Loading...
HomeMy WebLinkAboutWPO201500026 Correspondence 2017-02-02COUNTY OF ALBEMARLE Department of Facilities & Environmental Services 401 McIntire Road, Room 420 Charlottesville, Virginia 22902-4596 Phone (434) 872-4501 Fax (434) 972-4091 Project: Barracks Road Sidew From: John E. Anderson, PI Project Management —WP0201500026 /VSMP To: Matt Wentland, Civil Engineer II /Community Development /Engineering Division Date: 2-Feb 2017 Matt, Please accept WPO resubmittal, which includes copy of Drainage Report with project area DA Maps, soil maps, VSMH Appendix 5D Worksheets (water quality calculations), and storm routings. We realize need to purchase nutrient credits (in process), and to submit a SWPPP for this project. I have attached most recent Engineering plan review comments, as point of reference. We believe attached plans /report adequately address comments 1.4. Comment 5: Pre- and post -development drainage areas are identical. We hope that since VDOT plan template governs revenue share projects, drainage area maps inserted in the calculation booklet as opposed to plan sheets will suffice. Please note that Appendix B pre- and post -development drainage area maps now include contour labels. I am available during normal business hours to meet to discuss or assist with this comment. Comment 6: Appendix C, Drainage Report, shows calculations that report pollutant /phosphorus reduction requirements for this Part IIC project. Appendix C includes VSMH Vol. II Appendix 5D Worksheets, for development regime 2. We hope this section of the Drainage Report addresses this comment. Revision 1 Comments 2. The installation of the pipe leading to `Outfall I" and the proposed underground detention system are not included in your limits of disturbance, please correct. 3. Provide profiles for proposed pipe and associated structures. 4. Provide more information concerning the proposed underground detention system. What is its capacity? How exactly does it factor in to reducing the discharge at "Outtall I *"! This may be buried in your calculation booklet but should be detailed in the plans. 5. Please include the pro- and post -development drainage area plans (inserted in to your calculation booklet) in the actual VSMP plan set. Some of the drainage areas appear unrealistic relative to the provided contours, please explain. 6. The project description in your calculation booklet references a total project area of 0.51 acres and a total area to be disturbed of 0.94 acres. This is confusing, please clarify. You also referencc a required 10% pollutant reduction; however, "Situation 3" does not require a straight 10% reduction, as your calculation show. Please clarify this. Thanks in advance for your help.