HomeMy WebLinkAboutWPO201900039 Bond Estimates 2019-12-30Project Name: Hillcrest Vineyard Tasting & Venue VSMP WPO2019-00039 WPO file number: WPO201900039 TMP(s): 06900-00-00-02000 Date Estimate Completed: 122-30-19 Erosion and Sediment Control Bond Estimate Item Item Number 1 stablization (PS, TS) 2 silt fence (SF) 3 safety fence (SAF) 4 diversion (DID, FD, RWD) 5 temporary slope drain (TSD) 9 Sediment Basin #1 10 earthwork for trap/basin 11 12 13 14 15 16 17 18 19 20 21 22 structures for basin 23 24 25 26 27 28 29 30 Sediment Trap #1 31 earthwork for trap/basin 32 33 34 35 36 pipe length 01ft pipe diameter i in height of dam at toe 21 ft cut at high side oft ft height of fill at face ft cut at face ft length of dam 14 ft length of cut ft top width ft width of cut (area above transition 0 sf (total width of dam) 4 ft (height below transitio 2 ft (area below transition; 0 sf (total fill volume) 0.0 cy length of spillway ft width of spillway Mft riser height ft riser diameter in barrel length ft barrel diameter 1 in height of dam at toe 11.7 ft height of fill at face 3.7 ft length of dam 60 ft top width ft (area above transition 38.48 sf (area below transitic 539 sf (total width of cut) 75 ft (depth below transit 2 ft (area above transitic 71 sf (total fill volume) 4066.7 cy (TOAL CY estimate 4067 cy (spillway stone tons 34.5 tons (riser unit price) $150.00 base plate or fdn - (barrel unit price) $40.00 barrel collars baffle length Mft cut at high side 8 ft cut at face 4 ft length of cut 60 ft width of cut 17 ft (area below transitic 100 sf No. Unit Unit Cost Cost installed 13.2 acres $5,000.00 $66,200.00 7740.0 ft $5.00 $38,700.00 0.0 ft $5.00 $0.00 1250 ft $13.00 $16,250.00 $0.00 $0.00 $13.00 $52,871.00 $50.00 $1,725.00 $1,062.00 $200.00 $200 $2,400.00 $200.00 $200 $50.00 $0 12/30/2019 Project Name: Hillcrest Vineyard Tasting & Venue VSMP WP02019-00039 WPO file number: WP0201900039 TMP(s): 06900-00-00-02000 Date Estimate Completed: 122-30-19 Erosion and Sediment Control Bond Estimate Item Item Number 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 (total width of dam) 23.4 ft (height below transitio 8 ft (area below transition; 29.6 sf (total fill volume) 151.3 cy length of spillway ft width of spillway ft silt fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP)-Basin#1 length outlet protection (OP) length channel (SCC, matted) - EC-2 on 3:1 length check dam depth in channel construction entrance (CE) wash rack paved construction entrance rip -rap, placed, dam /rprap spillway depth width survey and layout (price per 0.1 mi.) acres mobilization Temporary Access road (total width of cut) 41 ft (depth below transit 4 ft (area above transitii 66 sf (total fill volume) 368.9 cy (TOAL CY estimate 419 cy (spillway stone tons 10.5 tons 12 ft width 9 ft 0 ft width 0 ft 46600 ft width 1 ft 1 ft channel width 6 ft 1.5 ft length -ft 45.0 543.375 tons M6_13.24 traps and basins WPO201900039 Hillcrest Vineyard Tasting & Venue VSMP ESC_bond_est 123019 No. Unit Unit Cost Cost installed $13.00 $5,447.00 $50.00 $525.00 $100.00 $200.00 WR1 $200.00 $200.00 1 $486.00 $486.00 0 $0.00 $0.00 $60,580.00 6 $135.00 $810.00 0 $2,500.00 $0.00 1 $2,000.00 $2,000.00 1 $3,500.00 $3,500.00 $60.00 $32,602.50 $7,620.00 $2,500.00 cost sum $296,078.50 contingency $29,607.85 Total $325,690 12/30/2019