Loading...
HomeMy WebLinkAboutSDP201900009 Correspondence Final Site Plan and Comps. 2020-01-10COLLINS ci c=INEERING 200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 434.293.3719 PH 434.293.2813 FX January 10, 2019 Megan Nedostup Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Pleasant Green Phase 1— Final Site Plan (SDP 2019-009) www.collins-engineering.com Thank you for your comments dated October 17, 2019 on the above referenced project. Planning Comments 1. Comment previously addressed 2. Comment previously addressed 3. The overall parking calculations and requirements have been updated for the site plan. The total required parking is 115 spaces, based on the required parking for the phase I development. That allowable spaces for the Phase I development, as listed on the cover sheet is 138 spaces, which is 20% over the required parking for the Phase I development. The parking provided no longer exceeds the required parking over 20%, as allowed by the ordinance. In addition, the parking along McComb Street is intermittent parking, and specific parking spaces are not designed along this street (as a requirement from VDOT). This area is available for parking, based on the signage along the street, which is part of the approved road plans, as noted on the final site plan. Additionally, some of the parking spaces within the clubhouse parking lot have been striped out as part of Phase 1. These spaces will be created with the phase 11 site plan. 4. Comment previously addressed 5. Comment previously addressed 6. The tot lot size has been updated on sheet 3 and 4. The minimum size of the proposed tot lot area is 2,500 SF. 7. Comment previously addressed 8. Comment previously addressed 9. Comment previously addressed 10. The record plat has been approved and recorded. The cover sheet, existing conditions sheet, and layout sheets have been updated with the recordation information from the recorded plat. 11. Comment previously addressed 12. The record plat has been approved and recorded. The existing conditions sheet, utility sheets, and layout sheets have been updated with the recordation information from the recorded plat for all the easements. 13. Comment previously addressed 14. Comment previously addressed 15. Comment previously addressed 16. The lighting note has been revised to state that no porch light shall exceed 3000 lumens, and that any site lighting must comply with section 4.17 of the county code. 17. Comment previously addressed 18. Comment previously addressed Additional comments: 1. This comment is acknowledgdd. VDOT The (3) VDOT comments were also the same (3) comments on the road plan. The comments have been addressed, and VDOT has approved the road plans. These comments are no longer outstanding comments for the project. Engineering Road Plan is now approved and WPO has been approved. There are no outstanding comments Utilities, Building Inspections, and GIS No remaining comments, plans are ready for approval Should you have any questions, please feel free to contact Scott Collins at scott@collins-engineering.com. Sincerely, Scott Collins, PE