Loading...
HomeMy WebLinkAboutWPO201900066 Correspondence 2020-02-05,� !r 608 Preston Avenue P 434.295.5624 T l M M O N S GROUP Suite 200 F 434.295.1800 Charlottesville, VA 22903 www.timmons.com February 4, 2020 Matt Wentland County of Albemarle Dept. of Community Development 401 McIntire Rd, Room 227 Charlottesville, VA 22902 RE: Beaver Creek Medical Office Building —VSMP Permit Plan Review — WP0201900066 - Comment Response Letter Dear Mr. Wentland: We have reviewed your comments from December 17, 2019 and made the necessary revisions. Please find our responses to the comments below in bold lettering. County Code Section 17-410 and Virginia Code 62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code Section 17-405. A SWPPP must contain (1), a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Provide a completed and signed Registration Form. A completed and signed Registration Form will be provided. 2. Provide a signed Certification. A signed Certification will be provided. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code Section 17-404. 1. The PPP is acceptable at this time. Acknowledged. ENGINEERING I DESIGN I TECHNOLOGY C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code Section 17- 403. 1. This plan cannot be approved until the 0.85 Ib/yr of nutrient credits have been purchased. Please contact Ana Kilmer prior to purchasing credits. Acknowledged. 2. Please contact Ana Kilmer to complete a Stormwater Management Facilities Maintenance Agreement. Acknowledged. 3. Show and label all proposed easements on the plans, including facility and access easements. All proposed easements are shown and labeled on Sheet C8.0. 4. The SWM Facility easement will need to be shown on a plat and a Deed of Dedication will need to be signed and recorded for this easement. The Deed will be filled out by the County and forwarded to the applicant when the plat is nearing approval. Acknowledged. 5. Provide more details and design information for the underground storage. Energy balance and flood protection calculations, as well as a detail of the proposed weir plate structure, have been provided on Sheet C6.0. An overall detail of the underground detention system has been provided on Sheet C6.3. Additional routing calculations have been provided as part of the Stormwater Design Calculations & Narrative. 6. Include the maintenance and inspection schedules for the underground storage on the plans. Detention pipe maintenance and inspection schedules have been added to Sheet C1.0. 7. Provide the routing calculations for the underground storage. Routing calculations have been provided as part of the Stormwater Design Calculations & Narrative. D. Erosion and Sediment Control Plan (ESCP) Virginia Code 62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code Section 17-402. 1. Provide wire reinforced silt fence at the front of the site instead of standard silt fence. Wire -reinforced silt fence has been substituted instead of standard silt fence on Sheets C3.2 and C3.3. 2. Provide additional measures beyond safety fence where the existing eastern entrance is being regraded. Additional wire -reinforced silt fence has been added along the eastern entrance on Sheets C3.2 and C3.3. 3. Include a note on the ESC sheets that the Inspector may require additional measures depending on site conditions. A note has been added to Sheets C3.2 and C3.3. We have included PDF copies of the plans and calculations for your review. If you have any questions or comments, please feel free to give me a call at 434.295.5624. Sincerely, -nit, Kim Mellon Project Engineer