HomeMy WebLinkAboutWPO201500026 Plan - E&S Erosion Control Plan 2017-04-05Drainage & Erosion Control Narrative for: APPROVED by the Albemarle County Community ►Deve en Department Barracks Road Sidewalk He ta, 6 -� Improvements Project From: 0.33 Mi. W. of Int. with Route 656 To: 0.05 Mi. E. of Int. with Route 656 PAC DRAINAGE NARRATIVE Albemarle County, Virginia December 13, 2016 Prepared by: Kimley-Horn & Associates, Inc. 1700 Willow Lawn Dr. Suite 200 Richmond, VA 23230 Owner: Albemarle County !� 0 o BRIAN A MOETERS � Lie. No. 041405 G�1s <v ■ SJO� A Ee..• rian A McPeters 017.02.01 15:47:50-05'00' Kimley-Horn and Associates, Inc. Richmond,VA Roadway Designer Ki rn ley,/&//'% Horn `%8W V. r.. This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. Cn TABLE OF CONTENTS DRAINAGE NARRATIVE APPENDIX A: SITE INFORMATION USDA Soil Survey Map FEMA Maps Permissible Velocities for Erodible Linings APPENDIX B: DRAINAGE AREA MAPS Pre -Development Drainage Area Map Post -Development Drainage Area Map APPENDIX C: WATER QUALITY Performance -Based Water Quality Calculations APPENDIX D: WATER QUANTITY Water Quantity Summary By Outfall MS-19 Receiving Channel Summary I APPENDIX E: DETENTION POND ROUTING AND DESIGN Detention System Summary Table Hydraflow Pond Hydrographs and Reports APPENDIX F: STORM DRAINAGE SYSTEM CALCULATIONS Storm Sewer and Hydraulic Grade Line Computations Spread and Throat Length Calculations NWARW DRAINAGE Project Description Albemarle County obtained a Revenue Sharing Grant from the Virginia Department of Transportation (or VDOT) for construction of proposed sidewalk along Barracks Road. The project will construct a sidewalk (approx. 1,675 feet), crosswalks, and pedestrian signals from the Barracks West apartments on the north side of Barracks Road to the existing sidewalk near the Georgetown Road intersection (referred to as Area 1). The project also will construct crosswalks and short segments of sidewalk (where feasible) at strategic locations on the south side of Barracks Road near the intersection with Route 656 (Georgetown Road) referred to as Area 2. The total project area is 0.391 acres and the total area disturbed is 0.833 acres. This project is grandfathered from the current stormwater regulations and is only required to meet the 1999 Stormwater Management Handbook Regulations for quantity (MS-19) and quality. Description of Existing Drainage Conditions Most of the stormwater runoff from Barracks Road is currently conveyed through \..• existing storm sewer. The on -site and off -site improvements drain offsite to three separate outfalls. Outfall 1 ultimately drains to Ivy Creek while Outfall 2 and 3 drain to the Rivanna River. • Outfall 1— An existing natural channel flowing north off Barracks Road to Little Ivy Creek. • Outfall 2 — An existing storm sewer system that runs north along Huntwood Lane. • Outfall 3 — An existing storm sewer system that runs southeast along Barracks Road. PROPOSED DRAINAGE IMPROVEMENTS Overview The proposed drainage system will consist of mostly storm sewer along Barracks Road and its intersections but also includes some roadside ditches. Most stormwater runoff on these roadways will be conveyed through concrete curb to proposed or existing drop - inlets into a designed storm sewer system. Runoff at Outfall 1 will be detained in a proposed underground detention system in order to control quantity requirements for the project. Runoff from Outfall 1 will be released into existing swale along Barracks Road. Runoff from Outfalls 2 and 3 will be released into existing storm sewer systems. OR `Wr Methodology The proposed drainage system is designed to collect, detain, and convey the storm water runoff for 2-year and 10-year storms. Storm water runoff calculations for the detention system were performed using the Rational method and analyzed using Hydraflow Hydrographs Extension Software. Storm sewer capacity and hydraulic grade line calculations were performed using the Rational method and Geopak Drainage Software. Times of concentration for overland flow were calculated using the Seelye chart. Times of concentration for channel flow were calculated using the Kirpich chart. The roadside ditches were analyzed using Bentley's Flowmaster software to calculate the 2 year flow velocity to determine whether the swales required erosion protection and the depth of water in the 10 year flow to ensure that the actual depth of swale was adequate. The following is a summary of the drainage design parameters for the proposed development. Design Parameters Design Storms: 2-Year, 10-Year and 100-Year Storms Manning's "N" Value for Concrete Pipe and Gutter: 0.013 2 year frequency, 24-hour Rainfall depth: 3.63" ,,ftlpl 10 year frequency, 24-hour Rainfall depth: 5.48" 100 year frequency, 24-hour Rainfall depth: 8.96" Minimum Pipe Size: 15" Minimum Proposed Pipe Slope: 0.30% MS-19 COMPLIANCE All site outfall points were analyzed for compliance with the Minimum Standards (MS- 19) set forth by the Virginia Stormwater Management Handbook. A summary of compliance calculations are included below. Full calculations are included in Appendix D. Outfall 1 Outfall 1 is an existing natural channel draining most of the northern section of Barracks Road in Area 1. Outfall 1 drains 0.54 acres from this project along Barracks Road Off - site drainage consists of moderately sloped open field area and forested area. The pre - development 10-year runoff of 7.17 cfs is increased to a post -development runoff of 7.60 cfs due to an increase in imperviousness of the contributing drainage area. This slight increase discharge is detained to 7.07 cfs, less than existing, through the proposed underground detention system. Computations based on the pre- and post -development conditions show this natural channel as adequate to convey both the pre- and post - development runoff. ,%.