HomeMy WebLinkAboutSDP200500113 Review Comments Letter of Revision 2 2020-02-07 (2)COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
February 7, 2020
Lisa Glass
Albemarle County Facilities and Environmental Services
401 McIntire Road
Charlottesville, VA 22901
VIA EMAIL TO:
RE: LOR#2 for SDP-2005-00113 — Cale Elementary School Major Site Plan Amendment
Tax Map/Parcel #09100-00-00-01300
Ms. Glass,
This letter contains review comments for your submitted Letter of Revision for the above referenced site plan.
Please provide revised drawings that demonstrate compliance with the reviewer comments.
This is the second (end ) Letter of Revision for this site. Three (3) Letters of Revision are allowed, after which all
required changes must submitted in the form of a site plan amendment.
Sincerely,
Llui�
Cameron Langille
Senior Planner
County of Albemarle
Department of Community Development
blan ig lle&albemarle.org
Phone: (434)296-5832 Ext. 3432
Albemarle County Planning Services (Planner) — Cameron Langille, blan ille =,albemarle.org — Requested changes:
1. [32.5.2 (a)] Please add notes with the general property information to Sheet C 1.0. This includes owner name, tax
map parcel (TMP) number, address, zoning district, etc.
2. [32.5.2 (n)] See Engineering comment #4. Please add the handrail along the proposed sidewalk in locations as
recommended by Engineering staff, and provide a construction detail of all handrails on the detail sheets.
3. [32.6.2 (e)] Prior to any grading or earthwork being conducted on site, a WPO plan must be reviewed and approved
by the Engineering Division. See Engineering comment #10.
4. [32.7.9] Please revise Sheet 9.1. Eleven (11) new trees are proposed according to the drawings.
5. Please add a date of last revision to the drawings.
Comments From Other Reviewers:
Albemarle County Planning Division (Transportation Planning) — Kevin McDermott, kmcdermottgalbemarle.org —
No objection, see attached.
Albemarle County Engineering Services - John Anderson, janderson2galbemarle.org—Requested changes, see attached.
Albemarle County Service Authority — Jeremy Lynn, jlynngserviceauthori , .org — Application underwent review with
ACSA staff in late 2019. Applicant has forwarded correspondence between ACSA and the plan designer confirming that
ACSA comments have been addressed and no further revisions are needed. Email is attached.
Virginia Department of Transportation — Adam Moore, adam.moorekvdot.vir ig nia.gov — VDOT review not yet
complete, comments or approvals will be forwarded to the applicant upon receipt.
Review Comments for SDP200500113 M ajor Ame nd me nt.
Project Name:
Cale Elementary School Additions & Renovations
Date Completed:
Wednesday, January 22, 20 0
DepartmentlDivisionfAgency:
Review sus:
Reviewer:
Kevin McDermott
CDD Planning
No Objection
Nd
No objection, plan is consistent with S.RTS. plans_
Page: County of Albemarle Printed On: 020712020
Phone (434) 296-5832
Project:
Plan preparer:
Owner or rep.:
Plan received date:
Date of comments:
Reviewer:
Project Coordinator:
SDP2005-00113
pF A
vincttylQ
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Fax (434) 972-4126
Site Plan review, LOR
Cale Elementary School Additions & Renovations (LOR2)
Safe Routes to School Sidewalk Project
Frank Slinsky, PE, Timmons Group, 1001 Boulders Pkwy, Suite 300
Richmond, VA 23225 [ Frank. Frank. slinsky(&timmons.com ]
County of Albemarle School Board, 401 McIntire Road
Charlottesville, VA 22902 [ lelass@kl2albemarle.org ]
13 Jan 2020
7 Feb 2020
John Anderson
Cameron Langille
1. C1.0: Recommend list Owner information:
a. County of Albemarle School Board
b. FES / FPC contact
i. Name individual
ii. Tel. # ; email address
2. C2.0: Provide Narrative and schematic elements to accommodate pedestrian bypass across the site (N/S)
during active construction, especially on the west side of Avon Street Ext. Plan must allow pedestrians that
rely on existing pedestrian facilities to transit the site.
