Loading...
HomeMy WebLinkAboutARB201900160 ChecklistCM l COUNTY -WIDE CERTIFICATE OF APPROPRIATENESS Building permits in which the proposed change occupies 50% or less of the altered elevation DESIGN CRITERIA Proportion Alteration must be in proportion with the Additional panels are in proportion to existing elevation. existin metal panels. Roof form Roof form must be consistent with the No changes to the roof form proposed. existing patterns of scale and proportion of the roof form of the existing building. Materials Materials must be consistent with the Materials are consistent with the existing patterns of scale and proportion of existing metal panels on the elevation. the existing materials. No new vinyl. Colors Colors must be coordinated with existing Colors coordinate with the color of the colors. existing metal panels. Planting Trees and shrubs may be required to No additional landscaping necessary. integrate the alteration into the building and site.