- Outfall 2 ""W Outfall 2 is an existing storm sewer system draining roughly half of the northern section of Barracks Road in Area 1. Outfall 2 drains 0.24 acres from this project along Barracks Road. The pre -development 10-year runoff of 2.10 cfs is decreased to a post - development runoff of 1.80 cfs due to a decrease in imperviousness of the contributing drainage area. Computations based on the pre- and post -development conditions show this existing system as adequate to convey both the pre- and post -development runoff. Outfall 3 Outfall 3 is an existing storm sewer system draining much of the southern section of Barracks Road in Area 2. Outfall 3 drains 0.057 acres from this project along Barracks Road. This drainage area is less than one percent (1%) of the total drainage area at the discharge point. The pre -development 10-year runoff of 15.01 cfs is increased to a post - development runoff of 15.05 cfs due to a minor increase in imperviousness of the contributing drainage area. This negligible increase in discharge is accounted for in the existing system. Computations based on the pre- and post -development conditions show this existing system as adequate to convey both the pre- and post -development runoff. WATER QUALITY SUMMARY The following table outlines the site conditions in pre- and post -development as well as the total phosphorus loads, necessary removal, and the remaining load to be purchased with credits to satisfy the removal requirement that applies to this project. OVERALL A -SITE IMPERVIOUS PERVIOUS IMPERVIOUS P LOAD REMOVAL SCENARIO [AREA] AREA (AC.) AREA (AC.) COVER (LB/YR) REQUIRED (AC.) (LB/YR) PRE- DEVELOPMENT 0.391 0.050 1 0.342 12.7% 0.17 0.42 FPOST- DEVELOPMENT 0.391 0.267 0.124 68.2% 0.59 AREA 1: Barracks West SCENARIO A -SITE [AREA] IMPERVIOUS PERVIOUS IMPERVIOUS P LOAD REMOVAL AREA (AC.) AREA (AC.) COVER (LB/YR) REQUIRED (AC.) (LB/YR) PRE- DEVELOPMENT 0.334 0.038 0.296 11.3% 0.15 0.37 POST- F0334 DEVELOPMENT . F0.236 0.098 70.7% 0.52 �✓ AREA 2: Georgetown A -SITE REMOVAL IMPERVIOUS PERVIOUS IMPERVIOUS P LOAD SCENARIO [AREA] AREA (AC.) AREA (AC.) COVER (LB/YR) REQUIRED (AC.) (LB/YR) PRE- 0.057 0.012 0.045 21.1% 0.03 DEVELOPMENT POST 0.04 0.057 0.031 0.027 53.7% 0.07 DEVELOPMENT APPENDIX A z z N 0009TZb 006S7b OOSSTZb OOLSTZb 009STZb 0055TZb OObSTZb OOESTZb 00ZSTZb OOTSTZb OOOSTZb M LS .6L AL 1114me rn 4.9 ,TE e8L LO Cl) M .6S bZ o8L N O � N 8 N M (a a 0 0 8 0 N a) C 01 a) m N y L m m N a) ° °) O O C O) C m � > m m ca N N N >V a)U N N N m C u7 I DO o O U T O m d O) Ca U O "o 0 ] m a) N N a) 0 p N] N OC 'O O � U U U U m E a) U cn L N N m"O E0 N C Od — a) O m U N C m E —y CL U NA Z m E a) U m d m a) O` In m e a0 N L fL N O N d U) m M C 'O O O O u 2 m E T m u L O a) O Cl) O_ N U @ o N .O a) T M C V) 7 U C M Olp _ U o Y= "' 3 N E m N E O N d N co C d "O 0 Z L a) a) 'D y U Z _�N > N L a) E L O d N J) V E N L O N Q C « fa O C wE d N m E O owW U. NCm 5 m m O Q Q i an :«. E d} Tm O m C m o m L 3 m N n C Q m d Y m L N o L C d- V1 .T• C U E E ✓ T C. m d C O O O O E O C a) 7 m cu m O .L..• C N O U al a) U O co Ul m> d TO > ) Y o L 3 -o '� `� C o 3 N >. N C .O m _ « E p °� N M ) p d a E cu O E m Z m y N t C O N O a Z v .o U .O O O m c U a) m E C> O N a a) 0 E W aC Oj, wo CO a) K L L a) O n O (n a) a) Q N L p E` O .O ` m 'D U '� L C 'C m L N U 0 N d o° T N n o o a) U m O o a�i a .� m „O a) m �_ oc d w Q _ f6 c `° E N" a o m m -' U) U) 0 ¢ m @ m °� ` Q U - E .S u, O `� m °' v L° C N° m m> E o) E Z .n C) m m N a) N N a) O rn m ° m� T m C L O L C N T «1 d m T >O L > N-0 a) U m m 0)2 to m m m m N a) 7 m Y C m E m m E O _a) a) T O "O m E ~ U O a) �_ Cn N -C m N U >, >� O N L O N 'C L Ud) 7 V) w U) a7 C E ` E O 'O E C m Q 0 "O .0 a) > Q Q) Z Q m C F Y6 .47 7 a) O m y CA C a7 Q) m E E N N C U�� E O N a) m U O a) y m a) @ � m O) ul o .� O) E 2' C .La m O (mj N m m j L `p N C E d .� @ m U d a) u! > (n a) — U) a) — a) p_ 7 U) a) C "O "6 E� m L C F >7m > C .N m 'Q W E d N N a) a E p >(D O (n > U m O y d_ d "O Q U L N F-- O 7 U co O 7 U) U) O L d > F m o .0 L 0 U7 O m o N L O H U .� a) m 0 o LL c U 0 t L m m a ) C m m m o d .O C J �' a1 L N N N ° O m n co n d ° nN > � O o 2 (5 cm O m S) i 2 o J Q Z W91 # , m o 0 + c 'o Y R m W J a N ° N m °a c o c o o n m � Cl) � C y CD a a •- •- •- 4) y m m a m n a 'o o n> n a a m m m ` a y '0 3 LL 3 O o cn n O -O N > a d > 3 o O = L r ° o m ° O (� ° >• n a) n Q U) co U) 'p m m > U U C7 C7 J J d T- U) U) > U) 'O U) U) U) CD c a A A X �• 0 '� ' 4C 0 0 `�' X d o two Q y LO CO >, o (D U) � m U) '«>- Uo m U d o m o U m 0 Z Soil Map —Albemarle County, Virginia, and Charlottesville City, Virginia Map Unit Legend Albemarle County, Virginia (VA003) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 2C Albemarle fine sandy loam, 7 to 15 percent slopes 0.3 0.5% 2D Albemarle fine sandy loam, 15 to 25 percent slopes 0.5 0.8% 21 B Culpeper fine sandy loam, 2 to 7 percent slopes 19.2 31.6% 21C Culpeper fine sandy loam, 7 to 15 percent slopes 26.3 43.1% 27C Elioak loam, 7 to 15 percent slopes 4.7 7.8% 47D Louisburg sandy loam, 15 to 25 percent slopes 8.2 13.5% 91 lUrbanland 1.5 2.4% Subtotals for Soil Survey Area 60.8 99.7% Totals for Area of Interest 61.0 100.0% Charlottesville City, Virginia (VA540) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 27C Elioak loam, 7 to 15 percent slopes 0.0 0.1%' 47D Louisburg sandy loam, 15 to 25 percent slopes 0.1 0.2% 91 Urban land 0.0 0.0% Subtotals for Soil Survey Area 0.2 0.3% Totals for Area of Interest 61.0 100.0% tSDA Natural Resources Web Soil Survey 3/27/2015 "� Conservation Service National Cooperative Soil Survey Page 3 of 3 t€ a it i f a 5 itJ' , py y r7� yiy 3 S 7 � S 3 till 11111,111 If III[' MOVE; t 1"I Hall pill ;114 lit � 4 x 1- t 't p •. gg iE ; k 01 l ey. � f it 2 s nit z,t g I R iIs at LL 4 E ifSF J,V! a 4 _ M M APPENDIX B Chapter 7 - Ditches and Channels Appendix 7D-6 Permissible Velocities for Erodible Linings Permissible velocities for channels with erodible linings, based on uniform flow in continuously wet, aged channels': Maximum permissible velocities for Soil type or lining (earth; Water no vegetation) Clear Water carrying water carrying fine silts sand and ravel Fine sand (noncolloidal) F.p.s. 15 F.p.s. 2.5 F.p.s. Sandy loam (noncolloidal) 1.7 2.5 2.0 Silt loam (noncolloidal) 2.0 3.0 Ordinary firm loam 2.5 3.5 2.2 Volcanic ash 2.5 3.5 2.7 Fine gravel 2.5 5.0 3.7 Stiff clay (very colloidal) 3.7 5.0 3.0 Graded, loam to cobbles (noncolloidal) 3.7 5.0 5.0 Graded, silt to cobbles (colloidal) 4.0 5.5 5.0 Alluvial silts (noncolloidal) 2.0 3.5 2.0 Alluvial silts (colloidal) 3.7 5.0 3.0 Coarse gravel (noncolloidal) 4.0 6.0 6.5 Cobbles and shingles 5.0 5.5 6.5 Shales and hard pans 6.0 6.0 5.0 Source: 'As recommended by Special Committee on Irrigation Research, American Society of Civil Engineers, 1926. 1 of 1 VDOT Drainage Manual e` DRAINAGE AREA J7� PRE -DEVELOPMENT 77 S' TI 7 / {/ j / Nd. \� /\,}�•J \ \ >. .. r�a�.` v��„ / /'t / `f 1— J..-'t J+lY`e't i/ 1 // ...-r•-'f"' _ {, _ - ,\ \ - %F'Fr y h•''�;,•,,i, Z� t.:'. j 7"1 i s , `j / i kslTE Sv 7*7 i y i / � . f f � � /,� � . r '4 ram_... j � v �! v�.,._ '��l.t „wyc-.�� f y,.� f � i s• �1y�` !�'�•C� l r s yy -.: 'yes _ /� r t �' / ,. .. �. � ,,•�i 1 4 � � �; Y j li i Y 3 onr.0 xu .vrr we. ____ _ Mr,y! buwCf MEN ®MMr .. .. rac a o twrecior rtnr ron Pre-D—lo ment Outfall Aaes [-Value 1 4.67 D.50 7 a.7z o.70 3 6.56 D58 ll, DRAINAGE AREA } w: POST -DEVELOPMENT a \ _ r �/ fi J /j ♦. "�Jf l ., Y ll.J ' 1 \ r✓- �,[1:�.'1 ,�+ /((r t ..� -17 - fib, / f..rr t '� ♦♦ \ ,�F r' '.r•4�"? ,F�,< h "�yT,F, d' .., ,%F• (1t,. r 'c` /i/j is=£gsfll //i. �° �'- �? .