Loading...
HomeMy WebLinkAboutWPO202000005 VSMP - SWPPP 2020-01-22ALA COUNTY OF ALBEMARLE �oF Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Tel. (434) 296-5832 • Fax (434) 972-4126 e vIRGII`11P Stormwater Pollution Prevention Plan (SWPPP) For Construction Activities At: Project Name: Boys and Girls Club - Northside WPO#2019000XX Lambs Lane Charlottesville, Virginia 22901 Prepared by: Timmons Group 608 Preston Avenue, Suite 200 Charlottesville, VA 22903 Contact: Craig Kotarski, P.E. 434.327.1688 Prepared for: Boys and Girls Club 1000 Cherry Avenue Charlottesville, VA 22903 Contact: James Pierce 434.242.8052 SWPPP Preparation Date: January 21, 2020 (This document is to be made publicly available according to 9VAC25-880-70, Part II, section D) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County CONTENTS: (from Albcmarlc County Code Sec. 17-405) 1. Registration statement 2. Notice of general permit coverage 3. Nature of activity 4. Erosion and Sediment Control Plan. 5. Stormwater Management Plan 6. Pollution Prevention Plan. 7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload allocation, and exceptional waters. 8. Qualified personnel 9. Signed Certification 10. Delegation of authority. 11. General permit copy 12. Inspection logs Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 1. Registration statement (Provide a signed completed copy of the DEQ registration statement) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County DRAFT VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM FOR OFFICE USE ONLY CONSTRUCTION ACTIVITIES ID Number: (VAR10) REGISTRATION STATEMENT Technical Criteria: 1113 ❑ IIC ❑ NEW ISSUANCE ® RE -ISSUANCE ❑ MODIFICATION WITH ACREAGE INCREASE ❑ MODIFICATION WITHOUT ACREAGE INCREASE ❑ Existing Permit Coverage Number (if applicable): Section I. Operator/Permittee Information. A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have operational control over construction activities to ensure compliance with the general permit. A person with signatory authority for this operator must sign the certification in Section VI. (per Part III. K. of the VAR10 Permit). Construction Activity Operator Name: TBD Contact person: Address: City, State Zip code: Phone number: Primary email: CC Email: B. Billing Information (leave blank if same as the Operator identified in Section I. A. above). This entity will receive Annual Permit Maintenance and Permit Modification Fee invoices (if applicable). Name: Boys and Girls Club Contact person: James Pierce Address: 1000 Cherry Avenue City, State Zip code: Charlottesville, VA 22903 Phone number: 434-242-8052 Primary email: JPierce@beclubcva.Org CC Email: C. May we transmit correspondence electronically? You must choose YES and include a valid email in order to pay by credit card and to receive your permit coverage approval letter via email: YES ® NO ❑ DEQ 199-DRAFT PAGE 1 18 CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT Section II. Construction Activity Location Information. Project site information. A. Include a site map showing the location of the existing or proposed land -disturbing activities, the limits of land disturbance, construction entrances and all water bodies receiving stormwater discharges from the site. B. Construction Activity Name: Boys and Girls Club - Northside Address: Lambs Lane City and/or County and Zip code: Charlottesville, VA 22901 Latitude and Longitude (6-digit decimal degrees): 38.076130; 78.508412 C. Construction Activity Entrance Location (description, street address and/or latitude/longitude in decimal degrees): Entrance located off of Lambs Lane Section III. Offsite Support Activity Location Information. List all offsite support activities to be included under this permit registration. Enter additional areas on a separate page. Offsite areas not included on this registration will need to obtain coverage under a separate VPDES permit. A. Offsite Activity Name: Address: City and/or County and Zip code: Latitude and Longitude (6-digit decimal degrees): B. Offsite Activity Entrance Location (description, street address and/or latitude/longitude in decimal degrees): Section IV. Site Information. A. Acreage totals for all land -disturbing activities to be included under this permit coverage. (to the nearest one -hundredth of an acre) Total land area of development (include the entire area to be disturbed under the approved Stormwater 6.49 AC Management Plan): Estimated area to be disturbed (portions with Erosion 6.49 AC and Sediment Control Plan approval only): Offsite estimated area to be disturbed (if applicable): C. Property owner status: B. Estimated Project Dates (M M/D D/YYYY) Start date: Spring 2020 Completion date: Winter 2020 FEDERAL ❑ STATE ❑ PUBLIC ❑ PRIVATE X D. Nature of the construction activity description (i.e. commercial, industrial, residential, agricultural, environmental): Commercial Community Center E. Municipal Separate Storm Sewer System (MS4) name (if discharging to a MS4): DEQ 199-DRAFT Albemarle County PAGE 2 1 8 CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT F. This construction activity is part of a common plan of development or sale: YES ® NO ❑ G. 61h Order Hydrologic Unit Code (HUC) and associated Receiving Water Name(s). Include additional HUCs and receiving waters on a separate page. HUC RECEIVING WATERBODY(S) 020802040202 Ivy Creek - Little Ivy Creek Section V. Other Information. A. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the General VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting the registration statement. By signing the registration statement, the operator is certifying that the SWPPP has been prepared. B. Has an Erosion and Sediment Control Plan been approved for the disturbance in Section IV. A.? YES ❑ NO X If yes, provide the date of Erosion and Sediment Control Plan approval: C. Land disturbance has commenced: YES ❑ NO X D. Stormwater management maintenance agreement included (if applicable): YES ❑ Not Applicable X E. If this project is using approved Annual Standards and Specifications (AS&S), attach the completed AS&S Entity Form. AS&S Entity Name (if different from the Operator identified in Section II. A.): SEE THE FOLLOWING PAGE FOR SIGNATURE AND CERTIFICATION REQUIREMENTS AND INFORMATION DEQ 199-DRAFT PAGE 3 18 CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT Section VI. Certification. This Certification must be signed by a person representing the operator identified in Section II. A. and meeting the requirements of 9VAC25-880-70. Part III. K. Please note that operator is defined in 9VAC25-870-10 as follows: "Operator" means the owner or operator of any facility or activity subject to the Act and this chapter. In the context of stormwater associated with a large or small construction activity, operator means any person associated with a construction project that meets either of the following two criteria: (i) the person has direct operational control over construction plans and specifications, including the ability to make modifications to those plans and specifications or (ii) the person has day-to-day operational control of those activities at a project that are necessary to ensure compliance with a stormwater pollution prevention plan for the site or other state permit or VSMP authority permit conditions (i.e., they are authorized to direct workers at a site to carry out activities required by the stormwater pollution prevention plan or comply with other permit conditions). In the context of stormwater discharges from Municipal Separate Storm Sewer Systems (MS4s), operator means the operator of the regulated MS4 system. 9VAC25-880-70. Part III. K Signatory Requirements: Registration statement. All registration statements shall be signed as follows: a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy -making or decision -making functions for the corporation; or (ii) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations, the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for state permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures; b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this chapter, a principal executive officer of a public agency includes: (i) the chief executive officer of the agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency. Certification: "I certify under penalty of law that I have read and understand this registration statement and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." Printed Name: Signature (signed in ink): Date: Submit this form to the VSMP Authority. If DEQ is the VSMP Authority, please send to: Department of Environmental Quality Office of Stormwater Management Suite 1400 PO Box 1105 Richmond VA 23218 constructiongp@deg.virginia.gov DEQ 199-DRAFT PAGE 4 18 INSTRUCTIONS CONSTRUCTION GENERAL PERMIT REGISTRATION STATEMENT PLEASE DO NOT SUBMIT WITH THE REGISTRATION STATEMENT. This registration statement is for coverage under the General VPDES Permit for Discharges of Stormwater from Construction Activities. The following permit actions are covered by this form: new issuance, re -issuance, modification with an increase in acreage and plan modifications that do not result in an increase in acreage. Choose NEW ISSUANCE if this registration statement submittal is to obtain a new permit coverage, RE -ISSUANCE to renew an active, expiring permit coverage or MODIFICATION to modify an active permit coverage When modifying permit coverage, indicate if the modification is increasing the amount of acreage previous covered (MODIFICATION WITH ACREAGE INCREASE) or changing the site design with no increase in acreage (MODIFICATION WITHOUT ACREAGE INCREASE). Existing Permit Coverage Number. Provide the permit number for a modification or reissuance (i.e. VAR10####). Section I. Operator/Permittee Information. A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have operational control over construction activities to ensure compliance with the general permit. For companies, use the complete, active, legal entity name as registered with a state corporation commission. Entities that are considered operators commonly consist of the property owner, developer of a project (the party with control of project plans and specifications), or general contractor (the party with day-to-day operational control of the activities at the project site that are necessary to ensure compliance with the general permit). If an individual person is named as the operator, that person (or a representative of) must sign the certification in Section V. I. An operator can be one of the following: 9VAC25-870-10. Definitions. "Operator" means the owner or operator of any facility or activity subject to the Act and this chapter. In the context of stormwater associated with a large or small construction activity, operator means any person associated with a construction project that meets either of the following two criteria: (i) the person has direct operational control over construction plans and specifications, including the ability to make modifications to those plans and specifications or (ii) the person has day-to-day operational control of those activities at a project that are necessary to ensure compliance with a stormwater pollution prevention plan for the site or other state permit or VSMP authority permit conditions (i.e., they are authorized to direct workers at a site to carry out activities required by the stormwater pollution prevention plan or comply with other permit conditions). In the context of stormwater discharges from Municipal Separate Storm Sewer Systems (MS4s), operator means the operator of the regulated MS4 system. "Owner" means the Commonwealth or any of its political subdivisions including, but not limited to, sanitation district commissions and authorities, and any public or private institution, corporation, association, firm or company organized or existing under the laws of this or any other state or country, or any officer or agency of the United States, or any person or group of persons acting individually or as a group that owns, operates, charters, rents, or otherwise exercises control over or is responsible for any actual or potential discharge of sewage, industrial wastes, or other wastes or pollutants to state waters, or any facility or operation that has the capability to alter the physical, chemical, or biological properties of state waters in contravention of § 62.1-44.5 of the Code of Virginia, the Act and this chapter. "Person" means any individual, corporation, partnership, association, state, municipality, commission, or political subdivision of a state, governmental body, including a federal, state, or local entity as applicable, any interstate body or any other legal entity. B. Billing information. If the person or entity responsible for billing/invoicing is different from the operator, please complete this section. If they are the same, leave this section blank. DEQ 199-DRAFT PAGE 5 18 INSTRUCTIONS CONSTRUCTION GENERAL PERMIT REGISTRATION STATEMENT PLEASE DO NOT SUBMIT WITH THE REGISTRATION STATEMENT. C. May we transmit correspondence electronically? If you choose YES to this question and provide an email address in Section I. A., all correspondence, forms, invoices and notifications will be transmitted by email to the operator. This will also allow the operator to pay by credit card and receive permit coverage approval letters immediately upon approval. Section II. Construction Activity Location Information. Location information related to the project site. A. A site map indicating the location of the existing or proposed land -disturbing activities, the limits of land disturbance, construction entrances and all water bodies receiving stormwater discharges from the site must be included with the submittal of this form. Aerial imagery maps or topographic maps showing the required items are acceptable. Plan sheet sized site maps are not required. Please consult your VSMP authority if you have additional questions regarding site map requirements. B. Provide a descriptive project name (it is helpful to use the same naming convention as listed on the Stormwater plans), 911 street address (if available), city/county of the construction activity, 6-digit latitude and longitude in decimal degrees format for the centroid, main construction entrance or start and end points for linear projects (i.e. 37.1234N/- 77.1234W). C. Construction Activity Entrance Location. Provide an address or decimal degrees coordinates and a description of the main construction entrance where the permit coverage letter will be posted. Section III. Offsite Support Activity Location Information. This general permit also authorizes stormwater discharges from support activities (e.g., concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, borrow areas) located on -site or off - site provided that (i) the support activity is directly related to a construction activity that is required to have general permit coverage; (ii) the support activity is not a commercial operation, nor does it serve multiple unrelated construction activities by different operators; (iii) the support activity does not operate beyond the completion of the construction activity it supports; (iv) the support activity is identified in the registration statement at the time of general permit coverage; (v) appropriate control measures are identified in a SWPPP and implemented to address the discharges from the support activity areas; and (vi) all applicable state, federal, and local approvals are obtained for the support activity. If requesting permit coverage for offsite activities, please complete this section. List additional offsite areas to be included under this permit coverage on a separate page. Offsite areas not included on this registration will need to obtain coverage under a separate VPDES permit. A. Offsite activity location information. Provide a descriptive offsite project name, 911 street address (if available) and city/county of all off -site support activities. Provide the 6-digit latitude and longitude in decimal degrees (i.e. 37.1234N,- 77.1234W). Please note that off -site activities not covered under this permit may require separate permit coverage. B. Offsite activity entrance location. Provide an address or decimal degrees coordinates and a description of the main construction entrance. Section IV. Site Information. A. Acreage totals for all land -disturbing activities, on- and off -site, to be included under this permit. Acreages are to be reported to the nearest one -hundredth acre (two decimal places; i.e. 1.15 acres). Provide the total acreage of the development as approved on the Stormwater Management Plans and the estimated acreage to be disturbed by the construction activity as approved under the Erosion and Sediment Control Plans. The offsite estimated area to be disturbed is the sum of the disturbed acreages for all offsite support activities to be covered under this general permit. DEQ 199-DRAFT PAGE 6 18 INSTRUCTIONS CONSTRUCTION GENERAL PERMIT REGISTRATION STATEMENT PLEASE DO NOT SUBMIT WITH THE REGISTRATION STATEMENT. Permit fees are calculated based on your disturbed acreage total for all areas being disturbed under this permit coverage (the sum of all onsite and offsite disturbed acreages). B. Estimated Project Dates. Provide the estimated project start date and completion date in Month/Day/Year or MM/DD/YYYY format (i.e. 07/30/2019). C. Property owner status. The status of the construction activity property owner. Any property not owned by a government entity or agency (i.e. federal, state or local governments) is PRIVATE. D. Nature of the construction activity description. Choose the designation that best describes the post -construction use of this project (you may choose more than one). (i.e. Residential, Commercial, Industrial, Agricultural, Environmental, Educational, Oil and Gas, Utility, Transportation, Institutional, etc.). Describe the project (i.e. Commercial — one new office building and associated parking and utilities; Transportation — Roads, sidewalks and utilities; Agricultural — 3 Poultry Houses, etc.). E. Municipal Separate Storm Sewer System (MS4) name(s) if discharging to a MS4. If stormwater is discharged through a MS4 (either partially or completely), provide the name of the MS4(s) that will be receiving water from this construction activity. The MS4 name is typically the town, city, county, institute or federal facility where the construction activity is located. F. This construction activity is part of a common plan of development or sale. "Common plan of development or sale" means a contiguous area where separate and distinct construction activities may be taking place at different times on different schedules per 9VAC25-870-10. Definitions. Le. a subdivision, commercial development, business park, etc. G. 61" Order Hydrologic Unit Code (HUC) and associated Receiving Water Name(s). Provide all 61" order HUCs and receiving waters for the site and offsite areas that could potentially receive stormwater runoff discharging from this activity. The HUC can be either a 12-digit number (i.e. 0208010101) or 2-letter, 2-number code (i.e. JL52). Include additional HUCs or receiving waters on a separate page. You may utilize DEQ's web -based GIS application, VEGIS, to obtain this information. VEGIS application link: DEQ's VEGIS Mapping Application Instructions for utilizing DEQ's VEGIS application link: CGP-GIS HUC Instructions Section V. Other Information. A. A stormwater pollution prevention plan (SWPPP) must be prepared prior to submitting the registration statement per 9VAC25-880. See 9VAC25-880-70. Part II. of the General Permit for the SWPPP requirements. B. Indicate if the Erosion and Sediment Control Plan for the estimated area to be disturbed listed in Section IV. A. has been approved. If YES, indicate the date of original plan approval. C. If land disturbance has commenced, choose YES. "Land disturbance" or "land -disturbing activity" means a man-made change to the land surface that may result in soil erosion or has the potential to change its runoff characteristics, including construction activity such as the clearing, grading, excavating, or filling of land per §62.1-44.15:24. Definitions. D. Stormwater Management Maintenance Agreement per 9VAC25-870-112 A. Choose YES if a maintenance agreement has been included for review and approval. E. If this project is using approved Annual Standards and Specifications (AS&S), attach the completed AS&S Entity Form. If the AS&S Entity is different than the operator identified in Section I. A., list the AS&S Entity Name.. The AS&S entity is the entity or agency that holds the approved annual standards & specification. DEQ 199-DRAFT PAGE 7 18 INSTRUCTIONS CONSTRUCTION GENERAL PERMIT REGISTRATION STATEMENT PLEASE DO NOT SUBMIT WITH THE REGISTRATION STATEMENT. • AS&S Entity Form link: Annual Standards and Specifications Entity Information Form Section VI. Certification. A properly authorized individual associated with the operator identified in Section I. A. of the Registration Statement is responsible for certifying and signing the Registration Statement. State statutes provide for severe penalties for submitting false information on the Registration Statement. State regulations require that the Registration Statement be signed as follows per 9VAC25-880-70 Part III. K. 1.: a. For a corporation: by a responsible corporate officer. For the purpose of this part, a responsible corporate officer means: (i) A president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy -making or decision -making functions for the corporation, or (ii) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively. c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this part, a principal executive officer of a public agency includes: (i) The chief executive officer of the agency, or (ii) A senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency. DEQ 199-DRAFT PAGE 8 18 Section 2. Notice of general permit coverage (This notice is to be posted near the main entrance according to 9VAC25-880-70, Part II, section C.) (Provide a copy of the DEQ coverage letter when obtained) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 3. Nature of activity (Provide a detailed narrative of the construction activities. Include or reference a construction schedule and sequence. Include any phasing.) This project includes the construction of a Boys and Girls Club community center and associated parking, utilities & landscaping. Erosion and sediment control limits of disturbance area is 6.49 acres. The property is bounded by Lambs Road to the east and Jack Jouett Middle School to the north. It is surrounded by vacant wooded property to the west and south. All construction shall take place in accordance with the Erosion and Sediment Control Sequence of Installation on plan sheet C3.0. Estimated construction dates are as indicated on the Registration Statement. Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 4. Erosion and Sediment Control Plan. (Provide a reduced, I Ix17 copy of the latest Erosion and Sediment Control Plan. Do not reference only.) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County w aop�paeiaosse pue�suepl sseyl NOI1dINJS3O NOISIA3N 'nq'enisnpui'isnea�eym esamntl •!ue iy peso eq'ou pays pue ystl ui io yoµu ui peanpwtlei�eq'ou ,(eau pue dnONO SNOW WIl to •lyetlwtl eu, STVIl Kl 13 S�110N -102i1NOD 1NIWIa�]S'8 NOISOd] vA AINnoD g-Nm3mv �IQISHI2JON - omD ST'dD aNV SA09 wsu0ww3pL tld bZ95'S6Z'b£b131 I E06ZZ VA'all!nSauONay� I OOZ aainS'anuantl U04SWd 809 SNnO HJf10H1 03A3IHJtl NOISIA 2n0AI ••• • •331ii0 311LAS3.LL01atlNJ • Hl ltl 03Ntld3d JNIMtldO SIH1 d nou J SNOW W 11 3 C IIIIIII III I a —III III Ii As"01111 r. Mu m - z y w $ @ d c c E m E c „ E Eo3 E gg �S�tl 3 a n ^ ry E e n 3 n 4 9 e e e e rq m - o. aCi d E E �°3 eeo a 9 a a eeoeo d a4 N a y 3 3 0 3 -o y«i4. a a o a w J zz m j G wpwow z z z wx ❑ " FJ w U w z .N a z d z z z o G ❑ o Wz w W. oz Jz� v' w �z _ o, o ZzQ.z.h wzQ f0 m� O Or O m0� ¢ y0 ¢Q WO i¢ w p ❑� N xu>w �m¢p wo3p p0 w w r ❑ JO O M. N�$ �o� wu z w w z m ow ooi uriom zw z >m z zamuoximJ ¢per '^ "'¢ a ¢w " LLu o o So w m w ¢ _ ¢w arw po.. c z rz" o Yx N zo�r aw�o wz oa < a wy�G rwF �?��� um o a a> £ y�'n=mio o�d wSa� �� z < owz ❑ C Nrm �p r� u faw: m rw z o ❑ z z ¢❑ o > owl o3❑m = w ❑wz z Y ci z w 0 =S w y❑,m Y a zNw3 oLL zw�f o .. ¢ a >❑mom Mm oz� w5 N az a w zw o o a 3a w .. z of >Fw r vi sw wo mma o Iwo u- o o m ^?o mrJ w of ❑ w zoo az ,y fwza o w z az �u❑ z w oz r u o W o w rc w r wa - c Nz w_ o=ow iz z o z o aSLL w, po .. ay` yri Sco w a w w m W mm❑ o r�ozi .mow mm az rru- .. 3 3 �w o o :��� �� ❑uwia og r omc ow ❑ o m y r G aw iw3 oC.,�m f❑ zw ..Q r w £i ow" r o z owcwar r $dzo ❑Y zaw z oo u u m a J❑w my, rzmz o o:3fwz O ayri "' yz,rxw wo z w �o .. 3 r w ❑ z 4 w z❑o-❑ 3 atiyr 3Y omw w❑zo <zo a� o ^Gw wo = o WNw ❑zwa < ti i¢a c„m� Wc ar rzc' ow. x G w .�� ° coQf yr,$ wow ma-uw aovi wz imz zf LLw m w o i> om-m r imo o mzwLLq F ww wao- �b o w of G uzo2p�a owFf ;J bozo fz 5 r7� £ LL ow w W. m m z>z� 3om �mzW w�i w w�z�rzmo 00 of 'mouwiwri u� o r Fzumiw w ?zrwu'iwzw❑d =oo� wo=5 Jo '� waz �w z> a F 0 oSLL G cc"< w 4W r o w wwaz o r>dm -wwaw ,rn yw,zI 3z o zwo r'w oc z o c- o u i o Or¢ cc ❑F-� w �iai1��o = owzw3❑m z u r cwy;ow Gmzrm m>s.. >Ncw w o oaw r❑ > �w m o r o r£woi muow�w� c o wr£ TWUH G3 u 'z f 3 oa ❑�w�ao wzo k ,oz rc p o Www or a ww w w o ,w i zimi >o or ca wwmz ❑ m azzwc r rw awJ^"' s �zj c rx ❑ a w = z yy;z❑3�z m w f zo r F iJ rwc aofz m£x anoo N c w G ..rrg o^m w �mzo❑�Gz or uo =� oz a ao❑a w 3 >cc a5axz- z��o uc ow z z y�r ❑ z"' ¢ iJ z m a oz ❑¢u�0 w'O ^ um =zzjN w CC z w O w2w wl4 O a pOwm wz° a zFrr j= z3z F z z mm U U O wrzlal Q�Nmzwz❑c i�❑.z.wJz"¢a O� <a �m U� z Vnjwwmczmw'wm Ow ¢_ ¢"zz F fa x tii y ❑ a Z N ro K Z K a 'n w a> o Z z- w 0 r .. a U g O Q ¢ so r z w w;> l w JGomw,a� z ��WLLS .4 "o55aaw o " o w a3 am�NmmN'W oz5c aw o ❑z oo- wo - - o fm w wz �- M. mW ❑ �� w m G ❑ xfu j N moc m d ¢N� ❑ w 3 of cz uw waGw� zu u o=w m❑mxoQ�i��wa�'n <oSr o0 3wy; - w z oc o a ��aF ww ��o��o �aNwfoaa o¢ arc ❑rw of o z mom¢ J nw>uxocrrwcwyg wwP5 ozmf rw w z >z�z m w❑ if ? eco m o F o wcwc o yaxio�z .o ar¢Foag�¢w N zzoNzuyw Jz >zaf�wa mp S w f=i �' af.~z.mmzzc.,o�ar� ❑who agzw oz s ¢ Goz� ❑o zo a� wo , w - z F oawamwwrror o f.. a �o f G m rm❑ o r oz❑of aczrn a amww Sw ¢ ❑a ¢o', u v, > w zumzaw wz= Gp zz o o G o�zaydooamzxzadr o wS❑u�awy wazowo� w z uoz❑ wmG=corf5z��o w �woz G z w��w a� az 3 m ow No 0 o a o PEW w ow�ww o u m❑awm u o'w c z a�z o aow ao u" fLL m a �"' 'a �z mJ ro e a�Sawwz woLLma❑fzw'w ❑ a❑fLL FWwmz �LL mg _ oo �o❑uwiwmcocxf sow-' Gama o w wio oc ° o o o.. ❑d o^arm o r r>iw z z' zscw �w Q-w or cwLLG z ow�o yw u ❑ ca zz z� N gu �N zo z w s �Y o f ❑�wxiwwwad azzz,n33 oc azu��zw w uwi ruFx o'"ammw torw�"' S cz couz u u mwz o mrrw a owa awf r uic w 4a m��Ca ¢>wrc Faro ❑w ❑ Om o �yr,�zw>ioomwtium .w oomoow�o wwwwi�❑zzzz, m> go m�oa o_coSsm�owomz3f wsoCwr�❑�z ��� z< zu o o�ww ww �a o so ao wi ow - zsJo❑aornaaozF� za oio u ownzzm arwoaa❑ .w ui ur�'z a z iwwmoo�ozazoxa❑oNi�oz z3io�o d °uz am ga a dw�� oz oW C pz "w "o w a dzowomwigGi>�foLL�gp! a�$f ro>yrz�uoo� r m w o,m aa�wozwooa roFwoawN z ���o 00 �m `a Goc f i� za o❑ oz N " o� p ¢muyzfrrz�owfc � �! w Somoozuo Fzf❑ozwm?a�wo varif ad,u'caJw N z ELL�urim5�zwwwsw°cd6 z❑�� a opio ow z� w w zo �� m� o oww r �� z o iz i zw�g¢icozwruw>ctia�mam ar�mzLL auc�GoQwc❑rnw 3� -z rZoaw 02ga swan a❑ca z cs a8 zrgw >J o zw O'a�c°rozFa�>zwF❑❑pG� '�i uxiz oLLza �co�rw3&Gw¢= 'ma �a°ocoim>rzwa^>'pzcg'�' 3Qow wzrG, w zza z� wa z ocr ¢z a� iJ w �� u zo �'yz, c,zow�zawzz ❑❑z=�S ❑oaw �rrrzFwrzwaoQ co o ¢m000❑c a '^uoiO r oz o roc o az -Na 3 >N ��os a$c'wzm s o mzm- Ow zx a w o o'w w a > wz�wG onwoazaN za❑zd > o amok mw❑as zzo�miz ozw avow o 3 > 'c f�co w a u o FrWpmom xo�yw,�� �yg,f �w�'nSow�mac c3rw�oawzoo�❑000�YUF wQ£o wwwo��,v rFFowox�a3ozv m yc,zom z oc o omz� oo wm 3 wwf �� o� n om ow r z> r �ysrmc ❑ r zS r az5�wm'�oo= �wWw1� �r❑w� �m ❑c ❑ oz o 'wo a s < o c� z YIs r a a3y,c w rmzzz cf a > oGz,,,cz ❑ rz o u ua a zs wJ h o m� oc ma�a w°p❑o ziz❑r�zo���>zr`¢of❑w3=oczoym>=�mm6,zjzo�w zzosz�mzf��aw'z 4a �ww ww W zoroo mwrj o� az F �xo,Y o£ G-❑ to G¢w zo w>�. "'W. "' yo ;o a ro ow r„x� mg o-x Q< QQ >z ❑wca wa a o o _ o a p z 2 �i r ri U w .. 2 N O z w] S a z m .. ❑ 'i r z F w F O U w¢❑ z m U O a 0 0 o> J f w O^ Q V OV r o w£ 0 6 K a c c o m U❑ Z o u m r 5 .. D O w U 'i p '� U Y w 2 V! ❑ ¢�w'^`wa�wGGof�>wmw�.. ❑fazmow4a>ooz3za�3a 3oaoJd�mppBsS 3r r� oz❑z�oar Ck3aa Jz�" wa qw oz ow 5 a c- cw a uac-�mzwwmwmwf�c-o£ww aa6uoz tn rfcm�a cmwc zww�oa�mawyr,f �w¢�wmo�icrosoo o �a5z ��>, gu f dcci,w am a5 0 ?fo mo wm > cw w G zz"'a oo❑w¢i❑ao aFoarwro sw'o 8 i�wy'zw uin `"zws¢<� moo £ ❑-ow�w Jwx r'woczz w aw w� �w u m F o G 000ccz ruwxwrfww c » wowxc�wrw❑zxwa z �N�¢w¢z❑ c¢xawx3zw�kGw°`ow��� w wm wo Jo - s o3aa'a❑r❑wda amammmm..mmd¢ummur3aamoma..3 3m a3r3❑aaroci o wii3smrmo❑¢macwa❑mmm z x Umc wo o❑ o w e m m lz m m h �t w o c Z cOJ m n m O� Z O U O• J Q J f aof f f f f f f f f f f f f f f f f f f o w w w w w w w w w LA om N� n,_ Moi ai m3 m o F z w g o10 � k 3 3 a z w a wa ❑ yr �❑03 ❑ ? Y .zw aN ao o N mm zQwu 1 O w�zu❑ aC Q LLa oz Z 3 oGoz au ' w mw. -,. oc aN N> ^ ozzoo rm �fzc¢wu wz wG z� 8 o Qio um �z�a� 2a or o f3 GOzmz fz uuxir 5 wM NcuiGi¢ G a ¢gmx oQ w y of zw'uw au Fz '� u� QzF wE -a >c > Oo Ga zz zw, mFzowo oC r ag zG �Gsow� 0z z u co❑�oa ow -t wJao�� z uriz aF a s❑ wN £ ❑a¢o ou;55 m� w �o �� �wGrzam ❑ oa o_a rccrw o �z ❑G mo m'a z w3Nufz z o J ¢o z z 5 z� G3 �� Wz� zgwf� F o�N �o'm� ❑� 3> awo f^w�z> auw w om ow $ aNu N:°of¢ ..zr mw uul yg� �zim z uui�? a��w wa= o�� ❑wmorw ¢ zwo aim wry a�mgY> o ❑o� oo w =LLG gww ovoid -ma "az awo uFi"' m >£ Guza a ara arw wr oza uwuwi N�I'nio or z of Mz� o w wc6 0 10 z zr w rz w a G z z mom G w z u w¢x w 3y >a z mw❑ woa �o u mz ri o w¢ r�LL Cz o o w S. .: o w E F z z� ti❑ F� i>> wzo ¢LL ¢ 9z `-' 'o r w^ zoow wu �d o z mwsz "'oo oZx a w w „w m¢ o wG xW " oz s �o � � rw m o s wa �� z w zoaio� u�k c m m 9 ❑z wsz o3a wf w ¢>�.� oa £-� >x o� zw a whin.,w of� G az �i Wok wW, c 3w 'z ❑ zQz az Yz o z y>+ E:3Fwo roz £ z w w¢ dS w. ¢rw ww c ooN waa J w. "zza ¢o oowmS .g aso za a� a3 Oz uwi�w w o .w uari ao a� No z aim ryo3 Ny JGg°< Fo fig❑ aW m�� ❑ z z �zuNOw ow 3 ow = w aF l<G ocr orFLLzmc a rc a wNz cm ozw o❑ w o ❑ ❑w r .Ca wG as wzw �wwz..s� °cN> w� w�.o w ❑ow xa z m aw w 3ooaN'" 'mwuo o o>o £ �Y wJ ur'z Paz Fu❑wom ua�- �o war ❑� �Co mo �wN �� 3 w"f�"'� �mr ❑ r F og u ¢❑cm�g 3om❑ 3m x.. wiz way mn z yg a.. Ma ac a u 9�'z rm wu g'xJ Nwwcwws Nao za zowaw $mow¢ ¢m oam o Fc zg �uzc�z so 5 uo< dr ¢w c oizoc m'-uric z� YzzaF Nzam�� wN zuari wz a a£o< om6 w maw zo ro Ww >¢ o£a Jm❑ JwzN O2 o Gw w _ w ar Nwcw r'n waw w z tou ar a r ow Uf ❑� o Zzw s3 fm m27: wr w oz'w z Nrai a oGw ^muwzw = ❑ i3 a❑�z❑ w�co3Qo w❑ u z so 'wc m .. LL aaw G ❑z �� ww z6 3� rwx f maw Wpzao mg>xc GH w5c d mo �❑"'= mww Z owm .. mw a of ^❑- ma�G w wwwo o uo. > rdo s �awawo� 5 ¢ ❑ a° > jw azw oza'a5w cFw ao_ 3c ZS� =�<4zo G^ t'wz uwri o� iz i-urooz agw omd ❑ ur'uari is m> zzo wgcomzw' �-oo ao m�LLwN w 3�w a� aac uri Sw Nf mzNNmwu wry a �� a o y� rwaozwo w�ru ❑w a❑ ^um zm mwo ^w ❑J kay .ugo zir o w u^oi� �i za s wsm NYz com 0o awmms❑z w oo cwGcrJz c❑ uw.g . we < dz wo oCwamzuwif 3� z sc 4 z r� ow wr'uf ,"�� oaz o oaw� w oaFaC goo, as a F.. ❑ ago ❑�f ono z z� zz ruaJ o wwo wNwmm�Jo rGd❑£o �o zow mo gG ?mmo w, ��� LL GHQ waao a a wd w. w' a2 zza `;000m�s ^o£-o�=rwam mzm = m ❑ Nz��zzo s rzr wrw ,rn as o ❑� ❑w ❑-awwa cmk,o>x pscz zw wowz a^ -off 'az - tom a�ymm po wuwz GourJ m❑� m zwm� wzo z�ocyzd �FN, >ooamwro �oSwwoC 3� kJw cCoa �z ¢wcF❑w mwz �md Gz ° z mwcaw o^ u way; iw�c aoorl� " frm wgcw rw wcwo ❑ m ru oz m -.w>_ x¢S rFo �.. r'-'wosr c5 cwrr G r oJ❑ dsza u mwa 3my, .. ua�ww ra >"' arwf zzmmtr m >z Jaa�a� ao-viow ow^ f > zmz°f > c5a wzG oziod gaowz❑a o .. sawN Jom _r sr 5�ux ❑�o�wa z w rzfc w u '3LLmaw as w--o ainw� zs o ❑�uz ymF coz z..o r ❑z o- _m Sc.. o_o o"' away ism u❑ ❑w+=�'-„ >H N� �mw rmzx mmw❑cma zw°nNw �u w 3..am fQaow o?wm arw r w❑__zY❑wriw '"G z.-g❑rw ,Y ozw rum" „'¢ati w.. o mz� >m� torah¢ rrc❑w uo❑W o��M3a mw Jo scow r z am ��c LLmmum o aw riwzz6m❑ ❑iz❑ 'rn53 ❑'w mNC ozs3 rLL4 i fez wow ¢ z¢azy;w omco w < ❑ ow- ❑w ❑wmz a wmmo > a ozw uo 0 o❑zz r cN6a m S� 5 mho ❑ww uyg o.o >c❑u wa zm r ,',^,r 3w'"c w> o,wzi�za ^o wo ❑¢a 3oo"a ywY zS JFco oca-ar ooyww�+f ..cowzww z r'w o'zzwma ❑ �Nzz❑ .oww..m❑ �❑wG�wa>gwm 3mz wyriw �z�z��� o ;' Mg u,.; 'n�w�'-wm oaw ww� s amz❑ruwx g^'..z oow u o mfz�,rnw ��wm❑ c _uo❑';❑mo Sz Ca> o�"Gro I.iw 3wzwmm uGi�m y;�oN�❑ w�zgw�o roaw❑om �lm =wj orFo f..� r zcawaw�a r w Sz swotxJfau om�wwiLLF ryr,zw w��co� wz Z �6zszow wz❑vi c G r ozoxroo f amm ow �^ rFz -a S❑zz r o m �a❑F$ w ��° ���wr ac Gwa YJw r5^a N� wwwo� <aozw o wrnzz o zwo ❑ owLLm cF�w z w� ❑ umzrz RYGcjo r �c zx o i�wu- w Noc zz wzcu-oz wo �r ztoza uw a ❑z> s rw�r�n'-❑ �wwwo"'3❑-moafzuz❑�w w�cwaaw ow�`no F oz ❑mz Wmwz�-- �xw"wm Fgo swwwom owupaw a�Q �z �3qd Soo 3c rcmmow �oqo » zwm ¢ �nw of - o��mw asz�� zxa a ua -tn omE-1 m c z❑❑or= zaJa �� oo a r Q o awrG^uc 4a -r�mmo sc^ s'^�rw acac za �axw U >22 JwwQc.. w—F UriK a ❑nEw7�mw w5w>g.. 'w7 w �w'�a U�K2 rar ❑ `I' rim£❑ ONmZm r zzw soaS.. m ���� w ¢ a oasi ac> az osooz�a a Sm�H _a3yw>,wmwm�w owz000w - 'a uudQuz o o a�,nwoSo� wcscm^� aooawxx� cw xz`"rzo r� Fnsrma�'nm❑woawow 'o v'i rwrawxiF ❑to ..wummma zw.. a..sac ozw u'-' omao❑3zuzam Vim.. uawm Vaiw❑wozmou o a w a �-x- war a .w yr e " > M e s e wafM��fLL mw , N-W. w. i4 m 4 M e J 'dnOUD SNOWW11 w Wasum uaryuns 11 ayI Wp4y,N 611N sup!pnasum I'M" Bulpplq'"Plisuppypa1lwp esarLntl we+w peso ey �pu iipys pue ystl ui �p etpyv. ui nepnppd sowu,caupupdn°aO sNOwwu �p kcal da npxss .. s—..pp pwe.—pup soap-s o m o o STVIl Kl 13 S�110N -102i1NOD 1NIWIMS'8 NOISOd] M �4ISHBdON Vh A1NnoD g-Nvw39iV - 9f1�D ST2iIO 4NV SA09 �Ih ° w z h ° w M Oa y ° Y ° Y NOI1dIiIJ530NOISIA3N Div(] 3��a 6' • O worsuoww9•mMM L Z'bEb Xtld bZ95'S6Z'b£b 131 E06ZZ VA'ajjlnsau0Ne4J I OOZ aainS'anuantl uoaswd 809 3JIid03llI311Ln531101atlNJ 'SNf10 H'Jf10UH103A3IHJtl NOISIA 21f10A •• • • novo SNOW ' W1 3Hl ltl 031MMId `JNIMYN SIHl • • • 0 0 ow N3 ww Imt 3 r aw w(o - mQ tt ea1 yi J j - a J _ 2 w Z g w w w ¢ w rc �w F } o J3a z o o W a J° 0 I`� 1 1 U m ¢ > 3o _zsaw g�w�z a m z o F. o \� _ LL - _- St oF= o_ S w i 3�s�� O �w 3 w N LLJ Z J w S o w W o xw S -/\\ _ o z°� wFOa W a 0 W w N �oy� O o a oW w o o `z' o ZLU Z O II LL m ¢ ¢ Of 0- 4 o - W o ° r I F > -1 Z o ~ oSw2 LU = 8 Z <w-a W a o 3 a - - _ a����� - Q �-' - w _ w S o w I1 (/ I a>w l o Z I _www Z5 - - - O ��5� �? �aEI z 0 w owJ� ❑ - 0 w¢.o _zw o Norm - - - - __ - o y = F. - w z S m z w �oF° -- = m J ==z ¢ Z a V F¢ w > F� I O LL Q m Y U Ow O F Z m X m¢ m z wOoOY 1-- ¢�xo -- - - - - s ---¢ o~ > Z X ¢ O LL a m ¢x w Wm w i z X03LL ❑-F ww z m 2 rxz� wWi w❑ D_'� -w - > mZ c tiz-w WW O r aKUw - oawzx �.. - - - - - - - - w., i W z W w- ❑ >� w (1m U ¢ O�OviO O rz O ¢�<zW O W OOwui L N Z QD_QU k^ ; §� w Q Z W KO U ma0_ X ~❑x W l]2> a❑W xo �mU SON W d rox� rN F Q w ma SFzk iiz rc � o -1 Q m� wx O (7 ¢�a z¢r i o- U z>ti a ¢ooxOa wmWW r z m mx ar¢ awa QW�z � a¢mzy 00 z ❑¢-m ❑m2�¢y W Fw pao'm N� ar we o m Sx L- qoo W O-' w� g zo O a wmW r a �¢� w �z0 o �m> w Kw�aO >b f„ ,6 ww OJOo m x wJz air¢a <¢~ - ¢ ati0w� ~ acl o wu a5w �¢r=n EwO � on ° O` I--r + F o0 U ti U d_ h Q Q Q z tt �mzza cX �Z 3 W W W W Om Oao S o>F xx�� yaz r ter¢¢ W KF� W W !A OYQF ¢Q¢ oz iww�a ��zg�_ ~ W Y NO QN ..� mow Sew a T aww ~ W Y j W �� m� vi w 2 ¢ �Jtaz Q¢U C um ac7a w ¢wN Como w�3 > ytio arc2i tiw0 O�2zLL zw�r `� �QOzc2J ❑<w Z Q Hg w° - w¢ "' gay � 'NIW ��801.9 �mm p .0 01.9 LL Z Q oz cJz ,wn' 2 g i= a 2m WFOzo m¢FF(9 W W z¢cwj 20QZ m>u_ LLo Oa¢ 3��¢ z0w oUo m�wmzr ati?wa ?a❑�� J m Fr Fz w.. o p O F „z ol., J m r0 mz a z> K 2-� W m W0 tt o a ¢ w m �m m a >- w x aww Q m J� ¢❑wX2 fCz�w �a�ww Oy0 Z O 0 4 z LL Z ~ N = o p, `� ' w w z > ° E FS o �" a _ N - o " Z Q F N w¢ < 3 z Q F °m w� ¢ a a g¢m �k y �y wg °� au g yai y �= �- �= z 0ZO N oz OLL KmW K ee'z e zcm�m Q z W r z Wz¢-ir mmUO 7ooQ<J H oo - 1 ao oz�>�3 CO m 5� as 00 oo yo2i2 0K1K H m wo m3 r3�O2r cA W a 2 m a a m 3 mm O y iu O a w :n z z :n z O m 0 0 0 0 U a m age 666 m'oo Q > W Y Y -,W W azw Q Q Q W Q W W g� `° a ❑ zJzz W❑�m� �w� Y�LL°J W ¢ a J w :o �NNJ�� gam W W W Q Z y 2WQ m °NEN :�:. - �.LL z fZ 2z z(D O r o O a w ❑ x w�a¢�� >i�ujwn w 3yg¢O� K U 'x LU awia _ ww Q a� mitt ¢ Ow O❑-m Q W (7� Kw yK mz¢ ¢m0 ww <O moo¢ O rQ to Ln Q aw W M¢ �m z ¢ r p iK� Uw QmZzZ tt Jlwr ¢mwoazw O tt N m¢ O2 oE0 W F Z O e > _ m W U w Ou; ¢ (9 u; X�F zw y� W> U w �o m❑ W W tt] m¢z rn I¢m �❑� ¢, ❑� �a �r z Q �a ¢F ~ ul W X C7 ¢� ai �z ¢ mr0 m X w❑ w ym U Oa wK0 tiU ¢�u� ngainw3zQ x m 0 m w W r o Q y �(❑72LL wxw�ti�m p o❑�x (7�w¢Qo W Cl i Y 11 ■ '���■■ w m w '< 0. mz J W w z J ¢O N ¢O (7y ❑ tio!J m J z WQ tt i¢O U' w»mj� `; U ~(720 C' O Z Ol]tJC7l] OODOO o0 WW FY y U V ZQ W WOzK ❑ V m WW OW N �Q mjK ttZWUm� ��~S WFWUZW❑ X N w I w �~ o� W WU m❑ J LLWOKJ cJ wnam "nzz mJ Um J �KFF wQJ��O¢ zO�rnW � x¢y❑ _O Vi a°s LL. - >W >z H n m a¢ ¢ m U> U O U Z Z N z W j N N m¢❑ w a> 3 O m J W r> O> U Z K wa 0 Z 9 = W > o r w W U U ¢❑ w o! ¢ (0 ¢ C7 ¢ W W 310, = c¢i a F O F m 1 1 m r m m �wwaw ¢zww zQ m❑ m> O> _ w¢ m¢ ¢ww¢❑Oa0 wtiW�¢z rya wtit7 W s ul LU F b c ul Y Y W Y tt m W W y J W F W p m❑w N } _ W d Z w z 3 �«' �m x ¢ 1 LLOO�¢ uW, Z g y �U (9 Li W O } 5 q 3 W q Q- F z a z ❑ H n a - ❑ O a w 3 y W ¢ > ti 3 U - zt"P wZ�S Q W o z g❑pr�viN m oor¢ -wwawE _0o owZo U2a?> o~>mz�ui w Q z z #w �} �a i �r aw o .wil1� 4 �IIIIII _ F ❑❑ m3Yawwz J az o_ wx0 Boa LLOO oo of >¢ i 3 III III d' O ❑❑ g oa>oW aaFmWQZW 2 z w I �1 Ij x U III ��o3wz� I iJ m o I� 111w CIO zaoo�y� o XEL m �¢ a o - J I b�l\\ c❑FNUI~Qta/� a 1 l _ IIIIIIIII \ z o W W�1m oza z o z w w 2 io z w ¢2rwzww O Q❑ z 2~ Z O o a a m I cWiO a '� =o ❑Q Q WU' > a > z ¢� K W c G 11\ w zU>¢ ugZ❑ U rQ O - z Y (\ w QZJ= azo mLL�a �Uw m J o U O o m 2 W LL L zo z N ti O a 0 31 'il OmIn Q-' z O a O u U > (9 O wropp pwenosse pue soap eseul NOI1dINOS3O NOISIA3N m w F F Y ti' C I �IS`dHd NV-1d -10'dIN00 1NIWI0�]S 13 NOISO2F] VA AINnoD 37VW39iV �IQISHBdON - omD ST'dI0 aNV SA09 wsww3L Z'bEbbZ95'S6Z'b£b131 I E06ZZ VA'all!nsauONay� I OOZ aainS'anuantl u0asad 809 SN0 119110H103A3IHJtl NOSIA 210AI 00,00 •331ii0311LA531101atlJ • H1 IV CIRIVd3d JNIMtldO SIHl d nouo SNOW W 11 I Z ❑ w o Q u n p m w z J aa❑❑ w ° E O j oOp z / j > > IY c� ❑ o u o o z w G < 3 z o a z o v u a g f S Z f O �❑ � o w m .. o � u In 'o w01 ❑ � h 0 zo I ,Awl i� �i � w LL LL ❑ ❑ � a ❑ m In ❑ � a c� 3NI '33a // ❑/�i%-/, i�/' /' /, / / 1, ,,, �l I'//I,l l,; ,l, , I ,IIII II If/iii '"',l/l//l/� o a / -i4''� // l I ' I 5�0 ' �' / I / , / l l ; / ; / 1 OI \ \1-U, ; ; /, I I ( l/'I'1 IIIII IIII �'// I III (I 1' / /� // , ','IIIIII IIII I, I III IIII II [[ I �/ A ' h N I m, I 1 1 I / / / �' �' �'.� '/, /'�'/ / // / , I I I K I I rYK /II I I 1 II `IIIIIIIII\�t �l\t�/I/��',I�; I�IIII�I UIIII����ll �l�llll AA V AA A AV1 AAA b , // / IIIIIIIII 'Il1 III1111, c /, � i/ h J I I \ 1 .-1 \ \ \ \ \ m � ///// I VA I A A\ I AA A / %p\� N ' I'd �' /�/�//// / / / , ; I I I \ \ / d"/ / I I I ~ I I I \I� yy III Ip'I\\\\I\\\\ \\\ \\\\\\ U I I WI IAA`V `VA AAAA A V A I A A A A A A A A I ,,WI (�p,II Idl II VAAAA V `� AAVAAVA\. ��;��y Vv. II LL 1 III11 / t I,' 0/,' IVAVAA ❑ AVAAA AVAAV� �,�. VV vAA U , II 1 /'' I V I I I I I OI lI l I A A LL V A A A ®®� ', /'/'',(0p$�y�, / . ; 1 `I 1 1 I 1 ' ❑ rid ' I </''�// ❑ la >VI I II a d I r l �' IIIIIIVAVAI`AIIIVII I I I IIII �Id �U�l;//��IIII�IIIII�III`VAII\II II AI, VA ��V A\IIIIIIII O A-w 12 II I I I I 11 o' Wou �" \ID WIIII I, IIII N ���;��I' 1'���I��I�;;'��;;I�I��I� �I'���1��"'%,'/�I�I�,UlI; � ;ao I°'� I I II II'ilill \1\111"II'iiil';iill ';111I�/', i;; � I; 1111ii�ili'\' Oo� NS I I I I I ( I I I I Qal I I I 1 \ \\\ \ \\ 1 ll\\ I I II I \\\\\\\ Iho'ol 1 A I I I 111I A`\\ `VA V A VA�AA AA AAVAVAVAI IIII,AVAAAA `. .