HomeMy WebLinkAboutARB201900153 Plan - Approved 2019-12-31. ,pdQV tA r2,J W J19
v�
Zo
0
Qr
O
To Waynesboro
Mystic Mountain Talkhouse
TM 69-7A
9660 Rockfish Gap Turnpike
Afton, Virginia
o +.
r �
SITE
FTON
Project Overview
The Mystic Mountain Talkhouse site consists of three existing buildings (one to
the west and two to the east). Improvements to the west building include
a dormer and skylights to the south side of building and a patio to the north
linking the top floor exits. A dumpster enclosure will be located to the south
side of the east buildings.
E
- Dais
e _-
GCkP
Site Plan
�4
l
1
L-
a�r
!�r
I
Project Overview
1. Skylights
2. Dormer
3. Patio
4. Dumpster
Ir ., �� I � -q-,- - — si-JAM7- �w - 1w
��, _ {' '�. '�.j� � ,e to
4L -
140 !A
A
4MR
S. 3W'
Jr.
MEOW -imam,
sm'I'l=XIM0,11111611116
Flu
u
JA
M�,:- �
i
IJ
•Iol. zjomIa@10
0
ik�eYO,J t� 11-1301i�
JOS
� Y
Existing East Buildings
Mile
we In
a - '
I i
� I
I
I
I�
a�
�I
f
�! I
Dumpster Enclosure at
East Buildings
a
Existing Building Md
I
i
I
I
�
4. Dumpster enclosure
White siding on walls and doors to match existing east buildings