� � �. ♦ �. �'",L� S — t � �'14.:� �„r�� '• � i� r l- 3 _ J! * 3 ♦ \•� * .arc wvw - Post-0eveb ent •, �•` \ a ` "ri/'(„� Outfall Avez C-Value ____ ri a rnxaxa[w rus ran 2 0.49 0.76 Y;�t� '• ` ? ..{Rn`�'�: a' j APPENDIX C Now, lk . PERFORMANCE -BASED WATER QUALITY CALCULATIONS APPENDIX 5D Worksheet 1 Page 1 of 3 STEP 1 Determine the applicable area (A) and the post -developed impervious cover (Ioost)• Applicable area (A)* = 0.391 acres ✓ Post -development impervious cover: structures = 0.00 acres parking lot = 0.00 acres roadway = 0.27 acres other: 0.000 acres 0.00 acres Total = 0.267 acres Ipost = (total post -development impervious cover _ A) x 100 = 68.2% * The area subject to the criteria may vary from locality to locality. Therefore, consult the locality for proper determination of this value. STEP 2 Determine the average land cover condition (Iwatershed) or the existing impervious cover (Iex►st;od. Average land cover condition fIwatershed): If the locality has determined land cover conditions for individual watersheds within its jurisdiction, use the watershed specific value determined by the locality as lwatershed- 0 watershed = 1 0 Otherwise, use the Chesapeake Bay default value: o watershed = 16 ,, /o 5D-5 PERFORMANCE -BASED WATER QUALITY CALCULATIONS APPENDIX 5D Worksheet 1 Page 2 of 3 Existing impervious cover Determine the existing impervious cover of the development site if present. Existing impervious cover: structures = 0 acres parking lot = 0 acres roadway = 0.05 acres other: 0 acres 0 acres Total = 0.050 acres Iexisting = (total existing impervious cover - A*) x 100 = 13% /2 . * The area should be the same as used in STEP 1. STEP 3 Determine the appropriate development situation. The site information determined in STEP 1 and STEP 2 provide enough information to determine the appropriate development situation under which the performance criteria will apply. Check (✓) the appropriate development situation as follows: Situation 1: This consists of land development where the existing percent impervious cover (Ie.isring) is less than or equal to the average land cover condition (Iwatershed) and the proposed improvements will create a total percent impervious cover (Ipos) which is less than ore ual to the average land cover condition Uwatershed)- Ipost 68% < Iwatershed 16% 5D-6 ' %W- PERFORMANCE -BASED WATER QUALITY CALCULATIONS APPENDIX 5D Worksheet 1 Page 3 of 3 ✓ Situation 2: This consists of land development where the existing percent impervious cover (Iexisting) is less than or equal to the average land cover condition (Iwatershed) and the proposed improvements will create a total percent impervious cover (Iposo which is greater than the average land cover condition G atershed)- Iexisting 13% :5 Iwatershed 16% ; and Ipost 68% > Iwatershed 16% Situation 3: This consists of land development where the existing percent impervious cover (Iexisting) is greater than the average land cover condition (IK,atershed)- Iexisting 13% > Iwatershed 16% Situation 4: This consists of land development where the existing percent impervious cover (Iexisting) is served by an existing stormwater management BNT(s) that addresses water quality. If the proposed development meets the criteria for development Situation 1, than the low density development is considered to be the BMP and no pollutant removal is required. The calculation procedure for Situation 1 stops here. If the proposed development meets the criteria for development Situations 2, 3, or, 4, then proceed to STEP 4 on the appropriate worksheet. `. SD-7 PERFORMANCE -BASED WATER QUALITY CALCULATIONS APPENDIX 5D Worksheet 2 : Situation 2 Page 1 of 4 Summary of Situation 2 criteria: from calculation procedure STEP 1 thru STEP 31 Worksheet 1: Applicable area (A)* = 0.3913 acres Ipost = (total post -development impervious cover _ A) x 100 = 68% Iwatershed — 16% or Iwatershed = 16% Iexisting = (total existing impervious cover _ A*) x 100 = 13% Iexisting 13% < Iwatershed 16% ; and Ipost 68% > Iwatershed 16% STEP 4 Determine the relative pre -development pollutant load (Lpre). Lpre(watershed) = [0.05 + (0.009 x Iwatershed)] x A x 2.28 (Equation 5-16) where: Lpre(watershed) = relative pre -development total phosphorous load (pounds per year) Iwatershed = average land cover condition for specific watershed or locality or the Chesapeake Bay default value of 16% (percent expressed in whole numbers) A = applicable area (acres) Lpre(watershed) = [0.05 + (0.009 x 16 )] x 0.3913 x 2.28 0. 173 08 pounds per year OR PERFORMANCE -BASED WATER QUALITY CALCULATIONS APPENDIX 5D ,%NW Worksheet 2 : Situation 2 Page 2 of 4 STEP 5 Determine the relative post -development pollutant load (Lpost). Lpost = [0.05 + (0.009 x Ipos)] x A x 2.28 (Equation 5-21) where: Lpost = relative post -development total phosphorous load (pounds per year) Ipost = post -development percent impervious cover (percent expressed in whole numbers) A = applicable area (acres) Lpost = [0.05 + (0.009 x 68.21 )] x 0.3913 x 2.28 0.5923 pounds per year STEP 6 Determine the relative pollutant removal requirement (RR). RR — Lpost - Lpre(watershed) `%-- RR = 0.59 - 0.17 0.42 pounds per year STEP 7 Identify best management practice (BMP) for the site. 1. Determine the required pollutant removal efficiency for the site: EFF = (RR _ Lpos) x 100 (Equation 5-22) where: EFF = required pollutant removal efficiency (percent expressed in whole numbers) RR = pollutant removal requirement (pounds per year) Lpost = relative post -development total phosphorous load (pounds per year) EFF = ( 0.42 — 0.59) x 100 71% 5D-10 `40W 'Vft - PERFORMANCE -BASED WATER QUALITY CALCULATIONS APPENDIX 5D Worksheet 2 : Situation 2 Page 3 of 4 2. Select BMP(s) from Table 5-15 and locate on the site: BMP 1: BMP 2: BMP 3: 3. Determine the pollutant load entering the proposed BMP(s): LBMP _ [0.05 + (0.009 x IBWA x A x 2.28 (Equation 5-23) where: LBMP = relative post -development total phosphorous load entering proposed BMP (pounds per year) IBMP = post -development percent impervious cover of BMP drainage area (percent expressed in whole numbers) A = drainage area of proposed BMP (acres) LBNwi = [0.05 + (0.009 x A x x 2.28 0.00 pounds per year LBMP2 = [0.05 + (0.009 x A x x 2.28 0.00 pounds per year LBMP3 = [0.05 + (0.009 x A x x 2.28 0.00 pounds per year 616all PERFORMANCE -BASED WATER QUALITY CALCULATIONS APPENDIX 5D *ftw Worksheet 2 : Situation 2 Page 4 of 4 4. Calculate the pollutant load removed by the proposed BMP(s): Lremoved = EffBw x LBMP (Equation 5-24) where: Lre..oved = Post -development pollutant load removed by proposed BMP (pounds per year) EffBmp = pollutant removal efficiency of BMW (expressed in decimal form) LBNP = relative post -development total phosphorous load entering proposed BMP (pounds per year) Lremoved/BMPI = x 0.00 = 0.00 pounds per year Lremoved/BMP2 = x 0.00 = 0.00 pounds per year Lremoved/BMP3 = x 0.00 = 0.00 pounds per year 5. Calculate the total pollutant load removed by the BMP(s): Lremoved/total = Lremoved/BW I + L removed/BMP2 + Lremoved/BMP3 + ...