`,\IA A\\VA I�;�I `\ `V A 1 I\ \\\ IIIIIII\VA`I\\`\\\\\V�\VAAAAAAVAAVAA\\VA\\V`AIIIII IVAA\V A�Vv.AAVA w I A I I V A I 1 I, A 1 A\ A V A\ A \ V A A A A I A A A A❑ V A\ V A ,1 A I I 1\ V`\ L v\\ V A v A\ IQ'I �� "\ ii 4 C II C I 1 1 1 I I, 1 1 I, ,\\ \\ I' `I A `I 1 'I I ', /�R I I w I Qp \ �\ I 11' I I I I I I I I I II I I I I I I I l l l l I" I 1 1 1 I I I � � l/ l l ❑ I I I I I I I I I I I I; I I; 11 1 1 1 1\ 11 \\\I I I I' r� I ,l ,l'I' % I U) -`�I d3 a I IV I I I I I V❑ I I ; ; I I I I I I; I I r l;' l' I I I I I' I l l l l l l i I I IIII II I/ 1I-Q 11 I I / I II 1, I, I, II IIIIII II IIII I"IIII'II'IIIIIIIIIIII II I;; II I�j I;; U,;,;I;////�'�;IIIIII; 1 I 1 ' I I I I I I I I I ❑ I i I I I' I' I I I I I I I I I I I I I I I I I I I I I " I I I I I I I I I / l, I I I IIII \ IIa I I 11 I, I II I II I I I I I, II II II ❑ WLL I I II IIII �VAAAVA yh Q, I I 1 1 I I \\I11 I I 1, , , I I I I I i I I i I I I I II II I I II I I II I I II 1, II I I I I I I I I II co In I I I I I I I I I I I I I 1 1 ryry ll, III II II v J , , , /, I ■ o '�, / / / / / , , , III , r l l , '¢ ///y0//// /__ ' o� ' i i ❑ ,' / /// // /,//' /�/ '�6/////Ill Il /, A'v'" U a�ugc(DO'i ❑ �� LL / /,// /� m �40�/ �i¢Y'm 00 / / / — 1 � ❑ ' / , � `�'� �', ��� z �i %�'��'�/ � ice' ��' � v __-�,,-,,;', �,i, -� -- _ Ln U ,' / // / /:,'i' \\\ \_ _ __`_-_-- --- _--_,-- — i 1 I I I\I I ' / r ) I I I I / ', �Z• - r00 — _ A / _-� �- - - ___ __ _ _______-_�_- 1I I'I I \ II \ `I 1 11 1 ` II \ _ - `�-_-_ -__- _____----_ — J w aop�pa\elaosse pue�suepl sseyl NOI1dINOS3O NOISIA3N Mm w F F Y S til C IsnI.ul'—.­ --nE,lue iy p-ne lou pays pue dulioq.Wu!Peanpwtlei�eq /ou,(�au pue dnONO SNOWWIl lo,lyetlw II �ISHHd NV-1d -102i1N00 1NIWIa�IS 13 NOISO2R VA AINnoD 3T?JVW39iV �IQISH-BdON - omD ST'dD aNV SA09 wsuw314•L Z'bEbXtld bZ95'S6Z'b£b131 I E06ZZ VA'aIIlnSauONay� I OOZ aalnS'anuantl u04Sad 809 SNO 11911OH10A3IHJtl NOSIA 210I 00,00 •331iiO 311LA5311OlatlJ • H1 IV 03IVd3d JNIMtlda SIHl d nouo SNOW W 11 �D0�0 .�,,MMMmMmMMm�mMmMmM� z 0 w N Y w ��� w z m o J 44❑❑ w > eO z 2 / j > > O — E x c� ❑❑ G w 7 E o z o z w G 3 z o z o o `�` \\ R w O o u�❑i w .. o I u In o u I a f w °z. zo o 11,8�� ., / ,��� / - ` ,ii'❑'���/�' // ,-4111*�i ^ W , I i i' / / ❑ ' l / , i / / i ' / y�i : ' / l l I I , / l l / , l l l / / I I , r r ' r I I'I , I I; r i i i' �' I I I r, /'//, /l / // mv�� � v � ❑ rII v � I I'r r 'l � /�� i / lr "'/ ��'� IlI'lll,', II III �'// II Irll 11 � ~ ;III// \ 1 , II ❑ I I 1 /��', /�'� � �'� �" //, /////���1�1//11 'I'I IIIIIIIIII/Ii- IIII I [ I I d� / Y K r a I I O O 11 V \ \ \ \ \ \ \ \ G , / / I IIII I I I I I I / `\\ f IIIII, I\1\ I ",c�c � � � I 1 �m I \`V ❑ A \V A A A AA1\AAVl i� '-i','"/,�,, , /�', �lllll IIII II III\1 �, oaw ' J I' I I A V .-A A A VAA 11 11VA A �'�'•:� y i�i /Ill I I I 1 II o¢ a M v v vvI 11 1v o'„ II ,Ih'll1z, l I I \II\1\ oa hh� �', ip 0�%I v vv .� Rid I I I I A A 1 hL I 111 AA AA V A A A A I I A I1p�pI 1A VAI VA `V AAA`V AVA AAVA\\ �'•i. �� I " r 1 WI Tjy,' I TI I A``V `VA AAAA A V A /, 1 1 1 I 1 1 i � �rr N1111 i `v `vv1 ❑ Avv��vvvv v U 1 1 Ii IZ II I ®® O 6 ®® IIUQQ��) / r p> h ' rd \IIII 11 IIIAI \IAA(All V� �ynl I\\A 1 I 1 IIII KI a tl1CJ `\ 1 1\\\ I I I I 1 LL ❑ \ W '�i \ \\ \ 11 I IIII p2�p r I I r I I I I I I I 111 A l I I 1 I x V0 A, II 1 O OUIW / / 1 1 r I I I a�QQ al , I 1, I I I' 1 1 11 I I, I I I I\\I \ 1 I j-" IWIIII'II IIII l' I I I ' II IIIII I\ III�IIIIj1 I,INI�I, w I I�hI III I l ¢ U U I /gym '/❑ I I I I I I, I I 15NN0�g 16 ILK I �w,'LLI I I I I I I I I' I I I I I I I I I I III I I I �r Cl)l I I I WOK iwl K�dl I II I I I\ \\I II 1"' II I I I I' I I I II I j I I Ijii H 'I' /,/� If1�IlI I ; Ili ;I a IQ W I I W I I I I I I ME i �I I I I Z O I I]a O IOI k \V I e ■p 1\ II A �IId IV A A `V 1 I\ \I A I 1 A\ \ A A\ A ` V A AA AV A\\I\\ \ VAVA V AIIIII 11V `A\ � 1 I O j Ip m I \ I 1 I I I I ❑ 1 I I I pOla U I '\ \ `\ \\ \ 1 \\ \ I �J II \I \I \ \ \\ \ \ \\ \ \ \\ \\ \\ I \I \ \I \I � \ \\\\\\ \ 1 1 \II \ \\ \\ \\ \\ ` � ❑ \\ ; � �; 2 O 1 \ I I I I0I \ \ \ \ 1 1 a l I I \ \ \ \ 11 I \ 1 \` \ ® p I I I 1 I 1 ❑ I I \ I \ ��"o I I 1 111 II I 21 \ \ �L Ou4d - �1 I II J I I� II II I lI lI l l�I I' I I'' I I I �' I I I I I I I❑ I I I I I I I I I\I \I\1\\\II\lA 1 11 / r,I III fI/ �¢ - 13I I � I �I1OII IIII IIIII IIIII/I�i l/%II rII I i III II I I II 1pI LL',�Iy�Ir/// l O I b I I O' I I h l' I I I I h l/ y l, ' l l 1 p l 1 1 I 0 1 1 1 � 1 1 1 m l l ro l l l N I LI — I ❑ II of I M /% h I / I I I I I I I I I " I I I I I I p l I I I III � r r r , I l r N, l I, y 1 1 h l m I I I I I 1 1 1 U I '' I'' I r I I I l r I r r r I I I I I I I I I I I I I I I I I � 1 1 1 1 1 I 1 � 93 ` / Z I I i I I OI 1 I I I I- I I S rh I, r r' l I' I I I' l l l III I �' �I IIIIIIII \ I F w I I I I I I I r / I I I I I I I I I I 1 1 I I I w I I I I I I I IIIII 1 ��� \ Iefn In I I I r I II I I I I I II QC7''I'I" I I I I I III II�'II'IIIIIIII I'll I I I I I I '"'lllrrl 1wI!IIIIII I I I \ d 1 I I II i I l l I I 1.1� l I I I I I l I II II II II I II II 11 II I I I I II I I /IIII/:: ,, IIIIII II l h 1 I I I I I I I I I I I ILLIKI ' I I IIIIIIII I I I I I I I I I I I I ( I I I I I I I I I I I IIII 11 III ' \\ I I I I I I I I r�ldl I I I I I I I I I I I I I I I I I I I I I I l III � 1AAAA - `I l l' I I ❑ I r Olwl I I I I I 1 1 1 1 I ❑ I I/ l i /I I `VAVAA` 1 A I I I IV I I I � I II ❑ I r 1, // a w l I I I I i I I I II II II I I I I II 11 II I I I I II II I I I I I I 1� I I I I I I I II 1 1 II II 1 I \�� \ VAA �� A W� \ I I /1 1 1 IIIIII Ir I, I,r IIII IIIII III IIII III IIII II III III II IIIIIII IIi IIIIIII FII\\\' W m N/ I I ; I I I I I I II \\\\ \ I I I II I I I I II 11 IIIIIII 1 1 I II I I I 1A II VI \I w I II I � II II I 1 1 I//IIi I /� // r�l_r'I'I' IIIIIII I//, 1, I (IIIIIIIIII IIII 'IIIIIII LL IIIIIII 9yW / / / ,/ / // /// I� �p ❑ /❑ //,/ // , / //// / / bib / / / / / / / j i/ / /-tea-vw so U / /,I/� / / / �O /❑/ �o oa/ o/kp ------ w / ---- RK TV ' ❑ / / � ^ � n j'/ an��� 'i /i'i i''� Iii ��" \\�___%�'�'��'� /�i �_/_____ _- i , �'' / '� /,','� ❑ '� �� �' �/ ��-�%,� o A�vA_ 1I I I i I 1 11 1 III III II 11\ I A�vv ooviIti�ll IIIIIIIIII /1 II`IIv. A�v�� I ��� (\A A�� __ _�__ _ i_/ � i --------- - - - - -- ��m z LLI- �, yd%_ -____________- --- oo oo O w aop�pa�elaosse pue�suepl sseyl NOI1dINOS3O NOISIA3N m w F F Y S til C Isnpu!'+sne.­ssarLnE,lue iy peso a I.. pays p.. yed u!ioy.wu1 Peanpwtlsi�sq�ou,('au pus d nZD SNOWWIl lo,lyetlwtl III �ISHHd NV-ld -f02ilNOO 1NIWIa�]S 13 NOISO'c2 VA AINnoD 5-Mvil39iV �IQISHBdON - omD ST'dD aNV SA09 z ry o Il- i V wsuw314•LiE9'S6tld bZ95'S6Z'b£b131 I E06ZZ VA'aIIlnSauONay� I OOZ aalnS'anuantl u04SWd 809 SNO 11911OH103A3IHJtl NOSIA 210AI 00,00 •331iiO3llIAS3.1-LOlatlJ • Hl ltl 0RIVd3d JNIMtldO SIHl d nouo SNOW W 11 � d3 M / rOp c -' : 1/c _J �4I m r \ ® I y � U I ' k (� _ •� � � m m m m m m m m m m m m m m m m m F I � � z❑ w o t a luo m o z aoz Q J 4C4 ❑ ❑ w .�. eO 2 2 W e x � U❑❑ o G w � 7 E o y o o z w G 3 z o z o o u cc a g f g o Z f y N Q U7 W z o I I I I I I I I I III I ,AA 11 h I VAATTT/J c v �' 1 K ��/� I I I I I I Il l ,vIOHU'�/, II 1 0 0 'II IIIII IIIII I'II III I I• IW,�<N �<CC IQ - lu�w / 0 9b9' I I I I QF JuFSS{Z1 I I d �6`��' ,CL r//II, fUI 1' IIII I °- ' o,oIO '�,( 1U,K y awl jOVd2oall ', 1 1 d y� 1 \ I�l 3 1 I I , I��W❑A I (n � pt k U-> 6� M. ��� �❑�\VA����A �A 1 (O o , 1 1 I ZK\ I 1 I I 1 1 \ \ I I 1 1 I I I I I o I I 1 I I III I IIIII I \ \\\ r rl 1 1 cr `W �11 'y II 'llr lr" IIII I,IrI II I,'I�I II 1 d IIII111 \I 1111'I I,I III I I�I111//' O q l , I h r H r I I I I I U II I II I ro1111�1 N ',11 P h l l 'n, l l Nr 1110 I I li'I,I 11 III II o1,1 I O I Illllr/ �' I 1 I I I I I I I I I I I/ I j li I I III I � I I' I I I I I I I I IIII I , r' \ EL I 1 1 I I I i i 1 /rr , r111/I/I �� d Iq`6�1 1I Ir r, /r,111, I�111 IIIIIIIH¢K'III'II 'II I m I/ III IIIIII ��A����AA� d d W 2� \I II I l l r I I I I I, I OIOr ZZI 1 I ' I I I I 'IQ�3 001¢I ' II II } I. (� III I IIIII 11 I WIQ I 1 11 I i 2 f I iI ;IIIIII TI i 1 - m/111 a /� r'llr 1, lrir'i irr II 10 l I 000, 18) r I / / k a Z \-__-_ __� Od \\� II-I�I ZWoaW A22o in�u�i \`— — _ -- �;�;/� I iy�l I � i i I 111 �1 \ y ✓�� w UOOQwx \a.�Uw QNnn�� Z N.I —w y _ _ r/// C) C9 --- __/_ �/i �� , , ❑ r w❑ CID � Section 5. Stormwater Management Plan (Provide a reduced I Ix17 copy of the latest stormwater management plan. Do not reference only.) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County "M" 6,,ppl4'umymisuoo W pal -I NOI1dINOS3O NOISIA3N 'm w F F Y ti' C WOdO SNOWWIl )o luacum IMW ,E,lue iy peso eq lou pays pue yed u!io yoµu u! peanpwd., lou, pue dnON£1£ N` -ld ]9VNP dG 19 JNIabRiJ DQISHI'dON - omD ST'dD aNV SA09 z ry 6 O wsuw314•L Z'bEbbZ95'S6Z'b£b131 I E06ZZ VA'aIIIASauONay� I OOZ aainS'anuantl u04Sad 809 SN1O HJf1OH103A3IHJtl NOISIA 210AI ••• ••331iiO 311LA531101atlJ • Hl ltl 03Ntld3dd JNIMtldO SIHl . d nomo SNOW W 11 mq \\ 14p0m\� Illy ,LL� p I Poo .� 4i£1u1{7ydI '. ri. 9 1 I ' I I I �" I 1 9 I '• Y. ' ' , 1 1 I I\ I\ \ I I 1 \ b � ,.. cj ' ; � � ; I I \ V I I I y�6 I I '�� , I '� � � :�I ,I• '1 I 9 I 1 � A� \V A \V I\ \I \ � l \` � �� \\ 1 I m ' I I I 1 , I I �� I uol 1 `1 V ` V \ 1 1 '� ` V A � �` •� 11 � U ' I � I ` \ 1 11 \ 53, II I ( }. . i I I ' LL ' n I \ \ 1 \ 1 . I � 1 , '• � \. \ `\ \ \ ` \ :. ll I \ 1 9E9 II —__ � I I� I 1\ 1 1 \ 1 1 •'6t ,.'I „ , 1 ` \ \ \a �I `, 1 1 1\ 1 \I 11 1 1( I I I .I.i l�' I 1 I `o I I 1 \I 'I �' '• •' 1° I \ I II I� I I I W I I I II \/1 �� I � �' I I I I t �i'• I I I I l I l I I l l I 1 � I I IW I I I I I I I ' — '—=, ,— � —' �r I —' —I—' I�','rr''�•' � i � T � �� 1�,�, JI , l ; , , ; I 1 I I O�� I , I I I I ; J I ; ' ; I ' 7 V90 133HS 33S 3NIl1-101t/W I G I I I � II , 'I I I ' ''I .. •1', I I . I � , , , ; � , • , / ' ' ' / � , , , ' / � ; ' ' ' r ' I I I I , I I I i i � I ' •i • i I i h I l l Q l l r '� l / ' ti I h I o '• r r' y I I � I I ,\ � I Fg I I I \\ I h I I I ' 1 ,: �' •{ I h / I I ' `5 / rl l I '� ' I '� I I I h I I I i I' r h, I I � __ e� I I I I I , I , �; I I I / / / / I I I /� , / / / I I l l I , l I , I I I •I I I I I I I � I , I I I i I r I i. 'I' :I I I I I ' I I I I 11 I I I I I I ,, r• ' I •'�` I I \O \ I I I I '>•I , P>• >I I I I I � � I I I I I I I I I I � I I ' ' ' 1' I' ''6• I I I I " I I I I °•I I 11,, 1 1 ,O I I I \\ \\ I I II 11 1 � I I I� '� .I+. � �'. •' I i i � � I i i; � I i�� I 'I 'i 'i II 11 p' 1• 1 '1 � 11 I a, \ �\ \ I I i I Jb'y 1 \I 1 ' I � '� i.•�>i'. I l r i i I �' I ' 1 I I i I I 1 ' r 1 I 'I fd° I � l r r , � I I � I � � I ; 'I I I I I I o'I ( , , \ • '\ ', 11 � � h I W \ I\ w\ / / ; y / / / •• ; I I I I � I I I I I I I I I I 1 F \ \ 1 1 I ILI wl I I I ! I W' it LU lLl NJ / / ' / � / ��,pp°w / ' � °y. / '/ l` ,' ' / r r ,' = i ' ;•, l l l l l I i I I I I � � � I rl / / / / %I �J, r / / / A h , 7 / v� ----'_ i -5'' /' — --------_--------- — ' '--- _ _� -------------_-_-_-_ ----------------- lou 1nq'enlsn1.u!nE,lue iy pesn eq lou pays pu.y.dulioq.Wulp;anp.dl%g7uuAaupu, dnZe SNOWWI1 lo,lyetlwtl eusnp'. ayl a+e sluewroop"p"l" osse pue'su.pl sseyy N ) 02 20 w N O �'Iy 4 es O F F Y. ,q NOI1dRIOS3O NOISIA3N 31V0 Y Y U '� c37z Eu worsuowwp•mmm LTE9'96Z'bEb XVJ MG-SU'b£b 131 E06ZZ VA'all!nsauoNay� I OOZ aainS'anuantl uol—d 909 3JIddO 3llIA5311OISV11J 'SNf1O H'Jf1OUH103A3IHJtl NOISIA 21f10A • •• • 3H1 IV 03Ntld3dd `JNIMVd(I SIHI •• • 0 rn m y m LLw LLw LLw LLw UN Uo UU _ UU N N N LL _ LL LL LL IN N �o� 8 6O Q O Q O Q O o j o 2 ro m ti'y S o0 3 as 3 a 3 o0 3 S 0 S 0 S o S o x;e xq IQQQOI F N QWO QWO U O Q Q F. Q Q �2 LL N ¢ K2 LL ON ¢ llx LL 0M D_'x LL w x Z - Z n w 2 Z Z N w x Z - w N w Q o N o Q m o N o Q y o Q o o Zen toh� No w II ZmfpNm N o oil Zm rovi qi No Nc ZyloN� a7o c II ^' d.o�oVvo�oVvo N� Qc KOUvo N� NV-1d ]9VNP dG 19 JNIabRiJ VA AINnoD 3-?JVW39iV N DQISH12iON - omD ST'dD aNV SAGO dnouo SNOWW11 O N y J 1 a ti de oa If I UO 0' 1 r I III ` lyti N i I �' 1 N I I I I p I U, ��U ' I• I I I I I I I I s 1011, c v J wropp pwenosse pue soap eseul NOI1dINOS3O NOISIA3N m w F F Y ti' C NV-1d ]9VNP dG 19 JNIabRiJ DQISHI'dON - omD ST'dD aNV SAO9 wosuoww3p•L tld bZ95'S6Z'b£b 131 1 E06ZZ VA'all!nsauoNay� I OOZ aainS'anuantl uoasad 809 'SNO HJf1OH103A3IHJtl NOSIA 210••• ••331idO 311LAS3.LLOlatl14J • H1 IV 03Ntld3dd JNIMtlda SIHl 000 dnomo SNOWW11 0�x'_��V, III/'r'',�\/, lI'/tilt l%�,rII I'III,/ III�III'II;II I'11',AI \ V mil l I %T I' III' III 11'I „I 1 I', \�, \ \ \ \Q �/ll-h,IIIII" 1\ \ \ \ \ \ N �l /I / 1 � 1 1 1 ' 1 ♦�A`�` V A4' I I I/"/'�' IBC /'�I I', / I ' ' 1 1 1 I A AI I I 7y'I I' , Iyti, 9I , %%IT%%l �� V 1 � L• 1 �, A A l A `` V` `V A�� A V � A V A A A A\ 1 I I'' " \ \ \ T t; \ \ I r 1 1 1 1 1 1 I I \ 1 n \ \ \ V��', \I 1 1 '\ 11 '\ I II II II '1 I .L ',•' ', '1 1 A \ V A A1�A� A \ \� V A\A V A V vTV 0111 IW W ; U) �W- % I I I I 1 > \ \ \ \ \ \ \ \ \L \ \ \ \ \ \ \ 1 \ \ \ \ \ 1 I \ IIW W I Z I % % I I , l / < l I'g.� ;r gJ i I, i / T>• I , ' '� \' �� \ �C 4�W/ / ,�,' \\N, 'It\ \ \)\ \n 1\ � -' I 'I�rh� I 'I I''1 \� ���A� ����A �� \\VAV\\VA�•11\ _ J I I o, w l I 1 1 I I I I I I 1 1 I II 11 1 I I ', I ', I, �1 ', ❑ � I ', 11 � I I � l � � l I l � � I � I I I I I ', 11 'I '� '; I ', 'I 11 I 1 ', 1 1 � ', 1 ', 1 � 'I ', I I �I 1111 ',� 1 I 'I '� 1 I I O`\ � \II \„ ,` 1 I .• I I I I / , I I I �' I l I I I I I I'' I I" I I , I I I I , I I 1 1 I I I l� I I � I I, I I � \III "� / ,/°�,•> //� / /I 'I , II'I �I�I I, ,�lll 'Ill ��;III�\;�� III'llll�VA"'`� � �` '�\�-S` /, I' I I I\ I I I - lI\' , l I 1 1 I I I II / a¢- - -- I, I I l l l I Ivy 1''I' I ' I , , I/ a N n N II II E/O I � � l l l / / , �, , / I , , / % I l I r 1 / I , / / / Ez o ❑ � w LU / WLU w. Aj ,, v -,---— ------------ - - - - -- -- - - - ------------------------- T'--------------------- -i "M" 6,,pp,q'umymis... W pal -I NOI1dINJS3O NOISIA3N m w F F Y ti' C WOdO SNOWWII 11 luacum IMW >E,lue iy pesos lou pays pue yed u!io yoµu u! peanpwd. eq lou, pus dnON£1£ NVId SlOHS lOdS ONIaH2fJ DGISHI'dON - omD ST'dI0 aNV SA09 wsuw314•L tld bZ95'S6Z'b£b 131 1 E06ZZ VA'all!nSauONay� I OOZ aainS'anuaAV uogSWd 809 'SNO HJf1OH103A3IHJtl NOSIA210. ••• ••331idO 311LAS3.LLOlatlNJ . HI IV 03Ntld3dd JNIMtlda SIHl 000 dnouo SNOW W 11 1 / '��Sddl I I ' r { � ,�' •I { .°, ' �� �' I I I I I ' ' I 5ti �� I I I ' 'I 1 1 , 1 1 yti I I /' / I IIF a � � / I • � � I � ; � ' I 'I 11 11 'I � � yti" ' I 49 1 I I I 1 I "mi- , 6`S I I �� j, �• I �• 1 I � '1 'V � `� 1 A '1 \, �\ \\ II I � I I I I � � , 1 I IF n ��� I I .I. � '� II. I 'I III '1 � � \\ `, \ , 1 1 � � I � I � '• V A. A A �I � \ ll � l ® � ; I \ '1 1 , I °-mil II I � ( 'f •� 'Nl�isll 1, h 'D'1 ', II ; 1 \\\ I \\ I `, \\ 1 \\ \\ 11 ll 1 11 II I II � \' \\ \\ \ \ \`\ 1 ll 1 \ aI� ---�I � I �I I m ', � I 1 '1 1 '��,•P '� •' ' 1 l 1� v` I v '1 1 v� 1 1 1 1 I I I 'I .L� ,•• � I � I C I 1 h m Imo^ ,' • '•1• � I I� I I I I I F�• I I \' I I u"i I n I - 1 1 •I i I 1 1 \ \ 1 I I I I I I I I I I I I I I ,- � I I I I I I I \ Flo �ry •If �'1 '•' I '1 1 \ \ I I I I' ', I I I I I I 'I I I I I K' I I I I y m I 1 I \ \ p I , W I I , I 1 I I ' I. I, '1 I ' I I I I I I � II j I I I I I I I I�u % I � i , ,.f,• i , i I I i II I i w I I l I I I I I I �I I: •" � I. � 1 i I I I I I I I I ' ' I I I p I I I I I 1 I I KO _ I \ I ' I II ml 1• °I � +11 >• I ' I I I j l 11 II I ' ' I I I / I I IW � I , I I �" I I � I � I /' I� \U I I I I I I I I I > .I '" � .. � 1 I I I I I / , , l , I I I I I I I I K I I I , I I I I>• I I I r �� •• � � I II I / r l l , l y -I -' • I �. i T �� 1� 1 JI I I I1 O, 17'90 133HS 33S 3NI-lH`OIVVY ' l ' ;,� I n I v I I I I a$ I � I J >: �°� �> •� I ' h l l r I � l '� l l h l / � r h I r r � h I ' , , '� •, ' h, ' i ' i I vY I I II i i•� 1. I i ' / i i i ' I i;' / // r% l l r, I 1; l r r 'I ' I i i, i � � ,� I d3 I I I r I , ?� �,•• '' ' , I I I I � I I � I � ' � / I I I I I I I,° ' I 1 1 I I I , , ,� ' ; � I � I °'. � •i I ; I I I I I ' I I `' � I � � ' � l ; � � : ,• I ; � ' '� � I ' I I ' I l h I , I >° 'I i. •I ;, I I I I , I I 1 I I I I I •' 1 w� I I I I I 1 I i t°.A.I °l it '{ r I I I , I I I� ' I I I I I I I ,• ml I I I ' IOC ' I ' 1 1 I ' I / I I I I I I f �� i� I ,f 15 °•>I .: j�>. � I I ' I ' ' I I I I ' ' I I I I I n' rm I I I i ,rui i I I I \� � I I I I I � IF^i .��° �6, •� �° I I I I I I '� I I I I II I ,� " '1 '1 ImlFul I �I �' I I I \ I I O I 'I I I I I I I ' I I ' ' I I I I °•I I I I 1 1 � 1 I I ' 11 II III ,1 1 �I �� ° • ,�•,II :. II,, � • I � � � I � � ; � I � � � I II II 11 ,I I 1 p> 1 • 1 �n I I 11 I I I �\ �r l I m ,' I I ' 11 ' I II S ' � i^ II n'f ✓; , ° , I ; � � ' I � � ; � I � 'I '1 I I I I I 'I I I II ' I ° I 11 II U'" ' T'\ I U Agri F'u \ � � I ~i' I ' ' ' I '.•>�•. I l r r I ' I I I I I 1 ' I I I I 'I I I 1 I I 1'' I 1 I c / r 1 m l , � I� l I I I ' I I ' I I' I ' ' I I I , of 1 \ °• 1 I 1 I I , I Z o /' / ~/ / I l r I '.. l• I j i N; I f- I N ' 1 I I w w ��(�(`-� I r I / / � / / � • >' ' I I w l I , 2 ,� , I I I I I i 1 , • I , 1 1 I I �, I I I I I W' w�I I IIIII l/ l I/ / /.` / / ,' / l I , l � Z / ( />> ,.i /F`m/ F�ii l�• I, I I / I I I I I I I' I / � /� S /I o I / / , ' °y: / � /� / // /, x I � ° './ • � ,<'', % // � / � I I I I I I I i I 101 22 1 '� 1 �. 1 1 1 \ / / ' / 'moo \` , / /�.��','� '�� � ,' /�'�' /' � " � �'"'� �'' 'i5; ' ,'" j�•� � - - ol i <'z- / `-_____- -- - ---------------�/ii�, ------ / —- ------------_ ''-- ---- --- -- --------'��''_---------- lou Inq'en,snpu, nene.­ --nE,lue iy p-ne I.. pays pue yed u,ioq.Wu,p=p.dl%g7uuAaupue dnONO SNOWWIl lo,lyetlwtl eusnlaxe ayl ue sluewroop�pale,aosse pue'suepl sseyl N ) 02 20 w N O �'IA y 4 es O F F Y. N011dRIOS3O NOISIA3N 31V0 Y Y U '� c37z Eu wW'Suowwp•mmm LTE9'96Z'bEb XVJ MG-SU'b£b131 3�� ' E06ZZ VA'all!nsauoNay� I OOZ aainS'anuantl uOI—d 909 Oa .�q-O 331dd0311AS31LOISV11J 'SN110 11'Jf10UH103A3IHJtl NOISIA 211101 •• • • • 3HI IV 03Ntld3dd `JNIMVdO SIHI 000 NVId SJ-OHS J-OdS ONIab2fJ VA AINnoD 3-?JVW39iV N DGISH1210N - omD ST'dI0 aNV SAO9 dnouo SNOWWII O N y J PE 1 1 a ro �1. U G viOi` 6 i� LU 11 Ir . . .� 1 � 1 I I III ( I 1 1 1 I 1 I 1 1 I Y 1 1� /1 1 1 1 J w aop�palelaosse pue�suepl sseyy NOI1dINOS3O NOISIA3N m w F F Y S til Ci iE,lue iy p-ne lou pays pue dulioyoµuu!Peanpwtlei�eq Iou,(>au pue dnON: NVId S-LOHS -LOdS ONIaH2fJ DGISHI'dON - omD ST'dI0 aNV SA09 z N IN h o R U a wsuw314•L Z'bEbbZ95'S6Z'b£b131 1 E06ZZ VA'alllnsauONay� I OOZ aalnS'anuantl uoasad 809 'SNO HJf1OH103A3IHJtl NOSIA 210. ••• ••331idO 311LA531101atlJ • Hl ltl 03Ntld3dd JNIMtlda SIHl 000 d nouo SNOW W 11 III jl ly�I� - II / n�llll A �/ /T/ � oml i I�ryl, I\ \\, 1 I I...,�•\� \\ \\\\\\\�\\\\\\\\\�\ \\\\\1\\`\\\ I 'I 1 I11'II IIIiT� I� \ \ \ \ \\\\\ \ I � 1 I I I I I I I I I \ I"�111'�I V �, 1 1 II "I L.>',• �'� I A V\vv vwyAvAv�\ \`,I`Iv,'II,II�v v vv �I W, I � (� I I I I I I I I I I I I I I ' \•, A ` `�V AA `\ `\��\�` A A A ' 1` 1''\�\``� A�` � �\ \ \ I I I 1 I I I I 1 I ' I , II r�• ' IrN , _ I ,\ \\ W W I� W uLLLLl I Z I I ; ; 1 I 1 LL ; I I I I •� I I I ', I II I I II \ \ \\\, \\ �\\ \ \\\ 1 / I I I I I I I I I I' l ' I I I I \ \ 1 1 IW °j ' I ' ' I ' ' I 1 1 `I 1 T '1\I III �}'�/ , I ► , , ,' /,' /\, \ ,\,I I�1.; I �\ \ \ l ti l I 1,6 ' II II � P• I, m �ro l I I I �h I I I , i� I II 1 I I ^' ' I I 1 � I I ' ' I I / 1 j , / r\' / '/ l \ \ \ \\ \ `\ I I I I Lm - �\\ V\\`I I I I I I I I •., 1 ��I I 'I ,� I I � I� I;I;�l;lll'�/llyl;�I ;','v1'�� `�.'„'���;�,�;��:::� 1 _�� /\�v ',`'�ry I I I I I I I I ' I I ', I 11 I• I I o' , I I.aI LI; I�/;///��II I, `,\ \ \ \!\\ \\\\\ I/II 1 1 \ \\ I I I \ \\1 I I I \ 1 I I I I I 1 1 \ \ \\ I 11 \\\I I i I I i I I I LL \ \ \\ \ \ •\ 1 1 I , I \n I I I � I i I I I I I 'l 1, I 'I I� 1 1 1 '1 I I \\ ',\\\ \\ \ 1\� \ '\ \ \ \ \'' I I ' I I' I I I 'I 1 "II �11 \\\\\\```1 I I I 1�\ \\`1\\\\ 111\ \\ I � '� l' ', 'I '1 <� I 1 1 • >I I I 1 '1 I I I ', I � � I � � � 'I I I ' 11 11 'I 'y II 'l IIII ' I I I 11 '1 �I 1 I \ - - - - - - � I 1 ,\�\\I\\ /•> / I I /1 I I I, I 11�' I I I I I I 11 I I .\I 11 , , 1 1� , � �\ I� \ \ I, 1 I /, \� \\ • \\ \\ �_�\\� / � �' " n rc ' ' / • /' ; ; 'I ' ; ' ; ; ; ' / ; 1{1{' ; ' ' ; ; ; / ; ' I y1�v' � I Imo,' � yI� �' , l I 1 ', � 1, 1, ; � I ' 'I I' ,' 'I I I ' ` \ ' ' l I cn'//l/r'/r LU ' r Lo U) /W. If _ ------- ------------- -- ------------------------------'-- > J w aop�parelaosse pue�suepl sseyl NOI1dINJS3(l NOISIA3N 'm w F F Y S til C snpu!'+snea�eym esarLntl,lue iy peso eq lou pays pue yetl u! io yoµu u! Peanpwtlei�eq \ou,(�au pue dnONO SNOW WIl lo,lyetl N`d_1d ),\dvwwns dilwAmdols VA .I 3-?JVW39iV DQISHBdON - omD ST'dD aNV SA09 z ry 6 O wsuw314•LiE9'S6Z'bEbbZ95'S6Z'b£b131 I E06ZZ VA'aIIIASauONay� I OOZ aalnS'anuantl u04Sad 809 SNO 11911OH103A3IHJtl NOSIA 20/I 00,00 •331iiO3llIA531101atlJ • H1 IV 03IItlJNII SIHl d nou J SNOW W I 1 � IIy II�1 II I III I\I'rI1'l�l�I /\ w ¢ \-/; 1j—, llrr�r ��rl;I 11/�','�'�'?;' T 3r hVr \\\ OZ `- /. I i�•��.