidewalk if the sidewalk is outside of the right-of-way Maximum — 25 feet from the right-of-way or the exterior edge of the sidewalk if the sidewalk is outside of the right-of-way Garase Minimum Front loading garage: 18 feet from the right-of-way or the exterior edge of the sidewalk if the sidewalk is outside of the right-of-way Side loading garage: 5 feet from the right-of-way or the exterior edge of the sidewalk if the sidewalk is outside of the right-of-way Maximum - None Side Minimum — 5 feet unless the building shares a common wall. Maximum — None Non-Infill Buildine Separation Minimum - 10 feet unless the building shares a common wall Maximum — None Rear Minimum — 20 feet Maximum — None 9. [32.5.2(c)] Phasing lines. Provide a note specifying that the phasing and timing of the development is after the development of Phase HB. Clearly delineate what improvements are proposed with this site plan and what is to be approved with other phases and submissions, such as Belvedere Phase JIB. 10. [32.5.2(b), 32.5.2(n), 32.5.1(c)] Dimensions. On the plan depict and dimension all proposed improvements, including buildings, driveways, garages and on -street parking spaces. This includes the single family detached lots. Since they have been included in this site plan the level of detail and information provided must be at the same level as the single family attached lots shown on the plan. 11. [32.5.2(a), 32.5.2(b), 32.5.2(i)] Information regarding the proposed use. Provide the acreages for each proposed residential lot and open space area.- 12. [32.5.2(k)] Private & public easements. Address the following: a) Provide the location and dimension of all existing and proposed private and public easements. b) Provide all required off -site easements. Off -site easements will be required for the temporary fire road and work in the portion of the yet to be built Fowler Street (NMD) adjoining the project area. c) Revise Sheet 5 Utility Plan to show the location of the proposed stormwater pond. 13. [32.5.2 (e), (n) 32.6.2(i) & 32.7.9.4 (c)] Address the following: a) Preserve all existing trees that are to remain. There are "Tree Save Areas" within the site. If they are to remain include the following: i. Areas and otherfeatures shown on landscape plan. The landscape plan shall show the trees to be preserved, the limits of clearing, the location and type of protective fencing, grade changes requiring tree wells or walls, and trenching or tunneling proposed beyond the limits of clearing. ii. Conservation checklist. The applicant shall sign a conservation checklist approved by the agent to ensure that the specified trees will be protected during construction. Except as otherwise expressly approved by the agent in a particular case, the checklist shall conform to the specifications in the Virginia Erosion and Sediment Control Handbook, pages III-393 through I1I-413, and as hereafter amended. b) On the grading plan sheet label the area of existing trees with the type of trees (evergreen, deciduous, or a mix of both) and show areas where existing vegetation will be removed. c) Ensure that all "Tree Save Areas" have trees in them and ensure areas which do not have woods are not included in the areas or in the calculation for the areas. d) Revise Sheet 11 Landscape Plan to include a street tree linear foot street frontage calculation. One large street tree is required for every 50 feet of street frontage. e) Ensure that the street trees shown will be allowed in the proposed location and if not that alternative locations are provided either within or outside of the right-of-way. If the trees will be outside of the right- of-way landscaping easements will be required with ownership and perpetual maintenance of the easements and landscaping put in place prior to the final site plan approval. 14. 132.5.2(i) & (n)] Address the following: a) Dimension the width, and centerline radii, and corner radii of all roads and ensure that the roads meet or exceed minimum road requirements. b) Show the location of any outdoor lighting. Any free standing or building mounted lighting, including front porch lights, must be shown in a photometric plan and meet all requirements. Ensure all lighting meets County requirements. 