(Equation 5-25) where: Lremoved/total = total pollutant load removed by proposed BMPs Lremoved/BMPI = pollutant load removed by proposed BMW No. 1 L'removed/BMP2 = pollutant load removed by proposed BMW No. 2 Lremoved/BMP3 = pollutant load removed by proposed BMP No. 3 Lremoved/total = 0.00 + 0.00 + 0.00 0.00 pounds per year 6. Verify compliance: Lremoved/total > RR 0.00 > 0.42 FAIL `%b..- 5D-12 APPENDIX D MS-19 Outfall Data �r Project: Barracks Rd Project #: 113038018 Date: 12/9/2016 Locality: Albemarle Outfall # 1 Rational C Value Total Area Impervious Area C= 0.90 Pervious Area C= 0.35 Time of Concentration Rainfall Data i = B / (Tc+ D)E Intensity Factors Storrs Event B D E 2 -year 5 -year 10 -year 25 -year 50 -year 100 -year 49.02 10.50 0.82 55.71 11.50 0.80 46.95 9.50 0.73 40.11 7.75 0.66 35.68 6.50 0.61 31.09 5.00 0.55 1 Pre -Development 0.503 4.67 acres 1.30 acres 3.37 acres 19.3 min Storm Event Rainfall Intensity Peak Flo 2 -year 3.03 in/hr 7.17 cfs 10 -year 4.04 in/hr 9.55 cfs 100 -year 5.38 in/hr 15.58 cfs Outfall # 1 2 Pre -Development Rational C Value 1 0.703 Total Area 1 0.72 acres impervious Area C= 0.90 0.47 acres Pervious Area C= 0.35 0.26 acres Time of Concentration 18.5 min Storm Event Rainfall Intensity 2 -year 3.10 in/hr 10 -year 100 4.13 in/hr 5.48in/hr -year Outfall # ;) 3 Pre -Development Rational C Value 1 0.583 Total Area 6.56 acres Impervious Area C= 0.90 2.77 acres Pervious Area C= 0.35 3.79 acres Time of Concentration 20.4 min 1� 1 Post -Development Disturbed Area 0.529 0.54 acres 4.91 acres 1.60 acres Project Drainage 3.31 acres 0.21 acres 19.9 min ainfall Intensity Peak Flow Detained Flow 2.98 in/hr (7.60 cfs", 7.07 cfs 3.98 in/hr 10.14 cfs 9.29 cfs 5.31 in/hr 16.59 cfs 16.12 cfs 2 Post -Development Disturbed Area 0.765 0.24 acres 0.49 acres 0.37 acres Pro'ect Drainage 0.12 acres 0.13 acres Peak Flow Rainfall Intensity Peak Flow 1.58 cfs 3.64 in/hr T:3Tcch,_ 2.10 cfs 4.78 in/hr 1.80 cfs 2.79 cfs 6.28 in/hr 2.37 cfs 3 Post -Development Disturbed Area 0.584 0.06 acres 6.56 acres 2.79 acres Pro ect Drainage 3.77 acres 0.06 acres Storm Event 24-hr Rainfall Peak Flow 24-hr Rainfall .Peak Flow 2 -year 2.94 in 11.24 cfs 2.94 in 11.27 10 -year 3.93 in 15.01 cfs 3.93 in 15.05 cfs 100 -year 5.25 in 20.05 cfs 5.25 in 20.10 cfs MS-19 Receiving Channel Computations : Outfall 1 Natural Channel Section Condition Slope Le Side Slope Rig t Si a sloe Bottom Width 2 Year 10 year Capacity Provided Depth Q v Qlo dio ft/ft h:v h:v ft cfs fps cfs ft cfs ft 1-A Pre 0.155 3.3:1 1.4:1 0 7.17 8.25 9.55 0.67 633 3.26 1-A Post 0.1550 3.3:1 1.4:1 0 7.07 8.24 9.29 0.67 1-B Pre 0.1550 1.4:1 1.2:1 9 7.17 5.38 9.55 0.18 1-13 Post 0.1550 1.4:1 1.2:1 8.65 7.07 5.36 9.29 0.18 218 1.15 1-C Pre 0.0682 2.2:1 1.2:1 5.00 7.17 4.99 9.55 0.31 1-C Post 0.0682 2.2:1 0.6:1 5.00 7.07 4.97 9.29 0.31 536 3.05 Nqm. APPENDIX E I !, Detention System Design No. of Pipes Dia. Of Pipes Length Low Invert 1 in. ft. elev. 48 40 575.32 Low Flow Orifice Diameter Low Invert 3 575.22 in. elev. Overflow Weir Invert 2.6 577.82 ft. elev. Outlet Pipe Slope 15 0.0699 in. 1.25 ft. ft/ft Hydraflow Table of Contents Hydraflow 1_48in only 10yr .gpw ,draflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc. v10.4 Friday, 12 / 9 / 2016 'er Watershed Model Schematic..................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 2 - Year SummaryReport ......................................................................................................................... 3 HydrographReports................................................................................................................... 4 Hydrograph No. 1, Rational, PRE............................................................................................ 4 Hydrograph No. 2, Rational, POST BYPASS........................................................................... 5 Hydrograph No. 3, Mod. Rational, POST ROAD...................................................................... 6 Hydrograph No. 4, Reservoir, Storage..................................................................................... 7 PondReport - STORAGE PIPE........................................................................................... 8 Hydrograph No. 5, Combine, POST OUTFALL...................................................................... 10 10 - Year SummaryReport ....................................................................................................................... 11 HydrographReports................................................................................................................. 12 Hydrograph No. 1, Rational, PRE.......................................................................................... 12 Hydrograph No. 2, Rational, POST BYPASS......................................................................... 13 Hydrograph No. 3, Mod. Rational, POST ROAD.................................................................... 14 Hydrograph No. 4, Reservoir, Storage................................................................................... 15 VMW Hydrograph No. 5, Combine, POST OUTFALL...................................................................... 16 100 -Year SummaryReport ....................................................................................................................... 17 HydrographReports................................................................................................................. 18 HydrographNo. 1, Rational, PRE.......................................................................................... 18 Hydrograph No. 2, Rational, POST BYPASS......................................................................... 19 Hydrograph No. 3, Mod. Rational, POST ROAD.................................................................... 20 Hydrograph No. 4, Reservoir, Storage................................................................................... 21 Hydrograph No. 5, Combine, POST OUTFALL...................................................................... 22 OFReport.................................................................................................................. 