Loading...
HomeMy WebLinkAboutARB201900123 Action Letter 2020-01-22of ALB O GIRGIN'k COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 January 22, 2020 Scott Collins Collins Engineering 200 Garrett Street Charlottesville, VA 22902 RE: ARB-2019-123: 2415 Ivy Road (TMP 06000-00-00-025A0) Dear Applicant, At its meeting on Tuesday, January 21, 2020, the Albemarle County Architectural Review Board unanimously voted to forward the following recommendations on the above -noted Initial Site Development Plan to the agent for the Site Review Committee: • Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c(2), (3) and (5) recommended conditions of initial plan approval: None • Regarding recommendations on the plan as it relates to the guidelines: None Regarding conditions to be satisfied prior to issuance of a grading permit: 1. Provide the conservation checklist in the site plan. 2. Provide a tree protection fencing detail in the site plan and show the tree protection fencing in the Grading and Draining Plan sheet. • Regarding the Final Site Plan A Certificate of Appropriateness is required prior to final site plan approval. The following items must be addressed, in addition to all items on the Final Site Plan Checklist. 1. Confirm that the dumpster location is workable. If it will be visible from the EC include details for the dumpster enclosure in the site plan and identify screen type, material, manufacturer and color. 2. Show all mechanical equipment on the site plan. Show how visibility of all mechanical equipment will be eliminated from the EC. 3. Provide the mechanical equipment visibility note: Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 4. Show the locations of the proposed gas meter and water utility box, and ensure that they are not visible from the EC. 5. Revise the plan to provide the required ornamental trees. 6. Revise the plan to show utility easements and ensure that there are no conflicts between the utilities and the proposed landscaping. 7. Revise the large street trees to a species with a narrower spread to minimize utility conflicts. 8. Provide two additional large shade trees, 21/" caliper at planting, spaced 40 feet on center, along the west side of the accessway. 9. Provide the standard perimeter and interior parking lot landscaping in all parking areas where improvements (other than paint striping) are proposed: Large trees should align the perimeter of parking areas, located 40 feet on center. Trees should be planted in the interior of parking areas at the rate of one tree for every 10 parking spaces provided and should be evenly distributed throughout the interior of the parking area. 10. Provide a wall detail and a material sample for the stone wall proposed between the EC and the front parking area. Matching the character of other retaining walls in the area would be appropriate. 11. Remove the decorative stone wall from the Existing Conditions & Demolition Plan. 12. Show tree protection fencing for preserved trees in both the grading and landscape plans. 13. Provide a conservation checklist in the site plan. 14. Ensure that no grading is proposed within the dripline of any tree designated as preserved. 15..If multiple tenants will occupy this building, submit a comprehensive sign plan for review. Note that ARB approval of a comprehensive sign plan is required for multi -tenant buildings with the final site plan. You may submit your application for continued ARB review at your earliest convenience. Application forms, checklists and schedules are available on-line at www.albemarle.orq/ARB. Please be certain that your ARB submittal addresses the above -noted issues. If you have any questions concerning any of the above, please feel free to contact me. Sincerel �S Paty S ye rlerSenioPa CC: Currell Corporatoin 35 Old Farm Road Charlottesville, VA 22903 File