Loading...
HomeMy WebLinkAboutSDP201900080 Review Comments Initial Site Plan 2020-01-30County of Albemarle Department of Community Development Memorandum To: Tim Padalino From: Emily Cox Date: 30 January 2020 Subject: Brook Hill River Park Boat Launch — Initial Site Plan (SDP201900080) The Brook Hill River Park Boat Launch — Initial Site Plan has been reviewed by Engineering. The following comments will need to be addressed before approval: 1. WPO Plan satisfying VSMP requirements must be submitted and approved before final site plan approval. 2. Floodplain Development Permit (FDP) must be submitted and approved before final site plan approval. 3. Fill is not allowed in the floodplain, therefore the proposed earthen mounds are not allowed. 4. Ensure all proper permits are obtained (army corps of engineers, VDOT, etc.) It appears the army corps must be contacted because the proposed detail for the boat launch shows work below the mean water level. It appears drainage goes off site onto VDOT property, so a land use permit or something else may be required. 5. The nearby Brookhill development is spelled as one word. (Just wanted to make sure you were aware)