23 1 Watershed Model Schematic Hydraflow Hydrographs Extension forAutoCAD® Civil 3D®2015 byAutodesk, Inc. v10.4 F L:j 5 Legend Hvd• Origin Description 1 Rational PRE 2 Rational POST BYPASS Mod. Rational POST ROAD Reservoir Storage 5 Combine POST OUTFALL Project: Hydraflow 1_48in only 10yr .gpw I Friday, 12 / 9 / 2016 Hyd rog ra p h Return Period Relr,�w Hydrographs Extension for AutoCAD®Civil 3D® 2015 by Autodesk, Inc v10.4 r- Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 Rational ------ ------- 7.172 ------- ------- 9.552 ------- ------- 15.58 PRE 2 Rational ------ ------- 6.784 ------- ------- 8.954 ------- ------- 14.37 POST BYPASS 3 Mod. Rational ------ ------- 0.695 ------- ------- 0.953 ------- ------- 1.750 POST ROAD 4 Reservoir 3 ------- 0.696 ----- ------- 0.982 ------- ------- 1.757 Storage 5 Combine 2,4 ------- 7.065 ------- ------- 9.286 ------- ------- 16.09 POST OUTFALL Proj. file: Hydraflow 1_48in only 10yr .gpw Friday, 12 / 9 / 2016 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2015 by Autodesk, Inc. v10.4 No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 Rational 7.172 1 19 8,176 ------ ------ ------ PRE 2 Rational 6.784 1 15 6,106 ------ ------ ------ POST BYPASS 3 Mod. Rational 0.695 1 15 3,753 ------ ------ ------ POST ROAD 4 Reservoir 0.696 1 24 3,752 3 577.91 337 Storage 5 Combine 7.065 1 15 9,858 2,4 ------ ------ POST OUTFALL Hydraflow 1_48in only 10yr .gpw Return Period: 2 Year Friday, 12 / 9 / 2016 Hydrograph Report iraflow Hydrographs Extension for AUtoCADO Civil 3D® 2015 by Autodesk, Inc. v10.4 Hyd. No. 1 PRE Hydrograph type = Rational Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 4.666 ac Runoff coeff. Intensity = 3.056 in/hr Tc by User OF Curve = Albemarle.IDF Asc/Rec limb fact Q (cfs) 8.00 wo 4.00 2.00 0.00 - V Z 4 6 Hyd No. 1 PRE Hyd. No. 1 -- 2 Year 4 Friday, 12 / 9 / 2016 = 7.172 cfs = 19 min = 8,176 cuft = 0.503 = 19.00 min = 1/1 Q (cfs) 8.00 . 1I 4.00 2.00 0.00 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 Time (min) Hydrograph Report s -Iraflow Hydrographs Extension for AutoCADO Civil 3D0 2015 by Autodesk, Inc. v10.4 Friday, 12 / 9 / 2016 Hyd. No. 2 POST BYPASS Hydrograph type = Rational Peak discharge = 6.784 cfs Storm frequency = 2 yrs Time to peak = 15 min Time interval = 1 min Hyd. volume = 6,106 cuft Drainage area = 4.104 ac Runoff coeff. = 0.48 Intensity = 3.444 in/hr Tc by User = 15.00 min IDF Curve = Albemarle.IDF Asc/Rec limb fact = 1/1 Q (cfs) 7.00 AM 4.00 3.00 M 0.00 it ' 0 2 4 Hyd No. 2 POST BYPASS Hyd. No. 2 -- 2 Year Q (cfs) 7.00 5.00 4.00 3.00 2.00 " full 8 10 12 14 16 18 20 22 24 26 28 30 0.00 Time (min) Hydrograph Report 6 iraflow Hydrographs Extension for AutoCADO Civil 3DO 2015 by Autodesk, Inc. v10.4 Friday, 12 / 9 / 2016 Hyd. No. 3 POST ROAD Hydrograph type = Mod. Rational Peak discharge = 0.695 cfs Storm frequency = 2 yrs Time to peak = 15 min Time interval = 1 min Hyd. volume = 3,753 cuft Drainage area = 0.808 ac Runoff coeff. = 0.769 Intensity = 1.118 in/hr Tc by User = 15.00 min IDF Curve = Albemarle.IDF Storm duration = 6.0 x Tc Target Q =0.390 cfs Est. Req'd Storage =2,518 cuft Q (cfs) 1.00 ".90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 - 0 10 20 Hyd No. 3 POST ROAD Hyd. No. 3 -- 2 Year 30 40 50 60 70 80 ® Mod. Rational Est. Storage = 2,518 cuft Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 90 100 110 Time (min) Hydrograph Report 7 +raflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc. 00.4 Friday, 12 / 9 / 2016 Hyd. No. 4 Storage Hydrograph type = Reservoir Peak discharge = 0.696 cfs Storm frequency = 2 yrs Time to peak = 24 min Time interval = 1 min Hyd. volume = 3,752 cuft Inflow hyd. No. = 3 -POST ROAD Max. Elevation = 577.91 ft Reservoir name = STORAGE PIPE Max. Storage = 337 cuft Storage Indication method used. Q (cfs) Storage Q cfs Hyd. No. 4 -- 2 Year ( ) 1.00 - - 1.00 90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 10 20 30 40 50 60 70 80 90 100 110 120 130 Hyd No. 4 Hyd No. 3 ® Total storage used = 337 cuft Time (min) Pond Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2015 by Autodesk, Inc. v10.4 Friday, 12 / 9 / 2016 ''ond No. 1 - STORAGE PIPE Pond Data UG Chambers - Invert elev. = 575.32 ft , Rise x Span = 4.00 x 4.00 ft , Barrel Len = 40.00 ft , No. Barrels = 1 , Slope = 0.20% , Headers = No Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cuft) 0.00 575.32 n/a 0 0 0.41 575.73 n/a 23 23 0.82 576.14 n/a 45 69 1.22 576.54 n/a 56 125 1.63 576.95 n/a 62 187 2.04 577.36 n/a 65 251 2.45 577.77 n/a 65 316 2.86 578.18 n/a 62 378 3.26 578.58 n/a 56 434 3.67 578.99 n/a 45 480 4.08 579.40 n/a 23 503 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 15.00 3.00 Inactive 0.00 Crest Len (ft) = 5.00 0.00 0.00 0.00 Span (in) = 15.00 3.00 4.00 0.00 Crest El. (ft) = 577.82 0.00 0.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 2.60 3.33 3.33 3.33 Invert El. (ft) = 575.22 575.22 5.00 0.00 Weir Type = Broad --- --- --- Length (ft) = 155.00 0.00 0.50 0.00 Multi -Stage = Yes No No No Slope (%) = 7.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) /lulti-Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 575.32 0.00 0.00 0.00 --- 0.00 --- -- --- --- --- 0.000 0.04 2 575.36 0.05 is 0.03 is 0.00 --- 0.00 --- --- --- --- --- 0.028 0.08 5 575.40 0.05 is 0.05 is 0.00 --- 0.00 --- --- --- --- --- 0.052 0.12 7 575.44 0.08 is 0.07 is 0.00 --- 0.00 --- --- --- --- --- 0.071 0.16 9 575.48 0.09 is 0.09 is 0.00 --- 0.00 --- --- --- --- --- 0.086 0.20 12 575.52 0.10 is 0.10 is 0.00 --- 0.00 --- --- --- --- --- 0.096 0.24 14 575.56 0.11 is 0.11 is 0.00 --- 0.00 --- --- --- --- --- 0.106 0.29 16 575.61 0.12 is 0.11 is 0.00 --- 0.00 --- --- --- --- --- 0.115 0.33 19 575.65 0.13 is 0.12 is 0.00 --- 0.00 --- --- --- --- --- 0.123 0.37 21 575.69 0.14 is 0.13 is 0.00 --- 0.00 --- --- --- --- --- 0.130 0.41 23 575.73 0.14 is 0.14 is 0.00 --- 0.00 --- --- --- --- --- 0.138 0.45 28 575.77 0.15 is 0.15 is 0.00 --- 0.00 --- --- --- --- --- 0.146 0.49 32 575.81 0.16 is 0.15 is 0.00 --- 0.00 --- --- --- --- --- 0.152 0.53 37 575.85 0.16 is 0.16 is 0.00 --- 0.00 --- --- --- --- --- 0.159 0.57 41 575.89 0.17 is 0.17 is 0.00 --- 0.00 --- --- -- --- --- 0.165 0.61 46 575.93 0.17 is 0.17 is 0.00 --- 0.00 --- --- --- --- --- 0.172 0.65 50 575.97 0.18 is 0.18 is 0.00 --- 0.00 --- --- --- --- --- 0.177 0.69 55 576.01 0.18 is 0.18 is 0.00 --- 0.00 --- --- --- --- --- 0.184 0.73 60 576.05 0.20 is 0.19 is 0.00 --- 0.00 --- --- --- --- --- 0.189 0.78 64 576.09 0.20 is 0.19 is 0.00 --- 0.00 --- -- --- --- --- 0.195 0.82 69 576.14 0.20 is 0.20 is 0.00 --- 0.00 --- --- --- --- --- 0.200 0.86 74 576.18 0.21 is 0.20 is 0.00 --- 0.00 --- -- --- --- --- 0.205 0.90 80 576.22 0.21 is 0.21 is 0.00 --- 0.00 --- --- --- --- --- 0.210 0.94 85 576.26 0.22 is 0.21 is 0.00 --- 0.00 --- -- --- --- --- 0.215 0.98 91 576.30 0.23 is 0.22 is 0.00 --- 0.00 --- --- --- --- --- 0.220 1.02 97 576.34 0.23 is 0.23 is 0.00 --- 0.00 --- - --- --- --- 0.225 1.06 102 576.38 0.23 is 0.23 is 0.00 --- 0.00 --- --- --- --- --- 0.230 1.10 108 576.42 0.24 is 0.23 is 0.00 --- 0.00 --- --- --- --- --- 0.234 1.14 113 576.46 0.24 is 