15. [32.5.2(1)] Provide the location of any existing or proposed utilities and utility easements including telephone, cable, electric and gas. Indicate the deed book and page reference for all exiting utility easements located on the property. 16. [32.5.2(e), 32.5.2(p) & 32.7.9] Provide a full landscape plan that provides all required landscaping, calculations and meets the landscaping requirements for 32.7.9. Ensure all calculations and graphics correctly represent the existing and proposed plantings and planting areas. 17. [32.5.2(b) & 32.5.2(n)] Address the following: a) Depict the parking in both the driveways and the garages in the site plan. b) Dimension the parking and/or driveways in the site plan. 18. [32.5.2(n) & 4.71 Ensure that not more than 80% of the minimum required open space is comprised of the limitations listed in Section 4.7(c)(3). 19. [32.8.21 Infrastructure improvementplans. All infrastructure required to construct Phase 5 shall be reviewed, approved, and built or bonded before the final plat and/or final site plan can be approved. This includes all offsite improvements required to serve the development, including road plans, WPO plan, water and sewer connections, some of which are part of Phase 1113. 20. [32.5.2 a] General information. a) Provide the current name of the owner, zoning district, tax map and parcel number and present use of abuttingparcels shown as Lot 197 thru Lot 201, Block 9 and all adjacent parcels including Belvedere NMD open space. 21. 132.5.2 b] Information regarding the proposed use. a) Verify that impervious cover includes buildings and driveways and revise Areas Summaries on Sheet 1 Cover Sheet if necessary. 22. [325.2 d] Topography and proposed grading. Revise Sheet 6 Grading Plan to show the location of Steep Slopes Managed. 23. [32.5.2 i] Streets, easements and travelways. Address the following: a) Show the existing and proposed streets and ensure that streets that do not exist are not shown as already existing. If they are proposed on a different site plan, that is expected to be built prior to this project, then specify that on this site plan and include the SDP number for that other site plan. b) Show the existing and proposed sidewalks and ensure that sidewalks that do not exist are not shown as already existing. If they are proposed on a different site plan, that is expected to be built prior to this project, then specify that on this site plan and include the SDP number for that other site plan. c) The proposed road centerline alignment for the previously approved section of Fowler Street east of Farrow Drive (SUB 2016-213) does not match what is shown in this application. Also, on -street parking previously approved on the south side of this section of Fowler Street and is now shown on the north side in this application. This would seem to create an awkward and dangerous traffic transition, particularly at night. 24. [32.5.2 j] Existing sewer and drainage facilities. There are waterlines shown on the site plan as "existing" that do not appear to exist. If they are proposed on a different site plan, that is expected to be built prior to this project, then specify that on this site plan and include the SDP number for that other site plan. 25. [32.5.2 k] Proposed sewer and drainage facilities. Indicate the direction of flow in all pipes and watercourses with arrows. 26. [32.5.2 0] Areas to be dedicated or reserved. Add a note on the plan stating that "All new public street right-of- way shown hereon is hereby dedicated to the County for public use." 27. [Comment] Provide a copy of all off -site easements, or letters of intent to grant them from off -site property owners. 28. [Comment] Any instrument assuring the perpetual maintenance of the open space areas, and any other improvements that are to be maintained by the HOA in perpetuity, require County Attorney approval prior to final site plan approval. 29. [Comment] Revise Sheet 1 Cover Sheet by removing the Architectural Review Board signature panel as Architectural Review Board approval is not required. 