VESCP Plan review
Project: Misty Mountain Campground — VESCP
Plan preparer: Ryan Cheney, Line + Grade Civil Engineers; 113 4`h Street NE, Suite 100
Charlottesville, VA 22902 [rcheney(&Iine-grade.com]
Owner or rep.: Mountain Dream, LLC; 56 Misty Mountain Rd., Greenwood, VA 22943
[mike(a� mi stycamp. com]
Plan received date: 18 Oct 2018
(Rev. 1) 12 Nov 2018
Date of comments: 31 Oct 2018
(Rev. 1) 26 Nov 2018 —Approved
Reviewer: John Anderson
WP0201800076
Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan
is approved.
(Rev. 1) Addressed.
( )
Addressed.
(Rev. l) Addressed.
! ,
? . , , .. (Rev. 1) Addressed.
(Rev. 1) Addressed.
(Rev. 1) Addressed.
„ : ,t ..
i; ..
t ,.t
_ i"•� (Rev. l)
Addressed.
(Rev. l) Addressed.
Engineering Review Comments
Page 2 of 3
;kil! (Rev. 1) Addressed.
If. ! I! til?-i'sti i lic INV IN
C <it nilrf tl{ l D1 \ h( I' pip"',
his to , ,., lid . p1pes. (Rev. 1) Addressed. Note: A concrete wall would impede inflow
from ditches to the north and southwest; contractor will shape riprap bowl to direct storm runoff from triple line pipe
outfall to twin line pipe inlet.
'.-, I'il ..,_;ui.n
1 L pile ���itl? .�0�' pipe. ;;r li!�l,;il5c etc- "t! tilul C!l',ul�c;:lil!01
I i ll.',C�! it tII�.Cli�lI;_i 10 I)ijIC "Kill. i«' C3paCltti. I'Iii)c _t 1C {i I`; tl!itEli 17 h%, S2tt11PfltcCl i'oi; lltilolls pool-
. .,
pipe' 1.1_\ IliW!ll"1 :11,1
(Rev. 1) Addressed.
I ll,w 1, s,ddcd ill ; l,.11lel "611. css 1' CMP. l'cclilnnW!Id iocaic h ol,24" pipe silk h
!l,a �lrity of Ilm" is lic41 lll!cc led inui tl., .4 , " ii€,c. ti+ith liven c�wtcss Cilnv po."sl1w to 111E I c. t�" pl;n�; lic I>" hil�>C
INV (Av ;t) (Rev.1)Addressed.
Its i'tM idc I- ti 1 ., hotly ii;ICI a1IId ixlIilill viI.x. ' �� (AIP I Iui;ii cI ),l lI o l,sIvlil; koo id
�1sll (Rev. 1) Addressed. VDOT EW-6 provided.
t l l' o u i,l. "c» lc p; o l i'.- 1 � ,. S - I �' I) \ W T'.. (Rev. 1) Addressed.
I -'ot,, ti.7ctwn J,, 1 il,l3k a' c ktoc.- of !,:ol�idk d (ic'lt; �. tilf�l�t' \ �;� ik,�_ h!+t ,. ::i kr� llioll ":f >wctlon
!;i I i. (Rev. 1) Addressed.
,nnIGT ,iltotci ti: ; ,a;>'c: i<"1i>-k' alru! t,!atil t!Il,ti�c'<lsli to tl.. ie i� 1 s"'p,ililtioll l�:h�crr
(Rev. 1)Addressed.
Process
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request
form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and
check parcel and easement information based on the approved plans. The County's Management Analyst will
prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash,
certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County
Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms.
After bonding is complete, the County can hold a pre -construction conference. Applicants will need to complete the
request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the
contractor and responsible land disturber, and the fee remaining to be paid ($300, in this instance; 2nd plan review).
This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the
County inspector. At the pre -construction conference, should everything proceed satisfactorily, a grading permit will
be issued by the County so that work may begin.
County forms can be found on the county website forms center under engineering;
http://www.albemarle.org/deptforiiis.asp?department=cdenp,wpo
Bond estimate:
https://www.albemarle.org/upload/images/fonns center/departments/Community Development/forms/bonds/Bond Request to
Establish a Bond.pdf
Pre -construction:
http://www.albemarle.org/upload/imaees/forms center/departments/CommunityDevelopment/forms/Engineering_ and WPO F
orms/WPO Pre -Construction Meeting and Permit Request.pdf