3. C3.0: Provide concrete flume detail.
4. C4.0: Since new sidewalk connecting portion of Ex. walk along Avon Street Ext. to Cale Elementary
Parking Lot exceeds VDOT sidewalk standard (ref. IIM-LD-55.16, sheet 3 of 8, 5% Max. for pedestrian
access routes not contained within a street or highway right-of-way; appears to exceed 10%), Engineering
strongly recommends revise this portion of design to include stair with handrail, such that all portions of
sidewalk outside VDOT RW are < 5%. It appears seven (7) — 8" risers would allow remaining walk to
meet 5% standard. Although a portion of walk continues along Avon, and is nearly ADA-complaint, this is
a safe routes to school project, and inherent risk posed to parents, children, teachers, and community with
- 10% proposed grade is somewhat difficult to understand. In winter, especially, risk of fall will persist for
those using this pedestrian facility, unless proposed grade is revised.
Instructional & Informational Memorandum
IIM-LD-55A 6
Sheet 3 of 8
The Pedestrian Access Route surfaces shall be firm, stable, and slip resistant and
openings that are more than 1/2" in one dimension are prohibited. The pedestrian
access route is permitted level changes up to 114" without treatment and level changes
between 1/4" and 112" that are beveled with a slope no greater than 2:1.
Where pedestrian access routes are contained within a street or highway right-of-way,
the grade of pedestrian access routes shall not exceed the general grade established
for the adjacent street or highway. Where pedestrian access routes are not contained
within a street or highway right-of-way, the grade of pedestrian access routes shall be
5% maximum
Engineering Review Comments
Page 2 of 4
5. C4.0: Ensure proposed 4" PVC @ 2.0% Min. has sufficient cover.
6. C4.0: Provide safety fence to isolate publicly accessible areas from construction. Also, item I O.o.i.4, below.
7. C4.1
a. Provide SAF. Also, item 6, above.
b. Examine sidewalk grade between proposed contours 585 and 586; this section exceeds VDOT 5%
Max. grade (-6%). Revision is essential since at least one sidewalk along the E side of Avon St.
Ext. serving Cale Elementary must meet ADA guidelines. Engineering recommends all sidewalk
sections be designed < 5%, excepting stairs recommended for section of walk shown on C4.0.
8. C4.2
a. Provide SAF. Also, item 6, above.
b. Item a., immediately above, may require chain -link SAF to separate vehicular /pedestrian paths
from construction.
9. 3_1: Label existing concrete sidewalk as existing concrete sidewalk to be removed.
10. Submit WPO Plan Application (no fee required; county project): submit to reviewer's attention. While
LOR comments provide advance notice of WPO plan revisions, based on this LOR, additional review
comments are possible once the VSMP /WPO Plan Application is submitted.
a. Application, link:
hqp://www.albemarle.org/upload/images/forms_center/departments/Community Development/for
ms/En ing eeringtand WPO Forms/WPO VSMP Virginia_Stormwater Management Program
Application.pdf
b. Submit SWPPP for project; use county template (link to template:
http://www.albemarle.ora/ui)load/images/forms center/departments/Community Development/forms/E
ngineering_and WPO Forms/Stormwater Pollution Prevention Plan SWPPP template.pdf):
i. Include PPP Exhibit in SWPPP, Sec. 6.A.
ii. Ensure named individual is listed as qualified personnel, SWPPP, Sec. 8.
iii. Ensure SWPPP SIGNED CERTIFICATION is signed.
iv. Ensure SWPPP, Sec. 1 is complete: 2019 VAR10 CGP Registration Statement.(Link:
hLtp://www.albemarle.org/upload/images/forms center/departments/Community Develo
pment/forms/En ineering_and_WPO_Forms/CGP_ Registration_ Statement _2019_FINA
L 201904.pdf
c. Review design criteria at https://www.swbmp.vwrrc.vt.edu/wp-content/uploads/2017/11/BMP-
Spec-No-9_BIORETENTION_v1-9_03012011.pdf, VA DEQ Stormwater Design Specification
No. 9 to ensure bioretention design criteria are met.
d. Remove sheets C5.0, C5.1, C5.2, C6.0 — 6.4 from the LOR. These sheets (w/ VSMP/WPO plan
title sheet) will constitute a VSMP /WPO plan, and cannot be approved with the LOR.
e. SWM
i. Provide Drainage Area maps (pre- /post -development identical, but need to show
drainage divide/s).
ii. Provide POA analysis. SW quantity evaluation is required at each point of post -
developed site discharge.
iii. Provide stormwater quantity evaluation. If site discharges to manmade facilities (pipe
conveyance system) evaluate channel protection against criteria at 9VAC25-870-66.B.1.
