Loading...
HomeMy WebLinkAboutARB201900153 Application 2019-12-31Architectural � 'view Board A pplica t,„g Pam A: Applicant Contact and parcel Inf ProjectName; �1ati0II ! stic Mountain Talkhouse o Tax map and Parcel(s): TM 69-7A Contact PPhysical ersoe n: Pau! StreetAddress: Address; 9660 Rockfish Gap Turnpike Business Na me: The Gaines Group Address 1430 ` PLC. Rolkin Court quite 302 DaYtame Phone C—j 434-979_5254 city Charlottesville Fax # (--j State VA ----zip 229� E-mail p�thegaine5grou Owner ofRecord: Dou pe11 feis p.com Address 6049 Howardsville Turnpike Daytime Phone (--J 954~410- City Af�`on 6357 Fax # L, State VA zip zzs� E maii dougslasdefei Part $; Re►,iew @gmail.com Select IV DC a and Fee type Revievt. by the Architectural Review Board X Conceptual l Plan/Advisory Re Prelirrun vzew (far a Special Use Permit or a �Y/Initial Review of a No Fee Final Review of Site DeveIopmentPlan Ame Site Development Plan No nd"ient to an a Fee Building approved Certificate ofA Caun g Permit Review pproPriat S1075.00 t3'-wide Cert' mess cate of ppropriateness S 242.00 S�ctures 75 0' or mAore from $ 634.00 S�etures located behind a the EC, no t Personal erso tore that fronts theEC tones g FencingFireless ser►'ice facilities No Fee or Eglipment or Lightin No Fee Additions to _ g No Fee Minor A" approved buildings �endxients to ural No Fee Bnildin site or architect NOTE: g perntits where the c plans No Fee For SIGNS use the hange is S0% or less of No Fee combined APP the altered elevation FOR OFFICE USE ONLYBP# L�C'ATIO No Fee p� Amount g �' AND C11"'CLIST FOR SIGNS. Date Paid Connty. or�be � By who? Albemarle Dept or Comm u � Receipt # � 4itybevelopmeut, 401 Check # D__ {,Q McIntire Rd, Charlottesville, V 22y02 Voice: (434 295_ �,t� i w,01 t ofz � 5832 Fa s: (434) 9724126 Part Q Description of Proposal Describe your proposal. Attach a separate sheet if necessary. Renovation to the existing west building at 9660 Rockfish Gap Turnpike. Improvements include a new dormer on the south face, new skylights on the south face, and new patio on the north side. Also a new dumpster and dumpster enclosure will be located near the existing east buildings. I Part D: Applicant Agreement I Applicant must read and sign • Each application package must contain (8) folded copies of all plans and documents being submitted. Only (1) set of building material samples is required. All submittal items, including building material samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of all submittal items in their own files. • Only complete application packages will be scheduled for ARB review. The application package is not complete without the appropriate checklist, completed, signed, and included with the required submittal materials indicated on the checklist. I hereby certify that I own the subject property or have the legal power to act on behalf of the owner in filing this application. 'See submittal requirements below. I also certify that the information provided on this application and accompanying informatio s accurate, true, and correct to the best of my knowledge, and that the attached plans coot ' ' fo quired by the appropriate checklist. Si e o wner, er's representative Da or contract purchase r,,,-7�45-5-oze— A akin- Printed name, Title Daytime phone number of Signatory *Ownership Information: • If ownership of the property is in the name of any type of legal entity or organization including, but not limited to, the name of a corporation, partnership or association, or in the name of a trust, or in a fictitious name, a document acceptable to the County must be submitted certifying that the person signing above has the authority to do so. 10 If the applicant is a contract purchaser, a document acceptable to the County must be submitted containing the owner's written consent to the application. 0 If the applicant is the agent of the owner, a document acceptable to the County must be submitted that is evidence of the existence and scope of the agency. Attach the owner's written consent. 11/2010 Page 2 of 2 OVER —►