%S -- rl' 1, ', 1,,1,�,, l /,//,�/'/ ,rrr,"t �// 0"�J'' I J -7)V W ////I y. Uv 1 0 ♦� _a_I N I I ��/� i �'/�i i'i' 6/�', 'l lrllll r,l,//�r�,�wllrrrl�-; I',T��1�1�1.1��I11��/Ti'/ I�III��I��'..t/ Ir%I�(�, Il i�.11iil�l l,l'�hl l�',ill�ll-I+(IIITII I , b� n 1 ,� �' / , Ilnl I O� I I I 11 , Iry , /, 1 I IVAVAVk ,//'' ��' kt/ /yell 1, I, I'111 '� '����'Ak ,�1 1 ,/ � I 11, I I v I ti��/,4'�`.' ?`;•,'iw�„�,/',�;o I ITvlvvv ► ;I � //o / I 1 I I , I , I , 1 , I I , I , I ,, ��H\,T .\I�l,�,r\III\y4','I , \ \ 1► I �` l ♦� /' I ' ' I I ' olf ► ,m / I I I I I , I 1 , I 1, V`\ ��� hyV` V\ A I ► l♦ ,'► , '/ , I I I I r r I l; ; 1% I I ' \ 1 \\ 1 1 \T\ 0\�\'{-1,I, I,I II I / J y � , I ( I I I I I.rvi l� I• �� l l 1 I� II I I I I I �1�I1��ll, illl�� l i'tilrl I I' �L, �I ► l ,/, / I �I 1 � 1orv1I' Illl rll' I' I' r'11`'; 1111�'I�/I I`I �II Ilrl l ► / ' I MIL ► r, ' I ' 11' I I I I I I I I I I I I I I''1 'ill I,� /'/\I�I,I I I, I I I S I ► l// � f' I I 1 I I I I I I II I I i I I I,II�II 1 17 T,I, /�R,/11 I I I I ,�IJ I `; 1 'v � o f ♦ II I I I I 1 1 I I A 1 �' 11 1 � ',�` � vY�, ` MW V I I ICI I 1 1 1 1 1 1 1 I l l l l l ; I I I I I I I I I I I I I l 11 1A\� AV �VAA\�\ `71 1 l l l l 1all 1 1 1I Inl I'o' I P e�l II ,bry ' I I I'I `�I I IIv�; ,, Ih, /��h; Il��%%Ih%,,% i Ihl I II II I ,��i1,1',y�11�1Ii1�1i I I I I7�IIIIII Irryl,llll�l 1 I I I I Ir I I'I�I,I ,I I III , II IIII 1 1 1 I I I'�, ,l\11�4,1�\\11 h`\\,,''\ 111�\\1\yl' p A/ WQ U �I �\ r ♦♦ ' N / I II � ;, , I I I 1 1 I I � I' I I II I I 1 ', I 11 I 1 V A v V A I I I I I I I I I �1� 1 �1'�l �111 \I T V A A mY , ♦�V mA I ; . '��; , I ; ; I ; I I ; II ; I II ; ; I I II ', `, `\ A AV `I I I I ' , '1 I I � I I I � I I' I' l l ',�111�',,1 '; I'1 A>IT�1\1 W 2-.I \\\�� / � l r l I I I I I I I I I I I I I I I I I I 1 1, 1 1 I I' I I I 11'IIIII'I '11 I11111,1'I III�NII�I�j 111 g ¢,► 1 \-♦ , r r I I I , I I I I I I 1 1 I I I I I 1 1 1 I � I O .-► \ ,' , ,' r I I I I I , 1 , I , I 1 1 1 , I I I I I I I II II ' 'I 1 1 1 1 1 1' I I I I I''� I IA � 1 1 l— I I � ,' ryryI ♦1'II,,,I��II,,�I,I III 1 I , I , T L_ _� ll,♦ ,/,r ipN OOK /' / / �//// /,l,/l /,', ll �/, ll l,', IIII/I'lll 'I II �F `I I v v ♦� �/ ,' / '" ' / / � / / , / , / , lei � ,�C/ / / 'T / A, l ' � '� 1ii' �G'•' r,',' ' \\a+A-_-'-'i '��'' II�'tTIII I1111A \ ` tp __------- _- __ ---- a\ ♦ _ `_----- --------------- 9 J aop�pa,elaosse pue�suepl sseyy NOI1dINOS3(l NOISII 9 m w F F Y S til C esarLntl,lue ry peso eq,ou pays pue yetl u! io yoµu u! Peanpwtler�eq,ou,(�au pue dn°N•J SI Md_1d 1N]W]9VNVW 'd]1`dMW'dO1S DQISHI'dON - emD ST'dD aNV SA09 z ry IN N o i U a wosuoww3p•LTE9'96Z'tEVXVJ bZ95'S6Z'b£b131 I E06ZZ VA'alllnsauoNay� I OOZ aalnS'anuantl uoaswd 809 SN0 HJf10H103A3IHJtl NOSIA 210AI 00,00 •331ii0311LA5311011tl• H1 IV 03Ntld3dd JNIMtldO SIHl dnouo SNOWW11 m m m m r N m m N Z J J J J W z z z z O Q Q Q Q LL o o LL LL LimW Q U ry U U m U m 5s5 U U ❑ Q m w m aiN m Nm 'L� m aiN 'L> m m m K U V Km U U K� U Km U �m U aiN a ¢ m > ¢ > > ¢ r? > ¢ r > > 4❑ 4❑ a m ❑ 4❑ m Z Z Z Z Z Z Q K F y J tt W N LL N . F N LL K W N f3/i ❑ W r ❑ ❑ W ❑ Q no o❑ LL ❑❑ o❑ LL ❑ LL ❑❑ o❑ LL ❑❑ ❑o^ LL ❑ LL w w r W w W r w W r W ug a h U> (7 o a= U>❑ o a o LL r U>❑ o a U> m o a o OZ¢-z O n- OLL¢wW O va O� O �m Ozvtw O v� OLL¢wW O co ON O �m W Q W LL N d W+ W W LL m LL Z W+ (7 W O of �_ E Z W O _ z Z W¢ W O �_ z Z W O o 2 W m Q ❑ U U K W ❑ `- U K W ❑ m K Q ❑ U< 5 K¢ ❑ U U K Q 4 m K Q z rr¢¢¢m ¢¢ rr¢¢m ¢¢ ra ¢¢ rr¢Q¢._m ¢¢ rr¢¢¢m ¢¢ ¢¢ ¢¢ Q ,oz II W Y m?ug v II W Y mug W Y mzW o V W> m?ug�N a5 Yo woo >o o< >o az.om >o on Y� aW Y� ❑ Q l u Q O U Q Q- O U Q o o F Q O d z z O ¢ W Q W W � O O r d w d d n W m m m ❑ ¢ ¢ rN J W W U - W U - Z+ U M m Q a W > mm w > mN o > Q m 7 7 m¢ m z K z tt < Q z K J F K J F z (W7 Z ¢ F O LL ❑ W F O LL ❑< LL Q ¢ F U K m U U U W mU U Q U Qo Z¢ W Kz o m� OLLQ dKz O `a' IS O '� o�Oz O"'-2OWmz_ m C7 > > > w W ¢ W II U U U W W II U U U W win Z W K z ❑r w¢¢Q� w� ❑rWa¢¢m wug ❑m wug ❑ o.1 6 cr W. <,: cr LLU e o z m a x -- U a � r a w x J 14 K O x ¢ r Z ❑ o W W J w U U t ❑w ¢ Q tt¢ O M K L m ❑ w r Z Q Qmm Qo �❑ 3� <" Q J WJr Z Q U Oz mo D p5W a W. w w QW�¢ W ❑� z w IN W r 55 (1 /1 >Q iz > old I O LL d IV o N �UUUU �cl: 'N woaroo OR W`W a > :_4 O� pCI WJ I_ O ti o $ W W 1 \ II II II II II II II II II II 'I II It I II 'I 1 W WI m 3a W 3- �'IN wo r U Z w^ x >IIm uglywI. YYIII F a C.) I�>I LU rLLJ o Wo g LLW O W LLa O m > J U H LU 00 7 0 3M of Wb F Ora ¢ W ¢ON 0 o> W Z Z r m w WI WI WI a m1 m1 m1 W wlm wlwl i Z O w ¢oQo I� Wlmwlm ? 1 � Ylm YI YI x F a U Io N x o° 018 g 00W rw I I I LL6 d �> �= � N I � � aJ 0 �o w M W OF LLm 5 03 CD W ENLU ra O > w Z Nz N I Itl',,1llkil Ik'1'llll IIIII„ I IIII' II I Iltll (III 11111111' 11' IIIII IIIII IIIII II IIII 11IIIIIIIlI�IIIII I'II'Itlll"Ili,',ljlll,i' llII l I I,k'I' III I ,,I ,I I IIIII IIIIII ,IIIIII(' IIII � U C��I��'/Jk'',;�I'I Il1'��I�lil'l 1pll''llll'l''I IIII11111111 pIIII�j1, /I 1, I, 1111,111'',IIIIIIII „III llllpl,;lll III - W h LL \\ /ll n✓ I I II II II' l Ill l'I �'IIII'I'lll'111111j1;,llllllllll'1IIIII l l 2O / U �II�I IIIIII II III I I //II'll"Illlll I'k'll'llll'li„III l/IIIII')"IIIIII I')If'llllllll,llllll C°oo gem ¢� O I I IIIIIIIII,,,,��/llllkll,lllllllllplllllll)III it 1;,► /I/°/I'/ Jopulplllk�l�l�/�/(/,/,//'z/1 W IIIII IIIIII,II II,Ir /�/�1\ y Q 2 W QU' IIII,II IIIIIII,I I/iI ,IIIII,/(„/�„l�,/%� 1 c ¢ W z 1 5 4r//i ¢ 6; ^�1 6?2 W > m O O O ll,'�ik; ll�j 11 IIII i'IgPI ,l,J�rl¢ �i�iili II I ll 11IIII Ill l /. y� 05� !i� // �I NIYI � I�IP Ipl ul l l l 41\\\\\\\ \\ /t 5 l�/� I��jIJ�I ICI plli 1111pl \\ I V, /,/ � ////I II 11,AIIIIIIIII//�1 V/(7fi'%%S° / I1I1Ipy�I \\,, \\\ Ir��y"-'i /A95, °, yAr'/Irril�ill'I�,'��11�11'11 \\\�\\I Si %AlIV M10ib1 a��/o"11\��\\III\ l �,'>;J^ ,I/i'I III IIII IIIIII\) IIIIIIII\1\\\\\\\\\\\\\\\\c�/\((I�I�b�a111111,1111111 A�A`V°�UVAV\I Illl,'I'lII IIII1A(IIIIIIAAVAAVA1NVA�\V�A�1111II11�'; IIIII'( ,\ 1, 1 I I I I I I I , I \ I 1 1 I I 1 11 I 11 I I I „ I u1 l i 1 Ill 1 I I I I I ll I I I II II I I II I , I I I l l I I I I l II I , I II I I I I I I I / 1 I III I � , // I////�/IIIIII 'I'11111 ), I, I)�III I11111,)Ill�li�l l�ll,lllllll�yl'�i;II II IIj//llylllllll'll'111�II I'llIIIII�IIII��lll\\�\o\I\\''I�\l��/IIII U\\\\; IIIII \\ 1 I I '1 IIIII l' I " ''\ \ \\'1'\'IIIIII \\\\\\ \\\\I 1\II\, 1\;;y�\II';�';°\\�\\\\ ; ,��Q\\\\\\♦;;\,x111,4 II„ I Ill I IIIIIIIII 'I 'I II 'I IIII III 111 IIII' I\IIII IIII III ('Ill lll'Illl;l,l'I II II II II II III II IIIIII I\\\I�\y1\�\�y\�I��\\\\\\\I\\'\\\IIII\T'1�\�'\�Ig'III (� If ' I I IIIIII IIIIIIII,I11/, 1 llllllrllll.11 1, Il k, IIII IIIII Illllr',1111\\; ,,�I IIIII II/11111 \'IIIII I I l I h 1 I I lhI I I I I o I I I o rn l/ I I 10 h o I I h I o m I of h h \ I l o l o h I I b I/ llln I� oo all la3 Wlnl I / 1 'al ilhlll ly�ll lly11111'al hll'Ih Illy lll''MIIIYJII,INI,I �IIp�ll 'ICI'�II�I��IIIbII,P/\I//�','/�1II lll'I'I'llllllll 111 k'11I11II'lII III IIII IIIIk I, llll�'IIIj IIIIII'll / ll�l A/e/,/1%/%� III) III l,l lllllll II IIII kill I111I III,II,II IIII IIII,I�,I'I",l//ll/I/I)lll,lllllll /II,I�II M�\T \ \ I I I I I I I I I I I IIIIII I I III I I I I I I IIII ,1 II ,// lllllll II N\� �- �\ �\ III 1 I 1 I I I I II I I z p I I I I \ I 1 I \•\•\ \ I I I 1 I I I I I 1\\ \\\1 f I, II III I II \\ 1 I I I I I t\ I I I 1 \ I I I I I I I I 1 I II 1 �1 I I I I I I I I \\\\ \\\\ I I ll II III I I I \ I I I II I I \ \1 1 I1 I I I I 1 I \1 I I I I I 1 I I I I 1 I \1 1 1 1 // I I I 1 1 1 \ \\ I I / , II III \ I I 11 \ / / I I I III I I 1 \ 1 1 1 I I 1 I I / 1/ I I \ I I I 1 I 1 I I I I 1 I I / I I II 1 I I I I / I I I \\ II � 1 1 / II I I II 11 1\ I I 1 I 1 I I I I 11 11 I I 1 II IIII II IIII IIIIIIIII IIIII Ii iil IIIIII IIII'III III III III (IIIIII llllllll lllllll _ I III 1 1 III 1,1 I ,I I ,III I f l nn (;,;III I11111111111'1 Ill-, IIIIIIIII"'Il I ,� a I I \ 1 1 );"((;IIII II1111 ll IIIIIIII'III ll II II'111I1�'I"II1\u�•� It l/l IIIII l,111 ,1 I,'I ll111 II''Illll llll'I 11 \/ (�,IIIkill I,, I ,,I IIII'11111'll llll�'"-' -_-_-_-__-- ---- — — _ ❑ F o F W U > U a a ❑ Z r ❑ Z U to ai am > and N ❑ F ❑ - - U mm > + o Z j Q m U ❑ j W LL W � LL zz5 z > �? W w ¢Uo Kw ❑ZQ �w Oa¢o�ti �� Dow ?o O N Z_ r n m A O z d I z (n 0w o¢ r LL U (A > m > ❑ J W w ❑ U a K IY > M n z LL Q y W O m ¢ ^ Z ❑ O LL ¢4 Q W D W=UK❑ -z¢wW U o0 Q O z K K Q Q Z Q m �o IY ❑ aa�o<' Q c o r II 1 W III j1'111j11 -W W Q — Z W W �'///�IIIIIIIIII'I111111 IIIJI/'' I 11 Q❑ �'I ,1 //'II)II II111111 ul tt ❑ y'I I'IIII'I� 11 (7 y \1 Q ui Z ,IIIIIIIII! iI J z / C7 N W II�IIiI IIIIIIIII IIIII / ❑r Q Qo WZ I'll I�41 "II,/, C W U D r Q ❑ I I" e � OaQmo\i Inz my _. w�o'4�0 °NQ�� --- �a° hl,'J'I 1,11 i��'�; �W�ciOjUU,,IIII III,IIII�III',II�I m ¢ W K m ❑ z > O \ W ¢ ¢ II I,I IIIIII Il/ OOtt J H /d0 N i l/Il / 11p r¢ a Q .. o o ¢ a r Q / O> Q � > O 1, �///l�,l,l (IIIIII I�IIIIIII / '52oOO��a I11 fi(j�liijvrl. I I II III a� ,I I I III M J _ I /�7 �Pma� � m��oo ¢ L W ¢ N F a?�oww zFQ>¢r W O- ❑ ❑ I. _, w W F j Q O z OLL >� W m LL❑ W in r 0 r Z K as a m 0 9 / il�lll IIII I-,1'I 11,1,111111\'I l,tl\ll �III1 I II � �� IIII'�,Il�ll'I'IIII',II'lll'1'Ill�llll'1,�11� � ;ill I I I I I I / III;( 'II�I�; lll;;�lll'I I111 IIIII'( 'IIIII ll ;;' I,I�k,, (,III ,(,IIIIIIIII (IIIIIIIII/ ', " I IIIIII klk I,IIII;,,Illll III, Ill, w Uw¢w z ry w O m ry r�r l 5 �, ¢ r Q o w Ilgl,ll,/,,,: z O>i=�__�__ 0o woll\Qoo¢w� old2 j 11III'1'lllll',111, lull ' m rl�% I" /'l'�i\. a wO IIIIIIII1111IIII III ,1\ 1, \ I t \.\ ___ ___Oz _ a_ _ _—_ — OLL >IIIIIIIII'IIIII \, I\_� —_—_— -_—_ — —---- — — ❑r I\\\,FL zI_—__ _ ❑Z "-----_— —_— m O \ \ Il\ j 111\ 1 `\\ \\ _ _ _ _ `_ _ o ___ m O _ _ aN — J \\ \\ _-_- _ _ _ - z o I 1 II I n III I' w J 'dnoa9 SNOWWIl )o wasuw ualpun ssa,axa ayl Noyyti` 5ui�els uoipngsum,oryue 5uippw'uoiyn,Isuoo o, paliwil W. Inqes -d Rue,y peso N Iou pays pus yed u!,o yoµu u! p-.pwde, eq W. Rau pue dnoa•J SNOW WI110 Ryedwd cusnpxe ay1 us sluauruop paWlaosse pue suspl ese41 'Ihs o o Sd]LIMId W'dOlS M -. CD w vn AINnoD g-Nvwgmv D 4 I S H12iO N - 9 f 1 � D ST2iI O 4 NV SA09 a ry o 3 w o w u Y 5$ ` h = U OZ a NOI1dIiIJ53ONOISIA3N 31tlO m y o Y 3��a 6` • xvd 6Z'b£b 131 EO6ZZ V 'alllAsall0Ne40 I OOZ allnS'anuaAv uolswd 809 worsuowwIHI •• 0 3OIiaO 3l1IA5311OlatlNJ 11LA 'dVd 'sNnO H'Jf1OUH1 03A3IHOtl NOISIA 21noA • • dnouo ••• SNOWWIML OLL0IVV4:) IV II dd DN I SIHI 3H3DI 09a Nw U m O tt oa ❑ w o ao z ( l09) BS'OlS ln0 ANI IL'9l9 dO1 � ¢ a 0 - n m 00'00+01. Vls , w a zos ° o N o (WO 68'609 1n0 ANI °x > (COP) 66'609 NI ANI o (CGH) LS'l lS NI ANI 96'K9 dO1 Lb'LB+E l Vie leolyl ll 9 O£-Ia :ZOb z w 10 f X 3 04 ( D L9'609 lnO ANI w U' m c L (COL) LL'609 NI ANI (£04) £Z'l lS ln0 ANI o Q SZ'M dO1 9L'LE+ol Vie / °j N ui (lOS) 99'llS NI ANI ¢N¢ ZOL G I N 0 , ui Q (90b) CC'l lS NI ANI c l l'9lS dO1 - (COL) l6'O l9 lnO ANI n 4 y1 ^� ^' $ U y Z8'Z9+zl Vls 00'S l9 dO1 l-HW bob J w 00'00+01 Vls mN= " - "' o ^ = r o' w c > 1 Q ¢ VOL N h Q (Sob) lo'9lS ln0 ANI N tt a (9 (Lot,) 96'OZS NI ANI w °> U E9'SZS dO1 s SE'bO+ZI Vls ¢ a l-HW :904 0 rn I) (LOB) S8'ZZS lnO ANI (600 Z6'9Z9 NI ANI 2 VC9 dO1 OZ'lb+l l V1S N - l-HW :80t, m G �i1 / (600 6S'LZS ln0 ANI ( l lb) 69'LZS NI ANI ❑ w ❑ (0 w +o o m h 96'££S do S9'99+OI tl1S 0. ti Q n tt ❑ o N a1e1O 1elnol!O-ulses „Zl :Olb aO (O w o O_ > a (l LZ) 96'LZ9 lnO ANI (l lb) SZ'O£S lnO ANI ( lCz) lb' l69 NI ANI (ZaN) LO'069 NI ANI 96'E£9 dO1 (£lZ) 90'SZ9 NI ANI bb'00+O1 tl1S OS'9£S dO1 ale,O ,elnonO - ulse8 ,,Zl :Zlb o N SO'89+1l tl1S zlZ - N o'^ ww, �LLW Qa ❑ O 0 w z❑ w jJ Z- - I N� O> d a W Q Q N= _ ?� N LL U rn16 N r ry m� v rn c o '`6 1 a - ° (LOz) S8'9ZS lnO ANI Qe n o r 0 z z (laa) 9L'LZ9 NI ANI m N m r p u z 0 (6oZ) 96'9Z9 NI ANI bo'SES dO1 Q a > N m Or z z l9'84+E1 Vls00 \ ROZ p o N Z p _ m z Q g Q (SOZ) 9b'9z91nO ANI (LOZ) 8S'9ZS NI ANI (2Z) 99'OES NI ANI m a O6'bES dO1 w (7 4 \ 3 m a`a , + OZ'ZO+bI Vls leo,418 Ol SE -la 30Z y R a Q O> (LOZ) 99'9ZS lnO ANI (1Gd) OL'LZS NI ANI O (60Z) 96'9ZS NI ANI a 40'SES dO1 l9'84+E1 Vls l-HW 80Z rn n C ;�R (0 � n (EOb) £Z' l lS lnO ANI � ES ry liiw (l09) 89'IIS NI ANI " "� � ¢ (got,) � - y' £E'l lS NI ANI U * m 'z j y m l l' 9l S d Ol N .-. m O N r ZWZ9+zl tlls ° NaNm ��o>z>z N �w bob '^ VJ J w Nmr__ N O> cN r LL ^oa UU mN mm�Nom �� N W N ❑ W 0 O> Z° F p»» 1O m¢ a 7 r¢ X of O L� r aQN rr� m r a w O z rn (£ lz) Bb'BZ9 ln0 ANI (9 Z) 89'9Z9 NI ANI 66'EE9 dO1 9b'b9+Ol Vls a1e1O,elnol!O- ulse9 „Zl :blZ (lob) 68'609 inO ANI (COP) 66'609 NI ANI (EGH) LS'llS NI ANI N 96'bl9 dO1 0 c Lb'LB+EI Vls leayl ll 9 OE -la :ZOb / / / J w (SlZ) 00'6ZS ln0 ANI LB'£CS dO1 O $ / ai / i p � y h I 00.00+Ol V1S o w w o n', �' m / Q N o M w W alemj ,elnmp-ulseS ,.ZL 91Z ° W (0 + Q o> °0 a u0110W WN Rq I Wd 9I:£ 5] —ll uo paI)gd I NAp�3 -oad WNo1Sn'Lo\Oo\Iaayyy�An\aplsypoN 951� g,1o�,ue sROStZSbb\£n I\�S ❑ W � G v° a2 a (m7 \ / / / LL mx� o Q oh O� w / o - V ^ a�aP / O $ / Q h z_ O a dP � mto / LLwa "°ovoi N U w , / n U / \ a� - ❑n To 0 � m m w �U Z (7 w \ zQ Z ? ¢ W h Q Q X O w LLW ° O 1 1 � ❑ P m- z3 m°a° � N - ❑ H� wo m Q K / aso m�U � z J you Inq'enisnpui'iene.­ --nd iy p-ne lou pays pue yetl ui io y.Wuip=p.dl.q7u�pue dnONO SNOWWIl to,lyetlwtl eusnpxe ayl ue sluewroop�pa�eiaosse pue�suepl sseyl � ^� o � 1�`�Iy a ti 3 W W ti s 2 4 as F F Y O r N W o Y Y V ¢ NOI1dIi1J53a NOISIA3N 31tl0 Uz — Ej woJ'Suoww9'mmm Lif9'S6Z'bEb Xtld vz9S'S6Z'b£b 131 E06ZZ VA'aIIlnSauoNa4J I OOZ aIInS'anuaAv uolSwd 909 00 331dd0 311 AS31101NVNJ 's'dw HOHOUH103A3IHatl NOISIA'dn0A •• • • HI IV 03Ntld3dd ONIMVda SIHI •• • • • ( 6£Z) 48'Z£S lnO ANI (lbZ) lL'Z£S NI ANI (EEZ) 99 US NI AN 00'LES d01 ZL'89+Z1 Vls ayei0 ielnon0 - u!se8 ,,S l :ZEZ (EEZ) 99'9e5 lnO ANI (S£Z) £6'6£9 Ni ANI 9S'EbS d01 9e'89+I l V1S 1aai4l u 9 SE -la Tez n' r x m m o ucei er ❑ n Z 0 xo yr o» 2 zz _ o y r z m ti o >> hrzz i (6£Z) Sl'£9S NO ANI 00'999 d01 00'00+M tlls VHW lX3 (LOO l8'bEb Ni ANI 96'9£b d01 S l'lb+sl Vls adld 4oul bZ iol I-S3 :OOI (l00 9z'OSb lnO ANI (SO0 60'LSb Ni ANI E9'Z9b d01 Lb'98+£ l V1S l-HW ZOl (COO L9'ZLb lnO ANI (SO l) 9l Lb NI ANI Zb'Z84 d01 b9'OE+zI V1S L-HW VO6 (900 LH'E60 lnO ANI (SL06) lZ'OO9 NI ANI (VLOL) lL'005 NI ANI LZ'90S d01 l9' 18+0 L V1S l-HW 9M (VLOI) 89'90S lnO ANI (600 l l M Ni ANI SZ'bZS d01 9S683 V1S l-HW 8M Sd-lId0'dd W'dOlS VA AINfloD 3-?JVW39iV N d. w DQISHI'dON - i3mD ST'dI0 ag UNV SA09 2 dnouo SNOWWII 0 01 � z LL Oa oo W z W / tt w(7 N o o c / / w z_ a� a mxui 3 U' w wa rw C6� mxo pwaQ N� O z w / vxuoi zwa ,�.,F W = Q w (�7 / o�P OF X cri 3 a / w ul m N ry @l w00 W o zw Ai w 3 xg o Q x 0 a J 3 N o� N ui w Q U UN N N w O_> o o O U mo�F vrOO Nmrz o ti m �NF oe�==oo oro>>> Nyrzzz I FON— �o m�°N m r o Q N z �- �anm or0oop y Nuoir zz0 O ZZZ 0 0 o r + l� 1 crc �'G O V! U mm6 �z� 0 N�o z v�rzz I G U NNF N N z z O N�o»> yrzzz I w zw 0 F❑ ao ww O Q O o 0 W Ba= =o z z a ❑w yQ a NOweF m v� xw a vo 16 NU O 4--A O o a C�7 w m. y y / z ar y^^ry h U (O / z ro / N Q tt w c0 / / 1 0-.41 o SO o0 ow / O a N M N (n J w U U N o A �w oNo> x o (D N o in w� � I U U c � tir N oo x> m 0(D o � o 1 'wcn'^ vJ Q U I U y CN �� >C O_ > o > o U) J Section 6. Pollution Prevention Plan. (reference County Code 17-404 and State Regulation 9VAC25-880-70 part II section A.4) A. Plan showing pollution activities and prevention practices (Provide a reduced I W 7 copy of a site plan on which all of the following activity locations are clearly marked. Keep this plan up-to-date with ongoing site changes and inspections.) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County 6. V7, TEMPORARY' --_-_ --\ TOILETS Q \ \ \ \ \ \ \ \ \ \ \ \ ` \ \ \ \ \ \\ \ \ \ CONSTRUCTION \\\\\\\ TRAILER _ i \ 8 DUMPSTER —545- —� _— _ - - - �_ _� CONCRETE \ - - - _ _ WASHOUT MORTAR MIXING �- `�STATION ABOVE GROUND FUEL CONTAINER- `\\ WITH IMPERMEABLE HEAVY -MIL III III I I ► / / l/.`\ �%`` ` \` \ \ \ \ ` \ ` \ \� \ _ _ LINER. VOLUME SUFFICIENT TO PROPOSED CONSTRUCTION ENTRANCE I IIII IIII 4 U `% �\ \%\ �` \ \ \ \ \ \ \ ` y CONTAIN STORED FUELED I 11 VOLUME + 10 /o (GAS/DEISEL) _ _ - - - - - - - - - _ 5?o III IIII \\ \ \\\ \\, I r 1 •\ \�` \`I \�(\\ �\\/� \�\ \\ \ \\ \\ \ \ - - _ _ _-_- _ _ 5_ _—_ _� �- ; _- - _ _ _ ��i \ " \ �ro \ _ _ \\\� \ III\I\\\\\\\\ \ W , III 111111`II\IIIIII\II\\\ 505 II,IIIIII\I11111j11111\\\11 _--'�J�i _-_--''���'� \-� J��-� \\� \ - - _----- -__500 ,� __ �/ \ \ 0 1 \\\ �� \ ` \ - - - - - - - - - - - - - - - � � J/ 7il \ \l\ v>�� � � I I11 \\\III 11 I \\\ \\1 \ \ ` I \ \\ \\ \ f \ - - - - - - - - - - - - - - �- '\ \l Z\ - I III \\\\\\ \\1 --- t------ - 7�� - II II I I II I IIIIII I I I \-f--fL III I1I II IIIIII IIIIII IIIIII II I 1I jI I 1 II I►IIII,I11%.\J\��.\� \�, ;-_—-_-�_`Lt=IIIII t7r Q?-�4�-7-t --�= 7 = �-�--7-��—f =l� _ \\\ l III I I I I I I I 1 I I I 11111 \ \ \ ZJ- � //// IJ1111111 II I ,I\1\\II\\\ \\\ / — 1\ \\ BOYS AND GIRLS CLUB - NORTHSIDE ••'**'• SCALE 1 "=60'NOR POLLUTION PREVENTION PLAN - PHASE I JANUARY 21, 2020 �062 0 60' 120' T I M M O N S GROUP YOUR VISION ACHIEVED THROUGH OURS. - - -TEMPORARY TOILETS \ \ \ \ \ \ \ \1,` CONSTRUCTION TRAILER - \ �' PROPOSED N CONSTRUCTION DUMPSTER ENTRANCE lot CONCRETE \ - %\ co- WASHOUT i MORTAR MIXING _ STATION c9 500 ABOVE GROUND FUEL CONTAINER _ WITH IMPERMEABLE HEAVY -MIL LINER. VOLUME SUFFICIENT TO\x`�\\ ' I I It I I I I �g0 - - CONTAIN STORED FUELED - -h Q '-' \ \�\ IIII10VII I I I \ ` \`\��� \� \ ` \` \ \ ` _- - - - - VOLUME + 10% (GAS/DEISEL) 5o — - \\\\mow\ x NY vy \\\ \\\IV \ \1\\\\\1\\r 4$'p I I I \ 1 I \ III 0�j`7Qq:� � I IIIIII111111 11IIII1111\ �5�``j \=y\ \\`\ \\ \� \ oil - -� \�- IIII IWWII \1 — I %_ II ► \ \ Jam`/- I II I II 1I I I I II III III II I I III II II I IIIIIII I II j II1I1I I I I 1I 11I1111 1I I 1 II IrI / ��// 0 P%.. \ l��\�� \� .( � �_\ — --- — — 4-90 ----- ___f #���` ��i�/�! \ 7���r\\"%�`='�?�\`�\�_ - y�—�7�_ \\ q II _ I _���--- t IIIIII I I 1 ,I 1 I► 1II II I I I I I ► I I I I I I I 111 1I \\`\ \\\ \\\ 1 \ `\ \ \ \ / \\ �``:`� ��`' \�_— -=L-- F __ _ _—� ' l— T �-� ?�/ % ��� // /— _— %' `\` r_' —_ T -`] - —I , \�- � \7 \ I IIII 11 I II 1 I 1 \ \ 1 I 1 I 1 I I IIII 1111 \\ 1\\ \�\JL- 7 / / / 1/►j 1 I I I I �I I I111 111 \\I�� 1\I\�\\\\\\�\� l Y``� �l_ — — — —�-_ L �r l_=— ` �� /'`/�/ _ _ _ _ — _ _ , = sOt1==_ =` _ \� 4 •, / I I I I I I � I I I I I\ \\ l l`� �/_ -�� / � J, �/ � � �' 46,s ��- / � � - - - - �=-- � - � �\ - ��� ;�� \ \� Z -Z--7 BOYS AND GIRLS CLUB - NORTHSIDE 00004900 SCALE 1 "=60'NOR POLLUTION PREVENTION PLAN - PHASE 11 JANUARY 21, 2020 �062 0 60' 120' T I M M O N S GROUP YOUR VISION ACHIEVED THROUGH OURS. __A� TEMPORARY TOILETS CONSTRUCTION h=---- - -- - �� TRAILER - \ \ ` \ PROPOSED v� -� CONSTRUCTION DUMPSTER _ _ _ - \\` \ _ _ ENTRANCE LUFA 00, CONCRETE v `WASHOUT MORTAR MIXING ' •_- os\\ \ \\\\ \ \\\ \ - _----Mill--_ _ _ - STATION c� -500 - rll' -M9 ABOVE GROUND FUEL CONTAINER W�\ \ \__ - -__ - WITH IMPERMEABLE HEAVY -MIL \�` \ ?;; \ \ - - _ _ -_ LINER. VOLUME SUFFICIENT TO _ ' - - - - - - CONTAIN STORED FUELED 1\� I\�\\`1\I I�^ \ \� �`�)�� \\\/\\ \ \ • - \ - - - - VOLUME + 10% (GAS/DEISEL) - - - - - - - _ - — - _ ` — _ " =- _ _ ----=ql I I � I I I I I I I � I ► � ��85 �\7 �`� \�l\��\ \ �(\ l``\�c \ •, ;. � — - - � - � _ _ ; � - � _ _= w ;ON"'o\\\ IIII I1III111I111III( '►1 \\�\%\\`/`fi\ii`%`_ r•:..,f•,t�;�r .\ �__-_�---_ _-_�`��--___ � --:;%;;,,, - \\`\r'cr\\�\\�. / I 5� - - - - - - - !` \_ \\\K III 111 \\ \ \\\ \ ► i r 1 •\ \ \`I \�(\\ �\ �` �\ \ i - - _ _ _ 5 \ \ IIII\\\\\\\1\1I\1\\I\ ,80 \/\��\ `- ------ - - ----------- - ;�\v�\ •\\\�\\� _ . ��y_'% ,\ l I 11 \ 11 \ II 1►II ' 1N'- _ -505 o =r=�/- 1 -- I 1 I 1 1 11 \ \ - = --- _ - I 1 ` \1 111\\1;I1i1 �1\► \IIII�IIIII(!I----------------------- =---------- --- - - _ - 1 1 I 1 11 \ \.