HomeMy WebLinkAboutWPO201500026 Checklist 2017-10-264
117+ s
At
Erosion & Sediment Control-Stormwater Management
Preconstruction Conference Checklist
Name of Plan: t�QrrAc L
Plan No.:
Date: /a' 2-eo, %
1) Copies of approved plan given to: Owner or Authorized Agent Contractor
2) Have all the conditions been met?,
3) Responsible Land Disturber:
__ (_Yi I
Cert./Lic.No.: n Type:
Address / Phone / Mobil Phone:
4) Name of Prime Contractor: NCB
Address / Phone / Mobil Phone:
Name of Subcontractor:
5) Persons in Attendance:
Name /
Aq.,.;2!5 C"ke-(L-
7✓�/ I_AJ ✓l,q fit. �—
Firm
6 t0"JCy
Z,, .+✓C-o
YEA
(6) Date Permit Issued: /b - L `_
MTalk about "First Steps" (Perimeter E&S controls and Tree Protection first), Erosion and Sediment Control
Narrative and Sequence of Construction
(8) Enforcement and Fees: Warnings, NTC and SWO in that order with re -inspection fees of $250 for NTC's
and SWO's. (Mud in the roadway will have a NTC issued without a warning)
(9) Review Frequency of Inspections: Every 4 business days or every 5 business days and within 48 hours of
a major rain event. Major rain event is .25" or more. Less frequent in areas of non -impaired waterways (5 days
or every 7days and within 48hours of a major storm event).
1 of 2
Revised 11/29/2011
C:\Users\gelsie\Desktop\Preconstruction Conf Checklist 9-21-17.doc