Loading...
HomeMy WebLinkAboutSP201900012 Review Comments Special Use Permit 2020-01-14COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4176 January 3, 2020 Kelsey Schlein Shimp Engineering, P.C. 912 E. High Street Charlottesville, VA 22903 kelseykshimp-en ing eering com / 434-227-5140 RE: SP201900012 Field School of Charlottesville Dear Ms. Schlein: Staff has reviewed your initial submittal for the special use permit, SP201900012, Field School of Charlottesville amendmen. We have a number of questions and comments which we believe should be addressed before we can recommend favorably on your SP request. We would be glad to meet with you to discuss these issues. Review comments are provided below, organized by Department, Division, or agency. Our comments are provided below: Planning — General Application Comments 1. Include the application file number that was given to this application, SP2019-00012, on the concept plan and in the project narrative. 2. Include on the cover sheet of the narrative that a Water Protection Ordinance (WPO) stream buffer is located on this site. 3. Include on the cover sheet of the narrative that this property is located within the Ivy Creek water supply watershed. 4. Revise the additional zoning considerations note to remove "steep slopes." Retain only "critical slopes." 5. Revise the information on the cover sheet to clarify the proposed zoning, as the "special use — private middle school" is already permitted by the existing special use permit, SP2015-00024, and this SP request is only amending that existing permit. 6. Although the project proposal states that the general layout of the project is not changing, one of the reserve drainfields depicted on the original concept plan is shown to be located within the 3.57 acres proposed to be transferred to the neighbors. Because this property is not on public sewer and not in the jurisdictional area, septic fields approved by the Virginia Department of Health are required. Demonstrate a new area where the drainfield can be located. 7. In the project narrative, clarify the language regarding the provision of utilities and the availability of public water and sewer. There are several instances in the project narrative where it is mentioned that a request for a jurisdictional area expansion of public water is made with this application. Such a request was not submitted with this application. However, it looks like this property is already located within the jurisdictional area for public water. If so, remove this language from the narrative and clarify that there already exists the availability of public water at this site. There are a few discrepancies regarding this language throughout the narrative. 8. In addition, it may help to more clearly identify which parts of the project narrative are new to SP2019-00012 and which parts are looking back to the narrative for SP2015-00024. 9. In the narrative, clarify whether a critical slopes waiver has been approved for the proposed disturbance of critical slopes, and provide the date it was approved if that is the case. 10. The location of the proposed picnic pavilion may not be feasible with the revised location of the tree buffer. On the revised concept plan, the location of the pavilion is completely surrounded by protected environmental features, where grading and construction would not be permitted to access the pavilion site. The tree buffer is to the east and south, the stream buffer is to the west, and critical slopes not proposed to be disturbed are to the north. 11. Where is the SP number in the heading of the traffic counts coming from? It is neither the number for this application or the application proposed to be amended (SP2015-00024). 12. The narrative explains that there is little impact on the fire and police departments. Elaborate further, as a private school would seem to have a large impact on such services. 13. Revise the zoning note on the cover sheet of the concept plan to include the Airport Impact Area. 14. On the concept plan, especially sheet C6, make the property line bolder all around the subject parcel, as it is difficult to differentiate the property line from the many other elements on the plan, such as the setbacks, tree buffers, and critical slope areas, making it hard for staff to accurately review the proposed new plan and the revised elements being depicted. 15. On the concept plan, provide a legend for all of the shaded areas. For example, the area of shading at the southwest corner of the 3.57 acre parcel is not identified in either a legend or a label, and it is unclear to staff what is being depicted. 16. If outdoor lighting is proposed, a lighting plan that complies with section 4.17 of the Albemarle County Zoning Ordinance will have to be submitted as a part of the site plan at that stage of development. 17. Conditions for this special use permit have not been written by staff at this time; however, they will be provided for review by the applicant prior to the first public hearing. It is likely that, at a minimum, all existing conditions from SP2015-00024 will continue with this proposed special use permit (although they may be modified to be consistent with this new SP), except for those conditions that specifically reference the original concept plan. Those conditions will be revised to reference the proposed new concept plan. The condition on the maximum enrollment number will remain, as that condition is not proposed to be amended with this SP application. 