=---- -- — - - _ 1 I I I 1 I I 1 IIII II 1 I 1 III1I11III1111 -_'z(- 1 1 1 \ 11 \ 1 IIII I 1 IIII 111 \\\ \\ \\ \�\ / ` \ \\/� \ _ - _ _- fi`,L 480_��'��'\�y��x�\�`-t 111\ 1\0I1111 \11 \\\\\\� \ \ \\' /. l _ — - �475_t �� e -�`- 7 `�•\>`--�-�_ 4 ��//// I! I III 1 1 I111 \ 1\\ \ 1\\ /�\� -_ _L—���� �-�--r _� �✓y fig �L �-- -- ,- � \'�_ � \ �\ �� lilt -t-_ BOYS AND GIRLS CLUB - NORTHSIDE 00004900 SCALE 1 "=60'NOR POLLUTION PREVENTION PLAN - PHASE III JAN UARY 21, 2020 'p- 0 60' 120, T I M M O N S GROUP YOUR VISION ACHIEVED THROUGH OURS. its. hources of ronutants. locations. ana Pollutant, or Pollutant Location on site Prevention Practices, Generating Activity Control Measures C. Sources of Pollutants continued. Common activities and minimum control and prevention practices Pollutant, or Pollutant Location on site Prevention Practices, Generating Activity Control Measures Follow Erosion and Sediment Control Clearing, grading, excavating, and un- Land disturbance area Plan. Dispose of clearing debris at stabilized areas acceptable disposal sites. Seed and mulch, or sod within 7 days of land clearing Cover storm drain inlets and use drip pans Paving operations Roads and driveways and absorbent/oil dry for all paving machines to limit leaks ands ills Concrete washout shall occur in area Direct concrete wash water into a leak - Concrete washout and adjacent to the construction entrance as proof container or leak -proof settling basin cement waste designated on the Pollution Prevention that is designed so that no overflows can Plan. occur Enclose or cover material storage areas. Mix paint indoors in a containment area or Structure construction, stucco, Structures in a flat unpaved area. Prevent the painting and cleaning discharge of soaps, solvents, detergents and wash water, paint, form release oils and curing compounds. Dewatering if necessary when Water shall be filtered, settled or similarly Dewatering operations converting culvert inlet protection treated prior to discharge as shown on shown on plans plan. Designated areas for material delivery and Material delivery and storage Adjacent to construction entrance and storage. Placed near construction construction trailer. entrances, away from waterways and drainage paths Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Pollutant, or Pollutant Location on site Prevention Practices, Generating Activity Control Measures Material use during building process Building areas Follow manufacturer's instructions. MSDS's attached. Waste collection area will not receive a substantial amount of runoff from upland areas and does not drain directly to a waterway. Containers have lids covered before periods of rain, or are in a covered area. Scheduled collection to prevent As provided by contractor overfilling. MATERIALS NOT TO BE Solid waste disposal BURIED ON -SITE Convenient and well -maintained portable sanitary facilities will be provided, and Sanitary waste Current locations shown on plan located away from waterways or inlets. Such facilities shall be regularly maintained. Apply fertilizers in accordance with Landscaping operations Landscape areas shown on plan manufacturer's recommendations and not during rainfall events To be treated in a sediment basin or better Wash area is located at the construction control as specified on plan. Minimize Wash Waters entrance. Adjacent diversion dike will the discharge of pollutants from divert wash water to sediment trap. equipment and vehicle washing Vehicle and equipment washing Designated areas and details shown on Provide containment and filtering for all plan wash waters per the plan Minimization of exposure to precipitation and stormwater. Minimize the exposure of building materials, building products, construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste, and other materials present on the site to precipitation and to stormwater. (Identify all non-stormwater discharges to occur on your site. Keep this plan up-to-date with ongoing site changes and inspections. See CGP, 9VAC25-880-70 section E for examples of non-stormwater discharges.) D. Non-stormwater discharges Discharge Pollutants or Pollutant Location on Site Constituents Dust control water Sediment As shown on plan Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Discharge Pollutants or Pollutant Location on Site Constituents E. Persons responsible for pollution prevention practices (Provide the names and contact information for all persons responsible for prevention practices as listed above.) F. Response and reporting practices Minimize discharges from spills and leaks. Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures as follows. Respond to all spills, leaks and discharges as follows; Materials and equipment necessary for oil or chemical spill cleanup will be kept in the temporary material storage trailer onsite. Equipment will include, but not be limited to, brooms, dust pans, mops, rags, gloves, goggles, kitty litter, sand, saw dust, and plastic and metal trash containers. All oil or other chemical spills will be cleaned up immediately upon discovery. Identify and stop source of discharge. Use absorptive materials to soak up as much chemical as possible. Place all contaminated material in trash containers for disposal. Report all spills, leaks and discharges as follows; (Provide detailed response and reporting practices according to 9VAC25-880-70, Part II, section A.4.e.) Reports will be made to the following: Virginia Department of Emergency Management Emergency Operations Center (EOC) Phone: (800) 468-8892 Spills large enough to reach the storm sewers will be reported to the National Response Center at 1-800-424-8802. G. Pollution Prevention Awareness (Describe training and procedures to provide awareness and compliance for all measures in this document; waste management, wash waters, prevention measures, etc.) The registered land disturber shall oversee all construction activities to implement and maintain pollution prevention measures. As such training and procedures shall be provided by contractor for each worker on site before they begin land disturbing activities. Training on implementation of erosion and sediment control devices/procedures must be provided by registered land disturber each time a new E&SC procedure is constructed. Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload allocation, and exceptional waters. This site discharges to impaired waters as detailed on the following sheets. Enhanced inspection frequency is required as outlined below: (1) Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day; and (2) Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls discharging to surface waters identified as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit. Addition items for implementation: (1) Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site. (2) Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events. Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 8. Qualified personnel The following personnel are responsible for inspections; (Provide the name, telephone number, and qualifications of the qualified personnel conducting inspections.) . V, Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 9. Signed Certification (Provide certification according to 9VAC25-870-370. For purposes of plan review and approvals, this certification should be the owner of the property, the same signature as appears on the bonds and applications. Another operator can be designated on the delegation of authority form to follow.) CERTIFICATION "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Owner/Operator Name: TBD Company: Title: Signature: Date: Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 10. Delegation of authority. (Provide the persons or positions with authority to sign inspection reports or to modify the stormwater pollution prevention plan. A formal, signed delegation of authority is needed.) Delegation of Authority I, (name), hereby designate the person or specifically described position below to be a duly authorized representative for the purpose of overseeing compliance with environmental requirements, including the Construction General Permit, at the construction site. The designee is authorized to sign any reports, stormwater pollution prevention plans and all other documents required by the permit. (name of person or position) (company) (address) (city, state, zip) (phone) By signing this authorization, I confirm that I meet the requirements to make such a designation as set forth in the Construction General Permit (CGP), and that the designee above meets the definition of a "duly authorized representative". Operator Name: Company: Title: Signature: Date: Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 11. General permit copy (Provide a copy of the construction general permit, 9VAC25-880) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY General Permit No.: VAR10 Effective Date: July 1, 2019 Expiration Date: June 30, 2024 GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES AUTHORIZATION TO DISCHARGE UNDER THE VIRGINIA STORMWATER MANAGEMENT PROGRAM AND THE VIRGINIA STORMWATER MANAGEMENT ACT In compliance with the provisions of the Clean Water Act, as amended, and pursuant to the Virginia Stormwater Management Act and regulations adopted pursuant thereto, operators of construction activities are authorized to discharge to surface waters within the boundaries of the Commonwealth of Virginia, except those specifically named in State Water Control Board regulations that prohibit such discharges. The authorized discharge shall be in accordance with the registration statement filed with the Department of Environmental Quality, this cover page, Part I - Discharge Authorization and Special Conditions, Part II - Stormwater Pollution Prevention Plan, and Part III - Conditions Applicable to All VPDES Permits as set forth in this general permit. Construction General Permit Effective July 1, 2019 Page 2 of 26 PART DISCHARGE AUTHORIZATION AND SPECIAL CONDITIONS A. Coverage under this general permit. 1. During the period beginning with the date of coverage under this general permit and lasting until the general permit's expiration date, the operator is authorized to discharge stormwater from construction activities. 2. This general permit also authorizes stormwater discharges from support activities (e.g., concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, borrow areas) located on -site or off -site provided that: a. The support activity is directly related to the construction activity that is required to have general permit coverage for discharges of stormwater from construction activities; b. The support activity is not a commercial operation, nor does it serve multiple unrelated construction activities by different operators; c. The support activity does not operate beyond the completion of the last construction activity it supports; d. The support activity is identified in the registration statement at the time of general permit coverage; e. Appropriate control measures are identified in a stormwater pollution prevention plan and implemented to address the discharges from the support activity areas; and f. All applicable state, federal, and local approvals are obtained for the support activity. B. Limitations on coverage. 1. Post -construction discharges. This general permit does not authorize stormwater discharges that originate from the site after construction activities have been completed and the site, including any support activity sites covered under the general permit registration, has undergone final stabilization. Post -construction industrial stormwater discharges may need to be covered by a separate VPDES permit. 2. Discharges mixed with nonstormwater. This general permit does not authorize discharges that are mixed with sources of nonstormwater, other than those discharges that are identified in Part I E (Authorized nonstormwater discharges) and are in compliance with this general permit. 3. Discharges covered by another state permit. This general permit does not authorize discharges of stormwater from construction activities that have been covered under an individual permit or required to obtain coverage under an alternative general permit. Page 3 of 26 4. Impaired waters and total maximum daily load (TMDL) limitation. a. Nutrient and sediment impaired waters. Discharges of stormwater from construction activities to surface waters identified as impaired in the 2016 § 305(b)/303(d) Water Quality Assessment Integrated Report or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit for (i) sediment or a sediment -related parameter (i.e., total suspended solids or turbidity) or (ii) nutrients (i.e., nitrogen or phosphorus) are not eligible for coverage under this general permit unless the operator develops, implements, and maintains a stormwater pollution prevention plan (SWPPP) in accordance with Part II B 5 of this permit that minimizes the pollutants of concern and, when applicable, is consistent with the assumptions and requirements of the approved TMDL wasteload allocations and implements an inspection frequency consistent with Part II G 2 a. b. Polychlorinated biphenyl (PCB) impaired waters. Discharges of stormwater from construction activities that include the demolition of any structure with at least 10,000 square feet of floor space built or renovated before January 1, 1980, to surface waters identified as impaired in the 2016 § 305(b)/303(d) Water Quality Assessment Integrated Report or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit for PCB are not eligible for coverage under this general permit unless the operator develops, implements, and maintains a SWPPP in accordance with Part II B 6 of this permit that minimizes the pollutants of concern and, when applicable, is consistent with the assumptions and requirements of the approved TMDL wasteload allocations, and implements an inspection frequency consistent with Part II G 2 a. 5. Exceptional waters limitation. Discharges of stormwater from construction activities not previously covered under the general permit effective on July 1, 2014, to exceptional waters identified in 9VAC25-260-30 A 3 c are not eligible for coverage under this general permit unless the operator develops, implements, and maintains a SWPPP in accordance with Part II B 7 of this permit and implements an inspection frequency consistent with Part II G 2 a. 6. There shall be no discharge of floating solids or visible foam in other than trace amounts. C. Commingled discharges. Discharges authorized by this general permit may be commingled with other sources of stormwater that are not required to be covered under a state permit, so long as the commingled discharge is in compliance with this general permit. Discharges authorized by a separate state or VPDES permit may be commingled with discharges authorized by this general permit so long as all such discharges comply with all applicable state and VPDES permit requirements. D. Prohibition of nonstormwater discharges. Except as provided in Parts I A 2, 1 C, and I E, all discharges covered by this general permit shall be composed entirely of stormwater associated with construction activities. All other discharges including the following are prohibited: 1. Wastewater from washout of concrete; 2. Wastewater from the washout and cleanout of stucco, paint, form release oils, curing compounds, and other construction materials; Page 4 of 26 3. Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; 4. Oils, toxic substances, or hazardous substances from spills or other releases; and 5. Soaps, solvents, or detergents used in equipment and vehicle washing. E. Authorized nonstormwater discharges. The following nonstormwater discharges from construction activities are authorized by this general permit when discharged in compliance with this general permit: 1. Discharges from firefighting activities; 2. Fire hydrant flushings; 3. Waters used to wash vehicles or equipment where soaps, solvents, or detergents have not been used and the wash water has been filtered, settled, or similarly treated prior to discharge; 4. Water used to control dust that has been filtered, settled, or similarly treated prior to discharge; 5. Potable water sources, including uncontaminated waterline flushings, managed in a manner to avoid an instream impact; 6. Routine external building wash down where soaps, solvents or detergents have not been used and the wash water has been filtered, settled, or similarly treated prior to discharge; 7. Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred (or where all spilled or leaked material has been removed prior to washing); where soaps, solvents, or detergents have not been used; and where the wash water has been filtered, settled, or similarly treated prior to discharge; 8. Uncontaminated air conditioning or compressor condensate; 9. Uncontaminated ground water or spring water; 10. Foundation or footing drains where flows are not contaminated with process materials such as solvents; 11. Uncontaminated excavation dewatering, including dewatering of trenches and excavations that have been filtered, settled, or similarly treated prior to discharge; and 12. Landscape irrigation. F. Termination of general permit coverage. 1. The operator of the construction activity shall submit a notice of termination in accordance with 9VAC25-880-60, unless a registration statement was not required to be submitted in accordance with 9VAC25-880-50 A 1 c or A 2 b for single-family detached residential structures, to the VSMP authority after one or more of the following conditions have been met: Page 5 of 26 a. Necessary permanent control measures included in the SWPPP for the site are in place and functioning effectively and final stabilization has been achieved on all portions of the site for which the operator has operational control. When applicable, long term responsibility and maintenance requirements for permanent control measures shall be recorded in the local land records prior to the submission of a complete and accurate notice of termination and the construction record drawing prepared; b. Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for the ongoing discharge; c. Coverage under an alternative VPDES or state permit has been obtained; or d. For individual lots in residential construction only, final stabilization as defined in 9VAC25- 880-1 has been completed, including providing written notification to the homeowner and incorporating a copy of the notification and signed certification statement into the SWPPP, and the residence has been transferred to the homeowner. 2. The notice of termination shall be submitted no later than 30 days after one of the above conditions in subdivision 1 of this subsection is met. 3. Termination of authorization to discharge for the conditions set forth in subdivision 1 a of this subsection shall be effective upon notification from the department that the provisions of subdivision 1 a of this subsection have been met or 60 days after submittal of a complete and accurate notice of termination in accordance with 9VAC25-880-60 C, whichever occurs first. 4. Authorization to discharge terminates at midnight on the date that the notice of termination is submitted for the conditions set forth in subdivisions 1 b through 1 d of this subsection unless otherwise notified by the VSMP authority or department. 5. The notice of termination shall be signed in accordance with Part III K of this general permit. G. Water quality protection. 1. The operator shall select, install, implement, and maintain control measures as identified in the SWPPP at the construction site that minimize pollutants in the discharge as necessary to ensure that the operator's discharge does not cause or contribute to an excursion above any applicable water quality standard. 