Bond Reduction Request
Date: August 13, 2019
March Mountain Properties, LLC
1005 Heathercroft Circle, Suite 100
Crozet, VA 22932
Re: Bond reduction request for WP0200800014
Old Trail village Block 3 Phase 6
Dear Mr. Brockman:
We received your bond inspection request for Old Trail village Block 3 Phase 6. This bond is currently
valued at $61,100. The bond cannot be reduced or released at this time. See attached checklist and
ensure everything is completed/provided.
Let us know if you have any questions.
Thanks,
Emily Cox, PE -
Civil Engineer II
(434) 296-58332 Ext. 3565
County of Albemarle
Department of Community Development
401 McIntire Rd
Charlottesville, VA 22902
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
Road Bond Inspection
Bond Title: Old Trail Village Phase 6, Block3
File Number: WP0200800014
Date of inspection: 7/26/19 Original Bond Amount: $143,400
Reviewer: Emily Cox Current Bond Amount: $61,100
Phone: (434) 296-5832 Updated Bond Amount: $61,100
Your bond inspection request has been processed. This list contains an update on the items received and
approved.
Received
Approved
Y
N
Y
N
N/A VDOT
■
❑
Completed inspection request and fee
■
❑
❑
❑
❑
■
As -built plan, updated, sealed to current date, per As -built policy
❑
❑
❑
❑
❑
■
Copies of recorded plats for right-of-way, easements
❑
❑
❑
❑
❑
■
VDOT approval AM-4.3, or partial completion via punchlist
❑
❑
❑
❑
❑
■
Letter from P.E. certifying improvements are built to plan
❑
❑
❑
❑
❑
■
Current certification form completed by owner/developer
❑
❑
❑
❑
❑
■
CBR test reports for each road
❑
❑
❑
❑
❑
■
Stone depth and material inspection reports (or core tests)
❑
❑
❑
❑
❑
■
Pavement depth and material inspection reports (or core tests)
❑
❑
❑
❑
❑
■
Compaction test reports for fill areas under road
❑
❑
❑
❑
❑
■
Pipe trench inspection reports
❑
❑
❑
❑
❑
■
Pipe interior inspections reports and video
❑
❑
❑
❑
❑
■
Concrete test reports for structural concrete, curbing, aprons, etc.
❑
❑
❑
❑
❑
■
Structural inspection reports for any bridges or box culverts
❑
❑
❑
❑
❑
■
County road name signs and posts, or a sign agreement for alt. posts ❑
❑
❑
Please refer to on-line content at http://www.albemarle.oriz/deptforms.asp?department=cdengno for checklists
and procedures.
Site Visit 7/26/19:
-Road appears to be satisfactory with no cracks.
-Some trees appear to be missing on Claremont, adjacent to Ashlar Ave.
Old Trail Village Phase 6 Block 3 Phase A Site Plan; also; Old Trail Phase VI - Block 3 Phase A Construction Plans; also; Old Trail Block 3 Pool Lot Site Plans
ROAD Construction Bond Estimate (roads, site work, storm sewer)
v
Item
Item
No. Unit
Unit Cost
Cost
Number
installed
%complete
cost remaining
Claremont
Lane 13+50 to 19+80 road length 375.0 ft
260'; station 17+25
to 20+00 is bonded with Old Trail
Block 3 Phase B
1
aggregate base 8.0 in d
375.0 ft L 27.0 ft W
250.0 cy
$43.09
$10,773.00
75%
$2,693.25
2
blotted or prime&double seal
375.0 It L 0.0 It W
0.0 sy
$7.56
$0.00
0%
$0.00
3
asphalt base 3.0 in d
375.0 ft L 27.0 it W
141.8 tons
$88.20
$12,502.35
50%
$6,251.18
4
asphalt surface 2.0, in d
375.0 ftL 27.0 ft W
94.5 tons
$98.28
$9,287.46
50%
$4,643.73
6
curb CG-2
0.0 ft
$10.08
$0.00
0%
$0.00
7
curb CG-6
750.0 ft
$16.59
$12.445.65
75%
$3.111.41
8
sidewalk, asphalt 0.0 in d
375.0 ft L 4.0 ft W
0.0 tons
$88.20
$0.00
0%
$0.00
9
sidewalk, concrete 4' width
750.0 ft
$13.99
$10,489.50
80%
$2,097.90
10
ramp CG-12
6
$378.00
$2,268.00
50%
$1,134.00
11
street name sign
2
$78.00
$156.00
50%
$78.00
12
traffic control sign
3
$59.22
$177.66
0%
$177.66
13
guardrail (or rebuild wall in right-of-wa
0 ES @ $3700
0.0 ft
$20.16
$0.00
0%
$0.00
E14
manhole or drop inlet
5
$1,638.00
$8,190.00
75%
$2,047.50
16
pipe, rcp (15 to 48") 36.0 in d
0 ES-1,2 $250 0 EC-1 $200
445.0 ft
$89.25
$39,716.25
50%
$19,858.13
17
pipe, rcp (15 to 48") 24.0 in d
0 ES-1,2 $250 0 EC-1 $200
25.0 ft
$39.90
$997.50
50%
$498.75
18
pipe, pvc (4 to 10") 8.0 in d
0.0 ft
$6.30
$0.00
0%
$0.00
19
pipe, cmp (15 to 48") 15.0 in d
0 ES-1,2 $250 0 EC-1 $200
0.0 ft
$23.10
$0.00
0%
$0.00
20
pipe, cmp (54 to 72") 60.0 in d
0 ES-1,2 $250 0 EC-1 $200
0.0 ft
$146.00
$0.00
0%
$0.00
21
rip -rap, placed
0.0 ton
$37.80
$0.00
0%
$0.00
22
E&S fabric,EC-2,3
0 ft L 4 ft W
0.0 sy
$12.60
$0.00
0%
$0.00
23
clear and grub (for wooded sites)
0.0 ft L 30.0 ft W
0.0 acre
$12,600.00
$0.00
0%
$0.00
24
grading (per cy for cut or import only)
0.0 cy fill 0.0 cy cut
0.0 cy
$3.78
$0.00
0%
$0.00
24
CBR tests (1 every 0.1 mi. per road)
375.0 ft L 0.75 inc of 500'
2
$189.00
$340.20
0%
$340.20
25
as -built drawings (1 k + price per 0.1 r
375.0 ft L 0,071 mi.
1
$1,260.00
$1,260.00
0%
$1,260.00
26
survey and layout (price per 0.1 mi.)
375.0 ft L 0.071 mi.
1
$630.00
$630.00
100%
$0.00
27
mobilization
1
$630.00
$630.00
0%
$630.00
28
VDOT surety (1 lane)
375.0 ft L 0.071 mi.
2 Lanes
$2,000.00
$2,840.91
0%
$2,840.91
29
VDOT maintenance fee (1 In rd, 1 yr)
375.0 ft L 0.071 mi.
2 Lanes
$150.00
$213.07
0%
$213.07
30
VDOT admin. Cost recovery fee(1 tarn
375.0 ft L 0.071 mi.
2 Lanes
$100.00
$392.05
0%
$392.05
cost sum
$113 309.59
., _.__. -............ ..__.. .... ........
$48,267.73
project management
15%
$16,996.44
15%
$7,240.16
subtotal
$130,306.03
$55,507.88
contigency
10%
$13,030.60
10%
$5,550.79
Total
$143,400
$61,100
12/15/2010