HomeMy WebLinkAboutSDP201800086 Review Comments 2019-01-24 lliM.
ors:
xff.
� Wiz_.
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road,North Wing
Charlottesville,Virginia 22902-4596
Phone(434)296-5832 Fax(434)972-4126
January 24,2019
Justin Skimp
Skimp Engineering
201 E.Main Street, Suite M
Charlottesville,VA 22902
RE: SDP2018-86 Boyd Tavern Market—Initial Site Plan
Dear Mr. Shimp:
The Site Review Committee has reviewed the development proposal referenced above. Initial comments
for the following divisions of the Department of Community Development and other agencies, as
applicable,are attached:
Albemarle County Engineering Services(Engineer)
Albemarle County Planning Services(Planner)
Albemarle County Information Services(E911)
Albemarle County Building Inspections
Albemarle County Department of Fire Rescue
Albemarle County Service Authority
Rivanna Water and Sewer Authority
Virginia Department of Transportation
Additional review comments from these SRC reviewers,and the SRC reviewers not listed above,will be
forwarded to you when they become available. Comments reflect information available at the time the
development proposal was reviewed,and should not be considered fmal. However,the Site Review
Committee has attempted to identify all issues that will be required to be resolved prior to Final Site Plan
approval.The Lead Reviewer will either approve with conditions or deny the Initial Site Plan within 35
days after receipt of approvals from all state agencies and not more than 90 days after the date of the plan
was officially submitted.
Please contact me at your earliest convenience if you have questions or require additional information.
Sincerel ,,,.f -- - --
Senior lanne anner
Planning Services
CC: Virginia Oil Company Incorporated Tiger Fuel Company
1100 Harris Street 200 Carlton Road
Charlottesville,VA 22903 Charlottesville,VA 22902
e of•
County of Albemarle
Department of Community Development
401 McIntire Road,
Charlottesville,VA,22902
Phone 434-296-5832 Fax 434-972-4126
Memorandum
To: Justin Shimp (justine.shimp-engineerinq.com)
From: Paty Saternye, Senior Planner
Division: Planning
Date: January 24, 2019
Subject: SDP 201800086 Boyd Tavern Market—Initial Site Plan(DRAFT Comments)
The County of Albemarle Planning Division will recommend conditional approval of the plan referenced above
once the following conditions/comments have been satisfactorily addressed (The following
conditions/comments are those that have been identified at this time. Additional comments or conditions may
be added or eliminated based on further review.): [Each comment is preceded by the applicable reference,
which is to the Subdivision/Zoning Ordinances unless otherwise specified.]
Comments required to be addressed prior to Initial Site Plan Approval:
1. It appears that the fee for the Tier 3 Groundwater Assessment review of$548 has not yet been paid. This
fee must be paid prior to initial site plan approval with conditions.
2. The fee for the Fire Rescue site plan review of$100 has not yet been paid. This fee must be paid prior to
initial site plan approval with conditions.
Comments to be addressed with the Final Site Plan submission:
3. The water consumption issue is still being evaluated. Comments will be provided once the initial site plan
review is completed.
4. A site plan meeting all the requirements of section 32.6 of Chapter 18 of the Code.
5. [32.7.2.1] Each entrance onto any public street shall be designed and constructed as required by the
standards of the Virginia Department of Transportation (VDOT).VDOT approval of the entrance to the site
• shall be required prior to final site plan approval. See the attached VDOT comments.
6. [32.5.2(p), 32.7.9.7(a)(1)&(2)&32.7.9.7(d)] Provide a complete landscape plan that meets all
requirements of section 32.7.9 with the Final Site Plan. This includes, but is not limited to, screening
requirements to all adjacent Rural Area Districts as well as Residential uses. It is important to note that
disturbance of the buffer zone(21.7(c)) is not allowed even for the purpose of screening. Therefore,
required screening will need to be located elsewhere. If the screening is accomplished by landscaping
ensure there is sufficient space to meet the minimum screening requirements.
7. [5.1.20] No storage tanks or loading facilities shall be located closer than 100'from any lot line. The loading
space is within the 100' setback to TMP 94-30 and the road and must be revised to meet this requirement.
8. [4.12.15(g)] Provide curb and gutter in the parking area and along the travelways. Gutter appears to only
be provide along one side of the site.