2. If it is determined by the department that the operator's discharges are causing, have reasonable potential to cause, or are contributing to an excursion above any applicable water quality standard, the department, in consultation with the VSMP authority, may take appropriate enforcement action and require the operator to: a. Modify or implement additional control measures in accordance with Part II C to adequately address the identified water quality concerns; b. Submit valid and verifiable data and information that are representative of ambient conditions and indicate that the receiving water is attaining water quality standards; or Page 6 of 26 c. Submit an individual permit application in accordance with 9VAC25-870-410 B 3. All written responses required under this chapter shall include a signed certification consistent with Part II I K. PART II STORMWATER POLLUTION PREVENTION PLAN A. Stormwater pollution prevent plan. A stormwater pollution prevention plan (SWPPP) shall be developed prior to the submission of a registration statement and implemented for the construction activity, including any support activity, covered by this general permit. SWPPPs shall be prepared in accordance with good engineering practices. Construction activities that are part of a larger common plan of development or sale and disturb less than one acre may utilize a SWPPP template provided by the department and need not provide a separate stormwater management plan if one has been prepared and implemented for the larger common plan of development or sale. 2. The SWPPP requirements of this general permit may be fulfilled by incorporating by reference other plans such as a spill prevention control and countermeasure (SPCC) plan developed for the site under § 311 of the federal Clean Water Act or best management practices (BMP) programs otherwise required for the facility provided that the incorporated plan meets or exceeds the SWPPP requirements of Part II B. All plans incorporated by reference into the SWPPP become enforceable under this general permit. If a plan incorporated by reference does not contain all of the required elements of the SWPPP, the operator shall develop the missing elements and include them in the SWPPP. 3. Any operator that was authorized to discharge under the general permit effective July 1, 2014, and that intends to continue coverage under this general permit, shall update its stormwater pollution prevention plan to comply with the requirements of this general permit no later than 60 days after the date of coverage under this general permit. B. Contents. The SWPPP shall include the following items: 1. General information. a. A signed copy of the registration statement, if required, for coverage under the general VPDES permit for discharges of stormwater from construction activities; b. Upon receipt, a copy of the notice of coverage under the general VPDES permit for discharges of stormwater from construction activities (i.e., notice of coverage letter); c. Upon receipt, a copy of the general VPDES permit for discharges of stormwater from construction activities; d. A narrative description of the nature of the construction activity, including the function of the project (e.g., low density residential, shopping mall, highway, etc.); e. A legible site plan identifying: Page 7 of 26 (1) Directions of stormwater flow and approximate slopes anticipated after major grading activities; (2) Limits of land disturbance including steep slopes and natural buffers around surface waters that will not be disturbed; (3) Locations of major structural and nonstructural control measures, including sediment basins and traps, perimeter dikes, sediment barriers, and other measures intended to filter, settle, or similarly treat sediment, that will be installed between disturbed areas and the undisturbed vegetated areas in order to increase sediment removal and maximize stormwater infiltration; (4) Locations of surface waters; (5) Locations where concentrated stormwater is discharged; (6) Locations of any support activities, including (i) areas where equipment and vehicle washing, wheel wash water, and other wash water is to occur; (ii) storage areas for chemicals such as acids, fuels, fertilizers, and other lawn care chemicals; (iii) concrete wash out areas; (iv) vehicle fueling and maintenance areas; (v) sanitary waste facilities, including those temporarily placed on the construction site; and (vi) construction waste storage; and (7) When applicable, the location of the on -site rain gauge or the methodology established in consultation with the VSMP authority used to identify measurable storm events for inspection as allowed by Part II G 2 a (1) (ii) or Part II G 2 b (2). 2. Erosion and sediment control plan. a. An erosion and sediment control plan designed and approved in accordance with the Virginia Erosion and Sediment Control Regulations (9VAC25-840), an "agreement in lieu of a plan" as defined in 9VAC25-840-10 from the VESCP authority, or an erosion and sediment control plan prepared in accordance with annual standards and specifications approved by the department. b. All erosion and sediment control plans shall include a statement describing the maintenance responsibilities required for the erosion and sediment controls used. c. An approved erosion and sediment control plan, "agreement in lieu of a plan," or erosion and sediment control plan prepared in accordance with department -approved annual standards and specifications, implemented to: (1) Control the volume and velocity of stormwater runoff within the site to minimize soil erosion; (2) Control stormwater discharges, including peak flow rates and total stormwater volume, to minimize erosion at outlets and to minimize downstream channel and stream bank erosion; Page 8 of 26 (3) Minimize the amount of soil exposed during the construction activity; (4) Minimize the disturbance of steep slopes; (5) Minimize sediment discharges from the site in a manner that addresses (i) the amount, frequency, intensity, and duration of precipitation; (ii) the nature of resulting stormwater runoff; and (iii) soil characteristics, including the range of soil particle sizes present on the site; (6) Provide and maintain natural buffers around surface waters, direct stormwater to vegetated areas to increase sediment removal, and maximize stormwater infiltration, unless infeasible; (7) Minimize soil compaction and, unless infeasible, preserve topsoil; (8) Ensure initiation of stabilization activities, as defined in 9VAC25-880-1, of disturbed areas immediately whenever any clearing, grading, excavating, or other land - disturbing activities have permanently ceased on any portion of the site, or temporarily ceased on any portion of the site and will not resume for a period exceeding 14 days; and (9) Utilize outlet structures that withdraw stormwater from the surface (i.e., above the permanent pool or wet storage water surface elevation), unless infeasible, when discharging from sediment basins or sediment traps. 3. Stormwater management plan. a. Except for those projects identified in Part II B 3 b, a stormwater management plan approved by the VSMP authority as authorized under the Virginia Stormwater Management Program (VSMP) Regulation (9VAC25-870), or an "agreement in lieu of a stormwater management plan" as defined in 9VAC25-870-10 from the VSMP authority, or a stormwater management plan prepared in accordance with annual standards and specifications approved by the department. b. For any operator meeting the conditions of 9VAC25-870-47 B of the VSMP regulation, an approved stormwater management plan is not required. In lieu of an approved stormwater management plan, the SWPPP shall include a description of, and all necessary calculations supporting, all post -construction stormwater management measures that will be installed prior to the completion of the construction process to control pollutants in stormwater discharges after construction operations have been completed. Structural measures should be placed on upland soils to the degree possible. Such measures must be designed and installed in accordance with applicable VESCP authority, VSMP authority, state, and federal requirements, and any necessary permits must be obtained. 4. Pollution prevention plan. A pollution prevention plan that addresses potential pollutant - generating activities that may reasonably be expected to affect the quality of stormwater discharges from the construction activity, including any support activity. The pollution prevention plan shall: a. Identify the potential pollutant -generating activities and the pollutant that is expected to be exposed to stormwater; Page 9 of 26 b. Describe the location where the potential pollutant -generating activities will occur, or if identified on the site plan, reference the site plan; c. Identify all nonstormwater discharges, as authorized in Part I E of this general permit, that are or will be commingled with stormwater discharges from the construction activity, including any applicable support activity; d. Identify the person responsible for implementing the pollution prevention practice or practices for each pollutant -generating activity (if other than the person listed as the qualified personnel); e. Describe the pollution prevention practices and procedures that will be implemented to: (1) Prevent and respond to leaks, spills, and other releases including (i) procedures for expeditiously stopping, containing, and cleaning up spills, leaks, and other releases; and (ii) procedures for reporting leaks, spills, and other releases in accordance with Part III G; (2) Prevent the discharge of spilled and leaked fuels and chemicals from vehicle fueling and maintenance activities (e.g., providing secondary containment such as spill berms, decks, spill containment pallets, providing cover where appropriate, and having spill kits readily available); (3) Prevent the discharge of soaps, solvents, detergents, and wash water from construction materials, including the clean-up of stucco, paint, form release oils, and curing compounds (e.g., providing (i) cover (e.g., plastic sheeting or temporary roofs) to prevent contact with stormwater; (ii) collection and proper disposal in a manner to prevent contact with stormwater; and (iii) a similarly effective means designed to prevent discharge of these pollutants); (4) Minimize the discharge of pollutants from vehicle and equipment washing, wheel wash water, and other types of washing (e.g., locating activities away from surface waters and stormwater inlets or conveyance and directing wash waters to sediment basins or traps, using filtration devices such as filter bags or sand filters, or using similarly effective controls); (5) Direct concrete wash water into a leak -proof container or leak -proof settling basin. The container or basin shall be designed so that no overflows can occur due to inadequate sizing or precipitation. Hardened concrete wastes shall be removed and disposed of in a manner consistent with the handling of other construction wastes. Liquid concrete wastes shall be removed and disposed of in a manner consistent with the handling of other construction wash waters and shall not be discharged to surface waters; (6) Minimize the discharge of pollutants from storage, handling, and disposal of construction products, materials, and wastes including (i) building products such as asphalt sealants, copper flashing, roofing materials, adhesives, and concrete admixtures; (ii) pesticides, herbicides, insecticides, fertilizers, and landscape Page 10 of 26 materials; and (iii) construction and domestic wastes such as packaging materials, scrap construction materials, masonry products, timber, pipe and electrical cuttings, plastics, Styrofoam, concrete, and other trash or building materials; (7) Prevent the discharge of fuels, oils, and other petroleum products, hazardous or toxic wastes, waste concrete, and sanitary wastes; (8) Address any other discharge from the potential pollutant -generating activities not addressed above; (9) Minimize the exposure of waste materials to precipitation by closing or covering waste containers during precipitation events and at the end of the business day, or implementing other similarly effective practices. Minimization of exposure is not required in cases where the exposure to precipitation will not result in a discharge of pollutants; and f. Describe procedures for providing pollution prevention awareness of all applicable wastes, including any wash water, disposal practices, and applicable disposal locations of such wastes, to personnel in order to comply with the conditions of this general permit. The operator shall implement the procedures described in the SWPPP. 5. SWPPP requirements for discharges to nutrient and sediment impaired waters. For discharges to surface waters (i) identified as impaired in the 2016 § 305(b)/303(d) Water Quality Assessment Integrated Report or (ii) with an applicable TMDL wasteload allocation established and approved prior to the term of this general permit for sediment for a sediment - related parameter (i.e., total suspended solids or turbidity) or nutrients (i.e., nitrogen or phosphorus), the operator shall: a. Identify the impaired waters, approved TMDLs, and pollutants of concern in the SWPPP; and b. Provide clear direction in the SWPPP that: (1) Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; (2) Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and (3) A modified inspection schedule shall be implemented in accordance with Part II G 2 a. 6. SWPPP requirements for discharges to polychlorinated biphenyl (PCB) impaired waters. For discharges from construction activities that include the demolition of any structure with at least 10,000 square feet of floor space built or renovated before January 1, 1980, to surface waters (i) identified as impaired in the 2016 § 305(b)/303(d) Water Quality Assessment Integrated Report or (ii) with an applicable TMDL wasteload allocation established and approved prior to the term of this general permit for PCB, the operator shall: Page 11 of 26 a. Identify the impaired waters, approved TMDI-s, and pollutant of concern in the SWPPP; b. Implement the approved erosion and sediment control plan in accordance with Part II B 2; c. Dispose of waste materials in compliance with applicable state, federal, and local requirements; and d. Implement a modified inspection schedule in accordance with Part II G 2 a. 7. SWPPP requirements for discharges to exceptional waters. For discharges to surface waters identified in 9VAC25-260-30 A 3 c as an exceptional water, the operator shall: a. Identify the exceptional surface waters in the SWPPP; and b. Provide clear direction in the SWPPP that: (1) Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; (2) Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and (3) A modified inspection schedule shall be implemented in accordance with Part II G 2 a. 8. Identification of qualified personnel. The name, phone number, and qualifications of the qualified personnel conducting inspections required by this general permit. 9. Delegation of authority. The individuals or positions with delegated authority, in accordance with Part III K, to sign inspection reports or modify the SWPPP. 10. SWPPP signature. The SWPPP shall be signed and dated in accordance with Part III K. C. SWPPP amendments, modification, and updates. 1. The operator shall amend the SWPPP whenever there is a change in the design, construction, operation, or maintenance that has a significant effect on the discharge of pollutants to surface waters and that has not been previously addressed in the SWPPP. 2. The SWPPP shall be amended if, during inspections or investigations by the operator's qualified personnel, or by local, state, or federal officials, it is determined that the existing control measures are ineffective in minimizing pollutants in discharges from the construction activity. Revisions to the SWPPP shall include additional or modified control measures designed and implemented to correct problems identified. If approval by the VESCP authority, VSMP authority, or department is necessary for the control measure, revisions to the SWPPP shall be completed no later than seven calendar days following approval. Implementation of these additional or modified control measures shall be accomplished as described in Part II H. Page 12 of 26 3. The SWPPP shall clearly identify the contractors that will implement and maintain each control measure identified in the SWPPP. The SWPPP shall be amended to identify any new contractor that will implement and maintain a control measure. 4. The operator shall update the SWPPP as soon as possible but no later than seven days following any modification to its implementation. All modifications or updates to the SWPPP shall be noted and shall include the following items: a. A record of dates when: (1) Major grading activities occur; (2) Construction activities temporarily or permanently cease on a portion of the site; and (3) Stabilization measures are initiated; b. Documentation of replaced or modified controls where periodic inspections or other information have indicated that the controls have been used inappropriately or incorrectly and were modified; c. Areas that have reached final stabilization and where no further SWPPP or inspection requirements apply; d. All properties that are no longer under the legal control of the operator and the dates on which the operator no longer had legal control over each property; e. The date of any prohibited discharges, the discharge volume released, and what actions were taken to minimize the impact of the release; f. Measures taken to prevent the reoccurrence of any prohibited discharge; and g. Measures taken to address any evidence identified as a result of an inspection required under Part II G. 5. Amendments, modifications, or updates to the SWPPP shall be signed in accordance with Part III K. D. Public notification. Upon commencement of land disturbance, the operator shall post conspicuously a copy of the notice of coverage letter near the main entrance of the construction activity. For linear projects, the operator shall post the notice of coverage letter at a publicly accessible location near an active part of the construction project (e.g., where a pipeline crosses a public road). The operator shall maintain the posted information until termination of general permit coverage as specified in Part I F. E. SWPPP availability. 1. Operators with day-to-day operational control over SWPPP implementation shall have a copy of the SWPPP available at a central location on -site for use by those identified as having responsibilities under the SWPPP whenever they are on the construction site. Page 13 of 26 2. The operator shall make the SWPPP and all amendments, modifications, and updates available upon request to the department, the VSMP authority, the EPA, the VESCP authority, local government officials, or the operator of a municipal separate storm sewer system receiving discharges from the construction activity. If an on -site location is unavailable to store the SWPPP when no personnel are present, notice of the SWPPP's location shall be posted near the main entrance of the construction site. 3. The operator shall make the SWPPP available for public review in an electronic format or in hard copy. Information for public access to the SWPPP shall be posted and maintained in accordance with Part II D. If not provided electronically, public access to the SWPPP may be arranged upon request at a time and at a publicly accessible location convenient to the operator or his designee but shall be no less than once per month and shall be during normal business hours. Information not required to be contained within the SWPPP by this general permit is not required to be released. F. SWPPP implementation. The operator shall implement the SWPPP and subsequent amendments, modifications, and updates from commencement of land disturbance until termination of general permit coverage as specified in Part I F. All control measures shall be properly maintained in effective operating condition in accordance with good engineering practices and, where applicable, manufacturer specifications. If a site inspection required by Part II G identifies a control measure that is not operating effectively, corrective actions shall be completed as soon as practicable, but no later than seven days after discovery or a longer period as established by the VSMP authority, to maintain the continued effectiveness of the control measures. 