Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201900039 Bond Estimates 2019-12-30 (3)
Project Name: Hillcrest Vineyard Tasting & Venue VSMP WP02019-00039 WPO file number: WP0201900039 TMP(s) 06900-00-00-02000 Date Estimate Completed: 12-30-19 Mitigation Plan Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 1 Mitigation Area -trees (canopy + understory) ; C-6.05 225 ea $150.00 $33,750.00 2 Small shrubs & grasses (VDOT bid tab- 2013, 4 species, $ x 2) 225 ea $29.52 $6,642.00 3 Seed mix (Assume wildflower meadow mix; 2 lb. /1000 SF - installed) 11 lb $50.00 $567.80 4 as -built drawings (per facility) 1 ea $2,000.00 $2,000.00 WP0201900039 Hillcrest Vineyard Tasting & Venue VSMP Mitigation_bond_est 123019 cost sum $42,959.80 contingency $4,295.98 Total $47,256 12/30/2019