30. [Comment] See the other SRC reviewer comments attached. All SRC reviewer comments must be sufficiently address prior to final site plan approval. Please contact Brent Nelson, Senior Planner Planning Division via bnelson albemarle.or or 434-296-5832 ext. 3438 as needed for further information. COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION reor dranpe vane CWpe"r VoVnin 22701 Stephen C. 8rich, P.E. Commissioner December 10, 2019 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Brent Nelson Re: Belvedere Phase 5 Initial Site Plan SDP-2019-00060 Review #1 Dear Mr, Nelson: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Roudabush, Gale, & Associates, dated October 22, 2019, and offers the following comments: 1. CG-12 locations need to be relocated on the intersection corners for pedestrian visibility and safety. 2. CD-1 shown at sta. 10+59 appears incorrectly labeled as Sta. 12+36 on proposed Fowler Street. 3. CD-1 needed at sta. 12+50, sta. 17+85, and sta. 19+00 on proposed Fowler Street. Cross drains will also be shown in plan view tying into drainage structures. 4. Pavement designs need to be in accordance with the Pavement Design Guide for Subdivisions and Secondary Roads, 2018 edition. http://www.virginiadol.oralbusiness/resoumegMaterials/Pavement Design Guide for S ubdivisinn and Secondary-Rgg&ndf 5. Sight distance triangles do not appear to be shown per RDM appendix F, please see table 2-5 Intersection sight distance detail. 6. Please show "No Parking" signs in the sight distance triangles. 7. Please show mill and overlay on plans in accordance with WP-2. Show limits of mill and overlay to adjacent travel lane. Also, please add the WP-2 detail to the plans. 8. Landscaping plants and trees adjacent to the sight distance triangle will need to be maintained in area between 2 and 7 feet above ground as a clear zone to preserve sight lines and accommodate pedestrians. 9. Note that the final plan must show conformance with the VDOT Road Design Manual Appendices B(1) and F, as well as any other applicable standards, regulations or other requirements. Please provide two copies of the revised plan along with a comment response letter. If further information is desired, please contact Max Greene at 434-422-9894. VirginiaDOT.org WE KEEP VIRGINIA MOVING December 10, 2019 Brent Nelson Page 2 A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, cu. N.0'bLk-1-1 Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginlaDOT.org WE KEEP VIRGINIA MOVING COMMONWEALTH of VIRGINIA In Coopefation with the T{tomov Jefferson Health District ALBEMARLE-CKABLO77ESVILLL State Department of Health FLUVANNA COUNTY (MLMYFA) 1138 Hose Hill Drive 0AEFkECOUWfYISTANANDSVB.LE) LOUISA COUNTYtLOtUISA) Phone (434) 972-5219 P. O. Box 7546 NELSON COUNTY ILOVINaSTONt Fox (434) 972-4310 Charlottesville. Virginia 22906 December 17, 2019 Brent Nelson, Senior Planner Albemarle County Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Belvedere, Phase 5, Part 1 Initial Site Plan SDP2019-60 Mr. Nelson: As requested by your department, 1 have reviewed the irutial Site Plan, stamped 10/23/19, for the proposed development for compliance with VDH regulations. It appears that all proposed construction is to connect to public water and sewer systems, therefore I have no comments or concerns. Recommendation: Approval Conditions: None If there are any questions or you wish to discuss, please give me a call, 434-972-4306. Sincerely, Alan Mazurowski Environmental Health Supervisor Thomas Jefferson Health District alan.mazurowskiAvdh.vir dnia•gov Review Comments for SDP201900060 Initial site Plan Project Name: I BELVEDERE - PHASE 5 - INITIAL Hate Completed: Wednesday December 18, 2019 DepartmentOlvislonfAgency: Review Status. Reviewer: Shawn Maddox Fire Rescue Requester! Changes 1. Road A should be marked No Parking both sides due to travel width. 