18. Please be advised that site plans and VSMP plans will be required at the site development stage if this special use permit is approved by the Board. 19. A boundary line adjustment plat will be required to transfer the proposed 3.57 acres from the Field School's property to the neighboring property owners. Comprehensive Plan Initial comments on how your proposal generally relates to the Comprehensive Plan are provided below. Comments on conformity with the Comprehensive Plan are provided to the Planning Commission and Board of Supervisors as part of the staff report. The Comprehensive Plan identifies Tax Map Parcel (TMP) 06000-00-00-06800 as Rural Areas. A full review against the Comprehensive Plan was not performed for this application because the private school use has already been approved. The major revision of shifting the tree buffer maintains a more rural character for neighboring properties by screening the school from other uses. However, the reduction in the size of the parcel that the school is sited on does cause the school use to become more intensive related to its smaller parcel size, which may have greater impact on neighbors because of less open space on the parcel relative to its overall size. Neighborhood Model This project is not located within the Development Areas and thus was not reviewed for consistency with the Neighborhood Model Principles found in the Comprehensive Plan. Comments from Other Reviewing Divisions. Departments. and Agencies Planning - Transportation No objections at this time; Transportation Planner, Daniel Butch, dbutch =,albemarle.org. Zoning Division, Community Development Department Review pending, comments will be forwarded to applicant upon receipt by staff, Francis MacCall, finaccall(kalbemarle.org. Engineering & Water Resources Division, Community Development Department No objections at this time; County Engineer, Frank Pohl, fpohl@albemarle.org. E911, Community Development Department No objections at this time; E911 plans reviewer, Brian Becker, bbeckerkalbemarle.org. Albemarle County Architectural Review Board (ARB) The following comments regarding this proposal have been provided by Margaret Maliszewski, staff planner for the ARB, mmaliszewski(kalbemarle.org: Currently, Entrance Corridor regulations are not being applied within the Barracks Road overlay. Building Inspections Division, Community Development Department The following comments regarding this proposal have been provided by the Building Inspections plans reviewer, Michael Dellinger, mdellinger(kalbemarle.org: All comments will be added to the SDP review. Albemarle County Fire -Rescue No objections at this time; Fire & Rescue plans reviewer, Shawn Maddox, smaddox(kalbemarle.org. Albemarle County Service Authority Please see the attached comments from ACSA plans reviewer, Richard Nelson, rnelson(u,serviceauthority.org. Virginia Department of Transportation Review pending, comments will be forwarded to applicant upon receipt by staff; Adam Moore, adam.moore(kvdot.vir ig nia.gov. Virginia Department of Health, Thomas Jefferson Health District Review pending, comments will be forwarded to applicant upon receipt by staff; Alan Mazurowski, alan.mazurowski@vdh.virginia. goy. Action after Receipt of Comments After you have read this letter, please take one of the actions identified on "Action After Receipt of Comment Letter" which is attached. Resubmittal If you choose to resubmit, please use the attached form. There is no fee for the first resubmittal. The resubmittal date schedule is provided for your convenience online at: http://www.albemarle.org/upload/images/forms center/departments/Community_Development/forms/schedules/Special Use _Permit _& Zoning_Map Amendment_Schedule.pdf Notification and Advertisement Fees Prior to scheduling a public hearing with the Planning Commission, payment of the following fees is needed: None. All fees have been paid at this time. Additional notification fees will not be required unless a deferral takes place and adjoining owners need to be notified of a new date. Please feel free to contact me if you wish to meet or need additional information. My email address is areitelbach(&albemarle.org, and my phone number is 434-296-5832 ext. 3261. Sincerely, Andy Reitelbach Senior Planner Planning Division, Department of Community Development enc: Memorandum from Albemarle County Service Authority SP2019-00012 Action After Receipt of Comments Special Use Permit Resubmittal Form ALBEMARLE COUNTY COMMUNITY DEVELOPMENT — Information from Service Providers To be filled out by ACSA for ZMA's and SP's 1) Is this site in the jurisdictional area for water and/or sewer? Water only JA. 2) What is the distance to the closest water and sewer line, if in the jurisdictional area? Along Barracks Road. 3) Are there water pressure issues which may affect the proposed use as shown on plan? Water pressures in the area are high. PRV will be needed. 