2. If site inspections required by Part II G identify an existing control measure that needs to be modified or if an additional or alternative control measure is necessary for any reason, implementation shall be completed prior to the next anticipated measurable storm event. If implementation prior to the next anticipated measurable storm event is impracticable, then additional or alternative control measures shall be implemented as soon as practicable, but no later than seven days after discovery or a longer period as established by the VSMP authority. G. SWPPP Inspections. 1. Personnel responsible for on -site and off -site inspections. Inspections required by this general permit shall be conducted by the qualified personnel identified by the operator in the SWPPP. The operator is responsible for ensuring that the qualified personnel conduct the inspection. 2. Inspection schedule. a. For construction activities that discharge to a surface water identified in Part II B 5 and B 6 as impaired or having an approved TMDL or Part I B 7 as exceptional, the following inspection schedule requirements apply: (1) Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 24 hours following a measurable storm event. In the event that a measurable storm event occurs when Page 14 of 26 there are more than 24 hours between business days, the inspection shall be conducted on the next business day; and (2) Representative inspections as authorized in Part II G 2 d shall not be allowed. b. Except as specified in Part II G 2 a, inspections shall be conducted at a frequency of: (1) At least once every five business days; or (2) At least once every 10 business days and no later than 24 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 24 hours between business days, the inspection shall be conducted on the next business day. c. Where areas have been temporarily stabilized or land -disturbing activities will be suspended due to continuous frozen ground conditions and stormwater discharges are unlikely, the inspection frequency described in Part II G 2 a and 2 b may be reduced to once per month. If weather conditions (such as above freezing temperatures or rain or snow events) make discharges likely, the operator shall immediately resume the regular inspection frequency. d. Except as prohibited in Part II G 2 a (2), representative inspections may be utilized for utility line installation, pipeline construction, or other similar linear construction activities provided that: (1) Temporary or permanent soil stabilization has been installed and vehicle access may compromise the temporary or permanent soil stabilization and potentially cause additional land disturbance increasing the potential for erosion; (2) Inspections occur on the same frequency as other construction activities; (3) Control measures are inspected along the construction site 0.25 miles above and below each access point (i.e., where a roadway, undisturbed right-of-way, or other similar feature intersects the construction activity and access does not compromise temporary or permanent soil stabilization); and (4) Inspection locations are provided in the inspection report required by Part II G. e. If adverse weather causes the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. Any time inspections are delayed due to adverse weather conditions, evidence of the adverse weather conditions shall be included in the SWPPP with the dates of occurrence. 3. Inspection requirements. a. As part of the inspection, the qualified personnel shall: (1) Record the date and time of the inspection and, when applicable, the date and rainfall amount of the last measurable storm event; Page 15 of 26 (2) Record the information and a description of any discharges occurring at the time of the inspection or evidence of discharges occurring prior to the inspection; (3) Record any land -disturbing activities that have occurred outside of the approved erosion and sediment control plan; (4) Inspect the following for installation in accordance with the approved erosion and sediment control plan, identification of any maintenance needs, and evaluation of effectiveness in minimizing sediment discharge, including whether the control has been inappropriately or incorrectly used: (a) All perimeter erosion and sediment controls, such as silt fence; (b) Soil stockpiles, when applicable, and borrow areas for stabilization or sediment trapping measures; (c) Completed earthen structures, such as dams, dikes, ditches, and diversions for stabilization and effective impoundment or flow control; (d) Cut and fill slopes; (e) Sediment basins and traps, sediment barriers, and other measures installed to control sediment discharge from stormwater; (f) Temporary or permanent channels, flumes, or other slope drain structures installed to convey concentrated runoff down cut and fill slopes; (g) Storm inlets that have been made operational to ensure that sediment laden stormwater does not enter without first being filtered or similarly treated; and (h) Construction vehicle access routes that intersect or access paved or public roads for minimizing sediment tracking; (5) Inspect areas that have reached final grade or that will remain dormant for more than 14 days to ensure: (a) Initiation of stabilization activities have occurred immediately, as defined in 9VAC25-880-1; and (b) Stabilization activities have been completed within seven days of reaching grade or stopping work; (6) Inspect for evidence that the approved erosion and sediment control plan, "agreement in lieu of a plan," or erosion and sediment control plan prepared in accordance with department -approved annual standards and specifications has not been properly implemented. This includes: Page 16 of 26 (a) Concentrated flows of stormwater in conveyances such as rills, rivulets, or channels that have not been filtered, settled, or similarly treated prior to discharge, or evidence thereof; (b) Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; (c) Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. Inlets and catch basins with failing sediment controls due to improper installation, lack of maintenance, or inadequate design are considered unprotected; (d) Sediment deposition on any property (including public and private streets) outside of the construction activity covered by this general permit; (e) Required stabilization has not been initiated or completed or is not effective on portions of the site; (f) Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage portion of the basin; (g) Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater from below the surface of the wet storage portion of the trap; and (h) Land disturbance or sediment deposition outside of the approved area to be disturbed; (7) Inspect pollutant generating activities identified in the pollution prevention plan for the proper implementation, maintenance, and effectiveness of the procedures and practices; (8) Identify any pollutant generating activities not identified in the pollution prevention plan; and (9) Identify and document the presence of any evidence of the discharge of pollutants prohibited by this general permit. 4. Inspection report. Each inspection report shall include the following items: a. The date and time of the inspection and, when applicable, the date and rainfall amount of the last measurable storm event; b. Summarized findings of the inspection; c. The locations of prohibited discharges; d. The locations of control measures that require maintenance; Page 17 of 26 e. The locations of control measures that failed to operate as designed or proved inadequate or inappropriate for a particular location; f. The locations where any evidence identified under Part II G 3 a (6) exists; g. The locations where any additional control measure is needed; h. A list of corrective actions required (including any changes to the SWPPP that are necessary) as a result of the inspection or to maintain permit compliance; Documentation of any corrective actions required from a previous inspection that have not been implemented; and The date and signature of the qualified personnel and the operator or its duly authorized representative. 5. The inspection report shall be included into the SWPPP no later than four business days after the inspection is complete. 6. The inspection report and any actions taken in accordance with Part II shall be retained by the operator as part of the SWPPP for at least three years from the date that general permit coverage expires or is terminated. The inspection report shall identify any incidents of noncompliance. Where an inspection report does not identify any incidents of noncompliance, the report shall contain a certification that the construction activity is in compliance with the SWPPP and this general permit. The report shall be signed in accordance with Part III K of this general permit. H. Corrective actions. The operator shall implement the corrective actions identified as a result of an inspection as soon as practicable but no later than seven days after discovery or a longer period as approved by the VSMP authority. If approval of a corrective action by a regulatory authority (e.g., VSMP authority, VESCP authority, or the department) is necessary, additional control measures shall be implemented to minimize pollutants in stormwater discharges until such approvals can be obtained. 2. The operator may be required to remove accumulated sediment deposits located outside of the construction activity covered by this general permit as soon as practicable in order to minimize environmental impacts. The operator shall notify the VSMP authority and the department as well as obtain all applicable federal, state, and local authorizations, approvals, and permits prior to the removal of sediments accumulated in surface waters including wetlands. Page 18 of 26 PART III CONDITIONS APPLICABLE TO ALL VPDES PERMITS NOTE: Discharge monitoring is not required for this general permit. If the operator chooses to monitor stormwater discharges or control measures, the operator shall comply with the requirements of subsections A, B, and C, as appropriate. A. Monitoring. Samples and measurements taken for the purpose of monitoring shall be representative of the monitoring activity. 2. Monitoring shall be conducted according to procedures approved under 40 CFR Part 136 or alternative methods approved by the U.S. Environmental Protection Agency, unless other procedures have been specified in this general permit. Analyses performed according to test procedures approved under 40 CFR Part 136 shall be performed by an environmental laboratory certified under regulations adopted by the Department of General Services (1 VAC30-45 or 1 VAC30-46). 3. The operator shall periodically calibrate and perform maintenance procedures on all monitoring and analytical instrumentation at intervals that will ensure accuracy of measurements. B. Records. 1. Monitoring records and reports shall include: a. The date, exact place, and time of sampling or measurements; b. The individuals who performed the sampling or measurements; c. The dates and times analyses were performed; d. The individuals who performed the analyses; e. The analytical techniques or methods used; and f. The results of such analyses. 2. The operator shall retain records of all monitoring information, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation, copies of all reports required by this general permit, and records of all data used to complete the registration statement for this general permit, for a period of at least three years from the date of the sample, measurement, report or request for coverage. This period of retention shall be extended automatically during the course of any unresolved litigation regarding the regulated activity or regarding control standards applicable to the operator, or as requested by the board. C. Reporting monitoring results. Page 19 of 26 1. The operator shall update the SWPPP to include the results of the monitoring as may be performed in accordance with this general permit, unless another reporting schedule is specified elsewhere in this general permit. 2. Monitoring results shall be reported on a discharge monitoring report (DMR); on forms provided, approved or specified by the department; or in any format provided that the date, location, parameter, method, and result of the monitoring activity are included. 3. If the operator monitors any pollutant specifically addressed by this general permit more frequently than required by this general permit using test procedures approved under 40 CFR Part 136 or using other test procedures approved by the U.S. Environmental Protection Agency or using procedures specified in this general permit, the results of this monitoring shall be included in the calculation and reporting of the data submitted in the DMR or reporting form specified by the department. 4. Calculations for all limitations which require averaging of measurements shall utilize an arithmetic mean unless otherwise specified in this general permit. D. Duty to provide information. The operator shall furnish, within a reasonable time, any information which the board may request to determine whether cause exists for terminating this general permit coverage or to determine compliance with this general permit. The board, department, EPA, or VSMP authority may require the operator to furnish, upon request, such plans, specifications, and other pertinent information as may be necessary to determine the effect of the wastes from his discharge on the quality of surface waters, or such other information as may be necessary to accomplish the purposes of the CWA and the Virginia Stormwater Management Act. The operator shall also furnish to the board, department, EPA, or VSMP authority, upon request, copies of records required to be kept by this general permit. E. Compliance schedule reports. Reports of compliance or noncompliance with, or any progress reports on, interim and final requirements contained in any compliance schedule of this general permit shall be submitted no later than 14 days following each schedule date. F. Unauthorized stormwater discharges. Pursuant to § 62.1-44.5 of the Code of Virginia, except in compliance with a state permit issued by the department, it shall be unlawful to cause a stormwater discharge from a construction activity. G. Reports of unauthorized discharges. Any operator who discharges or causes or allows a discharge of sewage, industrial waste, other wastes or any noxious or deleterious substance or a hazardous substance or oil in an amount equal to or in excess of a reportable quantity established under either 40 CFR Part 110, 40 CFR Part 117, 40 CFR Part 302, or § 62.1-44.34:19 of the Code of Virginia that occurs during a 24-hour period into or upon surface waters or who discharges or causes or allows a discharge that may reasonably be expected to enter surface waters, shall notify the Department of Environmental Quality of the discharge immediately upon discovery of the discharge, but in no case later than within 24 hours after said discovery. A written report of the unauthorized discharge shall be submitted to the department and the VSMP authority within five days of discovery of the discharge. The written report shall contain: 1. A description of the nature and location of the discharge; 2. The cause of the discharge; Page 20 of 26 3. The date on which the discharge occurred; 4. The length of time that the discharge continued; 5. The volume of the discharge; 6. If the discharge is continuing, how long it is expected to continue; 7. If the discharge is continuing, what the expected total volume of the discharge will be; and 8. Any steps planned or taken to reduce, eliminate and prevent a recurrence of the present discharge or any future discharges not authorized by this general permit. Discharges reportable to the department and the VSMP authority under the immediate reporting requirements of other regulations are exempted from this requirement. H. Reports of unusual or extraordinary discharges. If any unusual or extraordinary discharge including a "bypass" or "upset," as defined in this general permit, should occur from a facility and the discharge enters or could be expected to enter surface waters, the operator shall promptly notify, in no case later than within 24 hours, the department and the VSMP authority by telephone after the discovery of the discharge. This notification shall provide all available details of the incident, including any adverse effects on aquatic life and the known number of fish killed. The operator shall reduce the report to writing and shall submit it to the department and the VSMP authority within five days of discovery of the discharge in accordance with Part III 12. Unusual and extraordinary discharges include any discharge resulting from: 1. Unusual spillage of materials resulting directly or indirectly from processing operations; 2. Breakdown of processing or accessory equipment; 3. Failure or taking out of service of some or all of the facilities; and 4. Flooding or other acts of nature. I. Reports of noncompliance. The operator shall report any noncompliance which may adversely affect surface waters or may endanger public health. 1. An oral report to the department and the VSMP authority shall be provided within 24 hours from the time the operator becomes aware of the circumstances. The following shall be included as information that shall be reported within 24 hours under this subdivision: a. Any unanticipated bypass; and b. Any upset that causes a discharge to surface waters. 2. A written report shall be submitted within five days and shall contain: a. A description of the noncompliance and its cause; Page 21 of 26 b. The period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time it is expected to continue; and c. Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The department may waive the written report on a case -by -case basis for reports of noncompliance under Part III I if the oral report has been received within 24 hours and no adverse impact on surface waters has been reported. 3. The operator shall report all instances of noncompliance not reported under Part II I 1 1 or 2 in writing as part of the SWPPP. The reports shall contain the information listed in Part 111 12. NOTE: The reports required in Part III G, H and I shall be made to the department and the VSMP authority. Reports may be made by telephone, email, or by fax. For reports outside normal working hours, leaving a recorded message shall fulfill the immediate reporting requirement. For emergencies, the Virginia Department of Emergency Management maintains a 24-hour telephone service at 1-800-468-8892. 4. Where the operator becomes aware of a failure to submit any relevant facts, or submittal of incorrect information in any report, including a registration statement, to the department or the VSMP authority, the operator shall promptly submit such facts or correct information. J. Notice of planned changes. 1. The operator shall give notice to the department and the VSMP authority as soon as possible of any planned physical alterations or additions to the permitted facility or activity. Notice is required only when: a. The operator plans an alteration or addition to any building, structure, facility, or installation that may meet one of the criteria for determining whether a facility is a new source in 9VAC25-870-420; b. The operator plans an alteration or addition that would significantly change the nature or increase the quantity of pollutants discharged. This notification applies to pollutants that are not subject to effluent limitations in this general permit; or 2. The operator shall give advance notice to the department and VSMP authority of any planned changes in the permitted facility or activity, which may result in noncompliance with state permit requirements. K. Signatory requirements. 