January 10, 2019
Megan Nedostup
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
RE: Pleasant Green Phase 1— Final Site Plan (SDP 2019-009)
www.collins-engineering.com
Thank you for your comments dated October 17, 2019 on the above referenced project.
Planning Comments
1. Comment previously addressed
2. Comment previously addressed
3. The overall parking calculations and requirements have been updated for the site plan. The total required parking is 115
spaces, based on the required parking for the phase I development. That allowable spaces for the Phase I development, as
listed on the cover sheet is 138 spaces, which is 20% over the required parking for the Phase I development. The parking
provided no longer exceeds the required parking over 20%, as allowed by the ordinance. In addition, the parking along
McComb Street is intermittent parking, and specific parking spaces are not designed along this street (as a requirement
from VDOT). This area is available for parking, based on the signage along the street, which is part of the approved road
plans, as noted on the final site plan. Additionally, some of the parking spaces within the clubhouse parking lot have been
striped out as part of Phase 1. These spaces will be created with the phase 11 site plan.
4. Comment previously addressed
5. Comment previously addressed
6. The tot lot size has been updated on sheet 3 and 4. The minimum size of the proposed tot lot area is 2,500 SF.
7. Comment previously addressed
8. Comment previously addressed
9. Comment previously addressed
10. The record plat has been approved and recorded. The cover sheet, existing conditions sheet, and layout sheets have been
updated with the recordation information from the recorded plat.
11. Comment previously addressed
12. The record plat has been approved and recorded. The existing conditions sheet, utility sheets, and layout sheets have been
updated with the recordation information from the recorded plat for all the easements.
13. Comment previously addressed
14. Comment previously addressed
15. Comment previously addressed
16. The lighting note has been revised to state that no porch light shall exceed 3000 lumens, and that any site lighting must
comply with section 4.17 of the county code.
17. Comment previously addressed
18. Comment previously addressed
Additional comments:
1. This comment is acknowledgdd.
VDOT
The (3) VDOT comments were also the same (3) comments on the road plan. The comments have been addressed, and VDOT has
approved the road plans. These comments are no longer outstanding comments for the project.
Engineering
Road Plan is now approved and WPO has been approved. There are no outstanding comments
Utilities, Building Inspections, and GIS
No remaining comments, plans are ready for approval
Should you have any questions, please feel free to contact Scott Collins at scott@collins-engineering.com.
Sincerely,
Scott Collins, PE