Page 1 of 2
4
9. [32.5.1(c) &32.5.2(a)] Revise the:
• 6.60' boundary line bearing and distance near the south corner of the lot along Black Cat Road to
include the bearing.
• The front setback to specify both building and parking setbacks.
• The setback information on the coversheet to include not only C1 setbacks but also RA setbacks.
• Site plan to also show the setbacks in the RA portion of the parcel.
10. [32.5.2(i)] Provide the centerline of Black Cat Road in both the existing and proposed plan sheets.
11. [32.5.1(a)] Ensure that the vicinity map is black and white and not color. Site plans are to be only black and
white.
•
12. [32.5.2(I)] Provide the location of any existing or proposed utilities and utility easements including
telephone, cable and electric. Indicate the deed book and page reference for all exiting utility easements
located on the property is any exist.
13. [32.5.2(n)] Provide:
• Outdoor lighting information including a photometric plan and location, description, and specification
sheets that includes a photograph or diagram of each type of outdoor luminaire[Sec. 32.7.8 & Sec.
4.17]. If there will be any external lighting fixtures a photometric plan will be required for Final Site Plan
approval. In addition to meeting all lighting requirements a standard lighting note will be required.
• If there is to be a sign for the proposed use, on the final site plan depict and label the sign
location. (Depicting the sign on the final site plan is not approval of the sign location or type).
• Information on the proposed paving material types for all walkways, access ways and parking lots.
12. [Comment] Recommendations in reference to the cemetery:
• No fence exists around the perimeter of the existing cemetery. It appeared during the site visit that the
graveyard may extend further to the north and south then shown on the site plan. It is recommended
that more information on the extents of the cemetery are acquired and a more accurate location of the
cemetery be provided on the site plan so that it will not be disturbed by any of the proposed
improvements to the site.
• Because of the State requirement of access to graveyards, it is recommended that a path is provided as
part of the site plan for access to the cemetery and that the path be located in an area that is not steep
and hard for some people to utilize.
13. [Comment] This property is within the Monticello Viewshed. It is strongly encourage that you consult with
the Thomas Jefferson Foundation early in the site plan process about any potential visual impact of the
project.
14. [Comment] See the attached draft comments from most of the other SRC reviewers. Additional comments
will be included in the final version of these comments.
Please contact Paty Saternye in the Planning Division by using psaternye@albemarle.orq or 434-296-5832 ext.
3250 for further information.
Page 2 of 2
..,
..J'e.`✓�1..,...
ill `,i
�;, �:
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
1601 Orange Road
Culpeper,Virg+nla 22701
Stephen C.Stich,P.E.
Commissioner
January 10,2019
County of Albemarle
Department of Community Development ,
401 McIntire Road
Charlottesville,VA 22902 •
Attn: Paty Saternye -
Re: Boyd Tavern Market—Initial Site Plan
SDP-2018-00086 •
Review#1
Dear Ms. Saternye:
The Department of Transportation,Charlottesville Residency Transportation and Land Use
Section,has reviewed the above referenced plan as submitted by Shimp Engineering,,dated 30
November 2018, and offers the following comments:
1. Full dimensions of the shifting tapers and turn lanes must be provided on the plans. All
dimensions must be in accordance with Appendix F;please refer to Figure 3-4.
2. Provide analysis showing that the provided 100' of turn lane storage is adequate;
otherwise, 200' is the minimum.
3. Please note that trees within the sight distance easements or right-of-way may have to be
removed if not pruned in such a way as to avoid becoming sight line obstructions.
4. Provide the VDOT WP-2 detail and note on plans the required area of mill and overlay in
accordance with the WP-2 standard. Note that the entire affected lane must be included,
throughout the entire width of the affected area.
5. The entrance curbing should be offset 12 feet from the edge of pavement, and extended
the required length of storage and taper if a right turn lane is warranted. See Figure 4-9,
Appendix F.
6. Provide a Traffic Maintenance Plan in accordance with the latest revision of the Virginia
Work Area Protection Manual.
7. Note that the final site plan must show conformance with the VDOT Road Design
Manual Appendices B(1) and F,as well as any other applicable standards, regulations or
other requirements.
,
Please provide two copies of the revised plan along with a comment response letter.If further
information is desired,please contact Justin Deel at 434-422-9894.
