Erosion and Sediment Control Bond Estimate
Item Item
No. Unit
Unit Cost
Cost
Number
installed
stablization (PS. TS)
_
$1,000.00
silt fence (SF)
ft
..
$3,700.00
safety fence (SAF)
Macres
11
_. _.
$0.00
diversion (DID, FD, RWD)
ft
$0.00
temporaryslo a drain (TSD)
pipe length
,'ft
pipe diameter
®in
$0.00
earthwork for trap/basin
height of dam at toe
-- ft
cut at high side
It
height of fill at face
ft
cut at face
ft
length of dam
It
length of cut
ft
top width
ft
width of cut
ft
area abovo ;ranstlic,
D $t
(area below transition)
0 sf
(total width of oam)
0 ft
(total width of rut)
0 tt
(height below transition)
0 ft
- (depth below transitior 0 fl
a,oa hBiotiv transifioni
n st
[area above transition
0 sf
0 0 cY
(total fill volume?
0.0 cY
length of spillway
-It
{TOAL CY estimate)
0 cy
$13.00
$0.00
width of spillway
ft
(spillway stone tons)
0 tons
$50.00
$0.00
structures for basin
riser height
tt
riser diameterMin
in
(riser unit price]
$0.00
barrel lengthft
base plate or fdn
0
$200.00
$0
barrel diameter
(barrel unit pncei
$0.00
barrel collars
0
$200.00
$0
baffle length
0 ft
$50.00
$0
silt fence inlet protection (IP)
0
$100.D0
$0.00
stone inlet protection (IP)
14
$200,00
$2,800.00
outlet protection (OP)
channel (SCC, matted)
length
length
ft
ft
width
width
ft
EIft
'. 0
$0.00
$0.00
$0.00
check dam
depth in channel
ft
channel widthft
$90.00
$1,080.00
construction entrance (GE)
$2.500.00
$0.00
wash rack
-
$2.000.00
$0.00
paved construction entrance
0
53.500.00
$0.00
rip -rap, placed
depth
®ft
length
ft
width
C tom;
g0.pn
$0.00
survey and layout (price per 0.1 mi.)
acres
traps and basins
$0.00
mobilization
_.
$2,500.00
stream crossing (computed independently)
$0.00
cost sum
$11,080.00
contingency
$1,108.00
Total
$12,190
9/22/2017