Loading...
HomeMy WebLinkAboutWPO201700055 Bond EstimatesOrchard Acres Waterline Replacement WPO file number: WP0201700055 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed stablization (PS. TS) _ $1,000.00 silt fence (SF) ft .. $3,700.00 safety fence (SAF) Macres 11 _. _. $0.00 diversion (DID, FD, RWD) ft $0.00 temporaryslo a drain (TSD) pipe length ,'ft pipe diameter ®in $0.00 earthwork for trap/basin height of dam at toe -- ft cut at high side It height of fill at face ft cut at face ft length of dam It length of cut ft top width ft width of cut ft area abovo ;ranstlic, D $t (area below transition) 0 sf (total width of oam) 0 ft (total width of rut) 0 tt (height below transition) 0 ft - (depth below transitior 0 fl a,oa hBiotiv transifioni n st [area above transition 0 sf 0 0 cY (total fill volume? 0.0 cY length of spillway -It {TOAL CY estimate) 0 cy $13.00 $0.00 width of spillway ft (spillway stone tons) 0 tons $50.00 $0.00 structures for basin riser height tt riser diameterMin in (riser unit price] $0.00 barrel lengthft base plate or fdn 0 $200.00 $0 barrel diameter (barrel unit pncei $0.00 barrel collars 0 $200.00 $0 baffle length 0 ft $50.00 $0 silt fence inlet protection (IP) 0 $100.D0 $0.00 stone inlet protection (IP) 14 $200,00 $2,800.00 outlet protection (OP) channel (SCC, matted) length length ft ft width width ft EIft '. 0 $0.00 $0.00 $0.00 check dam depth in channel ft channel widthft $90.00 $1,080.00 construction entrance (GE) $2.500.00 $0.00 wash rack - $2.000.00 $0.00 paved construction entrance 0 53.500.00 $0.00 rip -rap, placed depth ®ft length ft width C tom; g0.pn $0.00 survey and layout (price per 0.1 mi.) acres traps and basins $0.00 mobilization _. $2,500.00 stream crossing (computed independently) $0.00 cost sum $11,080.00 contingency $1,108.00 Total $12,190 9/22/2017