HomeMy WebLinkAboutWPO201500026 Checklist 2017-10-264 117+ s At Erosion & Sediment Control-Stormwater Management Preconstruction Conference Checklist Name of Plan: t�QrrAc L Plan No.: Date: /a' 2-eo, % 1) Copies of approved plan given to: Owner or Authorized Agent Contractor 2) Have all the conditions been met?, 3) Responsible Land Disturber: __ (_Yi I Cert./Lic.No.: n Type: Address / Phone / Mobil Phone: 4) Name of Prime Contractor: NCB Address / Phone / Mobil Phone: Name of Subcontractor: 5) Persons in Attendance: Name / Aq.,.;2!5 C"ke-(L- 7✓�/ I_AJ ✓l,q fit. �— Firm 6 t0"JCy Z,, .+✓C-o YEA (6) Date Permit Issued: /b - L `_ MTalk about "First Steps" (Perimeter E&S controls and Tree Protection first), Erosion and Sediment Control Narrative and Sequence of Construction (8) Enforcement and Fees: Warnings, NTC and SWO in that order with re -inspection fees of $250 for NTC's and SWO's. (Mud in the roadway will have a NTC issued without a warning) (9) Review Frequency of Inspections: Every 4 business days or every 5 business days and within 48 hours of a major rain event. Major rain event is .25" or more. Less frequent in areas of non -impaired waterways (5 days or every 7days and within 48hours of a major storm event). 1 of 2 Revised 11/29/2011 C:\Users\gelsie\Desktop\Preconstruction Conf Checklist 9-21-17.doc