Loading...
HomeMy WebLinkAboutSDP200000100 Review Comments Letter of Revision 1 2020-01-13ALB,n. U ®d� �'IRG[ritA COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 January 13, 2020 Michelle Simpson Rivanna Solid Waste Authority 695 Moores Creek Lane Charlottesville, VA 22902 msimpson(o)rivanna.orq RE: LOR #1 SDP2000-100 Ivy Landfill Waste Management Areas — Letter of Revision Dear Michelle Simpson: Your Letter of Revision application has been reviewed. In order for the amended site plan to be approved the following revisions are required: [Comment] On the coversheet add VV after "Letter of Revision". 2. [4.12] Parking is proposed in this LOR, and therefore the previously approved, existing and proposed parking must be shown. Revise the parking as follows: a. Provide a parking calculation for the site plan (see the coversheet of the SDP2000-100). Ensure that the parking calculation: i. Includes the number of handicapped spaces (see comment from inspections. ii. Is for the whole site plan (area shown in SDP2000-100) and not just for the area the proposed improvements. iii. Note that the number of parking spaces around the office building was revised with SDP2017-22. Therefore, those specified on SDP2000-100 are not current. Make sure what is currently on site, and what is being proposed, are shown accurately in calculations and layout. b. Ensure the required number of ADA spaces are provided. 10 spaces are being added in this area, but no ADA spaces are shown. This number should be based upon the whole site plan and not just this area (see notes on parking calculations above). c. The 45 degree parking spaces do not appear to meet the minimum required parking space dimensions. Revise these parking spaces to meet the minimum requirements (see the attached "Design Standards Manual' and section 18- 4.12.16.c.3 of the zoning ordinance). d. Once the 45 degree parking spaces are revised added dimensions for the spaces to the LOR. e. Ensure that the perpendicular parking spaces are the correct dimensions. Since the 1It submission is not printed to a specific scale it could not be determined. f. Provide information on what the dashed lines in front of the containers represents. The proposed parking spaces must not be blocked. 3. [32.5.2.a] Either revise the scale of the submitted drawing or provide hard copies for which the scale was specified (24x36?). 11x17 size drawings are sufficient for this LOR submittal. However, the scale of the drawing is not as specified when printed to 11x17. Since the reviewers need to review the design, including the 45 degree parking spaces, provide a scalable version on the next submission. 4. [32.5.2.p & 32.6.2.j] Revise the LOR to address the changes to the landscaping that are proposed in comparison to what was approved in SDP2000-100. Address the following: a. Show all of the existing and proposed locations of all landscaping in area between the two existing access ways. b. Clarify why no trees are, or tree line is, shown along the northern edge of the lower existing access way even though three Red Maples are specified in SDP2000-100. All existing trees should be shown in this area. c. Specify the specific trees (species) that will be removed in the impacted area. There appears to be 2 to 4 white pines and 1 or 2 red maples (key found on sheet L-3 of SDP2000-100) that would be impacted. d. Specify whether the impacted trees will either relocate or replaced and show the proposed locations. e. Ensure that all landscaping shown on the approved site plan will still be provided, although slightly relocated because of the proposed addition of the access way, or the landscaping plan will need to be revised as part of this LOR. If the large shade trees (mentioned above) are not existing they could be added with this LOR in order to bring the site plan into compliance with the previous approval. 5. [Comment] The LOR submission has been reviewed by Engineering and Inspections. Their comments must be addressed before approval of the LOR. Please see their attached comments. In accord with the provisions of Section 32.4.3.5 of Chapter 18 of the Code if the developer fails to submit a revised final site plan to address all of the requirements within six (6) months after the date of this letter the application shall be deemed to have been voluntarily withdrawn by the developer. If you have any questions about the comments please feel free to contact me at psaternyeA-albemarle.org or at 434-296-5832 ext. 3250. Sincerely, Paty Sa G `J Senior Planner Planning Division CC: Kris Edelman, ARCADIS Review Comments for SDP200000100 Project Name: Ivy Landfill Minor Date Completed: Thursday, January 09, 2020 Department1DivisionfAgency: Review Status: Reviewer: Michael Bellinger -E CBB Inspections See Recommendations If additional parking spaces are added, compliance with accessibility requirements may be necessary_ Bldg permit will be required for installation of accessible parking spaces and electrical permit needed for gate arm if needed_ Verify with fire marshal for Knox Box requirements if gate arm is installed and limits access to fire and rescue after hours_ Other than this no objections_ Page: County of Albemarle Printed On: Fo71 2020 0 Review Comments for SDP200000100 Project Name: ky Landfill Minor Date Completed: Thursday, January 09, 2020 DepartmeWDivisionfAgency: Review Status: Reviewer: Emily hex CDD Engineering No Obje-:tion Page: County of Albemarle Printed On: Fo'U'1 2020 0