1. Registration statement. All registration statements shall be signed as follows: a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy -making or decision -making functions for the corporation; or (ii) the manager of one or more manufacturing, production, or operating facilities, provided the Page 22 of 26 manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for state permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures; b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this chapter, a principal executive officer of a public agency includes (i) the chief executive officer of the agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency. 2. Reports and other information. All reports required by this general permit, including SWPPPs, and other information requested by the board or the department shall be signed by a person described in Part III K 1 or by a duly authorized representative of that person. A person is a duly authorized representative only if: a. The authorization is made in writing by a person described in Part III K 1; b. The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the operator. (A duly authorized representative may thus be either a named individual or any individual occupying a named position); and c. The signed and dated written authorization is included in the SWPPP. A copy shall be provided to the department and VSMP authority, if requested. 3. Changes to authorization. If an authorization under Part III K 2 is no longer accurate because a different individual or position has responsibility for the overall operation of the construction activity, a new authorization satisfying the requirements of Part III K 2 shall be submitted to the VSMP authority as the administering entity for the board prior to or together with any reports or information to be signed by an authorized representative. 4. Certification. Any person signing a document under Part III K 1 or 2 shall make the following certification: 5. "1 certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant Page 23 of 26 penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." L. Duty to comply. The operator shall comply with all conditions of this general permit. Any state permit noncompliance constitutes a violation of the Virginia Stormwater Management Act and the Clean Water Act, except that noncompliance with certain provisions of this general permit may constitute a violation of the Virginia Stormwater Management Act but not the Clean Water Act. Permit noncompliance is grounds for enforcement action; for state permit coverage, termination, revocation and reissuance, or modification; or denial of a state permit renewal application. The operator shall comply with effluent standards or prohibitions established under § 307(a) of the Clean Water Act for toxic pollutants within the time provided in the regulations that establish these standards or prohibitions or standards for sewage sludge use or disposal, even if this general permit has not yet been modified to incorporate the requirement. M. Duty to reapply. If the operator wishes to continue an activity regulated by this general permit after the expiration date of this general permit, the operator shall submit a new registration statement at least 60 days before the expiration date of the existing general permit, unless permission for a later date has been granted by the board. The board shall not grant permission for registration statements to be submitted later than the expiration date of the existing general permit. N. Effect of a state permit. This general permit does not convey any property rights in either real or personal property or any exclusive privileges, nor does it authorize any injury to private property or invasion of personal rights, or any infringement of federal, state or local law or regulations. O. State law. Nothing in this general permit shall be construed to preclude the institution of any legal action under, or relieve the operator from any responsibilities, liabilities, or penalties established pursuant to any other state law or regulation or under authority preserved by § 510 of the Clean Water Act. Except as provided in general permit conditions on "bypassing" (Part III U) and "upset" (Part III V), nothing in this general permit shall be construed to relieve the operator from civil and criminal penalties for noncompliance. P. Oil and hazardous substance liability. Nothing in this general permit shall be construed to preclude the institution of any legal action or relieve the operator from any responsibilities, liabilities, or penalties to which the operator is or may be subject under §§ 62.1-44.34:14 through 62.1-44.34:23 of the State Water Control Law or § 311 of the Clean Water Act. Q. Proper operation and maintenance. The operator shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances), which are installed or used by the operator to achieve compliance with the conditions of this general permit. Proper operation and maintenance also includes effective plant performance, adequate funding, adequate staffing, and adequate laboratory and process controls, including appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems, which are installed by the operator only when the operation is necessary to achieve compliance with the conditions of this general permit. R. Disposal of solids or sludges. Solids, sludges or other pollutants removed in the course of treatment or management of pollutants shall be disposed of in a manner so as to prevent any pollutant from such materials from entering surface waters and in compliance with all applicable state and federal laws and regulations. Page 24 of 26 S. Duty to mitigate. The operator shall take all steps to minimize or prevent any discharge in violation of this general permit that has a reasonable likelihood of adversely affecting human health or the environment. T. Need to halt or reduce activity not a defense. It shall not be a defense for an operator in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this general permit. U. Bypass. 1. "Bypass," as defined in 9VAC25-870-10, means the intentional diversion of waste streams from any portion of a treatment facility. The operator may allow any bypass to occur that does not cause effluent limitations to be exceeded, but only if it also is for essential maintenance to ensure efficient operation. These bypasses are not subject to the provisions of Part I I I U 2 and 3. 2. Notice. a. Anticipated bypass. If the operator knows in advance of the need for a bypass, the operator shall submit prior notice to the department, if possible at least 10 days before the date of the bypass. b. Unanticipated bypass. The operator shall submit notice of an unanticipated bypass as required in Part III I. 3. Prohibition of bypass. a. Except as provided in Part III U 1, bypass is prohibited, and the board or department may take enforcement action against an operator for bypass unless: (1) Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage. Severe property damage means substantial physical damage to property, damage to the treatment facilities that causes them to become inoperable, or substantial and permanent loss of natural resources that can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production; (2) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass that occurred during normal periods of equipment downtime or preventive maintenance; and (3) The operator submitted notices as required under Part III U 2. b. The department may approve an anticipated bypass, after considering its adverse effects, if the department determines that it will meet the three conditions listed in Part III U 3 a. Page 25 of 26 V. Upset 1. An "upset," as defined in 9VAC25-870-10, means an exceptional incident in which there is unintentional and temporary noncompliance with technology -based state permit effluent limitations because of factors beyond the reasonable control of the operator. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation. 2. An upset constitutes an affirmative defense to an action brought for noncompliance with technology -based state permit effluent limitations if the requirements of Part III V 4 are met. A determination made during administrative review of claims that noncompliance was caused by upset, and before an action for noncompliance, is not a final administrative action subject to judicial review. 3. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventative maintenance, or careless or improper operation. 4. An operator who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs or other relevant evidence that: a. An upset occurred and that the operator can identify the cause of the upset; b. The permitted facility was at the time being properly operated; c. The operator submitted notice of the upset as required in Part III I; and d. The operator complied with any remedial measures required under Part III S. 5. In any enforcement proceeding, the operator seeking to establish the occurrence of an upset has the burden of proof. W. Inspection and entry. The operator shall allow the department as the board's designee, the VSMP authority, EPA, or an authorized representative of either entity (including an authorized contractor), upon presentation of credentials and other documents as may be required by law to: 1. Enter upon the operator's premises where a regulated facility or activity is located or conducted, or where records shall be kept under the conditions of this general permit; 2. Have access to and copy, at reasonable times, any records that shall be kept under the conditions of this general permit; 3. Inspect and photograph at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this general permit; and 4. Sample or monitor at reasonable times, for the purposes of ensuring state permit compliance or as otherwise authorized by the Clean Water Act or the Virginia Stormwater Management Act, any substances or parameters at any location. Page 26 of 26 For purposes of this section, the time for inspection shall be deemed reasonable during regular business hours, and whenever the facility is discharging. Nothing contained herein shall make an inspection unreasonable during an emergency. X. State permit actions. State permit coverage may be modified, revoked and reissued, or terminated for cause. The filing of a request by the operator for a state permit modification, revocation and reissuance, or termination, or a notification of planned changes or anticipated noncompliance does not stay any state permit condition. Y. Transfer of state permit coverage. 1. State permits are not transferable to any person except after notice to the department. Except as provided in Part III Y 2, a state permit may be transferred by the operator to a new operator only if the state permit has been modified or revoked and reissued, or a minor modification made, to identify the new operator and incorporate such other requirements as may be necessary under the Virginia Stormwater Management Act and the Clean Water Act. 2. As an alternative to transfers under Part III Y 1, this state permit may be automatically transferred to a new operator if: a. The current operator notifies the department at least 30 days in advance of the proposed transfer of the title to the facility or property; b. The notice includes a written agreement between the existing and new operators containing a specific date for transfer of state permit responsibility, coverage, and liability between them; and c. The department does not notify the existing operator and the proposed new operator of its intent to modify or revoke and reissue the state permit. If this notice is not received, the transfer is effective on the date specified in the agreement mentioned in Part III Y 2 b. 3. For ongoing construction activity involving a change of operator, the new operator shall accept and maintain the existing SWPPP, or prepare and implement a new SWPPP prior to taking over operations at the site. Z. Severability. The provisions of this general permit are severable, and if any provision of this general permit or the application of any provision of this state permit to any circumstance, is held invalid, the application of such provision to other circumstances and the remainder of this general permit shall not be affected thereby. Section 12. Inspection logs INSPECTION FREQUENCY: (1) Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day; and (2) Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls discharging to surface waters identified as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit. Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County STORM WATER INSPECTIONS FOR VSMP GENERAL PERMIT LAND DISTRIBUTING ACTIVITIES Page 1 PROJECT: MONITORING FOR THE WEEK BEGINNING: DATE AND TIME OF INSPECTION: RAINFALL: Date of Rain Amount (Inches) Initials EROSION AND SEDIMENT CONTROL FACILITIES INSPECTED: (Inspections shall be conducted according to Part IIF2 of the Permit. However, if the discharges of stormwater from construction activities are to surface waters identified as imparied, inspections shall be conducted according to Part 164d.) Facility Identification Date and Time of Inspection Operating Properly (Y/N) Description of inspection observations OBSERVATION OF RUNOFF AT STORMWATER DISHCARGE OUTFALLS: (Inspections shall be conducted according to Part IIF2 of the Permit. However, if the discharges of stormwater from construction activities are to surface waters identified as imparied, inspections shall be conducted according to Part 164d.) By this signature, I certify that this report is accurate and complete to the best of my knowledge: Qualified Personnel By this signature, I certify that the contruction activity is in compliance with the SWPP and general permit. Qualified Personnel Note: If msepction report does not identify any mci ceritication statement on page 3 shall be signed. By this signature, I certify that this report is accurate and complete to the best of my knowledge: Operator/Duly Authorized Representative By this signature, I certify that the contruction activity is in compliance with the SWPP and general permit. Operator/Duly Authorized Representative nce Stormwater Discharge Outfall Identification Date Clarity Floating Solids Suspended Solids Oil Sheen Other obvious indicators of stormwater pollution (list and describe) Visible sediment leaving the site? (Y/N) If yes, describe actions taken to prevent future releases (may need to attach additional information) Describe measures taken to clean up sediment outside of disturbed limits (may need to attach additional information) Clarity: Choose the number which best describes the clarity of the discharge where 1 is clear and 10 is very cloudy Floating Solids: Choose the number which best describes the amount of floating solids in the discharge where 1 is no solids and 10 the surface us covered in floating solids Suspended Solids: Choose the number which best describes the amount of suspended solids in the discharge where 1 is no solids and 10 is extremely muddy. Oil Sheen: Is there an oil sheen in the stormwater discharge (Y or N)? STORM WATER INSPECTIONS FOR VSMP GENERAL PERMIT LAND DISTRIBUTING ACTIVITIES Page 1 PROJECT: MONITORING FOR THE WEEK BEGINNING: DATE AND TIME OF INSPECTION: RAINFALL: Date of Rain Amount (Inches) Initials EROSION AND SEDIMENT CONTROL FACILITIES INSPECTED: (Inspections shall be conducted according to Part IIF2 of the Permit. However, if the discharges of stormwater from construction activities are to surface waters identified as imparied, inspections shall be conducted according to Part 164d.) Facility Identification Date and Time of Inspection Operating Properly (Y/N) Description of inspection observations OBSERVATION OF RUNOFF AT STORMWATER DISHCARGE OUTFALLS: (Inspections shall be conducted according to Part IIF2 of the Permit. However, if the discharges of stormwater from construction activities are to surface waters identified as imparied, inspections shall be conducted according to Part 164d.) By this signature, I certify that this report is accurate and complete to the best of my knowledge: Qualified Personnel By this signature, I certify that the contruction activity is in compliance with the SWPP and general permit. Qualified Personnel Note: If msepction report does not identify any mci ceritication statement on page 3 shall be signed. By this signature, I certify that this report is accurate and complete to the best of my knowledge: Operator/Duly Authorized Representative By this signature, I certify that the contruction activity is in compliance with the SWPP and general permit. Operator/Duly Authorized Representative nce Stormwater Discharge Outfall Identification Date Clarity Floating Solids Suspended Solids Oil Sheen Other obvious indicators of stormwater pollution (list and describe) Visible sediment leaving the site? (Y/N) If yes, describe actions taken to prevent future releases (may need to attach additional information) Describe measures taken to clean up sediment outside of disturbed limits (may need to attach additional information) Clarity: Choose the number which best describes the clarity of the discharge where 1 is clear and 10 is very cloudy Floating Solids: Choose the number which best describes the amount of floating solids in the discharge where 1 is no solids and 10 the surface us covered in floating solids Suspended Solids: Choose the number which best describes the amount of suspended solids in the discharge where 1 is no solids and 10 is extremely muddy. Oil Sheen: Is there an oil sheen in the stormwater discharge (Y or N)? STORM WATER INSPECTIONS FOR VSMP GENERAL PERMIT LAND DISTRIBUTING ACTIVITIES Page 1 PROJECT: MONITORING FOR THE WEEK BEGINNING: DATE AND TIME OF INSPECTION: RAINFALL: Date of Rain Amount (Inches) Initials EROSION AND SEDIMENT CONTROL FACILITIES INSPECTED: (Inspections shall be conducted according to Part IIF2 of the Permit. However, if the discharges of stormwater from construction activities are to surface waters identified as imparied, inspections shall be conducted according to Part 164d.) Facility Identification Date and Time of Inspection Operating Properly (Y/N) Description of inspection observations OBSERVATION OF RUNOFF AT STORMWATER DISHCARGE OUTFALLS: (Inspections shall be conducted according to Part IIF2 of the Permit. However, if the discharges of stormwater from construction activities are to surface waters identified as imparied, inspections shall be conducted according to Part 164d.) By this signature, I certify that this report is accurate and complete to the best of my knowledge: Qualified Personnel By this signature, I certify that the contruction activity is in compliance with the SWPP and general permit. Qualified Personnel Note: If msepction report does not identify any mci ceritication statement on page 3 shall be signed. By this signature, I certify that this report is accurate and complete to the best of my knowledge: Operator/Duly Authorized Representative By this signature, I certify that the contruction activity is in compliance with the SWPP and general permit. Operator/Duly Authorized Representative nce Stormwater Discharge Outfall Identification Date Clarity Floating Solids Suspended Solids Oil Sheen Other obvious indicators of stormwater pollution (list and describe) Visible sediment leaving the site? (Y/N) If yes, describe actions taken to prevent future releases (may need to attach additional information) Describe measures taken to clean up sediment outside of disturbed limits (may need to attach additional information) Clarity: Choose the number which best describes the clarity of the discharge where 1 is clear and 10 is very cloudy Floating Solids: Choose the number which best describes the amount of floating solids in the discharge where 1 is no solids and 10 the surface us covered in floating solids Suspended Solids: Choose the number which best describes the amount of suspended solids in the discharge where 1 is no solids and 10 is extremely muddy. Oil Sheen: Is there an oil sheen in the stormwater discharge (Y or N)?