HomeMy WebLinkAboutWPO201400071 Bond Estimates Erosion Control Plan 2014-12-15Project Name: Old Trail Village Block 12 Phase 1 Erosion Control and Stormwater Management Plan (WP0201400071)
WPO file number: WP0201400071 (REF ALSO wpo201300021 ESC BOND, WHICH COVERS CERTAIN ESC ITEMS REQUIRED UNDER WPO201400071)
Erosion and Sediment Control Bond Estimate
Item Item —2 U N
Number nit Unitt
ins ailed
stablization (PS, TS)
silt fence (SF)
safety fence (SAF) -OPTIONAL (36Y)
diversion (DID, FD, RWD)
temporary slope drain (TSD)
earthwork for trap/basin
silt fence inlet protection (IP)
stone inlet protection (IP)
outlet protection (OP1)
outlet protection (OP2)
channel (SCC, matted)
check dam
construction entrance (CE)
wash rack
paved construction entrance
pipe length
0 It
pipe diameter
0 in
height of dam at toe
0 ft
cut at high side
0 ft
height of fill at face
0 ft
cut at face
0 ft
length of dam
0 ft
length of cut
0 ft
top width
0 ft
width of cut
0 It
length
4 It
width
6 ft
length
8 ft
width
10 ft
length
264 ft
width
4.5 ft
depth in channel
0 ft
channel width
10 It
rip -rap, placed depth
width
survey and layout (price per 0.1 mi.) acres
mobilization
stream crossing (computed independently)
JA-121514
0 ft length 1.0 ft
1.0
3.1 traps and basins 1
3.1 acres
870.0 ft 4t
0.0 It
Oft
0
9
2
2
1
0
1
1
cost sum
prof mgmt
contingency
Total
$15,600.00
$4,350.00
$0.00
$0.00
$0.00
$0.00
$1,800.00
$162.00
$540.00
$1,544.40
$0.00
$0.00
$2,000.00
$3,500.00
$0.00
$2,050.00
$500.00
$0.00
$32,046.40
$4,806.96
$3,685.34
$40,540
12/15/2014