If site discharges to a natural stormwater conveyance system (defined natural feature),
evaluate against criteria at 9VAC25-870-66.B.3. Evaluate to Limits of Anal; see
guidance at 9VAC25-870-66.B.4. Evaluate flood protection against criteria at 9VAC25-
870-66.C. Evaluate to Limits of Analysis; guidance listed at 9VAC25-870-66.C.3.
f. Revise VaRRM.xls re -development worksheet, once LOD revised. Revisit biofilter design, if
necessary.
g. C5.1: In calculations packet, include /account for Ex. 15" RCP fraction of runoff that bypasses
bioretention.
h. C4.2: Label Ex. storm line 1, Ex. storm line 2.
i. C5.2: Revise VaRRM.xls, once LOD revised.
Engineering Review Comments
Page 3 of 4
j. C5.2: Label bioretention facility floor dimensions in plan view.
k. Copy Construction Record Drawings (As -built) for VSMP as .PDF image to the plan (link:
hLtp://www.albemarle.orgLupload/images/forins center/departments/Communiiy Development/forms/E
neineerin¢ and _WPO_Forms/WPO_VSMP_Construction _ Record_ Drawings Policy 23Ma, 2�pdf)
1. Include (attached) bio-retention periodic inspection guidelines on the plan.
in. Include relevant information from VA DEQ Stormwater Design Specification No. 9, Sec. 9.2 and
9.3 on the plan.
n. Include VA DEQ Spec. No. 9 Bioretention Installation steps, Sec. 8.2, on the plan.
o. ESC
i. C6.0
1. Provide construction access to stockpile /laydown area. Provide paved
construction entrance with spray wash (paved wash rack detail at p. 8 /ACDSM
/Link:
httD://www.albemarle.orL,/uDload/imaees/forms center/departments/communit
development/forms/desien standards manual/Albemarle Countv Design Sta
ndards_Manual _2015-04-25_draft.pdf .
2. Resolve 20" cedar /silt fence conflict.
3. Label Area of LOD (ft2).
4. Provide /label safety fence (SAF) needed to isolate paths routinely taken by
school children or residents, from areas of construction.
ii. C6.1
1. LOD width for 5' sidewalk construction is shown to be approx. 4.4' w. Revise
/increase LOD width. Compare with equipment used to construct; revise LOD
width to a reasonable minimum.
2. Silt fence (SF) along this portion of the project is hard to evaluate; revise to
ensure SF limits off -site sediment transport on this portion of project.
iii. C6.2
1. Increase LOD for bioretention pipe outfall installation to 10' w, min.
2. Label proposed bioretention pipe outfall.
3. Provide profile for proposed bioretention outfall.
4. Provide SF between graded slope and newly constructed sidewalk.
5. Provide SF between graded slope and newly constructed sidewalk, match line
inset.
6. Show construction entrance (CE).
iv. C6.3
1. Provide CE, PCE (paved /ACDSM), SAF typical details.
2. Note: Albemarle County ESC Inspector may require a paved construction
entrance, but given scope of work may accept a VESCH stone construction
entrance. Both construction entrance details should be included on the plan.
11. C7.0, C7.1: Albemarle defers to VDOT review comments on the Traffic Management Plan for measures
required to ensure vehicular and pedestrian safety along Avon Street Ext. for the duration of construction.
12. C7.2 /Notes:
a. General Notes
i. Note 5: replace `by the county engineer,' with `by the County (Owner), and VDOT.
ii. Note 6: replace `approval from the county,' with `approval from the County (Owner), and
VDOT.'
iii. Note 6: replace `permission of the county,' with `permission of the County (Owner), and
VDOT.'
iv. Note 8: replace `as approved by the county,' with `as approved by the County (Owner).'
v. Note 11: replace `directed by the county,' with `directed by VDOT.'
b. Transportation Operation Plan
i. Note 1: replace `the county when,' with `the County (Owner), and VDOT when.'
Engineering Review Comments
Page 4 of 4
c. Temporary Traffic Control (TTC) Plan
i. Note 4: replace `by the city engineer,' with `by VDOT.'