0.24 is 0.00 --- 0.00 --- --- --- --- --- 0.239 1.18 119 576.50 0.24 is 0.24 is 0.00 --- 0.00 --- --- --- --- --- 0.243 1.22 125 576.54 0.26 is 0.25 is 0.00 --- 0.00 --- --- --- --- --- 0.248 1.26 131 576.58 0.26 is 0.25 is 0.00 --- 0.00 --- --- --- --- --- 0.252 Continues on next page... E STORAGE PIPE Stage / Storage / Discharge Table 'Sage Storage Elevation Clv A c cuft ft cfs 1.31 1.35 1.39 1.43 1.47 1.51 1.55 1.59 1.63 1.67 1.71 1.75 1.80 1.84 1.88 1.92 1.96 2.00 2.04 2.08 2.12 2.16 2.20 2.24 2.28 2.33 2.37 2.41 2.45 2.49 2.53 2.57 2.61 2.65 2.69 2.73 2.77 2.82 2.86 2.90 2.94 2.98 3.02 3.06 3.10 3.14 3.18 3.22 3.26 3.30 3.35 3.39 3.43 3.47 3.51 3.55 3.59 3.63 3.67 3.71 3.75 3.79 3.84 3.88 3.92 3.96 4.00 I 4.04 4.08 End 137 576.63 0.26 is 143 576.67 0.26 is 149 576.71 0.27 is 156 576.75 0.27 is 162 576.79 0.27 is 168 576.83 0.28 is 174 576.87 0.29 is 180 576.91 0.29 is 187 576.95 0.29 is 193 576.99 0.29 is 200 577.03 0.30 is 206 577.07 0.31 is 213 577.12 0.31 is 219 577.16 0.31 is 225 577.20 0.31 is 232 577.24 0.31 is 238 577.28 0.33 is 245 577.32 0.33 is 251 577.36 0.33 is 258 577.40 0.33 is 264 577.44 0.33 is 271 577.48 0.33 is 277 577.52 0.35 is 284 577.56 0.35 is 290 577.60 0.35 is 297 577.65 0.35 is 303 577.69 0.35 is 310 577.73 0.35 is 316 577.77 0.37 is 322 577.81 0.37 is 329 577.85 0.43 is 335 577.89 0.61 is 341 577.93 0.84 is 347 577.97 1.12 is 354 578.01 1.46 is 360 578.05 1.83 is 366 578.09 2.21 is 372 578.13 2.66 is 378 578.18 3.10 is 384 578.22 3.58 is 390 578.26 4.10 is 395 578.30 4.62 is 401 578.34 5.17 is 406 578.38 5.74 is 412 578.42 6.33 is 417 578.46 6.94 is 423 578.50 7.56 is 429 578.54 8.20 is 434 578.58 8.59 is 439 578.62 8.84 is 443 578.67 9.04 is 448 578.71 9.22 is 452 578.75 9.38 is 457 578.79 9.52 is 461 578.83 9.65 is 466 578.87 9.77 is 471 578.91 9.89 is 475 578.95 10.00 is 480 578.99 10.10 is 482 579.03 10.20 is 484 579.07 10.30 is 487 579.11 10.39 is 489 579.16 10.48 is 491 579.20 10.56 is 493 579.24 10.65 is 496 579.28 10.73 is 498 579.32 10.81 is 500 579.36 10.88 is 503 579.40 10.96 is Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total cfs cfs cfs cfs cfs Cfs cfs Cfs cfs cfs 0.26 is 0.00 --- 0.00 --- --- --- --- --- 0.257 0.26 is 0.00 --- 0.00 --- --- --- --- --- 0.261 0.26 is 0.00 --- 0.00 --- --- --- --- --- 0.265 0.27 is 0.00 --- 0.00 --- --- --- --- --- 0.269 0.27 is 0.00 --- 0.00 --- --- --- --- --- 0.273 0.28 is 0.00 --- 0.00 --- --- --- --- --- 0.277 0.28 is 0.00 --- 0.00 --- --- --- --- --- 0.280 0.28 is 0.00 --- 0.00 --- --- --- --- --- 0.284 0.29 is 0.00 --- 0.00 --- --- --- --- --- 0.288 0.29 is 0.00 --- 0.00 --- --- --- --- --- 0.292 0.30 is 0.00 --- 0.00 --- --- --- --- --- 0.296 0.30 is 0.00 --- 0.00 --- --- --- --- --- 0.299 0.30 is 0.00 --- 0.00 --- --- --- --- --- 0.303 0.31 is 0.00 --- 0.00 --- --- --- --- --- 0.307 0.31 is 0.00 --- 0.00 --- --- --- --- --- 0.311 0.31 is 0.00 --- 0.00 --- --- --- --- --- 0.314 0.32 is 0.00 --- 0.00 --- --- --- --- --- 0.317 0.32 is 0.00 --- 0.00 --- --- --- --- --- 0.321 0.32 is 0.00 --- 0.00 --- --- --- --- --- 0.324 0.33 is 0.00 --- 0.00 --- --- --- --- --- 0.328 0.33 is 0.00 --- 0.00 --- --- --- --- --- 0.331 0.33 is 0.00 --- 0.00 --- --- --- --- --- 0.334 0.34 is 0.00 --- 0.00 --- --- --- --- --- 0.337 0.34 is 0.00 --- 0.00 --- --- --- --- --- 0.341 0.34 is 0.00 --- 0.00 --- --- --- --- --- 0.344 0.35 is 0.00 --- 0.00 --- --- --- --- --- 0.347 0.35 is 0.00 --- 0.00 --- --- -- --- --- 0.350 0.35 is 0.00 --- 0.00 --- --- --- --- --- 0.353 0.36 is 0.00 --- 0.00 --- --- - --- --- 0.356 0.36 is 0.00 --- 0.00 --- --- -- --- --- 0.360 0.36 is 0.00 --- 0.07 --- -- --- --- --- 0.427 0.36 is 0.00 --- 0.24 --- --- --- --- --- 0.602 0.36 is 0.00 --- 0.48 --- --- --- --- --- 0.838 0.35 is 0.00 --- 0.77 --- --- --- --- --- 1.124 0.35 is 0.00 --- 1.10 --- -- --- --- --- 1.451 0.35 is 0.00 --- 1.47 --- --- -- --- --- 1.815 0.35 is 0.00 --- 1.87 --- --- -- --- --- 2.212 0.34 is 0.00 --- 2.30 --- --- --- --- --- 2.640 0.34 is 0.00 --- 2.76 --- --- --- --- --- 3.100 0.33 is 0.00 --- 3.25 --- --- --- --- --- 3.583 0.33 is 0.00 --- 3.76 --- --- -- --- --- 4.092 0.32 is 0.00 --- 4.30 --- -- --- --- --- 4.622 0.31 is 0.00 --- 4.86 --- --- --- --- --- 5.173 0.30 is 0.00 --- 5.45 --- --- --- --- --- 5.744 0.28 is 0.00 --- 6.05 --- --- --- --- --- 6.334 0.26 is 0.00 --- 6.68 --- --- --- --- --- 6.941 0.24 is 0.00 --- 7.32 --- --- --- --- --- 7.563 0.21 is 0.00 --- 7.99 --- --- -- --- --- 8.199 0.19 is 0.00 --- 8.41 s --- --- --- --- --- 8.595 0.17 is 0.00 --- 8.66 s --- --- --- --- --- 8.839 0.16 is 0.00 --- 8.88 s --- --- --- --- --- 9.041 0.15 is 0.00 --- 9.06 s --- --- -- --- --- 9.218 0.15 is 0.00 --- 9.23 s --- --- --- --- --- 9.375 0.14 is 0.00 --- 9.38 s --- --- --- --- --- 9.518 0.13 is 0.00 --- 9.52 s --- --- --- --- 9.650 0.13 is 0.00 --- 9.65 s -- --- --- --- 9.773 0.12 is 0.00 --- 9.77 s --- -- --- --- --- 9.888 0.12 is 0.00 --- 9.88 s --- --- --- --- --- 9.996 0.11 is 0.00 --- 9.99 s --- --- --- --- --- 10.10 0.11 is 0.00 --- 10.09 s -- -- --- --- --- 10.20 0.10 is 0.00 --- 10.19 s --- --- --- --- --- 10.29 0.10 is 0.00 --- 10.29 s -- --- --- --- 10.39 0.10 is 0.00 --- 10.38 s - --- --- --- 10.48 0.09 is 0.00 --- 10.47 s --- --- --- --- --- 10.56 0.09 is 0.00 --- 10.55 s --- --- --- --- --- 10.64 0.09 is 0.00 --- 10.64 s --- --- --- --- 10.72 0.08 is 0.00 --- 10.72 s --- --- --- --- 10.80 0.08 is 0.00 --- 10.80 s --- --- --- --- --- 10.88 0.08 is 0.00 --- 10.88 s --- --- --- --- --- 10.96 Hydrograph Report 10 lraflow Hydrographs Extension for AutoCADO Civil 3D0 2015 by Autodesk, Inc. 00.4 Friday, 12 / 9 / 2016 Hyd. No. 5 POST OUTFALL Hydrograph type = Combine Peak discharge = 7.065 cfs Storm frequency = 2 yrs Time to peak = 15 min Time interval = 1 min Hyd. volume = 9,858 cuft Inflow hyds. = 2, 4 Contrib. drain. area = 4.104 ac Q (cfs) 8.00 . Me 4.00 2.00 0.00 Lr 0 10 20 -- Hyd No. 5 POST OUTFALL Hyd. No. 5 -- 2 Year 30 40 50 60 70 80 Hyd No. 2 Hyd No. 4 90 100 110 120 Q (cfs) 8.00 4.00 2.00 0.00 130 Time (min) 11 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D& 2015 by Autndack Inr w1n d No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 Rational 9.552 1 19 10,890 ------ ------ ------ PRE 2 Rational 8.954 1 15 8,059 ------ ------ ------ POST BYPASS 3 Mod. Rational 0.953 1 15 5,661 ------ ------ ------ POST ROAD 4 Reservoir 0.982 1 18 5,661 3 577.96 344 Storage 5 Combine 9.286 1 15 13,720 2,4 ------ ------ POST OUTFALL Hydraflow 1_48in only 10yr .gpw Return Period: 10 Year Friday, 12 / 9 / 2016 Hydrograph Report aflow Hydrographs Extension for AutoCADO Civil 3DO 2015 by Autodesk, Inc. v10.4 Hyd. No. 1 PRE Hydrograph type = Rational Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 4.666 ac Runoff coeff. Intensity = 4.070 in/hr Tc by User OF Curve = Albemarle.IDF Asc/Rec limb fact Q (cfs) 10.00 ..00, 8.00 . WO 4.00 2.00 PRE Hyd. No. 1 -- 10 Year 12 Friday, 12 / 9 / 2016 = 9.552 cfs = 19 min = 10,890 cuft = 0.503 = 19.00 min = 1/1 Q (cfs) 10.00 we] 4.00 2.00 0.00 JF ' ' I I I I I I I I I I I I I I N 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 Hyd No. 1 Time (min) Hydrograph Report 13 Iraflow Hydrographs Extension for AutoCADO Civil 3DO 2015 by Autodesk, Inc. v10.4 Friday, 12 / 9 / 2016 Hyd. No. 2 POST BYPASS Hydrograph type = Rational Peak discharge = 8.954 cfs Storm frequency = 10 yrs Time to peak = 15 min Time interval = 1 min Hyd. volume = 8,059 cuft Drainage area = 4.104 ac Runoff coeff. = 0.48 Intensity = 4.545 in/hr Tc by User = 15.00 min IDF Curve = Albemarle.IDF Asc/Rec limb fact = 1/1 Q (cfs) 10.00 .