VirginiaDOT.org
WE KEEP VIRGINIA MOVING
4
January 10,2019
Paty Saternye
Page 2
A VDOT Land Use Permit will be required prior to any work within the right-of-way.The
owner/developer must contact the Charlottesville Residency Transportation and Land Use
Section at(434)422-9399 for information pertaining to this process.
Sincerely,
Qd
Adam J.Moore, P.E.
Area Land Use Engineer
Charlottesville Residency
•
VirginiaDOT.org
WE KEEP VIRGINIA MOVING
iitial Site Plan Review Comment �®r � SDP201800086 L .
Project Name: Boyd Tavern Market- Initial
Date Completed: Wednesday, January 23, 2019 Department/Division/Agency: Review Status:
Reviewer: Matthew Wentland • CDD Enaineerina [Requested Changes
1.An approved WPO submittal will be required before site plan approval. Level Spreader design will need to follow DEQ Design
Spec. No.2,whether used for quality or only quantity control.
2. Provide bumper blocks where parking is adjacent to sidewalks less than 6'wide. [18.4.12.16(e)]
3. Show the location of the fueVoil seperator on the plans.
•
•
•
•
•
•
•
•
•
•
Page: 1 County of Albemarle Printed On: 101/24/2019
Review Comment; Dr SDP201800086 itial Site Plan
Project Name: Boyd Tavern Market- Initial
Date Completed: Thursday, January 24, 2019 Department/Division/Agency: Review Status:
Reviewer[Frank Pohl CDD Enaineerina [Requested Changes
The plan states consumption of 48.8 gallons per day(Water and Sanitary Services note on cover page) and the report states
800 gallons maximum daily groundwater withdrawal (pg 9). Please revise the report to include a statement specifically
acknowledging projected consumption versus withdrawal.
•
•
Page: 1 County of Albemarle Printed On: 101/24/2019
•
Review Comment "or ' SDP201800086 iitial Site Plan
Project Name: Boyd Tavern Market- Initial
•
Date Completed: Wednesday, January 23, 2019 Department/Division/Agency: Review Status:
Reviewer:[Michael Dellinger CDD Inspections [Requested Changes
Add the following note to the general notes page:
ALL water lines, sewer lines, and fire lines from the main to the structure MUST have a visual inspection performed by the
buildng department.
Add the following to the general notes page:
All roof drains shall discharge in a manner not to cause a public nuisance and not over sidewalks.
Add the following note to the general notes page:
Accessible parking spaces and access isles shall not have a surface slope greater than 1:48. Access isles shall be at the
same level as the parking space they serve.
•
•
•
Page: 1 County of Albemarle Printed On: 101/24/2019
Review Comment, "Dr SDP201800086 itial Site Plan
Project Name: Boyd Tavern Market- Initial
Date Completed: Tuesday, January 22, 2019 Department/Division/Agency: Review Status:
• Reviewer:[Shawn Maddox - Fire Rescue [No Objection le.I
Fire Rescue has no objections. SNM
•
•
Page: 1 County of Albemarle Printed On: I01/24/2019
Review Comment, "or SDP201800086 iitial Site Plan
Project Name: Boyd Tavern Market- Initial
Date Completed: Wednesday, December 26, 2018 Department/Division/Agency: Review Status:
Reviewer.[Richard Nelson ACSA [No Objection
2018-12-26: SDP201800086 Boyd Tavern Market— Initial is outside of the ACSA jurisdictional area. There are no comments.
•
•
•
•
Page: 1 County of Albemarle Printed On: 101/24/2019
Review Comment 'Dr SDP201800086 itial Site Plan
Project Name: Boyd Tavern Market- Initial
Date Completed: Wednesday, January 23, 2019 Department/Division/Agency: Review Status:
Reviewer:LVictoria Fort 7,1 RWSA [No Objection f�
RWSA does not have any utilities near this site, so we don't have any comments.
Page: 1 County of Albemarle Printed On: I01/24/2019
Review Comment "or SDP201800086 litial Site Plan
Project Name: Boyd Tavern Market- Initial
Date Completed: Friday, January 11, 2019 Department/Division/Agency: Review Status:
lAndrew Walker CDD E911 [No Objection Cr.
Reviewer
i
1
•
Page: 1 County of Albemarle Printed On: I01/24!2019