13. C8.0: Provide:
a. Concrete flume detail,
b. VDOT handrail detail,
c. Stair detail; also, item 4, above.
Please feel free to call if any questions: 434.296-5832 -0069
Thank you
SDP2005-00113 Cale Elem safe routes sidewalk LOR2 020720
Cameron Langille
From: Jeremy Lynn <jlynn@serviceauthority.org>
Sent: Monday, December 16, 2019 11:16 AM
To: Coleman, Eugene
Cc: Lisa Glass
Subject: RE: Cale SRTS (UPC 113508) (1 of 2)
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Eugene,
Thanks for addressing the ACSA's comments.
Jeremy M. Lynn, P.E.
Senior Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(434) 977-4511
anoImm
From: Coleman, Eugene <ecoleman@amtengineering.com>
Sent: Friday, December 13, 2019 4:39 PM
To: Jeremy Lynn <jlynn@serviceauthority.org>
Cc: Lisa Glass <Iglass@albemarle.org>
Subject: RE: Cale SRTS (UPC 113508) (1 of 2)
Jeremy,
Please find attached updated plan sheets addressing your comments and responses below in red. Please let me know if
you have questions. Thanks,
Eugene Coleman P.E.
Senior Project Manager
P 276-889-4044 1 M 423-383-3897
W www.amtengineering.com
From: Jeremy Lynn <jlynn@serviceauthority.org>
Sent: Wednesday, December 11, 2019 2:55 PM
To: Coleman, Eugene <ecoleman@amtengineering.com>
Cc: Lisa Glass <Iglass@albemarle.org>
Subject: RE: Cale SRTS (UPC 113508) (1 of 2)
Eugene,
The ACSA offers the following comments:
1. Sheet C3.0 — Show existing water main and sanitary sewer Avon Street Extended. The existing water line along
the western side of Avon Street Extended is depicted on the plan sheet. The existing water and sanitary sewer
line in front and to the side of the school is depicted on the plan sheet.
2. Sheet C3.1 — Show existing water main in front of the school. The existing water and sanitary sewer line in front of
the school is depicted on the plan sheet.
3. Sheet C3.2 — Show existing water main. The existing water line crossing Avon Street Extended and the northern
drive aisle and parking lot of the school is depicted on the plan sheet.
4. Sheet C4.0 — Label existing 8-inch ACSA sanitary sewer main. Add note that MH's must be adjusted to grade in
accordance with ACSA specifications. A label, "8" ACSA sanitary sewer main has been added to the plan sheet.
The grading has been updated in the area so the manhole will not require adjustment.
5. Sheet C4.1 — Show existing water main in front of the school. The existing water and sanitary sewer line in front of
the school is depicted on the plan sheet.
6. Sheet C4.2 — Show existing water main. The existing water line crossing Avon Street Extended and the northern
drive aisle and parking lot of the school is depicted on the plan sheet.
7. Sheet C5.1 — Call our vertical separations between storm sewer and ACSA utilities. Currently there is no new
storm sewer over ACSA utilities. Therefore, is the note still desired?
8. Sheet C9.1 — Is the 24-inch tree existing that sits within the ACSA sanitary sewer easement? Show water main
on Landscape Plan. Yes, there is an existing tree within the existing 20' Sanitary Sewer Easement. The water
main has been depicted on the plan sheet.
Jeremy M. Lynn, P.E.
Senior Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(434) 977-4511
From: Coleman, Eugene <ecoleman@amtengineering.com>
Sent: Monday, December 02, 2019 7:07 PM
To: Jeremy Lynn <jlynn@serviceauthority.org>
Cc: Lisa Glass <Iglass@albemarle.org>; David Hensley <dhenslev@serviceauthority.org>
Subject: Cale SRTS (UPC 113508) (1 of 2)
Mr. Lynn,
Please find attached the 100% plan submittal made to VDOT and Albemarle County for their review and comment. We
would appreciate your review and provide any comments you may have. Note the plans are subject to change
depending upon comments received from VDOT and the County.
It is still the County's objective to bid the project early next year and construction during the summer while school is not
in session. Please let me know if you have any questions. Thanks for your assistance.
Eugene Coleman P.E.
Senior Project Manager
P 301-545-2697 I M 423-383-3897