✓ 8.00 4.00 2.00 0.00 W 0 2 4 - Hyd No. 2 6 8 POST BYPASS Hyd. No. 2 -- 10 Year Q (cfs) 10.00 MI M. 11 4.00 2.00 0.00 10 12 . 14 16 18 20 22 24 26 28 30 Time (min) Hydrograph Report raflow Hydrographs Extension for AutoCADO Civil 3D0 2015 by Autodesk, Inc. 00.4 Hyd. No. 3 POST ROAD Hydrograph type = Mod. Rational Storm frequency = 10 yrs Time interval = 1 min Drainage area = 0.808 ac Intensity = 1.534 in/hr IDF Curve = Albemarle.IDF Target Q =0.600 cfs Q (cfs) 1.00 - .90 0.80 0.70 0.60 0.50 0.40 0.30 -) 0.20 0.10 0.00-0 14 Friday, 12 / 9 / 2016 Peak discharge = 0.953 cfs Time to peak = 15 min Hyd. volume = 5,661 cuft Runoff coeff. = 0.769 Tc by User = 15.00 min Storm duration = 6.6 x Tc Est. Req'd Storage =3,599 cuft POST ROAD Hyd. No. 3 -- 10 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 0 10 20 30 40 50 60 70 80 90 100 110 120 Hyd No. 3 Time (min) Y ®Mod. Rational Est. Storage = 3,599 cuft Hydrograph Report 15 Iraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc. v10.4 Friday, 12 / 9 / 2016 Hyd. No. 4 Storage Hydrograph type = Reservoir Peak discharge = 0.982 cfs Storm frequency = 10 yrs Time to peak = 18 min Time interval = 1 min Hyd. volume = 5,661 cuft Inflow hyd. No. = 3 - POST ROAD Max. Elevation = 577.96 ft Reservoir name = STORAGE PIPE Max. Storage = 344 cuft Storage Indication method used Q (cfs) 1.00 .90 w- 0.80 0.70 0.60 - 0.50 - 0.40 - 0.30 - 0.20 0.10 Storage Hyd. No. 4 -- 10 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 — I J_ I I I I 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 0.00 Hyd No. 4 Hyd No. 3 LF= Total storage used = 344 cuft Time (min) Hydrograph Report lraflow Hydrographs Extension for AutoCAD® Civil 3DO 2015 by Autodesk, Inc. v10.4 Hyd. No. 5 POST OUTFALL Hydrograph type = Combine Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyds. = 2, 4 Contrib. drain. area Q (cfs) 10.00 - e 2.00 0.00 -1 0 10 20 30 40 50 Hyd No. 5 Hyd No. 2 POST OUTFALL Hyd. No. 5 -- 10 Year 60 70 80 90 Hyd No. 4 16 Friday, 12 / 9 / 2016 = 9.286 cfs = 15 min = 13,720 tuft = 4.104 a c Q (cfs) 10.00 M 4.00 2.00 0.00 100 110 120 130 140 Time (min) 17 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2015 by Autodesk, Inc. v10.4 Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (tuft) 1 Rational 15.58 1 19 17,756 ------ ------ ------ PRE 2 Rational 14.37 1 15 12,930 ------ ------ ------ POST BYPASS 3 Mod. Rational 1.750 1 15 9,134 ------ ------ ------ POST ROAD 4 Reservoir 1.757 1 16 9,134 3 578.05 359 Storage 5 Combine 16.09 1 15 22,064 2,4 ------ ------ POST OUTFALL Hydraflow 1_48in only 10yr .gpw Return Period: 100 Year Friday, 12 / 9 / 2016 Hydrograph Report draflow Hydrographs Extension for AutoCADO Civil 3D0 2015 by Autodesk, Inc. v10.4 Hyd. No. 1 PRE Hydrograph type = Rational Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 4.666 ac Runoff coeff. Intensity = 6.636 in/hr Tc by User OF Curve = Albemarle.IDF Asc/Rec limb fact Q (cfs) 18.00 15.00 12.00 • o . M 3.00 PRE Hyd. No. 1 -- 100 Year 18 Friday, 12 / 9 / 2016 = 15.58 cfs = 19 min = 17,756 cuft = 0.503 = 19.00 min = 1/1 Q (cfs) 18.00 15.00 12.00 M 3.00 0.00 -" I' I I I I I I I I I I I I I I I I X 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 V%we Hyd No. 1 Time (min) Hydrograph Report 19 1raflow Hydrographs Extension for AutoCADO Civil 3D0 2015 by Autodesk, Inc. v10.4 Friday, 12 / 9 / 2016 Hyd. No. 2 POST BYPASS Hydrograph type = Rational Peak discharge = 14.37 cfs Storm frequency = 100 yrs Time to peak = 15 min Time interval = 1 min Hyd. volume = 12,930 cuft Drainage area = 4.104 ac Runoff coeff. = 0.48 Intensity = 7.292 in/hr Tc by User = 15.00 min IDF Curve = Albemarle.IDF Asc/Rec limb fact = 1/1 Q (cfs) 15.00 - 12.00 go . 11 3.00 0.00 -! 0 2 4 6 Hyd No. 2 POST BYPASS Hyd. No. 2 -- 100 Year Q (cfs) 15.00 12.00 • 11 0 11 3.00 0.00 8 10 12 14 16 18 20 22 24 26 28 30 Time (min) Hydrograph Report 20 •,Jraflow Hydrographs Extension for AutoCADO Civil 3D0 2015 by Autodesk, Inc. v10.4 Friday, 12 / 9 / 2016 Hyd. No. 3 POST ROAD Hydrograph type = Mod. Rational Peak discharge = 1.750 cfs Storm frequency = 100 yrs Time to peak = 15 min Time interval = 1 min Hyd. volume = 9,134 cuft Drainage area = 0.808 ac Runoff coeff. = 0.769 Intensity = 2.816 in/hr Tc by User = 15.00 min IDF Curve = Albemarle.IDF Storm duration = 5.8 x Tc Target Q =1.210 cfs Est. Req'd Storage =5,412 cuft n 1.00 0.00 0 10 Hyd No. 3 POST ROAD Hyd. No. 3 -- 100 Year 20 30 40 50 60 70 80 90 100 ® Mod. Rational Est. Storage = 5,412 cuft Q (cfs) 2.00 1.00 Hydrograph Report 21 ' draflow Hydrographs Extension for AutoCADO Civil 3DO 2015 by Autodesk, Inc. v10.4 Friday, 12 / 9 / 2016 `Ilyd. No. 4 Storage Hydrograph type = Reservoir Peak discharge = 1.757 cfs Storm frequency = 100 yrs Time to peak = 16 min Time interval = 1 min Hyd. volume = 9,134 cult Inflow hyd. No. = 3 - POST ROAD Max. Elevation = 578.05 ft Reservoir name = STORAGE PIPE Max. Storage = 359 cuft Storage Indication method used Q (cfs) 2.00 ,rr 1.00 0.00 r 0 10 20 Hyd No. 4 Storage Hyd. No. 4 -- 100 Year 30 40 50 60 Hyd No. 3 Q (cfs) 2.00 1.00 0.00 70 80 90 100 110 120 130 Time (min) � Total storage used = 359 cuft Hydrograph Report 22 Araflow Hydrographs Extension for AutoCADO Civil 3D0 2015 by Autodesk, Inc. 00.4 Friday, 12 / 9 / 2016 Hyd. No. 5 POST OUTFALL Hydrograph type = Combine Peak discharge = 16.09 cfs Storm frequency = 100 yrs Time to peak = 15 min Time interval = 1 min Hyd. volume = 22,064 cuft Inflow hyds. = 2, 4 Contrib. drain. area = 4.104 ac Q (cfs) 18.00 15.00 12.00 M AM MR A 0.00 ' 0 10 20 Hyd No. 5 POST OUTFALL Hyd. No. 5 -- 100 Year 30 40 50 60 70 80 90 Hyd No. 2 Hyd No. 4 Q (cfs) 18.00 15.00 12.00 M . 