4) Are there major upgrades needed to the water distribution or sewer collection system of which the applicant and staff should be aware? N/A 5) Are there other service provision issues such as the need for grinder pumps? N/A 6) Which issues should be resolved at the SP/ZMA stage and which issues can be resolved at the site plan/plat stage? 7) If the project is a large water user, what long term impacts or implications do you forsee? 8) Additional comments? DEPARTMENT OF COMMUNITY DEVELOPMENT trRrtNl°' ACTION AFTER RECEIPT OF COMMENT LETTER FIRST SET OF COMMENTS Your project has been scheduled for a public hearing by the Planning Commission for February 18, 2020, which is 77 days from the date your application was accepted for review. State Code requires a 90-day review by the Planning Commission unless the applicant requests deferral. As you will read in this comment letter, staff recommends changes to your project to help you achieve approval. Without these changes, staff cannot recommend approval to the Planning Commission. If you would like to address the comments, you must request deferral by January 17, 2020. If you choose not to request deferral, staff will take your project to the Commission as originally submitted, but without a recommendation of approval. Instructions for requesting a deferral are outlined below. Please note that you can submit revisions even if you defer your application. Please do one of the following on or before January 17, 2020: (1) Request deferral to resubmit to address comments, pursuant to Section 33.52(A)(1). Please understand that if a deferral request is made, the Planning Commission public hearing date will be later than February 18, 2020. (2) Request to proceed to a Planning Commission public hearing on February 18, 2020. All advertising fees must be paid by January 24, 2020. (3) Withdraw your application. (1) Deferral Request and Resubmittal To request deferral, you must submit a request in writing to defer action by the Planning Commission and Board of Supervisors. The request may be made by email. You may request a deferral for up to 36 months from the date your application was accepted for review, which is December 3, 2022. However, all outstanding information necessary for Commission action must be submitted by June 3, 2022, according to the published schedule. (See Section 18-33.52 (A)(2) of the Albemarle County Code). Revised 10-9-18 MCN (2) Proceed to Planning Commission Public Hearing on February 18, 2020 At this time, you may request that your application proceed to public hearing with the Planning Commission on February 18, 2020. With this option, staff will take your project to the Commission as originally submitted, but without a recommendation of approval. (3) Withdraw Your Application If at any time you wish to withdraw your application, please provide your request in writing. Resubmittals As stated above, a deferral does not preclude you from resubmitting the application to address changes based upon the comments. If you would like to resubmit after you defer, you may do so following the resubmittal schedule. Be sure to include the resubmittal form on the last page of your comment letter with vour submittal. The application fee which you paid covers staff review of the initial submittal and one resubmittal. Each subsequent resubmittal requires an additional fee. (See attached Fee Schedule.) Failure to Respond An application shall be deemed to be voluntarily withdrawn if the applicant requests deferral pursuant to subsection 33.52(A), and fails to provide within 120 days before the end of the deferral period all of the information required to allow the Board to act on the application. (See Section 18-33.53 (C) of the Albemarle County Code). Fee Payment Fees paid in cash or by check must be paid at the Community Development Intake Counter. Make checks payable to the County of Albemarle. Do not send checks directly to the Review Coordinator. Fees may also be paid by credit card using the secure online payment system, accessed at http://www.albemarle.org/department.asp?department=cdd&relpage=21685. Revised 10-9-18 MCN FOR OFFICE USE ONLY SP # Fee Amount $ Date Paid By who? Receipt # Ck# Bv: a Resubmittal of information for CV � 1 T T T • i Special use Permit �— PROJECT NUMBER THAT HAS BEEN ASSIGNED: SP2019-00012 Field School of Charlottesville Owner/Applicant Must Read and Sign I hereby certify that the information provided with this resubmittal is what has been requested from staff Signature of Owner, Contract Purchaser Date Print Name Daytime phone number of Signatory FEES to be paid after application For original Special Use Permit fee of $1,075 ® First resubmission (TO BE PAID WHEN THE RESUBMISSION IS MADE TO INTAKE STAFF) Free ❑ Each additional resubmission (TO BE PAID WHEN THE RESUBMISSION IS MADE TO INTAKE STAFF) $538 For original Special Use Permit fee of $2,000 ❑ First resubmission (TO BE PAID WHEN THE RESUBMISSION IS MADE TO INTAKE STAFF) Free ❑ Each additional resubmission (TO BE PAID WHEN THE RESUBMISSION IS MADE TO INTAKE STAFF) $1,075 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126 Revised 11/2/2015 Page 1 of 1