HomeMy WebLinkAboutARB201900127 Review Comments 2019-11-16 PrintReview_Comment X
Reviewer Comments
Review Comments for ARB2O19OO127 Minor Amendment
Project Name: 5TH STREET DEVELOPMENT- MINOR
Date Completed: Monday, November 18, 2019 Department/Division/Agency: Review Status:
9 Reviewer:
Margaret Maliszewski CDD ARB Requested Changes
1. Parking lot pole light fixtures differ from those previously approved. Parking lot pole lights must have a consistent
appearance throughout the development. If lighting changes are proposed in this minor amendment, lighting on the entire
site must be addressed with this amendment. If Phase 2 lighting changes can't be shown on this plan, include notes on
this plan indicating that with this amendment all Phase 2 lighting is eliminated. When you submit your Phase 2
amendment, you can add lighting back that matches Phase 1 approved lighting.
2. Revise the quantity and spacing of the large trees along 5th Street to 35'on center all along the frontage.