11 3.00 - 0.00 100 110 120 Time (min) Hydraflow Rainfall Report 23 'vdraflow Hydrographs Extension for AutoCADO Civil 3DO 2015 by Autodesk, Inc. v10.4 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 0.0000 0.0000 0.0000 -------- 2 49.0200 10.5000 0.8200 -------- 3 0.0000 0.0000 0.0000 -------- 5 79.2600 14.6000 0.8370 -------- 10 46.9500 9.5000 0.7300 -------- 25 102.6070 16.5000 0.8220 -------- 50 114.8190 17.2000 0.8200 -------- 100 127.1600 17.8000 0.8190 -------- File name: Albemarle.IDF Intensity = B / (Tc + D)^E Friday, 12 / 9 / 2016 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.18 4.12 3.44 2.97 2.63 2.36 2.14 1.97 1.82 1.70 1.59 1.50 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.57 5.43 4.65 4.08 3.65 3.30 3.02 2.79 2.59 2.42 2.27 2.15 10 6.67 5.37 4.55 3.97 3.54 3.21 2.94 2.72 2.54 2.38 2.24 2.12 25 8.24 6.94 6.02 5.33 4.80 4.37 4.02 3.72 3.47 3.26 3.07 2.90 50 9.04 7.65 6.66 5.92 5.34 4.87 4.48 4.16 3.88 3.64 3.44 3.25 100 9.82 8.35 7.29 6.49 5.86 5.36 4.94 4.58 4.28 4.02 3.80 3.59 Tc = time in minutes. Values may exceed 60. r , III- Ilallle. Jarn le. C Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.64 3.36 0.00 4.32 5.28 6.24 7.20 8.40 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 APPENDIX F VDOT STORM SEWER TABULATION REPORT ROAD: Berrecke UNITS: US CuMomMy 2 NETWORKNAME 5 PROJECTS: RNNd 2i Metric(S.) YMem3 3beet o1 CheckMb: BAM ,= 12/912016 LOCATION U O — ORAINAOE E w HYDRAULIC GUIDE LINE PIPE 312E — '. NOTES OF hw �pil ANFA lec. or ti.l E C i E EIEVATKIN lin or mml O = E — E p AND REIMRKS UPPER ENO _ O'E 8 CROWN ELEVATION COUNTY or CITY: Alimmerle — o uY E o:0 : S Y UPPER ¢ m — u =o �— gg ? LL Oi u FLOWLINE ELEVATION C RISE a N L 3 FREQUENCY (yrs): 10 ALIONMERT NAME MANNINOS0.01] r 0< a b C 0 _ LL STATION E E E SPAN w W O O �uIY O u Wg2 BR2 St DI Grefe 0)00 0056 0.039 5.00 86) 0.039 0.26 56866 3.65 S6301 563.03 -0.02 B93 15 1 0.002% 393 8.35 E 0.01 NOTESIREMARKS 201�9TM 38.18 Rt. Si 583.95 583.85 0.10 BR2 5-2 582.T0 582 J10 0.10 1M% 201�3986 25.16 Rt. El 5-3 Mµ1 'wn�D" 0039 500 68) 0039 026 568.8) 5.61 563.03 %385 562.02 563.1) 1.01 0.65 S.Be 15 0.002% 1 81% 6.0] 23.10 0.02 g0 Ppa 1 of 1 IT N OT ROADWAY SPREAD ANALYSIS REPORT BertacMs units: u.6. Customary X ojeH A`. aPa-0p2A46 MHnc (61) Shcet: of Preparetl by: MRM Strlrcture $Winn V T Drainage Composite Rainfall InIH Previous TOW Cross Logitudinal GuttarlLacal Gutter GalcWrtetl . AlbSprutl ComputetlSlot SumL POntlW ORaet SlaMartl Area RunoR O61 InlenaRy DiuM1arpe InlH eBY—DiacM1arge Slope Slope Depreas.wMM1 Slope Mamm�p• Sprud Leng[h 1100X ER.) pe 6preatl Depth Ea. S3 S2 201�48.52 S e4fi 20.fi4 166 F End WM 030 4.00 0.43 0.00 0.43 0.0201 0.0000 I0020D 0.012 4.45 ].50 N/A NIA 0.09 5-t1 W11re337 W.1 -1 L4 DI-M12N6 I 0N0a a0 0N.7 O.pp 0..0200 0.012 4.45 ].50 NIA NIA 008 0016 00.020 228.64633 1 ].50 1 7.25 306 O.pa NEC-12 N R for apmatl and bypass wmpubtians "-1 conWh0—.-us GEOP-Dminape VDOT STORM SEWER TABULATION REPORT ROAD: Barracks UNITS: USCuatomary A NETWORK NAME: Sy,-2 SNwF. of PROJECT#: 9969-002�Matnt lSN Cl s— bv BAN Data: 121912016 LOCATION — DRAINAGE — E w HYDRAULIC GRADE LINE PIPE SIZE NOTES OF AREA Iac. or Na.) E U O O s E ELEVATION (in or mmI Ox _ a E u p AND UPPER END — c E REMARKS FO O <g< u Oi uw CROWN ELEVATION E - 5 Tai i COUNTY .,CITY, plWmarle UPPER FLOWLINE ELEVATION RISE FREGUENCY Iyral: 10 ALgNMENT NAME — w� E j o aQ 2 _ 30 MANNINOS"n": 0.013 2 STATION h a - LOWER Y o _ j o a m a E C ynj E E w SPAN w 3 O- — — Y „~ ¢ ' u O = O O i0 O nY OC <IS M1 a0 O J n f.E &31 47 DIJBB IO Cub 0.831 0421 0.3N1 1330 1.81 0.350 1.68 583S3 32 580.32 578.00 1.33 88.N 15 1 0089% 5.0] eat O22 NOTESIREMARKS 111N000 21 ]3 LI y 58055 51B85 1.00 BR1 51B80 518050 low tA8% 11I�82.92 d'9B8 DYre 2.In 0.109 0588 13./3 1.11 11.. 2.W 582.59 3.. 51920 5]T69 1.51 0.IB1% -26.]8 ll. 1 49 5]9.T5 B 5]8.95 10 1A0 15/A8 15 1 0.9096 a.91 6S0 0.53 ItA*22.18 -1821 It Ek. 410 MH-1 JurcSm 0588 I3A3 �]] D. 2.BD 581.11 S95 5Tn] 51825 sn.w ST].85 o.]2 OAO B.SI 15 1 o.1e1% 0.02 wmP�a WM uf9q tivOpak I3rkmpa L.J Bartacka Nct �: 9N4g2it46 YDOT ROADWAY SPREAD ANALYSIS REPORT Units: U.S. Cwtomary X Metric (SH SM1eet: of Preparetl by: MRM Sbuetlm VWT Drainage Composite Rainfall Inlet Previous Total Cross Logitutlinal OrMerMcal GUHer Calculalttl No. Sfalbn OfMM StaMaM Area Rur1oH Intensity Dillh a InletB ypaas Discharge Slope Slope Depress. M6MM1 Slope Mannin9'a Spreatl gllowaWe Sproatl CamputctlSlat LGn `=SEH.) Sumpetl Spreatl Pon DeMM1 Ex..10 114+2].P 2].13 Fstl OUIIe Na Na Na C98 0.00 4-9 - 114+22.16 112+62.92 -18.21 -24]6 MH-1 DI-3B6 Na 0.11 Ne Na 0.66 000 0.96 0.66 0.040 0.020 0.0000 0.0000 rile 00633 0.0633 0.014 0.013 ;.06 1.90 5.00 536 N/A NIA NIA N/A 0.21 0.16 4-] 11t+gp,pp -21.]3 DI-38B 1p 0.42 2.18 0.83 4.00 4.00 0.96 14p ODO 0.9E p.p80 1.2000 2.0000 0.0633 p'014 2.82 S00 6.09 N/A 032 0.00 1.40 0.0]6 1.120p 2.000p 00833 0014 3.1fi 8.00 T04 NIA 0.26 HEC-12 is - for epestl and Eypaas mmlNMtiona NIWN,wm %VImt using GEOPAKDrainge I ►' VDOT STORM SEWER TABULATION REPORT ROAD: B."c UNITS: US Cua -y A NETWORK NAME: Syaam 1 FRojECT8: 9999-00- ml.. IBII Sbaat _ CMc1M bY: BAM e: 12AY1016 One'. 1219l2016 LOCATION t~i0 - DRAINAGE pREA NYDRq¢�pULIC SIZE a NOTES w lac. er lu.l F G O O I� IONELINE IPnPE mTl OX - REMARKS UPPER END - u, c o E E ® u E �] a Q CROWN ELEVATION RISE COUNTY ar CITY'. Albmarle _ C 3 _ E UPPER u a O f o F 2 �i OO O o O O FLOWLINE ELEVATION _ G a m a t >' _ O FREQUENCY IYrsl: 10 ALIGNMENT W1ME MANNINOS "n': 0.013 w g b 1. rruO,{{ U STATION i �f! LOWER CEOII S - Z. i E g E E SPAN ¢ - S a iE o �O O 'O O C O;� �Z E p0 O = BR1 33 01-)GrAb Gres¢ 0.398 0.116 0.039 12. 1.90 0039 0.19 596.10 3.72 582.88 58211 ON 21.01 = 0.001% E NOT-1111ARKS 103a25.50 1 -ISM LL }2 583.65 583.95 O90 BR1 I 31 59210 1 59210 1 On I1154° 1Of a28.e2 J100 LL }2 MH.2 Junctim 0.000 0.1]0 0110 Do. ow 60510 6A7 80213 60285 598.33 58915 S80 3.60 197.68 00110 13R1 1 12 1 698. 9. 15 1 1.82%% S.. 8.98 O.IH 103+27.0/ -18.00 LL 9I dSB86 CUT 0821 0191 0.19) 12 ]8 1159 0.197 216 bA2 J5 9.T1 592.63 589.39 931 0.12fi% gRl },� 593.25 5 590.11 588. 3.11 9.11 28910 15 1 1in% 4.91 7.18 0.- 106+22.)6 1 -18.12 LL 41 dSBe CuT 0882 DO50 0110 13.78 1023 0110 2.15 58328 3.1e 58950 59001 68291 5B3 ]5 659 619 211.00 0.116% R1 41 9 9 15 281% I'- 058 1011 -f ).86 JLL 42 daB88 CUT 0.839 011] 0- 11.9] 7.59 011] 9.98 SS899 f068 5]6.25 5)910 5]611 3)9.32 001 01%11% BRi 42 )5.10 2 00B ]9.80 b 1 010% 2.8] 58.18 0.25 108.]118 E5.01 LL N MH-t Junction O.M7 11.97 759 O.IIi 9.99 581.91 8.f0 5]821 5)fi �] 564 )8 565.65 11 A6 1082 151.15 15 0.2M% BR1 N ) 5611 1 6.BB% M. IBJ] L. tOB+088i-215.18 LL 411 MH-I Jundbn ONi f1.3] )59 OAI) 3.99 56].]1 IJ] Sfi3.34 563.I5 56151 562.25 1S0 117 89.51 0.2]9% BRt 411 Sfi 561. 15 1 298% ].91 f0A8 0.11 t0i.73.89 377.68 LL H MH-I Jun°8pn DM] 113) ]� OAI) 3.39 58130 5.80 558.]5 550.25 ].50 SB.01 15 OIiB% 1 12.]1% 19.tl 21.71 0.07 53].50 0.00 50 Papa 1 M 1 VDOT ROADWAY SPREAD ANALYSIS REPORT Barracks J— Vs. Customary X sM1eet: of ojM p. 99—R" Met -IV) PreparM by: MRM Cl—ke by: am Rem s HEC-12 is used for spreatl antl bypass wmpubtions All otMr campuhbons done using GEOPAK Drain