Loading...
HomeMy WebLinkAboutWPO201800055 Bond Bond Inspection 2019-12-02InternaltoRe lived: T (./' Date Received: fee Paid: ��t✓ O%> �� C1Y AGf t' � —'L/ ' `'� ✓ Received bv: _ nA ( _ Intake: Forward to Management lnalvst- V BOND INSPECTI ON REQUEST APPROVED PLAN # WPO-2018-00055 PROIEC'T NAME: Old Trail Heights (amendment to WPO-2013-00052) (As listed on the approved plan) This is to request that an inspection be performed by the County. Where fees are assessed, a fee is required for each inspection. Please check the inspections requested. VSMP/VESCP Erosion Control, Stormwater Management and/or Mitigation per Water Protection Ordinance section 17-207 & 208 S250 ❑ Subdivision (roads, drainage, etc.) per Subdivision Ordinance section 14-435 and 14-438: S269 ❑ Water & Sewer per Subdivision Ordinance section 14-435 $269 ❑ Site Development Performance bond (Incomplete Site Work & Landscape Maintenance) $301 TOTAL FEES $250.00 Inspections for the purposes of bond reduction or release will require a separate fee for each bond. Submit requests to: Department of Community Development, 401 McIntire Road, North Wing, Charlottesville, VA 22902, Attention: Management Analyst - Phone 434-296-5832: Fax 434-972-4126. All roads and stormwater facilities will require construction record drawings, inspection reports. and completion processes through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection documentation per the state requirements and county's published procedures. A minimum 20% of the original posting is held until acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is part of the bonded incomplete site work, a request for reduction should only be made once all site work is complete. fhe revised estimate should be sent to: EMAIL..: reid bmcholdings rou .com & ian .tbmcom.com_ OR REGULAR MAIL ADDRESS: Signature of wnei Reid A. Murphy..____.__._ Print Name 12/02/2019 Date Revised T 152014, 720'1015. 11'3'201;