2_ Fowler St should be marked No Parking on one side. 3_ Please provide specifications for the temporary fire apparatus access road. It should be an all weather surface and capable of supporting at least 75,000lbs_ Review Comments for SDP201900060 Initial site Plan Project Name: PELVEDERE - PHASE 5 - INfT1AL DateCompleted: Tuesday; December 03 20'19 DepartmentlDivlslonl�4gency: Review Status: Michael Dellinger a CDD L Re►iewer: Buildin 9 _-- g Code Requested Changes � Add the following note to the general notes page: Retaining walls greater than 3 feet in height require a separate building permit. Walls exceeding 4 feet in height require a stamped engineered design also_ Walls require inspections as outlined in the USBC. Add the following note to the general notes page: ALL water lines, sewer lines, and fire lines from the main to the structure MUST have a visual inspection performed by the building department. Add the following note to the general notes page: Where the flood level rims of plumbing fixtures are below the elevation of the manhole cover of the next upstream manhole in the public sewer, the fixtures shall be protected by a backwater valve installed in the building drain, branch of the building drain or horizontal branch serving such fixtures. Plumbing fixtures having flood level rims above the elevation of the manhole cover of the next upstream manhole in the public sewer shall not discharge through a backwater valve. !Vote to developer: Due to required distances from lot lines and structures as required by the IVFPA_ underground propane tanks may be prohibited. Plan accordingly_ ^,w Comments for SDP201900060 Initial Site Plan Project dame: I BELVEDERE - PHASE 5 - INITIAL Date Completed: Wednesday, November 13 2018 DeparEmenVlDivision/Agenry: Review Status: Reviewer: Brian Becker ! CDD G1S ,• , Requester! Changes The apoicant should contact this office with a list cfithree (3) proposad road names for Road X Bted. n the plar#s Review Comments for Project Name: I13ELVEDERE - PHASE 5 - INITIAL Hate Completed: I Friday, December 06, 2019 Reviewer: [David James SDP201900060 initial site Plan DepartmenVDivision/Agency: Review Status: CQIJ Engineering .. t Requested Changes Engineering comments: 1. Submit a VSMP plan & application for review, if haven't. Land disturbance is over 10,000 sf. [17-302] 2. VSMP plan approval required prior to FSP approval. 3. Include County's 'General Construction dotes' on the FSP. 4. Show grading and access easements for offsite constructionlimprovements. 5. Show access easement to SWM facility. PSM, p. 12] 6_ Show/label angle of intersection at entrances. -80 degrees (Min) [14-410] 7_ Retaining walls over 30" in height will need safety railing. 8_ Retaining walls 4' and higher will require engineered plans and structural calculations. 9_ Sheet 6 — Show maximum height of retaining walls. 10. Sheet 9— Please see Road Plan comments. Brent Nelson From: Richard Nelson <rnelson@serviceauthority.org> Sent: Wednesday, December 18, 2019 3:28 PM To: Brent Nelson Subject: SDP201900060 Belvedere Phase 5 Initial Site Plan CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Brent, I recommend approval of SDP201900060 Belvedere Phase 5 - Initial Site Plan with the following conditions: Submit 3 copies to ACSA for review. Provide master plan for water and sewer. Dedication of Belvedere Phase 213 will be required before final approval. Confirm required fire flow can be met. ACSA will review available sewer capacity with Phase 213 included. Tying into RWSA sewer interceptor may be preferred. Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434) 977-4511 Brent Nelson From: Victoria Fort <vfort@rivanna.org> Sent: Wednesday, December 18, 2019 4:12 PM To: Brent Nelson Cc: Richard Nelson; Dyon Vega Subject: RE: SDP 2019-60 Belvedere Ph 5, Site Review Comments CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Brent, RWSA will require a sewer flow capacity certification prior to final site plan approval. Thank you, Victoria Victoria Fort, P.E. Senior Civil Engineer Rivanna Water and Sewer Authority 695 Moores Creek Lane Charlottesville, VA_22902 (0): (434) 977-2970 ext. 205 (F): (434) 295-1146 From: Brent Nelson <bnelson@albemarle.org> Sent: Tuesday, December 17, 2019 5:31 PM To: Victoria Fort <vfort@rivanna.org> Subject: SDP 2019-60 Belvedere Ph 5, Site Review Comments Hi Victoria - I am the planner overseeing the review of the above -noted Initial Site Plan application. The SRC meeting is this Thursday at 10 a.m. Do you have comments that you can provide me? Thanks, Brent W. Nelson Senior Planner Albemarle County Community Development 434-296-5832 ext. 3438 bnelson@albemarle.org